CN213629242U - Prefabricated direct-burried insulating tube positioner - Google Patents

Prefabricated direct-burried insulating tube positioner Download PDF

Info

Publication number
CN213629242U
CN213629242U CN202022789101.5U CN202022789101U CN213629242U CN 213629242 U CN213629242 U CN 213629242U CN 202022789101 U CN202022789101 U CN 202022789101U CN 213629242 U CN213629242 U CN 213629242U
Authority
CN
China
Prior art keywords
prefabricated direct
insulating tube
adjusting screw
screw rod
pipe positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022789101.5U
Other languages
Chinese (zh)
Inventor
纪付江
王恒朝
王恒纲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Yugang Keep Warm Construction Material Co ltd
Original Assignee
Tianjin Yugang Keep Warm Construction Material Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Yugang Keep Warm Construction Material Co ltd filed Critical Tianjin Yugang Keep Warm Construction Material Co ltd
Priority to CN202022789101.5U priority Critical patent/CN213629242U/en
Application granted granted Critical
Publication of CN213629242U publication Critical patent/CN213629242U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Thermal Insulation (AREA)

Abstract

The utility model discloses a prefabricated direct-burried insulating tube positioner, including prefabricated direct-burried insulating tube location support body, the tubulose base is installed to the bottom of prefabricated direct-burried insulating tube location support body, the guiding axle is installed to the intermediate position of the top of tubulose base, the removal adjustment hoop cover is installed at the both ends of the top of guiding axle, remove the top of adjustment hoop cover and install and consolidate the balance plate, consolidate the top of balance plate and install the support, the nut is installed to the intermediate position of the inside of support, the internally mounted of nut has adjusting screw, the locating piece is installed to the both sides of connecting plate. The utility model discloses a removal adjustment hoop cover is inlayed through sliding with the guiding axle and is connected, is convenient for will remove the adjustment hoop cover through sliding and adjusts to both ends, centre or on a bias to certain one side, can carry out small distance with prefabricated direct-burried insulating tube and adjust, is convenient for carry out accurate location with prefabricated direct-burried insulating tube and fixes.

Description

Prefabricated direct-burried insulating tube positioner
Technical Field
The utility model relates to a prefabricated direct-burried insulating tube technical field specifically is a prefabricated direct-burried insulating tube positioner.
Background
The prefabricated direct-buried heat-insulating pipe is characterized by also comprising a high-temperature-resistant heat-insulating layer, a lubricating layer and an elastic sealing element, wherein the high-temperature prefabricated direct-buried heat-insulating pipe is widely used for liquid and gas conveying pipe networks, chemical pipeline heat-insulating engineering petroleum, chemical industry, central heating networks, central air-conditioning ventilation pipelines, municipal engineering and the like, the high-temperature prefabricated direct-buried heat-insulating pipe has good heat-insulating property, safety, reliability and low engineering cost, effectively solves the problems of heat insulation, sliding lubrication and water prevention of exposed pipe ends of the prefabricated direct-buried heat-insulating pipe for high-temperature heat transmission at 130-600 ℃ in town central heating, adopts a direct-buried heat-supplying pipeline technology, and marks that the technical development of Chinese heat-supplying pipelines has entered a new starting point.
At present, the prefabricated direct-buried heat insulation pipe positioning device has various defects, for example, the size of the positioning device is not convenient to adjust according to the size of a pipeline, and the positioning effect is poor.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a prefabricated direct-burried insulating tube positioner to solve the size of being not convenient for according to the size adjustment positioner of pipeline among the prior art, fix a position the not good problem of effect.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a prefabricated direct-burried insulating tube positioner, includes prefabricated direct-burried insulating tube location support body, the tubulose base is installed to the bottom of prefabricated direct-burried insulating tube location support body, the guiding axle is installed to the intermediate position of the top of tubulose base, the removal adjustment hoop cover is installed at the both ends of the top of guiding axle, the top of removing the adjustment hoop cover is installed and is consolidated the balance plate, consolidate the top of balance plate and install the support, the nut is installed to the intermediate position of the inside of support, the internally mounted of nut has adjusting screw, the connecting plate is installed to adjusting screw's one end, the locating piece is installed to the both sides of connecting plate.
Preferably, the movable adjusting hoop sleeve is connected with the guide shaft in a sliding embedded mode, and the movable adjusting hoop sleeve is fixedly connected with one side of the guide shaft through a fastening bolt.
Preferably, the inner side of the positioning block is provided with an anti-slip pad, and the anti-slip pad is fixedly connected with the positioning block through a fixing screw.
Preferably, one end of the adjusting screw is connected with the connecting plate in a rotating mode, the other end of the adjusting screw is provided with a pinching handle, and the pinching handle is connected with the adjusting screw in a welding mode.
Preferably, the reinforcing balance plate is connected with the adjusting screw rod in a welding mode, and the reinforcing balance plate is of an inverted triangular structure.
Preferably, a groove is formed in the middle of each of two sides of the tubular base, a handle is arranged in the middle of the inner portion of the groove, and the handle is fixedly connected with the groove through a bolt.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a removal adjustment hoop cover is inlayed through sliding with the guiding axle and is connected, be convenient for remove the adjustment hoop cover through sliding and adjust to both ends, centre or on a par with certain one side, can carry out small distance with prefabricated direct-burried insulating tube and adjust, be convenient for carry out accurate location with prefabricated direct-burried insulating tube and fix, and the locating piece passes through adjusting screw with the support and is connected, can carry out careful adjustment according to the size of pipeline through adjusting screw, make locating piece and pipeline inlay more fastening, positioning effect is better.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a top view of the present invention.
Fig. 3 is a side view of the present invention.
In the figure: 1. prefabricating a positioning frame body of the directly-buried heat-insulating pipe; 2. reinforcing the balance plate; 3. a handle knob; 4. adjusting the screw rod; 5. a nut; 6. positioning blocks; 7. a non-slip mat; 8. a tubular base; 9. a guide shaft; 10. a connecting plate; 11. fixing screws; 12. a support; 13. fastening a bolt; 14. moving the adjusting hoop; 15. a groove; 16. a handle.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 3, in an embodiment of the present invention, a prefabricated direct-buried insulating pipe positioning device includes a prefabricated direct-buried insulating pipe positioning frame body 1, a tubular base 8 is installed at the bottom of the prefabricated direct-buried insulating pipe positioning frame body 1, the tubular base 8 increases stability, a groove 15 is disposed at a middle position of two sides of the tubular base 8, a handle 16 is hidden by the groove 15, a handle 16 is disposed at a middle position inside the groove 15, the handle 16 is convenient to hold by hand, the handle 16 is fixedly connected with the groove 15 by a bolt, a guide shaft 9 is installed at a middle position above the tubular base 8, the guide shaft 9 is convenient to adjust the position of a movable adjusting hoop 14, movable adjusting hoops 14 are installed at two ends above the guide shaft 9, the movable adjusting hoop 14 adjusts a support 12 in a movable manner, the movable adjusting hoop 14 is connected with the guide shaft 9 by a sliding embedding manner, a movable adjusting hoop sleeve 14 is fixedly connected with one side of a guide shaft 9 through a fastening bolt 13, a reinforcing balance plate 2 is arranged above the movable adjusting hoop sleeve 14, the reinforcing balance plate 2 increases stability, the reinforcing balance plate 2 is connected with an adjusting screw rod 4 through welding, the reinforcing balance plate 2 is of an inverted triangle structure, a support 12 is arranged above the reinforcing balance plate 2, a screw cap 5 is arranged at the middle position inside the support 12, the adjusting screw rod 4 is arranged inside the screw cap 5, the adjusting screw rod 4 is convenient for extending or shortening the positioning block 6, one end of the adjusting screw rod 4 is rotatably connected with the connecting plate 10, the other end of the adjusting screw rod 4 is provided with a knob 3, the knob 3 is convenient for holding by hand, the knob 3 is connected with the adjusting screw rod 4 through welding, one end of the adjusting screw rod 4 is provided with the connecting plate 10, and the positioning blocks 6 are arranged on two sides of, the prefabricated direct-burried insulating tube is fixed in position by the locating piece 6, the inner side of the locating piece 6 is provided with the anti-slip pad 7, the anti-slip pad 7 increases the anti-slip property, and the anti-slip pad 7 is fixedly connected with the locating piece 6 through the fixing screw 11.
The utility model discloses a theory of operation is: this equipment is when using, shelve prefabricated direct-burried insulating tube location support body 1 in required position, according to the position of piping erection, carry out position control to both ends, centre or certain one end with the removal adjustment hoop 14 at both ends through sliding, according to the size of prefabricated direct-burried insulating tube, through adjusting screw 4 with locating piece 6 extend or shorten the adjustment to required size, shelve including the prefabricated direct-burried insulating tube can.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. A prefabricated direct-buried insulating pipe positioning device comprises a prefabricated direct-buried insulating pipe positioning frame body (1), the method is characterized in that: the bottom of the prefabricated direct-buried insulating pipe positioning frame body (1) is provided with a tubular base (8), a guide shaft (9) is arranged in the middle position above the tubular base (8), a movable adjusting hoop sleeve (14) is arranged at the two ends above the guide shaft (9), a reinforcing balance plate (2) is arranged above the movable adjusting hoop sleeve (14), a bracket (12) is arranged above the reinforcing balance plate (2), a screw cap (5) is arranged in the middle of the inner part of the bracket (12), an adjusting screw rod (4) is arranged in the screw cap (5), a connecting plate (10) is installed at one end of the adjusting screw rod (4), and positioning blocks (6) are installed on two sides of the connecting plate (10).
2. The prefabricated direct-burial thermal insulation pipe positioning device as claimed in claim 1, wherein: the movable adjusting hoop sleeve (14) is connected with the guide shaft (9) in an embedded mode in a sliding mode, and the movable adjusting hoop sleeve (14) is fixedly connected with one side of the guide shaft (9) through a fastening bolt (13).
3. The prefabricated direct-burial thermal insulation pipe positioning device as claimed in claim 1, wherein: the inner side of the positioning block (6) is provided with an anti-slip pad (7), and the anti-slip pad (7) is fixedly connected with the positioning block (6) through a fixing screw (11).
4. The prefabricated direct-burial thermal insulation pipe positioning device as claimed in claim 1, wherein: one end of the adjusting screw rod (4) is connected with the connecting plate (10) in a rotating mode, the other end of the adjusting screw rod (4) is provided with a pinching handle (3), and the pinching handle (3) is connected with the adjusting screw rod (4) in a welding mode.
5. The prefabricated direct-burial thermal insulation pipe positioning device as claimed in claim 1, wherein: the reinforcing balance plate (2) is connected with the adjusting screw rod (4) in a welding mode, and the reinforcing balance plate (2) is of an inverted triangle structure.
6. The prefabricated direct-burial thermal insulation pipe positioning device as claimed in claim 1, wherein: a groove (15) is formed in the middle of each of two sides of the tubular base (8), a handle (16) is arranged in the middle of the inner portion of the groove (15), and the handle (16) is fixedly connected with the groove (15) through bolts.
CN202022789101.5U 2020-11-27 2020-11-27 Prefabricated direct-burried insulating tube positioner Active CN213629242U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022789101.5U CN213629242U (en) 2020-11-27 2020-11-27 Prefabricated direct-burried insulating tube positioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022789101.5U CN213629242U (en) 2020-11-27 2020-11-27 Prefabricated direct-burried insulating tube positioner

Publications (1)

Publication Number Publication Date
CN213629242U true CN213629242U (en) 2021-07-06

Family

ID=76636798

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022789101.5U Active CN213629242U (en) 2020-11-27 2020-11-27 Prefabricated direct-burried insulating tube positioner

Country Status (1)

Country Link
CN (1) CN213629242U (en)

Similar Documents

Publication Publication Date Title
CN213629242U (en) Prefabricated direct-burried insulating tube positioner
CN107830260A (en) A kind of fixing device for pipe fitting
CN209213192U (en) A kind of Pipe installing support frame
CN210587405U (en) Bellows fixed length automatic cutout machine
CN106441640B (en) Stress analysis method for inlet and outlet pipelines of intermediate heat exchanger of large methanol device
CN214924079U (en) Municipal pipe network pipeline installation device
CN214749451U (en) Be applied to pipeline pressure detection device of ferrous metallurgy safety evaluation
CN209773153U (en) A steam turbine overhauls return bend auxiliary device for thermal power plant
CN210475632U (en) Perforating machine for maintaining natural gas pipeline
CN212190729U (en) Hydraulic pipe bender for constructional engineering
CN220560825U (en) Device for multifunctional engineering electromechanical installation
CN207316250U (en) Buried guiding trestle
CN218349571U (en) Electromagnetic flowmeter with high installation stability
CN207155163U (en) A kind of pipeline turning rolls
CN216607423U (en) Manual cutting device of pipeline for building site
CN220389222U (en) Pipeline positioning device for municipal engineering
CN214870939U (en) Bracket system for cutting prefabricated direct-buried insulating pipe
CN220894005U (en) Building pipe pressure resistance detection device
CN213532760U (en) Prefabricated direct-burried insulating tube end cutting platform
CN220461807U (en) Elbow correcting and positioning device
CN214789794U (en) Protection device for municipal engineering equipment with shock-absorbing function
CN216560200U (en) Underground pipeline corrosion monitoring device
CN214037248U (en) Multifunctional joint for electric heating oil extraction
CN215725899U (en) Simple pipeline gradient measuring device
CN107297633A (en) A kind of adjustable fixing device punched for Plastic valve

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant