CN213625372U - Erect central division strip of framing bridge of pipeline and green planting - Google Patents
Erect central division strip of framing bridge of pipeline and green planting Download PDFInfo
- Publication number
- CN213625372U CN213625372U CN202022168414.9U CN202022168414U CN213625372U CN 213625372 U CN213625372 U CN 213625372U CN 202022168414 U CN202022168414 U CN 202022168414U CN 213625372 U CN213625372 U CN 213625372U
- Authority
- CN
- China
- Prior art keywords
- platform
- planting
- bridge
- pipeline
- planting platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009432 framing Methods 0.000 title claims abstract description 13
- 239000002351 wastewater Substances 0.000 claims abstract description 21
- 238000011084 recovery Methods 0.000 claims abstract description 16
- 230000004888 barrier function Effects 0.000 claims abstract description 15
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 15
- 230000001681 protective effect Effects 0.000 claims abstract description 11
- 241001464837 Viridiplantae Species 0.000 claims abstract description 9
- 238000005507 spraying Methods 0.000 claims abstract description 6
- 229910000831 Steel Inorganic materials 0.000 claims description 28
- 239000010959 steel Substances 0.000 claims description 28
- 238000000926 separation method Methods 0.000 claims description 12
- 239000002184 metal Substances 0.000 claims description 10
- 229910052751 metal Inorganic materials 0.000 claims description 10
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 claims description 8
- 239000005341 toughened glass Substances 0.000 claims description 8
- 239000010410 layer Substances 0.000 claims 2
- 239000002356 single layer Substances 0.000 claims 2
- 239000007921 spray Substances 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 239000004744 fabric Substances 0.000 description 2
- 230000006698 induction Effects 0.000 description 2
- 239000003973 paint Substances 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical group [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Cultivation Of Plants (AREA)
Abstract
The utility model discloses a middle separator of a framing bridge for erecting pipelines and green plants, which comprises a protective platform and a planting platform which are arranged between anti-collision guardrails at two sides of the middle separator of the framing bridge, wherein the planting platform is arranged above the protective platform, a pipeline bracket for erecting telecommunication pipelines is arranged on the anti-collision guardrails between the protective platform and the planting platform, and lap pieces for placing the protective platform and the planting platform are fixed on the anti-collision guardrails; it should green cultivated in a pot of planting to place the planting on the planting platform in season, and planting platform one side is equipped with the spraying water pipe, and the spraying water pipe passes through water pipe support to be fixed on anticollision barrier, and planting platform one side is equipped with the waste water recovery groove that is used for accepting the waste water on the planting platform, and one side overlap joint of planting platform and waste water recovery groove. The utility model discloses can improve the view on the bridge, can play the induced and anti-dazzle guard action of sight to the driver of the current vehicle on the bridge again.
Description
Technical Field
The utility model relates to a width of cloth bridge central separation area especially relates to an erect pipeline and green width of cloth bridge central separation area of planting.
Background
When an urban bridge is designed, if the bridge is wide and the geology of a bridge position is poor, a left-right framing form is adopted, the distance between central separation belts is about 0.5-1 m, and only anti-falling or anti-dazzle structures are installed above gaps, so that the urban bridge has no landscape aesthetic feeling; simultaneously, for the daily maintenance of convenient telecommunication pipeline, can set up the telecommunication pipeline under the pavement, when needing, utilize to enclose temporarily and keep off the pavement and overhaul the telecommunication pipeline.
The existing partial city framing bridge is provided with a concrete bottom plate in a central separation zone, and after planting soil is accumulated, green flowers are planted, so that the greening landscape on the bridge is improved. However, the following disadvantages exist in the design: firstly, under the influence of the vibration of a travelling crane, a concrete bottom plate arranged in a central separation belt is easy to crack, and muddy water flows out of the bottom plate in rainy days or when green plants are watered, so that the environment is polluted; secondly, the large-area accumulation of planting soil can easily generate dust and pollute the environment in dry weather.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a reasonable in design conveniently erects pipeline and green framing bridge central separation area of planting.
In order to achieve the above object, the present invention provides the following technical solutions:
the utility model relates to a frame the central division strip of the framing bridge of pipeline and green planting, its characteristics are, the device includes protection platform and planting platform that are established between the anticollision barrier of the central division strip both sides of framing bridge, and the planting platform is established above the protection platform, is equipped with the pipeline support that is used for setting up the telecommunication pipeline on the anticollision barrier between protection platform and the planting platform, is fixed with the overlap joint spare that is used for placing protection platform and planting platform on the anticollision barrier; it should green cultivated in a pot of planting to place the planting on the planting platform in season, and planting platform one side is equipped with the spraying water pipe, and the spraying water pipe passes through water pipe support to be fixed on anticollision barrier, and planting platform one side is equipped with the waste water recovery groove that is used for accepting the waste water on the planting platform, and one side overlap joint of planting platform and waste water recovery groove.
Preferably, the protection platform is provided with a protection net, and the protection net is a metal net.
Preferably, the planting platform is provided with a transparent toughened glass plate.
Preferably, the overlap joint spare is including fixing the pre-buried steel sheet on crash barrier and fixing the shaped steel of encorbelmenting on the pre-buried steel sheet, waste water reclamation groove is fixed on the pre-buried steel sheet of crash barrier one side.
Preferably, the length of the cantilever steel section is 0.05-0.15m shorter than the width of the central separation band gap of the bridge.
Preferably, the embedded steel plate, the cantilever steel section and the metal mesh are all sprayed with anti-rust layers.
Preferably, a flexible rubber sheet is arranged at the lap joint of the wastewater recovery tank and the planting platform.
Preferably, the pipeline support is provided with at least two layers, the horizontal distance between the pipeline supports at the same height is 0.5-0.9 m, and the vertical distance between the pipeline supports at different heights is 0.30-0.40 m.
Preferably, the lap joints at the protection platform and the planting platform are arranged in a staggered mode.
Preferably, the protection platform is arranged at the height of 0.1m from the bottom of the anti-collision guardrail, the pipeline support is arranged at the height of 0.4m or 0.7m from the bottom of the anti-collision guardrail, and the planting platform is arranged at the height of 1m from the bottom of the anti-collision guardrail.
Compared with the prior art, the utility model can improve the landscape on the bridge and play the roles of sight line induction and anti-dazzle protection for the driver of the vehicle passing on the bridge by arranging the planting platform; the protective platform is paved with a corrosion-resistant metal net to avoid the metal net from being damaged and deformed under the influence of the vibration of a travelling crane; the pipeline support is equipped with on the anticollision barrier between protection platform and the planting platform, when overhauing the pipeline, only need remove the green plant of part, toughened glass and apron, need not to set up and enclose the fender, and the maintainer can work safely, conveniently, can not influence on the bridge and road surface traffic.
Drawings
The accompanying drawings, which are described herein, serve to provide a further understanding of the invention and constitute a part of this specification, and the exemplary embodiments and descriptions thereof are provided for explaining the invention without unduly limiting it. In the drawings:
FIG. 1 is a schematic view of a safety shield apparatus according to the present invention;
FIG. 2 is a block diagram of a planting platform;
FIG. 3 is a block diagram of a pipeline carriage;
FIG. 4 is a block diagram of a protective platform;
description of reference numerals: 1-embedded steel plate with steel bars, 2-long overhanging section steel, 3-rust-resistant metal protective net, 4-pipeline support, 5-telecommunication pipeline, 6-wastewater recovery tank, 7-flexible rubber sheet fixed on the recovery tank, 8-short overhanging section steel, 9-transparent toughened glass plate, 10-spray water pipe, and 11-potted plant.
Detailed Description
In order to make the technical problem, technical solution and advantageous effects to be solved by the present invention more clearly understood, the following description is given in conjunction with the accompanying drawings and embodiments to illustrate the present invention in further detail. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Referring to fig. 1-4, the utility model provides a framing bridge central separator for erecting pipelines and green plants, which comprises a protection platform 3 and a planting platform arranged between anti-collision guardrails at two sides of the framing bridge central separator, wherein the planting platform is arranged above the protection platform 3, a pipeline bracket 4 for erecting telecommunication pipelines 5 is arranged on the anti-collision guardrail between the protection platform 3 and the planting platform, and a lap joint for placing the protection platform 3 and the planting platform is fixed on the anti-collision guardrail, so that partial green plants, toughened glass and a cover plate can be conveniently removed; a potted plant 11 for planting green plants corresponding to seasons is placed on the planting platform, a spray water pipe 10 is arranged on one side of the planting platform, the spray water pipe 10 is fixed on the anti-collision guardrail through a water pipe support, a wastewater recovery tank 6 for receiving wastewater on the planting platform is arranged on one side of the planting platform, and the planting platform is in lap joint with one side of the wastewater recovery tank 6;
the pipeline supports 4 are at least provided with two layers, the horizontal distance between the pipeline supports 4 at the same height is 0.5-0.9 m, and the vertical distance between the pipeline supports 4 at different heights is 0.30-0.40 m;
the protection platform 3 is arranged at a height of 0.1m from the bottom of the anti-collision guardrail, the pipeline support is arranged at a height of 0.4m or 0.7m from the bottom of the anti-collision guardrail, and the planting platform is arranged at a height of 1m from the bottom of the anti-collision guardrail;
the protective platform 3 is provided with a protective net which is a metal net;
the planting platform is provided with a transparent toughened glass plate 9;
the lap joint piece comprises an embedded steel plate 1 fixed on the anti-collision guardrail and overhanging section steels 2 and 8 fixed on the embedded steel plate 1, and the wastewater recovery tank 6 is fixed on the embedded steel plate 1 on one side of the anti-collision guardrail;
the length of the overhanging section steels 2 and 8 is 0.05-0.15m shorter than the width of the central separation band gap of the bridge, the overhanging section steel 8 which is 0.15m shorter than the width of the central separation band gap of the bridge is adopted at the planting platform, and the overhanging section steel 2 which is 0.05m shorter than the width of the central separation band gap of the bridge is adopted at the protection platform;
all the embedded steel plates 1, the overhanging section steels 2 and 8 and the metal mesh are sprayed with anti-rust layers, all the components which are easy to rust are sprayed with anti-rust paint, and all the iron parts are sprayed with anti-rust paint after the welding is finished;
a flexible rubber sheet 7 is arranged at the lap joint of the wastewater recovery tank 6 and the planting platform, so that the anti-skid function is realized, and the planting platform can be firmly lapped on the wastewater recovery tank 6;
the lap joints at the protective platform 3 and the planting platform are arranged in a staggered manner;
the utility model discloses the following technical problem of solution that can be better: 1. the bottom layer is provided with a layer of metal mesh which is rust-resistant, is a working platform for erecting pipelines and is a safety protection for preventing falling objects; 2. The top layer is provided with a layer of transparent toughened glass, the top part is fixedly provided with season green plant pot plants and spray water pipes, and the lower part is provided with a wastewater recovery tank, so that the landscape on the bridge can be improved, and the sight line induction and anti-dazzle protection effects on a driver passing through vehicles on the bridge can be realized; 3. when the town road broad, the central authorities greenbelt in select suitable position to set up the apron ditch and erect the telecommunication pipeline to pre-buried steel sheet on the anticollision barrier of bridge along the line, the installation pipeline support, the pipeline is erect in vertical layering, when overhauing the pipeline, only need remove the green plant of part, toughened glass and apron, need not to set up and enclose the fender, the maintainer can work safely, conveniently, can not influence on the bridge and the road surface traffic.
The above description is only for the specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art can easily think of the changes or substitutions within the technical scope of the present invention, and all should be covered within the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.
Claims (10)
1. The utility model provides a erect central division of framing bridge strip of pipeline and green planting which characterized in that: the device comprises a protection platform and a planting platform which are arranged between anti-collision guardrails on two sides of a central separation belt of the framing bridge, wherein the planting platform is arranged above the protection platform, a pipeline bracket for erecting a telecommunication pipeline is arranged on the anti-collision guardrail between the protection platform and the planting platform, and a lapping piece for placing the protection platform and the planting platform is fixed on the anti-collision guardrail; it should green cultivated in a pot of planting to place the planting on the planting platform in season, and planting platform one side is equipped with the spraying water pipe, and the spraying water pipe passes through water pipe support to be fixed on anticollision barrier, and planting platform one side is equipped with the waste water recovery groove that is used for accepting the waste water on the planting platform, and one side overlap joint of planting platform and waste water recovery groove.
2. The bridge frame central divider of claim 1, wherein: the protection platform is provided with a protection net which is a metal net.
3. The bridge frame central divider of claim 1, wherein: the planting platform is provided with a transparent toughened glass plate.
4. The bridge centre separator for erecting pipelines and green plants according to claim 2 or 3, wherein: the overlap joint spare is including fixing the pre-buried steel sheet on anticollision barrier and fixing the shaped steel of encorbelmenting on the pre-buried steel sheet, waste water reclamation groove is fixed on the pre-buried steel sheet of anticollision barrier one side.
5. The bridge frame central divider of claim 4, wherein said central divider is a single-layer bridge with a plurality of spaced-apart: the length of the cantilever profile steel is 0.05-0.15m shorter than the width of the central separation belt gap of the bridge.
6. The bridge frame central divider of claim 4, wherein said central divider is a single-layer bridge with a plurality of spaced-apart: and the embedded steel plate, the cantilever steel section and the metal net are all sprayed with anti-rust layers.
7. The bridge frame central divider of claim 1, wherein: and a flexible rubber sheet is arranged at the lap joint of the wastewater recovery tank and the planting platform.
8. The bridge frame central divider of claim 1, wherein: the pipeline support is provided with at least two layers, the horizontal distance between the pipeline supports at the same height is 0.5-0.9 m, and the vertical distance between the pipeline supports at different heights is 0.30-0.40 m.
9. The bridge frame central divider of claim 1, wherein: the lap joints at the protective platform and the planting platform are arranged in a staggered mode.
10. The bridge frame central divider of claim 1, wherein: the protection platform is established at the 0.1m high department apart from the anticollision barrier bottom, and the pipeline support is established at the 0.4m or 0.7m high department apart from the anticollision barrier bottom, plants the platform and establishes at the 1m high department apart from the anticollision barrier bottom.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022168414.9U CN213625372U (en) | 2020-09-28 | 2020-09-28 | Erect central division strip of framing bridge of pipeline and green planting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022168414.9U CN213625372U (en) | 2020-09-28 | 2020-09-28 | Erect central division strip of framing bridge of pipeline and green planting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213625372U true CN213625372U (en) | 2021-07-06 |
Family
ID=76656639
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022168414.9U Expired - Fee Related CN213625372U (en) | 2020-09-28 | 2020-09-28 | Erect central division strip of framing bridge of pipeline and green planting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213625372U (en) |
-
2020
- 2020-09-28 CN CN202022168414.9U patent/CN213625372U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213625372U (en) | Erect central division strip of framing bridge of pipeline and green planting | |
CN111472305B (en) | Middle pier anti-collision system and construction method | |
CN214657202U (en) | Road shoulder type retaining wall top safety protection structure | |
CN210561681U (en) | Bridge central authorities median | |
CN112663670A (en) | Road shoulder type retaining wall top safety protection structure and construction method | |
CN203878476U (en) | Tracklayer reconstructed by DJ180 bridge girder erection machine | |
CN215760902U (en) | Enclosure for paving semi-closed road | |
CN208441048U (en) | A kind of laying auxiliary device of the prefabricated hexagonal block of river levee slope protection | |
CN113279295A (en) | Construction traffic fluffing method for narrow urban road station in famous-region tourist area | |
CN214656435U (en) | Movable truss type bridge construction operation platform | |
CN211547611U (en) | City narrow river course shore protection structure | |
CN103061248A (en) | Water source pollution preventing bridge type tunnel structure and construction method thereof | |
CN208632918U (en) | A kind of road roller baffle device for water | |
CN210975437U (en) | Multifunctional permeable pedestrian blind sidewalk | |
CN208329563U (en) | A kind of movable hanger operating platform | |
CN212428140U (en) | Isolation shed | |
CN211312353U (en) | Protection facility is used to national province way of highway | |
CN107761574B (en) | Midspan folding device for swivel groove-shaped continuous beam of service line of electrified railway | |
KR101048759B1 (en) | How to inhibit weed growth around guardrails | |
CN206736793U (en) | A kind of isolating device | |
CN105568809A (en) | Railway crossing laying method for metallurgical enterprises | |
CN105926407A (en) | Highway water seepage structure | |
CN218581306U (en) | Rail guard is used in public road bridge roof beam construction | |
CN206418439U (en) | Environmental sanitation sweeper multifunctional washing device | |
CN113653403A (en) | Enclosure for paving semi-closed road and using method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210706 |