CN213597158U - Automatic drainage system of building - Google Patents

Automatic drainage system of building Download PDF

Info

Publication number
CN213597158U
CN213597158U CN202022548954.XU CN202022548954U CN213597158U CN 213597158 U CN213597158 U CN 213597158U CN 202022548954 U CN202022548954 U CN 202022548954U CN 213597158 U CN213597158 U CN 213597158U
Authority
CN
China
Prior art keywords
drainage
pump
building
alarm
buoy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022548954.XU
Other languages
Chinese (zh)
Inventor
林梦圆
李宏
黄蓉
李晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Polytechnic
Original Assignee
Beijing Polytechnic
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Polytechnic filed Critical Beijing Polytechnic
Priority to CN202022548954.XU priority Critical patent/CN213597158U/en
Application granted granted Critical
Publication of CN213597158U publication Critical patent/CN213597158U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The embodiment of the utility model discloses automatic drainage system of building, including sump pit and escape canal intercommunication, position intercommunication between early warning water level and the high water level of inferior well top and two adjacent sump pits, install the immersible pump in the sump pit, the immersible pump is connected with the drainage pond, there is the buoy fluviograph in the sump pit, the buoy fluviograph is connected with the alarm, the alarm is connected with communication basic station and pump drainage headstock gear respectively, pump drainage headstock gear and communication basic station and immersible pump connection, install secondary immersible pump in the inferior well, secondary immersible pump is connected with the drainage pond, be provided with secondary buoy fluviograph in the inferior well, secondary buoy fluviograph is connected with the second grade alarm, the second grade alarm is connected in communication basic station and second grade pump drainage headstock gear respectively, the second grade pump drainage headstock gear is connected with communication basic station and secondary immersible pump. This automatic drainage system of building sets up secondary well, secondary alarm and communication base station, has reduced because the possibility that the mainline trouble can not in time feed back and lead to drainage system inefficacy.

Description

Automatic drainage system of building
Technical Field
The utility model relates to a building engineering construction field especially relates to a building automation drainage system.
Background
Along with the development of the living standard of China, more and more buildings are built, and the building of a drainage system is also concerned by the building industry more and more. The existing building drainage system generally adopts the mode that a submersible pump and a buoy water level gauge are directly arranged in a water collecting well, when the water level reaches an early warning water level, a pumping on-off device is manually or automatically opened to pump accumulated water in the water collecting well, and the pumping on-off device is closed after the accumulated water drops to a normal water level.
SUMMERY OF THE UTILITY MODEL
The embodiment of the utility model provides a technical problem that will solve lies in, to current building drainage system more singleness, if immersible pump or alarm or pump drainage start-stop device break down, delays drainage time very easily, leads to whole drainage system paralysed, and the serious problem of consequence has provided a building automation drainage system.
In order to solve the technical problem, the embodiment of the utility model provides a building automation drainage system is provided, this building automation drainage system includes: the drainage ditch, the water collecting wells and the secondary wells are arranged, the drainage ditch is provided with a plurality of drainage ditches which are respectively arranged on the periphery of a foundation pit of a building, the water collecting wells are respectively arranged on angular points on the periphery of the building and are communicated with the drainage ditches, the number of the secondary wells is the same as that of the water collecting wells and is respectively arranged between two adjacent water collecting wells and correspondingly arranged at the bottom of the drainage ditch, the top parts of the secondary wells are communicated with the parts between the early warning water level and the high water level of the two adjacent water collecting wells, bosses are arranged at the bottom in the water collecting wells, the submersible pumps are installed on the bosses and are connected with a drainage pool on the ground surface through main pipelines, buoy water level meters are arranged in the water collecting wells and are connected with an alarm, the alarm is respectively connected with a communication base station and a pumping on-off device, the pumping on-off device is, the secondary submersible pump is connected with the drainage pool through a secondary pipeline, a secondary buoy water level meter is arranged in the secondary well and connected with a secondary alarm, the secondary alarm is respectively connected with the communication base station and the secondary pumping on-off device, and the secondary pumping on-off device is connected with the communication base station and the secondary submersible pump.
Wherein, the height of boss and inferior boss is 1 m.
Wherein, the periphery of the submersible pump and the secondary submersible pump is covered with filter screens.
The filter screens around the submersible pump are hung on the well wall of the boss and the water collecting well through hooks, and the filter screens around the secondary submersible pump are hung on the well wall of the secondary boss and the secondary well through hooks.
Wherein, the distance between the early warning water level in the water collecting well and the high water level is at least more than 1 meter.
Implement the embodiment of the utility model provides a, following beneficial effect has: this automatic drainage system of building sets up secondary well, secondary alarm and communication base station, has reduced because the possibility that the mainline trouble can not in time feed back and lead to drainage system inefficacy.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural diagram of an automatic building drainage system provided by the present invention;
fig. 2 is a schematic structural view of the ground building provided by the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, fig. 1 is a schematic structural view of an automatic building drainage system provided by the present invention; fig. 2 is a schematic structural view of the ground building provided by the present invention. This automatic drainage system of building includes: the drainage ditch 10, the water collecting well 20, the boss 21, the submersible pump 22, the main pipeline 23, the buoy water level gauge 24, the alarm 25, the pumping on-off device 26, the secondary well 30, the secondary boss 31, the secondary submersible pump 32, the secondary buoy water level gauge 33, the secondary alarm 34, the secondary pumping on-off device 35, the secondary pipeline 36, the drainage pond 40, the communication base station 41, the filter screen 42 and the hook 43.
The drainage ditch 10 is provided with a plurality of drainage ditches which are respectively arranged on the periphery of a foundation pit of the building, the water collecting wells 20 are provided with a plurality of drainage ditches which are respectively arranged on the corner points on the periphery of the building and communicated with the drainage ditch 10, the number of the secondary wells 30 is the same as that of the water collecting wells 20, the secondary wells are respectively arranged between two adjacent water collecting wells 20 and correspondingly arranged at the bottom of the drainage ditch 10, and the tops of the secondary wells are communicated with the parts between the early warning water levels and the high water levels of the two adjacent water collecting wells.
The bottom in the sump 20 is provided with a boss 21, the boss 21 is provided with a submersible pump 22, and the submersible pump 22 is connected with a drainage pool 40 on the ground surface through a main pipeline 23. A buoy water level meter 24 is arranged in the water collecting well 20, the buoy water level meter 24 is connected with an alarm 25, the alarm 25 is respectively connected with a communication base station 41 and a pumping on-off device 26, and the pumping on-off device 26 is connected with the communication base station 41 and the submersible pump 22.
The bottom in the secondary well 30 is provided with a secondary boss 31, a secondary submersible pump 32 is arranged on the secondary boss 31, and the secondary submersible pump 32 is connected with a drainage pool 40 through a secondary pipeline 36. And a secondary buoy water level meter 33 is arranged in the secondary well 30, the secondary buoy water level meter 33 is connected with a secondary alarm 34, the secondary alarm 34 is respectively connected with a communication base station 41 and a secondary pumping on-off device 35, and the secondary pumping on-off device 35 is connected with the communication base station 41 and a secondary submersible pump 32.
In the present embodiment, the distance between the early warning water level in the water collecting well 20 and the high water level is at least 1 meter. The height of the boss 21 and the sub-boss 31 are both 1 m. The submersible pump 22 and the secondary submersible pump 32 are all covered with a filter screen 42 to prevent the submersible pump 22 and the secondary submersible pump 32 from being damaged. The filter screens 42 around the submersible pump 22 are hung on the wall of the boss 21 and the water collecting well 20 through the hooks 43, and the filter screens 42 around the secondary submersible pump 32 are hung on the wall of the secondary boss 31 and the secondary well 30 through the hooks 43.
The automatic drainage system for the building comprises a main drainage system, a drainage ditch, a water level gauge, an alarm, a drainage starting and stopping device, a communication base station and a water level meter, wherein the main drainage system is a water collecting well; when the buoy water level meter, the alarm or the pumping drainage opening and closing device breaks down, water cannot be pumped out, after the water rises to the early warning water level, the water enters the secondary well through a pipeline, the secondary buoy water level meter in the secondary well detects that the water level rises to the set water level (the set water level is generally set to be 2m), the secondary alarm gives an alarm, the secondary pumping drainage opening and closing device is informed to pump drainage, the adjacent water collecting well water level is ensured not to exceed the highest water level, and the communication base station is informed at the same time, and the communication base station can start to investigate which part has errors after receiving signals. In addition, the signal can also be sent out directly through the communication base station to order the pumping hoist and the secondary pumping hoist to directly pump and close the pumping.
This automatic drainage system of building sets up secondary well, secondary alarm and communication base station, has reduced because the possibility that the mainline trouble can not in time feed back and lead to drainage system inefficacy.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. A building automation drainage system, characterized in that the building automation drainage system comprises: drainage ditch, sump pit and time well, the drainage ditch is provided with many, divide to locate building foundation ditch around, the sump pit is provided with a plurality ofly, divide to locate on the angle point all around of building, with the drainage ditch intercommunication, the number of time well is the same with the number of sump pit, divide to locate between two adjacent sump pits, correspond to set up in the ground bottom of drainage ditch, its top rather than two adjacent sump pit's the position between early warning water level and the high water level communicates, the bottom is provided with the boss in the sump pit, install the immersible pump on the boss, the immersible pump passes through the trunk line and is connected with the drainage pond of ground surface, be provided with the buoy fluviograph in the sump pit, the buoy fluviograph is connected with the alarm, the alarm is connected with communication base station and pumping headstock gear respectively, pumping headstock gear with communication base station and immersible pump are connected, the bottom is provided with inferior boss in the time, install secondary immersible pump on the inferior boss, secondary immersible pump pass through secondary pipeline with the drainage pond is connected, be provided with secondary buoy fluviograph in the time, secondary buoy fluviograph is connected with the second grade alarm, the second grade alarm respectively in communication basic station and second grade pump drainage are opened and close the ware and are connected, the second grade pump drainage is opened and close the ware with communication basic station with secondary immersible pump is connected.
2. The automated building drainage system of claim 1, wherein the height of the boss and the secondary boss are both 1 m.
3. The automated building drainage system of claim 1, wherein the submersible pump and the secondary submersible pump are each covered with a screen.
4. The automatic building drainage system of claim 3, wherein the filter screens around the submersible pump are hung on the bosses and the wall of the water collecting well through hooks, and the filter screens around the secondary submersible pump are hung on the bosses and the wall of the secondary well through hooks.
5. The automated building drainage system of claim 1, wherein the early warning water level within the sump is at least 1 meter above the high water level.
CN202022548954.XU 2020-11-06 2020-11-06 Automatic drainage system of building Expired - Fee Related CN213597158U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022548954.XU CN213597158U (en) 2020-11-06 2020-11-06 Automatic drainage system of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022548954.XU CN213597158U (en) 2020-11-06 2020-11-06 Automatic drainage system of building

Publications (1)

Publication Number Publication Date
CN213597158U true CN213597158U (en) 2021-07-02

Family

ID=76596389

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022548954.XU Expired - Fee Related CN213597158U (en) 2020-11-06 2020-11-06 Automatic drainage system of building

Country Status (1)

Country Link
CN (1) CN213597158U (en)

Similar Documents

Publication Publication Date Title
CN110552409A (en) self-starting vacuum water diversion siphon sewage drainage system and control method thereof
CN213597158U (en) Automatic drainage system of building
CN205975650U (en) Building automation drainage system
CN207919729U (en) A kind of sewerage integrated pumping plant of prefabrication type
CN213805483U (en) Utility tunnel drainage system
CN210315444U (en) Water leakage collecting well suitable for underground powerhouse of pumped storage power station
CN204919792U (en) Drainage trouble emergency treatment type area back flush lifting means
CN112709245A (en) Intelligent control system and control method for drainage of constructional engineering
CN210071066U (en) Remote monitoring system for dam sump drainage
CN105525669B (en) The anti-waterlogging wisdom flood diversion equipment of city heavy rain
CN217640393U (en) Flooding alarm system for specific space
CN215630061U (en) Deep well precipitation device with liquid level monitoring function
CN214940310U (en) Water pressure induction type sump pit automatic alarm drainage system
CN214657152U (en) Foundation pit drainage system
CN212612559U (en) Automatic drainage device for foundation pit
CN212674235U (en) Urban sewage pipeline drainage waterlogging-prevention monitoring system
CN111855940A (en) Water conservancy intellectualized management platform based on Internet of things
CN209924109U (en) Automatic sewage discharge device for cable trench
CN218373973U (en) Pressure relief device for basement sump pit
CN208167944U (en) It crosses sea, cross river section drainage pumping plant
CN111206608A (en) Automatic drainage system based on lifting type underground ring main unit
CN219676701U (en) Can turnover precipitation well water level monitoring automatic early warning device
CN220090771U (en) Underground automatic drainage system
CN216475117U (en) Drainage device that construction used
CN218263951U (en) Local drainage structures of large-scale high building deep basal pit for construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210702

Termination date: 20211106