CN213654248U - Noise structure falls in construction platform - Google Patents
Noise structure falls in construction platform Download PDFInfo
- Publication number
- CN213654248U CN213654248U CN202021024050.0U CN202021024050U CN213654248U CN 213654248 U CN213654248 U CN 213654248U CN 202021024050 U CN202021024050 U CN 202021024050U CN 213654248 U CN213654248 U CN 213654248U
- Authority
- CN
- China
- Prior art keywords
- fixed cylinder
- guide rail
- sliding
- arc guide
- ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 14
- 230000000694 effects Effects 0.000 claims abstract description 24
- 239000003292 glue Substances 0.000 claims abstract description 10
- 238000003466 welding Methods 0.000 claims description 15
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims description 3
- 235000017491 Bambusa tulda Nutrition 0.000 claims description 3
- 241001330002 Bambuseae Species 0.000 claims description 3
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims description 3
- 239000011425 bamboo Substances 0.000 claims description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 abstract description 6
- 229910052742 iron Inorganic materials 0.000 abstract description 3
- 238000009435 building construction Methods 0.000 description 5
- 239000007787 solid Substances 0.000 description 3
- 239000000463 material Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a noise structure falls in construction platform, including a fixed cylinder, a fixed cylinder and work platform fixed connection, be equipped with the arc guide rail on the fixed cylinder, and the arc guide rail is equipped with four and is around evenly distributed as the center with the fixed cylinder central line, a fixed cylinder and first sliding connection of activity, the overhead slip post that is equipped with of activity, and the slip post is equipped with four and is around evenly distributed as the center with the first central line of activity, the slip post slides with the arc guide rail is corresponding, activity head and disc welded connection. The utility model discloses an object acts on the disc for the activity head removes, and arc guide rail and slip post relative movement simultaneously make the activity head take place to rotate, lead to first ring to glue and the effect is glued to the second ring, reduces the striking between the iron sheet, prevents to produce a large amount of noises.
Description
Technical Field
The utility model relates to a construction technical field specifically is a noise structure falls in building construction platform.
Background
The building construction method has the advantages that a lot of noise is generated frequently in the building construction process, the duration is long, the spread range is wide, the normal life of surrounding residents is seriously influenced, particularly in the high-rise building construction, the noise source is less in obstruction and is further transmitted, and the daily life of the surrounding residents is seriously influenced.
In the prior art, the unloading platform is a construction platform which is usually provided with various temporary operation platforms and operation frames on a construction site, is generally used for material turnover, and can generate large noise when heavy materials such as reinforcing steel bars, concrete and the like fall on the unloading platform. Accordingly, it is desirable to provide a noise reducing structure of a construction platform that can significantly reduce and lessen noise, reducing the impact on the normal lives of surrounding residents.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a noise structure falls in building construction platform to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a noise structure falls in construction platform, glues, space, second ring including work platform, first ring, disc, frame, connecting rod, welding rod, down tube, sliding guide, slip head, spring, a slip section of thick bamboo, solid fixed cylinder, arc guide, slip post, activity head, gu fixed cylinder and work platform fixed connection, gu be equipped with the arc guide on the fixed cylinder, and the arc guide is equipped with four and uses gu the fixed cylinder central line to be around evenly distributed as the center, gu fixed cylinder and first sliding connection of activity, the overhead slip post that is equipped with of activity, and the slip post is equipped with four and uses the first central line of activity to be around evenly distributed as the center, the slip post slides with arc guide is corresponding, activity head and disc welded connection.
Preferably, the working platform is provided with a sliding guide rail, the sliding guide rail is connected with the sliding head in a sliding mode, and the sliding cylinder is connected with the disc in a welding mode.
Preferably, the outer surface of the disc is sleeved with a second ring rubber, and a gap is formed between the second ring rubber and the first ring rubber.
Preferably, the outer surface of the first ring rubber is fixedly sleeved with a working platform, and the first ring rubber and the second ring rubber are concentric circles.
Preferably, work platform and frame welded connection, the frame is connected through the connecting rod, connecting rod and welding rod welded connection, the welding rod other end and work platform welded connection, the welding rod is equipped with a plurality of and equidistance and distributes, frame and down tube welded connection, and the down tube is equipped with two intercrossing.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses an object acts on the disc for the activity head removes, and arc guide rail and slip post relative movement simultaneously make the activity head take place to rotate, lead to first ring to glue and the effect is glued to the second ring, reduces the striking between the iron sheet, prevents to produce a large amount of noises.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a top view of the working platform of the present invention;
FIG. 3 is a partial cross-sectional view of the working platform of the present invention;
FIG. 4 is a side view of the movable head of the present invention;
fig. 5 is a side view of the sliding cartridge of the present invention.
In the figure: the device comprises a working platform-1, a first ring rubber-2, a gap-3, a second ring rubber-4, a disc-5, a frame-6, a connecting rod-7, a welding rod-8, an inclined rod-9, a sliding guide rail-10, a sliding head-11, a spring-13, a sliding cylinder-14, a fixed cylinder-15, an arc guide rail-16, a sliding column-17 and a movable head-18.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides an embodiment:
the utility model provides a noise structure falls in construction platform, glues 4, disc 5, frame 6, connecting rod 7, welding rod 8, down tube 9, sliding guide 10, slip head 11, spring 13, slip section of thick bamboo 14, solid fixed cylinder 15, arc guide 16, slip post 17, activity head 18 including work platform 1, first ring, space 3, second ring, gu fixed cylinder 15 and 1 fixed connection of work platform, gu be equipped with arc guide 16 on the fixed cylinder 15, and arc guide 16 is equipped with four and is encircleing evenly distributed for the center with solid fixed cylinder 15 central line, gu fixed cylinder 15 and activity head 18 sliding connection, gu be equipped with slip post 17 on the head 18, and slip post 17 is equipped with four and is encircleing evenly distributed for the center with activity head 18 central line, slip post 17 slides with arc guide 16 is corresponding, activity head 18 and disc 5 welded connection.
In this embodiment, the working platform 1 is provided with a sliding guide rail 10, the sliding guide rail 10 is slidably connected with a sliding head 11, and the sliding cylinder 14 is connected with the disc 5 by welding.
In this embodiment, the outer surface of the disc 5 is sleeved with a second ring glue 4, and a gap 3 is formed between the second ring glue 4 and the first ring glue 2.
In this embodiment, the outer fixed surface of the first ring rubber 2 is sleeved with a working platform 1, and the first ring rubber 2 and the second ring rubber 4 are concentric circles.
In this embodiment, work platform 1 and 6 welded connection of frame, frame 6 is connected through connecting rod 7, connecting rod 7 and 8 welded connection of welding rod, the 8 other ends of welding rod and 1 welded connection of work platform, welding rod 8 is equipped with a plurality of and equidistance and distributes, frame 6 and 9 welded connection of down tube, and down tube 9 is equipped with two intercrossing.
The working principle is as follows: during the use, act on disc 5 through the object for activity head 18 removes, and arc guide 16 and sliding column 17 relative movement simultaneously make activity head 18 take place to rotate, lead to first ring to glue 2 and the effect of second ring glue 4, reduce the striking between the iron sheet, prevent to produce a large amount of noises.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (5)
1. The utility model provides a noise structure falls in construction platform, glues, space, second ring including work platform, first ring, disc, frame, connecting rod, welding rod, down tube, sliding guide, slip head, spring, a slip section of thick bamboo, a fixed cylinder, arc guide, slip post, activity head, its characterized in that:
the utility model discloses a fixed cylinder, including a fixed cylinder, a movable head, a sliding column, a fixed cylinder and work platform fixed connection, be equipped with the arc guide rail on the fixed cylinder, and the arc guide rail is equipped with four and uses the fixed cylinder central line to be as the center and encircle evenly distributed, fixed cylinder and movable head sliding connection, the overhead slip post that is equipped with of activity, and the slip post is equipped with four and uses the movable head central line to be as the center and encircle evenly distributed, the slip post slides with the arc guide rail.
2. The noise reduction structure of a construction platform according to claim 1, wherein: the working platform is provided with a sliding guide rail, the sliding guide rail is connected with the sliding head in a sliding mode, and the sliding cylinder is connected with the disc in a welded mode.
3. The noise reduction structure of a construction platform according to claim 1, wherein: the outer surface of the disc is sleeved with second ring rubber, and a gap is formed between the second ring rubber and the first ring rubber.
4. The noise reduction structure of a construction platform according to claim 1, wherein: the outer surface of the first ring rubber is fixedly sleeved with a working platform, and the first ring rubber and the second ring rubber are concentric circles.
5. The noise reduction structure of a construction platform according to claim 1, wherein: work platform and frame welded connection, the frame is connected through the connecting rod, connecting rod and welding rod welded connection, the welding rod other end and work platform welded connection, the welding rod is equipped with a plurality of and equidistance and distributes, frame and down tube welded connection, and the down tube is equipped with two intercrossing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021024050.0U CN213654248U (en) | 2020-06-07 | 2020-06-07 | Noise structure falls in construction platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021024050.0U CN213654248U (en) | 2020-06-07 | 2020-06-07 | Noise structure falls in construction platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213654248U true CN213654248U (en) | 2021-07-09 |
Family
ID=76683661
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021024050.0U Expired - Fee Related CN213654248U (en) | 2020-06-07 | 2020-06-07 | Noise structure falls in construction platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213654248U (en) |
-
2020
- 2020-06-07 CN CN202021024050.0U patent/CN213654248U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210508603U (en) | Shock-absorbing effect good anti-seismic steel structure | |
CN213626139U (en) | Effectual building steel construction of elasticity shock attenuation | |
CN209025066U (en) | A kind of adjustable height ramming machine for building | |
CN213654248U (en) | Noise structure falls in construction platform | |
CN211200377U (en) | Highway highway guardrail pile driver | |
CN210684453U (en) | Bridge expansion joint auxiliary device of BIM technique | |
CN212354902U (en) | Bottom steel structure for supporting cargo platform | |
CN213635596U (en) | Noise reduction assembly of transformer | |
CN220033948U (en) | Hanging basket with protective structure for building engineering | |
CN204530990U (en) | A kind of housing construction fire preventing steel structure framework with curvature-prevention support component | |
CN210712530U (en) | Bridge protector for municipal works | |
CN207772009U (en) | A kind of full-automatic scouring machine | |
CN210682895U (en) | Elevator guide rail with shock attenuation anticollision structure | |
CN203284967U (en) | Novel steel structural beam | |
CN220284578U (en) | Suspension bridge three-dimensional damping vibration attenuation device | |
CN111501724A (en) | Ramming machine for environment-friendly green construction | |
CN220725712U (en) | Assembled construction hanging basket | |
CN214117465U (en) | Climb a shock attenuation safety device | |
CN213200810U (en) | Water-reducing agent monomer long service life's carbon steel tray for loading | |
CN211479779U (en) | Electric power composite suspension insulator | |
CN217500540U (en) | Building steel structure with multilayer shock-absorbing function | |
CN207480074U (en) | A kind of plank screw blanking machine lathe bed | |
CN218881330U (en) | High-strength anti-deformation welded H-shaped steel | |
CN213505760U (en) | Building lifting construction platform | |
CN210505265U (en) | Gantry crane cantilever with reinforced structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210709 |