CN213596922U - Flood control board of high stability - Google Patents

Flood control board of high stability Download PDF

Info

Publication number
CN213596922U
CN213596922U CN202022360791.2U CN202022360791U CN213596922U CN 213596922 U CN213596922 U CN 213596922U CN 202022360791 U CN202022360791 U CN 202022360791U CN 213596922 U CN213596922 U CN 213596922U
Authority
CN
China
Prior art keywords
vertical pole
cloth
flood control
high stability
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022360791.2U
Other languages
Chinese (zh)
Inventor
陈万吹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022360791.2U priority Critical patent/CN213596922U/en
Application granted granted Critical
Publication of CN213596922U publication Critical patent/CN213596922U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model relates to a high stability's flood control board, including the vertical pole of two piece at least relative settings, flood control cloth and the transverse bar that is connected with each vertical pole lower extreme, all be equipped with telescopic machanism between the adjacent vertical pole and between the adjacent transverse bar, flood control cloth's both ends respectively with each vertical pole, each transverse bar through first fastening device, second fastening device fixed connection, flood control cloth passes through third fastening device and each vertical pole fixed connection towards one side of vertical pole, third fastening device connects in the outside of vertical pole and bracing piece, telescopic machanism includes fixed connection in vertical pole or the first connecting piece of transverse bar opposite side, overlaps the second connecting piece of locating on vertical pole or transverse bar and cross arrangement's connecting rod, vertical pole is equipped with the bracing piece for the junction of vertical pole and transverse bar, provides a firm degree high, Simple structure, high stability's flood control board easy to assemble.

Description

Flood control board of high stability
Technical Field
The utility model relates to a flood control technical field, in particular to flood control board of high stability.
Background
According to the chinese utility model patent with publication number CN 210459103U, it includes at least two longitudinal rods and flood control cloth which are oppositely arranged, each longitudinal rod is hinged with a transverse rod, the distance between two longitudinal rods is adjusted by a first telescopic mechanism, the distance between two transverse rods is adjusted by a second telescopic mechanism, the flood control cloth is detachably arranged on the transverse rods and the longitudinal rods; the first telescopic mechanism comprises at least two first supporting rods, wherein the middle part of one first supporting rod is movably connected with the middle part of the other first supporting rod through a first pin; the two ends of each first supporting rod are connected with each longitudinal rod in a sliding mode through first connecting pieces, and the two ends of each first supporting rod are hinged to the first connecting pieces on the longitudinal rods respectively.
In the prior art, the longitudinal rod is hinged with the transverse rod, so that one end of the longitudinal rod is in contact with the ground, the structure has larger pressure to the longitudinal rod when in use, and the longitudinal rod is easily damaged without a better support.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims to provide a flood control board of firmness height, simple structure, easy to assemble's high stability.
The technical scheme of the utility model is realized like this: the utility model provides a flood control board of high stability, includes the vertical pole of two piece at least relative settings, flood control cloth and the horizontal pole that is connected with each vertical pole lower extreme, between the adjacent vertical pole and all be equipped with telescopic machanism between the adjacent horizontal pole, flood control cloth's both ends respectively with each vertical pole, each horizontal pole through first fastening device, second fastening device fixed connection, flood control cloth passes through third fastening device and each vertical pole fixed connection towards one side of vertical pole, third fastening device connects in the outside of vertical pole and bracing piece, telescopic machanism includes fixed connection in vertical pole or horizontal pole opposite side first connecting piece, the cover locates second connecting piece and the connecting rod of cross arrangement on vertical pole or horizontal pole, vertical pole is equipped with the bracing piece for vertical pole and horizontal pole junction.
By adopting the technical scheme, one end of the flood control cloth is fixed with the end part of the longitudinal rod through the first fastening mechanism when the flood control cloth is installed, the other end of the flood control cloth is fixed with the end part of the transverse rod through the second fastening mechanism, the middle part of the flood control cloth is fixed with the longitudinal rod through the third fastening mechanism, the third fastening mechanism binds the longitudinal rod with the supporting rod, the firmness is further improved, the flood control cloth can be firmly fixed on the longitudinal rod and the transverse rod through the connecting mode, the firmness of connection is improved, the longitudinal rod is outwards stretched, the second connecting piece moves towards the first connecting piece, the connecting rod is opened at the moment, the distance between the longitudinal rod and the transverse rod is increased, and the structure after the opening is stable under the condition that the longitudinal rod is inwards extruded without external force because the first connecting piece is fixedly connected with the transverse rod or the longitudinal rod, the operation is convenient during the use, and the intensity and the firmness of support have been improved in the setting of this bracing piece.
The utility model discloses further set up to: a reinforcing mechanism is fixedly connected between the outer side of each supporting rod and each transverse rod.
Through adopting above-mentioned technical scheme, horizontal pole, bracing piece and strengthening mechanism form the triangular supports, further improvement firmness and stability, improved life.
The utility model discloses further set up to: the reinforcing mechanism comprises two oppositely arranged connecting pieces which are respectively connected to two sides of the supporting rod and the transverse rod.
Through adopting above-mentioned technical scheme, this connection piece links to each other transverse bar and bracing piece, can play the effect of support, further improvement intensity and life, this connection piece passes through rivet connection, consequently the not hard up situation of connection can not appear.
The utility model discloses further set up to: first fastening device includes with flood control cloth fixed connection's first cloth, set up the first mounting hole on vertical pole and be used for with flood control cloth and the fixed first fastener of vertical pole, be equipped with on the first cloth and be used for the cover to establish the first cloth cover at vertical pole tip, set up the first through-hole that corresponds with first mounting hole on the first cloth cover, first fastener runs through first through-hole and first mounting hole in proper order.
Through adopting above-mentioned technical scheme, the quantity of first cloth cover corresponds with the quantity of vertical pole, and every first cloth cover is established and is established the tip that corresponds vertical pole, deviates from the one end of horizontal pole promptly, and the cover is established the back and is fixed first cloth cover through first fastener, and consequently the mode firm in connection of this installation, flood control cloth can not break away from the flood control frame board, and first cloth cover is connected for sewing with first cloth.
The utility model discloses further set up to: the second fastening device comprises a second cloth strip fixedly connected with the flood control cloth, a second mounting hole formed in the transverse rod and a second fastener used for fixing the flood control cloth and the transverse rod, a second cloth sleeve used for being sleeved at the end part of the transverse rod is arranged on the second cloth strip, a second through hole corresponding to the second mounting hole is formed in the second cloth sleeve, and the second fastener sequentially penetrates through the second through hole and the second mounting hole.
Through adopting above-mentioned technical scheme, the quantity of second cloth cover corresponds with the quantity of transverse rod, and every second cloth cover is established at the tip of corresponding transverse rod, deviates from the one end of vertical pole promptly, and the cover is established the back and is fixed the second cloth cover through the second fastener, further improvement the firmness of connecting, the both ends of flood control cloth are all fixed this moment, can bear the pressure of rivers and can not break away from the flood control frame plate.
The utility model discloses further set up to: the third fastening mechanism is a magic tape.
Through adopting above-mentioned technical scheme, the setting of third fastening device can prevent that the middle part of flood control cloth from floating when rivers are gathered, has improved the leakproofness that flood control cloth used, adopts the magic to paste the procedure of having simplified the installation, convenient operation, and the top that the magic was pasted can contradict with the first connecting piece bottom that is located on the longitudinal rod, has prevented because flood control cloth is outstanding to the face that blocks water under the effect of negative pressure.
The utility model discloses further set up to: the second connecting piece includes with vertical pole or horizontal pole sliding fit's sliding part and be used for with connecting rod articulated connecting portion, be equipped with the through-hole in the sliding part, the through-hole inner wall is equipped with the splice bar that is used for reducing sliding part and vertical pole or horizontal pole area of contact.
Through adopting above-mentioned technical scheme, the intensity and the firmness have been improved to sliding part and articulated portion integrated into one piece, and the setting up of this splice bar can reduce the frictional force of sliding part when sliding, has reduced the loss, can carry out the protection of an surface to longitudinal rod or transverse rod simultaneously, and this gliding efficiency is higher.
The utility model discloses further set up to: the connecting ribs are arranged along the circumferential direction of the inner wall of the through hole at intervals.
By adopting the technical scheme, the stability during sliding is improved, and meanwhile, the abrasion caused by large contact area is further reduced.
The utility model discloses further set up to: the supporting rod is provided with a first sleeve body at one end contacting with the ground, and a second sleeve body at one end contacting with the ground.
Through adopting above-mentioned technical scheme, the setting of the first cover body and the second cover body can prevent that bracing piece and transverse bar from leading to wearing and tearing to cause and can not steadily place when placing ground with ground contact, and can improve its and ground frictional force through the first cover body and the second cover body, further improvement stability.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive exercise.
FIG. 1 is a schematic structural view of an embodiment of the present invention;
FIG. 2 is a side view of a flood control panel according to an embodiment of the present invention;
FIG. 3 is an enlarged view of the point A in FIG. 2 according to the embodiment of the present invention;
FIG. 4 is an enlarged view of the embodiment of the present invention at B in FIG. 2;
FIG. 5 is a schematic view of a second connecting member according to an embodiment of the present invention;
fig. 6 is an enlarged view of the point C in fig. 1 according to the embodiment of the present invention.
Reference numerals: 1. a longitudinal rod; 2. a transverse bar; 201. a second sleeve body; 3. a telescoping mechanism; 301. a first connecting member; 302. a second connecting member; 303. a connecting rod; 304. a sliding part; 305. a connecting portion; 306. connecting ribs; 4. a first fastening mechanism; 401. a first cloth strip; 402. a first mounting hole; 403. a first cloth cover; 404. a first through hole; 5. a second fastening mechanism; 501. a second cloth strip; 502. a second mounting hole; 503. A second cloth cover; 504. a second through hole; 6. a third fastening mechanism; 7. a support bar; 701. a first sleeve body; 8. and (7) connecting the sheets.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
As shown in fig. 1 to 6, the utility model discloses a flood control board with high stability, which comprises at least two longitudinal rods 1 arranged oppositely, flood control cloth and transverse rods 2 connected with the lower ends of the longitudinal rods 1, wherein a telescopic mechanism 3 is arranged between the adjacent longitudinal rods 1 and between the adjacent transverse rods 2, the two ends of the flood control cloth are respectively and fixedly connected with the longitudinal rods 1 and the transverse rods 2 through a first fastening mechanism 4 and a second fastening mechanism 5, one side of the flood control cloth facing the longitudinal rods 1 is fixedly connected with the longitudinal rods 1 through a third fastening mechanism 6, the third fastening mechanism 6 is connected with the outer sides of the longitudinal rods 1 and the support rods 7, the telescopic mechanism 3 comprises a first connecting piece 301 fixedly connected with the opposite sides of the longitudinal rods 1 or the transverse rods 2, a second connecting piece 302 sleeved on the longitudinal rods 1 or the transverse rods 2 and connecting rods 303 arranged crosswise, a support rod 7 is arranged at the joint of the longitudinal rod 1 and the transverse rod 2 relative to the longitudinal rod 1; when the flood control cloth is installed, one end of the flood control cloth is fixed with the end part of the longitudinal rod 1 through the first fastening mechanism 4, the other end of the flood control cloth is fixed with the end part of the transverse rod 2 through the second fastening mechanism 5, the middle part of the flood control cloth is fixed with the longitudinal rod 1 through the third fastening mechanism 6, as the longitudinal rod 1 and the support rod 7 are bound together through the third fastening mechanism 6, the firmness is further improved, the flood control cloth can be firmly fixed on the longitudinal rod 1 and the transverse rod 2 through the connecting mode, the firmness of connection is improved, the longitudinal rod 1 is outwards stretched, the second connecting piece 302 moves towards the first connecting piece 301, at the moment, the connecting rod 303 is spread, the distance between the longitudinal rod 1 and the transverse rod 2 is enlarged, as the first connecting piece 301 is fixedly connected with the transverse rod 2 or the longitudinal rod 1, under the condition that the longitudinal rod 1 is inwards extruded without external force, its stable in structure after strutting, the operation is convenient during the use, and the intensity and the firmness of support have been improved in setting up of this bracing piece 7, and longitudinal rod 1 is integrated into one piece with transverse rod 2.
A reinforcing mechanism is fixedly connected between the outer side of each supporting rod 7 and each transverse rod 2; the transverse rod 2, the support rod 7 and the reinforcing mechanism form a triangular support, so that the firmness and the stability are further improved, and the service life is prolonged.
The reinforcing mechanism comprises two connecting pieces 8 which are oppositely arranged, and the two connecting pieces 8 are respectively connected to the two sides of the supporting rod 7 and the transverse rod 2; this connection piece 8 links to each other transverse bar 2 and bracing piece 7, can play the effect of support, further improvement intensity and life, this connection piece 8 passes through rivet connection, consequently the not hard up situation of connection can not appear.
The first fastening mechanism 4 comprises a first cloth strip 401 fixedly connected with the flood control cloth, a first mounting hole 402 formed in the longitudinal rod 1 and a first fastener used for fixing the flood control cloth with the longitudinal rod 1, a first cloth cover 403 used for being sleeved on the end portion of the longitudinal rod 1 is arranged on the first cloth strip 401, a first through hole 404 corresponding to the first mounting hole 402 is formed in the first cloth cover 403, and the first fastener sequentially penetrates through the first through hole 404 and the first mounting hole 402; the quantity of first cloth cover 403 corresponds with the quantity of vertical pole 1, and every first cloth cover 403 cover is established at the tip that corresponds vertical pole 1, deviates from the one end of horizontal pole 2 promptly, fixes first cloth cover 403 through first fastener after the cover is established, and consequently the firmness is connected to the mode of this installation, and flood control cloth can not break away from the flood control frame board, and first cloth cover 403 is connected for sewing with first cloth 401.
The second fastening mechanism 5 comprises a second cloth strip 501 fixedly connected with the flood control cloth, a second mounting hole 502 formed in the transverse rod 2 and a second fastener used for fixing the flood control cloth with the transverse rod 2, a second cloth sleeve 503 used for being sleeved on the end portion of the transverse rod 2 is arranged on the second cloth strip 501, a second through hole 504 corresponding to the second mounting hole 502 is formed in the second cloth sleeve 503, and the second fastener sequentially penetrates through the second through hole 504 and the second mounting hole 502; the quantity of second cloth cover 503 corresponds with the quantity of transverse bar 2, and every second cloth cover 503 cover is established at the tip of corresponding transverse bar 2, deviates from the one end of vertical pole 1 promptly, and the cover is established the back and is fixed second cloth cover 503 through the second fastener, further improvement the firmness of connecting, the both ends of flood control cloth were all fixed this moment, can bear the pressure of rivers and can not break away from the flood control frame plate.
The third fastening mechanism 6 is a magic tape; the setting of third fastening device 6 can prevent that the middle part of flood control cloth from floating when rivers are gathered, has improved the leakproofness that flood control cloth used, adopts the magic to paste the procedure of having simplified the installation, and convenient operation, the top that the magic was pasted can contradict with the first connecting piece 301 bottom that is located on longitudinal rod 1, has prevented because flood control cloth is outstanding to the face that blocks water under the effect of negative pressure.
The second connecting piece 302 comprises a sliding part 304 in sliding fit with the longitudinal rod 1 or the transverse rod 2 and a connecting part 305 for hinging with the connecting rod 303, a through hole is arranged in the sliding part 304, and a connecting rib 306 for reducing the contact area of the sliding part 304 and the longitudinal rod 1 or the transverse rod 2 is arranged on the inner wall of the through hole; the sliding part 304 and the hinge part are integrally formed, so that the strength and the firmness are improved, the arrangement of the connecting rib 306 can reduce the friction force of the sliding part 304 during sliding, the loss is reduced, meanwhile, the longitudinal rod 1 or the transverse rod 2 can be protected by one outer surface, and the sliding efficiency is higher.
The connecting ribs 306 are arranged along the circumferential direction of the inner wall of the through hole at intervals; therefore, the stability during sliding is improved, and meanwhile, the abrasion caused by large contact area is further reduced.
A first sleeve 701 is arranged at one end of the support rod 7, which is in contact with the ground, and a second sleeve 201 is arranged at one end of the transverse rod 2, which is in contact with the ground; the setting of first cover body 701 and second cover body 201 can prevent that bracing piece 7 and transverse bar 2 from leading to wearing and tearing to cause and to place can not steadily place when ground with the ground contact, and can improve its and ground frictional force between through first cover body 701 and second cover body 201, further improvement stability.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (9)

1. The utility model provides a flood control board of high stability, includes the vertical pole of two piece at least relative settings, flood control cloth and the horizontal pole that is connected with each vertical pole lower extreme, between the adjacent vertical pole and between the adjacent horizontal pole all be equipped with telescopic machanism, its characterized in that: the utility model discloses a flood control cloth, including vertical pole, horizontal pole, telescopic mechanism, first fastening mechanism, second fastening mechanism, third fastening mechanism, second fastening mechanism, first connecting piece, the second connecting piece and the connecting rod of crossing arrangement on vertical pole or horizontal pole are located to the cover, and the both ends of flood control cloth pass through first fastening mechanism, second fastening mechanism fixed connection with each vertical pole, each horizontal pole respectively, flood control cloth one side towards vertical pole is through third fastening mechanism and each vertical pole fixed connection, third fastening mechanism connects in the outside of vertical pole and bracing piece, telescopic mechanism includes fixed connection in the first connecting piece of vertical pole or horizontal pole opposite side, the cover, vertical pole is equipped with the bracing piece for vertical pole and horizontal pole junction.
2. A flood barrier with high stability according to claim 1, wherein: a reinforcing mechanism is fixedly connected between the outer side of each supporting rod and each transverse rod.
3. A flood barrier with high stability according to claim 2, wherein: the reinforcing mechanism comprises two oppositely arranged connecting pieces which are respectively connected to two sides of the supporting rod and the transverse rod.
4. A flood barrier with high stability according to claim 1, wherein: first fastening device includes with flood control cloth fixed connection's first cloth, set up the first mounting hole on vertical pole and be used for with flood control cloth and the fixed first fastener of vertical pole, be equipped with on the first cloth and be used for the cover to establish the first cloth cover at vertical pole tip, set up the first through-hole that corresponds with first mounting hole on the first cloth cover, first fastener runs through first through-hole and first mounting hole in proper order.
5. A flood barrier with high stability according to claim 1, wherein: the second fastening device comprises a second cloth strip fixedly connected with the flood control cloth, a second mounting hole formed in the transverse rod and a second fastener used for fixing the flood control cloth and the transverse rod, a second cloth sleeve used for being sleeved at the end part of the transverse rod is arranged on the second cloth strip, a second through hole corresponding to the second mounting hole is formed in the second cloth sleeve, and the second fastener sequentially penetrates through the second through hole and the second mounting hole.
6. A flood barrier with high stability according to claim 1, wherein: the third fastening mechanism is a magic tape.
7. A flood barrier with high stability according to claim 1, wherein: the second connecting piece includes with vertical pole or horizontal pole sliding fit's sliding part and be used for with connecting rod articulated connecting portion, be equipped with the through-hole in the sliding part, the through-hole inner wall is equipped with the splice bar that is used for reducing sliding part and vertical pole or horizontal pole area of contact.
8. A flood barrier with high stability according to claim 7, wherein: the connecting ribs are arranged along the circumferential direction of the inner wall of the through hole at intervals.
9. A flood barrier with high stability according to claim 1 or 2, wherein: the supporting rod is provided with a first sleeve body at one end contacting with the ground, and a second sleeve body at one end contacting with the ground.
CN202022360791.2U 2020-10-21 2020-10-21 Flood control board of high stability Active CN213596922U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022360791.2U CN213596922U (en) 2020-10-21 2020-10-21 Flood control board of high stability

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022360791.2U CN213596922U (en) 2020-10-21 2020-10-21 Flood control board of high stability

Publications (1)

Publication Number Publication Date
CN213596922U true CN213596922U (en) 2021-07-02

Family

ID=76591698

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022360791.2U Active CN213596922U (en) 2020-10-21 2020-10-21 Flood control board of high stability

Country Status (1)

Country Link
CN (1) CN213596922U (en)

Similar Documents

Publication Publication Date Title
CN213596922U (en) Flood control board of high stability
CN201174025Y (en) Projection curtain with frame construction
CN215054347U (en) Glass curtain wall convenient for indoor installation
CN210439529U (en) Light steel bar truss floor support plate
CN205988161U (en) Multi-functional environment-protection pin-connected panel exhibitions section bar
CN209932603U (en) Cleaning machines people water tank mounting structure
CN213596923U (en) Reinforcing structure of flood control plate
CN210249351U (en) Foldable screen
CN217631667U (en) Rapid installation tent with quick water drainage speed and water accumulation prevention
CN206800187U (en) A kind of combined type bridge expansion joint structure
CN220557805U (en) Connecting piece for guide rail connection
CN214306174U (en) Mounting structure of concatenation screen
CN213115119U (en) Detachable building curtain wall
CN213539917U (en) High-wear-resistance high polymer material foldable camping tent
CN220434792U (en) Hydraulic support for lapping
CN218229353U (en) Collapsible swimming pool first aid board
CN218541709U (en) Concatenation formula stage mesa
CN210799001U (en) Side protection plate for coal mine excavation roadway
CN209628938U (en) A kind of mountain-climbing packet of bottom surface and side enhancing
CN210380097U (en) Three-way cable bridge
CN214656802U (en) Water conservancy flood control slope protection structure
CN212323635U (en) Cable threading subassembly and applied photovoltaic support of this subassembly convenient to nimble equipment
CN205568448U (en) Convenient mosquito net of mosquito repellent activity is exempted from in stealth
CN213604979U (en) Multifunctional mosquito-proof rollover-prevention hammock
CN217601833U (en) Foldable main keel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant