CN213655080U - Natural gas compressor cooling device - Google Patents

Natural gas compressor cooling device Download PDF

Info

Publication number
CN213655080U
CN213655080U CN202022073149.6U CN202022073149U CN213655080U CN 213655080 U CN213655080 U CN 213655080U CN 202022073149 U CN202022073149 U CN 202022073149U CN 213655080 U CN213655080 U CN 213655080U
Authority
CN
China
Prior art keywords
water
fixed mounting
cooler bin
natural gas
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022073149.6U
Other languages
Chinese (zh)
Inventor
张耀
姚瑞峰
李粮英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022073149.6U priority Critical patent/CN213655080U/en
Application granted granted Critical
Publication of CN213655080U publication Critical patent/CN213655080U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a natural gas compressor cooling device, comprises a workbench, the lower extreme fixed mounting of workstation has the support base, the upper end fixed mounting of workstation has the cooler bin, the middle part fixed mounting of cooler bin left end has compressor body, compressor body extends to the inside of cooler bin, the middle part fixed mounting of cooler bin right-hand member has the water tank, the fixed water filling port that is provided with in middle part of water tank right-hand member is one, both ends fixed mounting has supplementary vaulting pole around the water tank lower extreme, the rear fixed mounting of water tank lower extreme has the backup pad, the upper end fixed mounting of backup pad has water pump one, the right-hand member fixed mounting of cooler bin upper end has water pump two connecting pipe one. This natural gas compressor cooling device utilizes the cooling plate to cool down the compressor lower extreme below the watering can play above at the cooler bin to the compressor cooling to the effect that the lower extreme that makes the compressor also can play the cooling, and water can recycle, has reduced the waste at water source.

Description

Natural gas compressor cooling device
Technical Field
The utility model relates to a natural gas technology field specifically is a natural gas compressor cooling device.
Background
The natural gas is mainly used as fuel, can produce carbon black, chemicals and liquefied petroleum gas, propane and butane produced by the natural gas are important raw materials of modern industry, compressed natural gas refers to gaseous natural gas which is compressed to the pressure of more than or equal to 10MPa and not more than 25MPa, the natural gas is pressurized and stored in a container in a gaseous state, the compressed natural gas has the same component as pipeline natural gas, the main component is methane (CH4), and the compressed natural gas can be used as vehicle fuel.
The natural gas compressor often generates heating phenomenon in the long-time compression working process, and because the natural gas is combustible gas, if the natural gas is not cooled and cooled in time, the danger of ignition and explosion of the natural gas exists.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a natural gas compressor cooling device to propose natural gas compressor in solving above-mentioned background art and in long-time compression working process, often can produce the phenomenon of generating heat, because the natural gas is combustible gas, if untimely cool down the cooling process to it, there is the dangerous problem of natural gas ignition explosion.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a natural gas compressor cooling device, includes the workstation, the lower extreme fixed mounting of workstation has the support base, the upper end fixed mounting of workstation has the cooler bin, the middle part fixed mounting of cooler bin left end has the compressor body, the compressor body extends to the inside of cooler bin, the middle part fixed mounting of cooler bin right-hand member has the water tank, the fixed water filling port that is provided with in middle part of water tank right-hand member, both ends fixed mounting has supplementary vaulting pole around the water tank lower extreme, rear fixed mounting of water tank lower extreme has the backup pad, the upper end fixed mounting of backup pad has water pump one, the right-hand member fixed mounting of cooler bin upper end has water pump two connecting pipe one.
Preferably, the middle part of cooler bin upper end is fixed and is provided with water filling port two, water filling port two is apart from the distribution, the middle part fixedly connected with connecting pipe one of water tank upper end, connecting pipe one and two fixed connection of water pump, the left end fixedly connected with water injection pipe of water pump two, water injection pipe and two fixed connection of water filling port, both ends fixedly connected with communicating pipe one about water filling port two.
Preferably, the left end fixedly connected with of water pump one draws water pipe one, draw water pipe one extends to the inside bottom of cooler bin, the right-hand member fixedly connected with connecting pipe two of water pump one, connecting pipe two and water tank fixed connection.
Preferably, the lower end of the second water injection port is fixedly connected with a second communicating pipe, the communicating pipes are distributed at equal intervals, the lower end of the second water injection port is fixedly connected with a water sprinkling port, and the water sprinkling port is located at the upper end inside the cooling box.
Preferably, the outside fixed mounting at both ends has rings about the compressor body, the upper end fixedly connected with davit of rings, the inner wall of davit and cooler bin upper end, the inside downside fixed mounting of water tank has the filter screen, the lower extreme fixedly connected with drinking-water pipe two of connecting pipe one.
Preferably, both ends fixedly connected with bracing piece about compressor body lower extreme, the inside fixed mounting of bracing piece has damping spring, fixed mounting has the cooling plate between the bracing piece.
Compared with the prior art, the beneficial effects of the utility model are that:
1. according to the natural gas compressor cooling device, the natural gas compressor can shake when working in the cooling box, and the compressor can be fixed during operation by installing the suspension arm and the suspension ring, so that the compressor cannot shake during operation, and the stability of the device is improved;
2. the natural gas compressor cooling device can cool the natural gas compressor during working by installing the water tank, so that water in the water tank is recycled for saving resources, thereby avoiding waste of water resources and improving the energy saving performance of the device;
3. according to the natural gas compressor cooling device, the water sprayed out of the water tank can be recycled and filtered by installing the first water pump, so that waste of water sources is reduced, and recycling of the device is improved.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic sectional view of the cooling box of the present invention;
FIG. 3 is a schematic view of the structure of the hanging ring of the present invention;
fig. 4 is a schematic diagram of the structure of the cooling plate of the present invention.
In the figure: 1. a work table; 2. a support base; 3. a cooling tank; 4. a compressor body; 5. a water tank; 6. a first water injection port; 7. an auxiliary stay bar; 8. a support plate; 9. a first water pump; 10. a second water pump; 11. a second water injection port; 12. a first connecting pipe; 13. a water injection pipe; 14. a first communicating pipe; 15. a first water pumping pipe; 16. a second connecting pipe; 17. a second communicating pipe; 18. sprinkling a water gap; 19. a hoisting ring; 20. a suspension arm; 21. a filter screen; 22. a second water pumping pipe; 23. a support bar; 24. a damping spring; 25. and (6) cooling the plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a natural gas compressor cooling device, comprises a workbench 1, the lower extreme fixed mounting of workstation 1 has support base 2, the upper end fixed mounting of workstation 1 has cooler bin 3, the middle part fixed mounting of the 3 left ends of cooler bin has compressor body 4, compressor body 4 extends to the inside of cooler bin 3, the middle part fixed mounting of the 3 right-hand members of cooler bin has water tank 5, the fixed water filling port that is provided with in middle part of the 5 right-hand members of water tank 6, both ends fixed mounting has supplementary vaulting pole 7 around the 5 lower extremes of water tank, the rear fixed mounting of the 5 lower extremes of water tank has backup pad 8, the upper end fixed mounting of backup pad 8 has a water pump 9, the right-hand member fixed mounting of the 3.
Further, the fixed water filling port two 11 that is provided with in middle part of the upper end of cooler bin 3, water filling port two 11 equidistance distributes, middle part fixedly connected with connecting pipe one 12 of water tank 5 upper end, connecting pipe one 12 and two 10 fixed connection of water pump, the left end fixedly connected with water injection pipe 13 of two 10 of water pump, water injection pipe 13 and two 11 fixed connection of water filling port, both ends fixedly connected with communicating pipe one 14 about water filling port two 11, through installation water tank 5, can cool down it with the natural gas compressor at the during operation, in order to save the resource, make the water in the water tank 5 circulated and used, thereby the waste of water resource has been avoided, the energy conservation of the device has been improved.
Furthermore, the left end of the first water pump 9 is fixedly connected with a first water pumping pipe 15, the first water pumping pipe 15 extends to the bottom end inside the cooling box 3, the right end of the first water pump 9 is fixedly connected with a second connecting pipe 16, the second connecting pipe 16 is fixedly connected with the water tank 5, and water sprayed from the water tank 5 can be recycled after being recycled by installing the first water pump 9, so that waste of water sources is reduced, and recycling of the device is improved.
Further, the lower extreme fixedly connected with of two 11 water filling ports communicating pipe two 17, two 17 equidistance distribution communicating pipe, the lower extreme fixedly connected with of two 11 water filling ports spills the mouth of a river 18, spills the mouth of a river 18 and is located the inside upper end of cooler bin 3, spills mouth of a river 18 through the installation, can cool off the compressor when the operation to the natural gas compressor for danger can not appear when the high temperature in the natural gas combustible substance, thereby has improved the device's security.
Further, the outer sides of the left end and the right end of the compressor body 4 are fixedly provided with lifting rings 19, the upper end of each lifting ring 19 is fixedly connected with a lifting arm 20, the lifting arms 20 and the inner wall of the upper end of the cooling box 3 are fixedly provided with a filter screen 21, the lower end of the first connecting pipe 12 is fixedly connected with a pumping pipe two 22, the natural gas compressor can shake when working in the cooling box 3, the compressor can be fixed when in operation by installing the lifting arms 20 and the lifting rings 19, and therefore the compressor cannot shake when in operation, and the stability of the device is improved.
Further, both ends fixedly connected with bracing piece 23 about 4 lower extremes of compressor body, the inside fixed mounting of bracing piece 23 has damping spring 24, and fixed mounting has cooling plate 25 between the bracing piece 23, through installation damping spring 24, can carry out the shock attenuation to the lower extreme of compressor, avoids cooler bin 3 to appear rocking about, further improvement the device's stability.
The working principle is as follows: firstly, in the operation of natural gas, water can be injected into a water tank 5 through a first water injection port 6, after the water injection is completed, water can be pumped into a second water injection port 11 through a first connecting pipe 12 and a second water injection pipe 13 through a second water pump 10, then the water can be automatically improved to be communicated with a first 14 equally distributed water injection port 11 for water injection, then after the water injection is completed, the natural gas compressor can be properly sprayed through a water spraying port 18, the natural gas compressor is cooled, a cooling plate 25 can be used for cooling the lower end of the natural gas compressor during the water spraying, then the water sprayed through the water spraying port 18 can drive a first water pumping pipe 15 through a first water pump 9 to pump the water at the bottom end inside a cooling tank 3 into the water tank 5, then the water can be filtered through a filter screen 21, the phenomenon that impurities cause the blockage of a water pipe during the next use is avoided, and finally the natural gas compressor is cooled and cooled through the, the device utilizes cooling plate 25 to cool down the natural gas compressor lower extreme below the watering can play above at the cooler bin 3 to the natural gas compressor cooling to the effect that the lower extreme that makes the compressor also can play the cooling, and water can recycle, has reduced the waste at water source.
It should be finally noted that the above only serves to illustrate the technical solution of the present invention, and not to limit the scope of the present invention, and that simple modifications or equivalent replacements performed by those skilled in the art to the technical solution of the present invention do not depart from the spirit and scope of the technical solution of the present invention.

Claims (6)

1. A natural gas compressor cooling device comprises a workbench (1), and is characterized in that: the utility model discloses a cooler, including workstation (1), compressor body (4), both ends fixed mounting have supplementary vaulting pole (7), the lower extreme fixed mounting of workstation (1) has support base (2), the upper end fixed mounting of workstation (1) has cooler bin (3), the middle part fixed mounting of cooler bin (3) left end has compressor body (4), compressor body (4) extend to the inside of cooler bin (3), the middle part fixed mounting of cooler bin (3) right-hand member has water tank (5), the middle part of water tank (5) right-hand member is fixed and is provided with water filling port (6), both ends fixed mounting has supplementary vaulting pole (7) around water tank (5) lower extreme, rear fixed mounting of water tank (5) lower extreme has backup pad (8), the upper end fixed mounting of backup pad (8) has water pump (9), the right-hand member fixed mounting of cooler bin (3.
2. The natural gas compressor cooling device according to claim 1, wherein: the middle part of cooler bin (3) upper end is fixed and is provided with water filling port two (11), water filling port two (11) equidistance distributes, middle part fixedly connected with connecting pipe (12) of water tank (5) upper end, connecting pipe (12) and two (10) fixed connection of water pump, the left end fixedly connected with water injection pipe (13) of two (10) of water pump, water injection pipe (13) and two (11) fixed connection of water filling port, both ends fixedly connected with (14) communicating pipe about two (11) of water filling port.
3. A natural gas compressor cooling arrangement as claimed in claim 2, wherein: the left end fixedly connected with drinking-water pipe (15) of water pump (9), drinking-water pipe (15) extend to the inside bottom of cooler bin (3), the right-hand member fixedly connected with connecting pipe two (16) of water pump (9), connecting pipe two (16) and water tank (5) fixed connection.
4. A natural gas compressor cooling arrangement as claimed in claim 2, wherein: the lower extreme fixedly connected with communicating pipe two (17) of water filling port two (11), communicating pipe two (17) equidistance distributes, the lower extreme fixedly connected with of water filling port two (11) spills mouth of a river (18), it is located the inside upper end of cooler bin (3) to spill mouth of a river (18).
5. The natural gas compressor cooling device according to claim 1, wherein: the outside fixed mounting at both ends has rings (19) about compressor body (4), the upper end fixedly connected with davit (20) of rings (19), inner wall on davit (20) and cooler bin (3), the inside downside fixed mounting of water tank (5) has filter screen (21), the lower extreme fixedly connected with drinking-water pipe two (22) of connecting pipe (12).
6. The natural gas compressor cooling device according to claim 1, wherein: both ends fixedly connected with bracing piece (23) about compressor body (4) lower extreme, inside fixed mounting of bracing piece (23) has damping spring (24), fixed mounting has cooling plate (25) between bracing piece (23).
CN202022073149.6U 2020-09-21 2020-09-21 Natural gas compressor cooling device Expired - Fee Related CN213655080U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022073149.6U CN213655080U (en) 2020-09-21 2020-09-21 Natural gas compressor cooling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022073149.6U CN213655080U (en) 2020-09-21 2020-09-21 Natural gas compressor cooling device

Publications (1)

Publication Number Publication Date
CN213655080U true CN213655080U (en) 2021-07-09

Family

ID=76697173

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022073149.6U Expired - Fee Related CN213655080U (en) 2020-09-21 2020-09-21 Natural gas compressor cooling device

Country Status (1)

Country Link
CN (1) CN213655080U (en)

Similar Documents

Publication Publication Date Title
CN102230570A (en) System and method for recovering vapour of liquefied natural gas transfer station
CN104613045B (en) Nitrogen energy-storage hydraulic cylinder
CN213655080U (en) Natural gas compressor cooling device
CN207262033U (en) A kind of LNG tank installs decrease temperature and pressure device
CN210708964U (en) Large-volume oil storage tank
CN203404050U (en) Heat insulation pump shell device for liquefied natural gas low temperature heat insulation gas cylinder
CN204327988U (en) A kind of seal arrangement for RH refining furnace roof rifle
CN204187273U (en) LNG diffuses Adsorption Natural Gas recovering device
CN204572247U (en) A kind of bulldozer liquefied natural gas supplying system and bulldozer
CN211010763U (en) L NG storage tank with gas separation and mass storage functions
CN109595458B (en) BOG recovery unit based on L NG storage tank
CN206093504U (en) Portable empty wet spinning disk atomiser
CN104863753A (en) Bulldozer with LNG supply system
CN215292717U (en) High-pressure gasifier matched with vehicle-mounted low-temperature liquid storage bottle
CN212532901U (en) Skid-mounted device for recycling and preparing CNG (compressed natural gas) of marginal well
CN104976511A (en) Liquefied petroleum gas (LPG) bottle support
CN212776795U (en) Natural gas pipeline gas storage device
CN205535073U (en) Novel cold energy cascade utilization system of LNG accepting station
CN209309656U (en) A kind of tank arrangement storing volatile liquefaction product
CN216202442U (en) Gas supply station gas supply fixed storage tank
CN204941714U (en) A kind of novel integrated cylinder head
CN106185088A (en) A kind of Novel oil storage tank for petroleum storage transport
CN205064221U (en) Be used for water -cooling cooling air compressor machine
CN204082386U (en) LNG vaporization Buffer Unit assembly
CN209507575U (en) A kind of movable type charging machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210709

Termination date: 20210921