CN213651617U - Material lifting device for steel structure high-rise building - Google Patents

Material lifting device for steel structure high-rise building Download PDF

Info

Publication number
CN213651617U
CN213651617U CN202021936811.XU CN202021936811U CN213651617U CN 213651617 U CN213651617 U CN 213651617U CN 202021936811 U CN202021936811 U CN 202021936811U CN 213651617 U CN213651617 U CN 213651617U
Authority
CN
China
Prior art keywords
splint
guide rail
fixedly connected
post
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021936811.XU
Other languages
Chinese (zh)
Inventor
张长春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Chuandong Membrane Structure Engineering Co ltd
Original Assignee
Shenzhen Chuandong Membrane Structure Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Chuandong Membrane Structure Engineering Co ltd filed Critical Shenzhen Chuandong Membrane Structure Engineering Co ltd
Priority to CN202021936811.XU priority Critical patent/CN213651617U/en
Application granted granted Critical
Publication of CN213651617U publication Critical patent/CN213651617U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a steel construction is high-rise to build and is used material hoisting device belongs to the steel construction is high-rise to build and uses material hoisting device technical field, and this steel construction is high-rise to build and uses material hoisting device includes first front splint, and the inside edge of first front splint has first guide rail post through slide sliding connection, and first screw hole has been seted up to the one end fixedly connected with second front splint of first guide rail post, the inner wall swing joint of first screw hole has first screw thread post. Through the cooperation setting between first front splint, first back splint and the second back splint, through rotating the handle, make first screw thread post and second screw thread post rotate simultaneously in the first screw hole and the second screw thread of first front splint and first back splint side, make first front splint and second back splint remove on the surface of first guide rail post and second guide rail post respectively, realize the position control of steel material hoisting point promptly.

Description

Material lifting device for steel structure high-rise building
Technical Field
The utility model belongs to the technical field of the material promotes for the high-rise building of steel construction, concretely relates to material hoisting device for the high-rise building of steel construction.
Background
High-rise steel construction generally indicates six more than (or more than 30 m), mainly adopt shaped steel, the steel sheet is connected or welded into the component, again through connecting, the structural system that the welding formed, high-rise steel construction is built and is used H shaped steel frame more so far, this model steel inboard does not have the inclination, the welding concatenation operation is simple and easy, the mechanical properties of unit weight is better, it needs to carry out aerial lifting motion to H shaped steel to build high-rise steel construction at present, but general steel construction is high-rise to be built with material hoisting device and is fixed to the hoisting point of steel material, can not adjust according to the length of steel material, hoisting device's availability factor has been reduced, and when general hoisting device hoisted the fixed of steel material and dismantlement, it is comparatively loaded down with trivial details, both influenced the engineering progress, increased the physical demands to the workman again.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a steel construction is high-rise to build uses material hoisting device aims at solving among the prior art difficult regulation lifting point position and hoisting device and fixes and demolish complex operation's problem.
In order to achieve the above object, the utility model provides a following technical scheme: a material lifting device for steel structure high-rise building comprises a first front clamp plate, wherein the edge inside the first front clamp plate is connected with a first guide rail column in a sliding mode through a sliding way, one end of the first guide rail column is fixedly connected with a second front clamp plate, a first threaded hole is formed in one side face of the first front clamp plate, a first threaded column is movably connected to the inner wall of the first threaded hole, the other side face of the first front clamp plate is fixedly connected with a first rear clamp plate through a hinge, the edge inside the first rear clamp plate is connected with a second guide rail column in a sliding mode through a sliding way, one end of the second guide rail column is fixedly connected with a second rear clamp plate, a second threaded hole is formed in one side face of the first rear clamp plate, a second threaded column is movably connected to the inner wall of the second threaded hole, and bearing plates are movably connected to the tops of the first front clamp plate and the second front, the equal fixedly connected with draw-in groove fixed block in top of splint behind first back splint and the second, hinge fixedly connected with spill limiting plate is passed through to one side of draw-in groove fixed block.
In order to make this steel construction high-rise build with material hoisting device can fix the position of spill limiting plate, as the utility model relates to an it is preferred, the equal swing joint in top of first back splint and second back splint has the baffle.
In order to make this steel construction high-rise build with material hoisting device be convenient for rotate first screw thread post and second screw thread post, conduct the utility model discloses an it is preferred, the equal fixedly connected with in surface of first screw thread post and second screw thread post rotates the handle.
In order to make this steel construction high-rise build with material hoisting device can fix the wire rope of hoisting, conduct the utility model relates to an it is preferred, a side difference fixedly connected with promotion fixed column of first front splint, second front splint, first back splint and second back splint.
In order to make this steel construction high-rise build with material hoisting device can prevent that the steel material from promoting the removal of in-process position, as the utility model relates to an it is preferred, the inner wall difference fixedly connected with antiskid rubber plate of splint behind first front splint, second front splint, first back splint and the second.
In order to make this high-rise material hoisting device of building of steel construction can restrict the shift position of first front splint and first back splint, conduct the utility model relates to an it is preferred, the equal fixedly connected with limiting plate of one end of first guide rail post and second guide rail post.
In order to make this steel construction high-rise build with material hoisting device can make first threaded rod and second threaded rod rotate, as the utility model relates to an it is preferred, the one end swing joint of first screw thread post has the second front splint, the one end swing joint of second screw thread post has splint behind the second.
Compared with the prior art, the beneficial effects of the utility model are that:
1. this kind of steel construction is high-rise builds and uses material hoisting device, through first front splint, the second front splint, cooperation setting between first back splint and the second back splint, promote the specification and size of steel material as required, through rotating the handle, make first screw thread post and second screw thread post rotate at first screw hole and second screw thread inside of first front splint and first back splint side simultaneously, make first front splint and second back splint remove on the surface of first guide rail post and second guide rail post respectively, realize promptly that the device can be according to the different length of steel material, adjust and hang the position control of starting point with the steel material, promote the device's availability factor.
2. This a steel construction is high-rise builds and uses material hoisting device, through the bearing plate, the draw-in groove fixed block, the spill limiting plate, cooperation setting between baffle and the limiting plate, treat after adjusting the fixed position between first front bezel and the second front bezel, with front and back splint respectively with steel material surface contact, rotate the bearing plate, make the trapezoidal draw-in groove inside of the trapezoidal draw-in groove of draw-in groove fixed block joint of trapezoidal card post joint of bearing plate one end, detain the spill limiting plate at draw-in groove fixed block surface again, carry out the fixed of position to the spill limiting plate through rotating the baffle, with this position that comes spacing bearing plate, when demolising hoisting device, only need shift out the bearing plate from the draw-in groove fixed block, can be with fixed and demolising the steel material hoisting point fast, promote the construction progress of engineering.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic front view of the present invention;
fig. 2 is an enlarged schematic structural view of a point a in fig. 1 according to the present invention;
fig. 3 is a schematic top view of the present invention;
fig. 4 is a schematic view of a partial cross-sectional structure of the present invention.
In the figure: 1. a first front splint; 2. a first guide rail column; 3. a second front splint; 4. a first threaded hole; 5. a first threaded post; 6. a first rear cleat; 7. a second guide rail column; 8. a second rear cleat; 9. a second threaded hole; 10. a second threaded post; 11. a bearing plate; 12. a clamping groove fixing block; 13. a concave limiting plate; 14. a baffle plate; 15. rotating the handle; 16. lifting the fixed column; 17. an anti-slip rubber sheet; 18. and a limiting plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-4, the present invention provides the following technical solutions: a material lifting device for steel structure high-rise building comprises a first front splint 1, a first guide rail column 2 is connected at the edge inside the first front splint 1 in a sliding manner through a slideway, a second front splint 3 is fixedly connected at one end of the first guide rail column 2, a first threaded hole 4 is formed in one side surface of the first front splint 1, a first threaded column 5 is movably connected to the inner wall of the first threaded hole 4, a first rear splint 6 is fixedly connected to the other side surface of the first front splint 1 through a hinge, a second guide rail column 7 is connected at the edge inside the first rear splint 6 in a sliding manner through a slideway, a second rear splint 8 is fixedly connected at one end of the second guide rail column 7, a second threaded hole 9 is formed in one side surface of the first rear splint 6, a second threaded column 10 is movably connected to the inner wall of the second threaded hole 9, bearing plates 11 are movably connected at the tops of the first front splint 1 and the second front splint 3, the top of first back splint 6 and second back splint 8 is equal fixedly connected with draw-in groove fixed block 12, and hinge fixedly connected with spill limiting plate 13 is passed through to one side of draw-in groove fixed block 12.
In the embodiment of the present invention, by means of the cooperation arrangement between the first front splint 1, the second front splint 3, the first rear splint 6 and the second rear splint 8, the specification and size of the steel material can be increased as required, and by rotating the handle 15, the first threaded post 5 and the second threaded post 10 can be simultaneously rotated inside the first threaded hole 4 and the second threaded hole 9 on one side of the first front splint 1 and the first rear splint 6, so that the first front splint 1 and the second rear splint 8 can be respectively moved on the outer surfaces of the first guide rail post 2 and the second guide rail post 7, that is, the device can adjust the position adjustment of the lifting point of the steel material according to different lengths of the steel material, thereby increasing the utilization efficiency of the device, and after the fixed position between the first front splint 1 and the second front splint 3 is adjusted by means of the cooperation arrangement between the bearing plate 11, the clamping groove fixing block 12, the concave limiting plate 13, the baffle plate 14 and the limiting plate 18, with front and back splint respectively with steel material outer surface contact, rotate bearing plate 11, make the trapezoidal card post joint of 11 one ends of bearing plate inside the trapezoidal draw-in groove of draw-in groove fixed block 12, detain spill limiting plate 13 at draw-in groove fixed block 12 surface again, carry out the fixed of position to spill limiting plate 13 through rotating the baffle 14, with this position of spacing bearing plate 11, when demolising hoisting device, only need shift out bearing plate 11 from draw-in groove fixed block 12, can be with quick fixed and demolish the steel material hoisting point, promote the construction progress of engineering.
Specifically, the top parts of the first back splint 6 and the second back splint 8 are movably connected with a baffle plate 14.
In this embodiment: by the arrangement of the stopper 14, the position of the concave stopper plate 13 can be fixed.
Specifically, the outer surfaces of the first threaded column 5 and the second threaded column 10 are fixedly connected with a rotating handle 15.
In this embodiment: by turning the arrangement of the handle 15, it is possible to facilitate turning the first and second threaded cylinders 5, 10.
Specifically, one side of the first front clamping plate 1, the second front clamping plate 3, the first rear clamping plate 6 and the second rear clamping plate 8 is fixedly connected with a lifting fixing column 16 respectively.
In this embodiment: the hoisting steel wire rope can be fixed through the arrangement of the lifting fixing column 16.
Specifically, the inner walls of the first front splint 1, the second front splint 3, the first rear splint 6 and the second rear splint 8 are fixedly connected with an anti-skid rubber plate 17 respectively.
In this embodiment: by the provision of the anti-slip rubber plate 17, the steel material can be prevented from moving in the lifting process position.
Specifically, one end of each of the first guide rail column 2 and the second guide rail column 7 is fixedly connected with a limiting plate 18.
In this embodiment: by the arrangement of the stopper plate 18, the movement positions of the first front plate 1 and the first rear plate 6 can be restricted.
Specifically, one end of the first threaded column 5 is movably connected with a second front clamping plate 3, and one end of the second threaded column 10 is movably connected with a second rear clamping plate 8.
In this embodiment: through the cooperation setting between first screw post 5, second front splint 3, second screw post 10 and the second back splint 8, can make first screw post 5 and second screw post 10 rotate.
The utility model discloses a theory of operation and use flow: when the material lifting device for steel structure high-rise building is used, the first front clamping plate 1, the second front clamping plate 3, the first rear clamping plate 6 and the second rear clamping plate 8 are matched, the specification and the size of a steel material are lifted as required, the first threaded column 5 and the second threaded column 10 are enabled to simultaneously rotate in the first threaded hole 4 and the second threaded hole 9 on one side surface of the first front clamping plate 1 and the first rear clamping plate 6 by rotating the handle 15, the first front clamping plate 1 and the second rear clamping plate 8 respectively move on the outer surfaces of the first guide rail column 2 and the second guide rail column 7, namely the position adjustment of a lifting point of the steel material can be adjusted according to different lengths of the steel material, the use efficiency of the device is improved, the material lifting device is matched and arranged by the bearing plate 11, the clamping groove fixing block 12, the concave limiting plate 13, the baffle plate 14 and the limiting plate 18, after the fixing position between the first front clamping plate 1 and the second front clamping plate 3 is adjusted, with front and back splint respectively with steel material outer surface contact, rotate bearing plate 11, make the trapezoidal card post joint of bearing plate 11 one end inside the trapezoidal draw-in groove of draw-in groove fixed block 12, detain spill limiting plate 13 at draw-in groove fixed block 12 surface again, carry out the fixed of position to spill limiting plate 13 through rotating the baffle 14, with this position of spacing bearing plate 11, when demolising hoisting device, only need shift out bearing plate 11 from draw-in groove fixed block 12, can be with quick fixed and demolish to steel material hoisting point, promote the construction progress of engineering, through the setting of anti-skidding rubber slab 17, can prevent to promote the removal of steel material in-process position, setting through limiting plate 18, can restrict the shift position of first front plate 1 and first back splint 6, setting through promotion fixed column 16, can fix the wire rope of hoisting.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. The utility model provides a steel construction is high-rise builds and uses material hoisting device, includes first front splint (1), its characterized in that: the edge of the inner part of the first front splint (1) is connected with a first guide rail column (2) through a slide way in a sliding way, one end of the first guide rail column (2) is fixedly connected with a second front splint (3), a first threaded hole (4) is formed in one side surface of the first front splint (1), a first threaded column (5) is movably connected with the inner wall of the first threaded hole (4), a first rear splint (6) is fixedly connected with the other side surface of the first front splint (1) through a hinge, a second guide rail column (7) is connected with the edge of the inner part of the first rear splint (6) through a slide way in a sliding way, a second rear splint (8) is fixedly connected with one end of the second guide rail column (7), a second threaded hole (9) is formed in one side surface of the first rear splint (6), and a second threaded column (10) is movably connected with the inner wall of the second threaded hole (9, the equal swing joint in top of first front splint (1) and second front splint (3) has bearing plate (11), the equal fixedly connected with draw-in groove fixed block (12) in top of first back splint (6) and second back splint (8), hinge fixedly connected with spill limiting plate (13) is passed through to one side of draw-in groove fixed block (12).
2. The material lifting device for steel structure high-rise building according to claim 1, characterized in that: the tops of the first rear clamping plate (6) and the second rear clamping plate (8) are movably connected with a baffle plate (14).
3. The material lifting device for steel structure high-rise building according to claim 1, characterized in that: the outer surfaces of the first threaded column (5) and the second threaded column (10) are fixedly connected with rotating handles (15).
4. The material lifting device for steel structure high-rise building according to claim 1, characterized in that: one side surfaces of the first front clamping plate (1), the second front clamping plate (3), the first rear clamping plate (6) and the second rear clamping plate (8) are fixedly connected with lifting fixing columns (16) respectively.
5. The material lifting device for steel structure high-rise building according to claim 1, characterized in that: the inner walls of the first front splint (1), the second front splint (3), the first rear splint (6) and the second rear splint (8) are fixedly connected with anti-skidding rubber plates (17) respectively.
6. The material lifting device for steel structure high-rise building according to claim 1, characterized in that: the equal fixedly connected with limiting plate (18) of one end of first guide rail post (2) and second guide rail post (7).
7. The material lifting device for steel structure high-rise building according to claim 1, characterized in that: one end swing joint of first screw thread post (5) has second front splint (3), the one end swing joint of second screw thread post (10) has second back splint (8).
CN202021936811.XU 2020-09-08 2020-09-08 Material lifting device for steel structure high-rise building Active CN213651617U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021936811.XU CN213651617U (en) 2020-09-08 2020-09-08 Material lifting device for steel structure high-rise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021936811.XU CN213651617U (en) 2020-09-08 2020-09-08 Material lifting device for steel structure high-rise building

Publications (1)

Publication Number Publication Date
CN213651617U true CN213651617U (en) 2021-07-09

Family

ID=76695279

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021936811.XU Active CN213651617U (en) 2020-09-08 2020-09-08 Material lifting device for steel structure high-rise building

Country Status (1)

Country Link
CN (1) CN213651617U (en)

Similar Documents

Publication Publication Date Title
CN210151578U (en) Bridge supporting bracket
CN209811808U (en) Auxiliary holding clamp for cutting building pipe
CN101298839A (en) Tunnel concrete lining formwork apparatus
CN210650595U (en) Safety support of large-scale steel structure
CN213651617U (en) Material lifting device for steel structure high-rise building
CN209830403U (en) Plate shearing machine
CN207888146U (en) A kind of universal evaporator fin turnover device
CN214935432U (en) Anti-shaking mechanism suitable for shore bridge crane hoisting equipment
CN216235912U (en) Steel construction vestibule hydraulic pressure whole hoist mechanism
CN214935331U (en) Long plate hoisting device for composite plate processing
CN208662261U (en) A kind of spinning machine sheet material clamping device
CN219429474U (en) Hoisting device for toughened glass
CN112854746A (en) Inverted hanging type supporting system for steel truss floor support plate and construction method
CN206858045U (en) A kind of jack supporting piece of convenient regulation
CN113233375B (en) Clamping trolley for grate frame
CN215315247U (en) Automatic feeding device for pipe bending machine
CN218085767U (en) Small box girder moving base
CN202685123U (en) Silicon ingot turnover device
CN209872236U (en) Freely-lifting type receiving pry
CN214424120U (en) Positioning device for supporting concrete formwork
CN213826560U (en) Stamping mechanism for extruding pipe fitting end
CN208866297U (en) A kind of truss reinforcing bar bending machine
CN209942201U (en) Pulley hanging seat for attached scaffold
CN219950242U (en) Lifting hook structure for lifting H-shaped steel
CN217617748U (en) Aluminum cutting device with replaceable tungsten steel ejector pin

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant