CN213579255U - Building site is with climbing frame weight monitoring early warning system - Google Patents

Building site is with climbing frame weight monitoring early warning system Download PDF

Info

Publication number
CN213579255U
CN213579255U CN202023239562.1U CN202023239562U CN213579255U CN 213579255 U CN213579255 U CN 213579255U CN 202023239562 U CN202023239562 U CN 202023239562U CN 213579255 U CN213579255 U CN 213579255U
Authority
CN
China
Prior art keywords
clamping block
early warning
control processing
processing unit
box body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023239562.1U
Other languages
Chinese (zh)
Inventor
陈亚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Yingmen Electronic Technology Co ltd
Original Assignee
Chongqing Yingmen Electronic Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Yingmen Electronic Technology Co ltd filed Critical Chongqing Yingmen Electronic Technology Co ltd
Priority to CN202023239562.1U priority Critical patent/CN213579255U/en
Application granted granted Critical
Publication of CN213579255U publication Critical patent/CN213579255U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

The utility model relates to the technical field of construction sites, and discloses a climbing frame weight monitoring and early warning system for construction sites, which comprises a box body, the box body is cuboid, connecting plates are integrally formed on the upper surface and the lower surface of the box body, a rotating shaft is rotatably connected between the upper connecting plate and the lower connecting plate, a first straight plate and a second straight plate are respectively fixedly arranged at two sides of the rotating shaft, a first clamping block is integrally formed on the first straight plate, the second straight plate is integrally formed with a second clamping block, the opposite inner sides of the first clamping block and the second clamping block are both provided with a rubber layer, the tail ends of the first clamping block and the second clamping block are both fixedly provided with a pull-open frame, a pull wire displacement sensor is arranged in the box body, a first control processing unit is connected with the stay wire displacement sensor, an RF wireless transmitting unit is connected with the control processing unit, the box has a plurality ofly, and the RF wireless transmitting unit in the box is connected with the control end. The utility model discloses use simple to operate, practicality are strong.

Description

Building site is with climbing frame weight monitoring early warning system
Technical Field
The utility model relates to a building site technical field especially relates to a building site is with climbing frame weight monitoring early warning system.
Background
The climbing frame is also called a lifting frame, and can be classified into hydraulic, electric, manual and hand-pulling types according to its power source. The scaffold is a novel scaffold system developed in recent years and is mainly applied to high-rise shear wall type floors. It can climb up or down along the building. This system makes the scaffold technology completely improved: firstly, the frame does not need to be turned over; secondly, the dismounting and mounting working procedure of the scaffold is avoided
The construction method is not limited by the height of the building (the construction is finished after one-time assembly), and the manpower and the materials are greatly saved. And also has a great improvement on the traditional scaffold in the safety angle. Has great development advantages in high-rise buildings.
The trunk body of the climbing frame is stabilized by bolts embedded in the wall body between floors, but in long-time use, the problems of rusting or loosening and the like of the embedded stabilizing bolts are inevitable, and although the climbing frame is frequently overhauled, in the process of ascending and descending daily workers, the overhauling holes are inevitable, so that the danger is caused in the ascending and descending processes of the workers.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model aims at providing a building site is with climbing frame weight monitoring early warning system, the utility model discloses a first splint and second splint press from both sides this device on the trunk of climbing frame atress, then will act as go-between displacement sensor and wall embedding draw and connect, appear becoming flexible, the displacement when the trunk of climbing the frame, the displacement sensor that acts as go-between passes to the control end with data real-time RF wireless transmitting unit that passes through, the monitoring device to concrete sequence number shows through the pronunciation early warning and the display screen of control end, make things convenient for the workman to carry out timely maintenance and reinforcement, avoid the emergence of bigger accident. The utility model discloses only need the centre gripping can on the trunk, the installation is simple and convenient, and the mobility is strong, and is with low costs, and the practicality is strong.
The utility model discloses an above-mentioned technical problem is solved to following technical means:
the utility model discloses a climbing frame weight monitoring and early warning system for construction sites, which comprises a box body, wherein the box body is cuboid, the upper surface and the lower surface of the box body are integrally formed with connecting plates, a rotating shaft is rotatably connected between the upper connecting plate and the lower connecting plate, the two sides of the rotating shaft are respectively fixedly provided with a first straight plate and a second straight plate, the first straight plate is integrally formed with a first clamping block, the second straight plate is integrally formed with a second clamping block, the opposite inner sides of the first clamping block and the second clamping block are respectively provided with a rubber layer, the tail ends of the first clamping block and the second clamping block are respectively fixedly provided with a pulling frame, a pulling wire displacement sensor is arranged in the box body, the pulling wire displacement sensor is connected with a first control processing unit, the control processing unit is connected with an RF wireless transmitting unit, the box body is provided with a plurality of boxes, the RF wireless transmitting units in the boxes are connected with a monitoring end, the monitoring end comprises a cuboid shell, an RF wireless receiving unit is arranged in the shell, a second control processing unit is connected with the RF wireless receiving unit, and a display screen and an early warning unit are connected with the second control processing unit.
Furthermore, the first clamping block and the second clamping block are both arc-shaped.
Further, the first control processing unit and the second control processing unit both adopt 80C51 series single-chip microcomputers, and the early warning unit is a voice early warning loudspeaker.
Furthermore, the stay wire displacement sensor adopts a WEP50 type stay wire displacement sensor.
Furthermore, the RF wireless transmitting unit and the RF wireless receiving unit adopt wireless transmitting and receiving units matched with DTR920 types.
The utility model has the advantages that: through first splint and second splint with this device clamp on the trunk of climbing the frame atress, then will act as go-between displacement sensor and wall embedding draw and connect, appear becoming flexible when the trunk of climbing the frame, the displacement sensor that acts as go-between passes through the real-time RF wireless transmitting unit of data to the control end, the monitoring device to concrete sequence number through the pronunciation early warning and the display screen of control end shows, make things convenient for the workman to carry out timely maintenance and reinforcement, avoid the emergence of bigger accident. The utility model discloses only need the centre gripping can on the trunk, the installation is simple and convenient, and the mobility is strong, and is with low costs, and the practicality is strong.
Drawings
Fig. 1 is a schematic structural view of a climbing frame weight monitoring device for a construction site of the present invention;
fig. 2 is a schematic structural view of the system of the present invention;
wherein: the box body 1, the connecting plate 11, the stay wire 2, the scarf joint needle 3, the rotating shaft 4, the first clamping block 5, the first straight plate 50, the second clamping block 6, the second straight plate 60, the rubber layer 7 and the pull-open frame 8.
Detailed Description
The invention will be described in detail with reference to the following drawings and specific embodiments:
as shown in the figures 1-2, the climbing frame weight monitoring and early warning system for construction sites of the utility model comprises a box body 1, wherein the box body 1 is rectangular, the upper surface and the lower surface of the box body 1 are integrally formed with a connecting plate 11, a rotating shaft 4 is rotatably connected between the upper connecting plate 11 and the lower connecting plate 11, two sides of the rotating shaft 4 are respectively fixedly provided with a first straight plate 50 and a second straight plate 60, the first straight plate 50 is integrally formed with a first clamping block 5, the second straight plate 60 is integrally formed with a second clamping block 6, the inner sides of the first clamping block 5 and the second clamping block 6 which are opposite are respectively provided with a rubber layer 7, the tail ends of the first clamping block 5 and the second clamping block 6 are respectively fixedly provided with a pulling frame 8, a pulling displacement sensor is arranged in the box body 1, the pulling displacement sensor is connected with a first control processing unit, and the control processing unit is connected with an RF wireless transmitting unit, the box has a plurality ofly, and the RF wireless transmitting unit in the plurality of boxes is connected with the control end, the control end includes cuboid form casing, is equipped with RF wireless receiving unit in the casing, is connected with second control processing unit with RF wireless receiving unit, with second control processing unit is connected with display screen and early warning unit.
In this embodiment, the first clamping block 5 and the second clamping block 6 are both arc-shaped.
In this embodiment, the first control processing unit and the second control processing unit both use 80C51 series single-chip microcomputers, and the early warning unit is a voice early warning speaker.
In this embodiment, the pull wire displacement sensor is a WEP50 type pull wire displacement sensor.
In this embodiment, the RF wireless transmitting unit and the RF wireless receiving unit adopt wireless transmitting and receiving units matched with DTR920 types.
Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art will understand that the present invention can be modified or replaced with other embodiments without departing from the spirit and scope of the present invention, which should be construed as limited only by the appended claims. The technology, shape and construction parts which are not described in detail in the present invention are all known technology.

Claims (5)

1. The utility model provides a building site is with climbing frame weight monitoring early warning system which characterized in that: the wireless transmission box comprises a box body (1), wherein the box body (1) is cuboid, a connecting plate (11) is integrally formed on the upper surface and the lower surface of the box body (1), a rotating shaft (4) is rotatably connected between the upper connecting plate and the lower connecting plate (11), a first straight plate (50) and a second straight plate (60) are fixedly arranged on two sides of the rotating shaft (4) respectively, a first clamping block (5) is integrally formed on the first straight plate (50), a second clamping block (6) is integrally formed on the second straight plate (60), a rubber layer (7) is arranged on the inner side, opposite to the first clamping block (5) and the second clamping block (6), a pulling frame (8) is fixedly arranged at the tail ends of the first clamping block (5) and the second clamping block (6), a pulling line displacement sensor is arranged in the box body (1), a first control processing unit is connected with the pulling line displacement sensor, and an RF wireless transmitting unit is connected with the control processing unit, the box has a plurality ofly, and the RF wireless transmitting unit in the plurality of boxes is connected with the control end, the control end includes cuboid form casing, is equipped with RF wireless receiving unit in the casing, is connected with second control processing unit with RF wireless receiving unit, with second control processing unit is connected with display screen and early warning unit.
2. The climbing frame weight monitoring and early warning system for the construction site as claimed in claim 1, wherein: the first clamping block (5) and the second clamping block (6) are both arc-shaped.
3. The climbing frame weight monitoring and early warning system for the construction site as claimed in claim 1, wherein: the first control processing unit and the second control processing unit both adopt 80C51 series single-chip microcomputers, and the early warning unit is a voice early warning loudspeaker.
4. The climbing frame weight monitoring and early warning system for the construction site as claimed in claim 1, wherein: the stay wire displacement sensor adopts a WEP50 type stay wire displacement sensor.
5. The climbing frame weight monitoring and early warning system for the construction site as claimed in claim 1, wherein: the RF wireless transmitting unit and the RF wireless receiving unit adopt wireless transmitting and receiving units matched with DTR920 types.
CN202023239562.1U 2020-12-29 2020-12-29 Building site is with climbing frame weight monitoring early warning system Active CN213579255U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023239562.1U CN213579255U (en) 2020-12-29 2020-12-29 Building site is with climbing frame weight monitoring early warning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023239562.1U CN213579255U (en) 2020-12-29 2020-12-29 Building site is with climbing frame weight monitoring early warning system

Publications (1)

Publication Number Publication Date
CN213579255U true CN213579255U (en) 2021-06-29

Family

ID=76553014

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023239562.1U Active CN213579255U (en) 2020-12-29 2020-12-29 Building site is with climbing frame weight monitoring early warning system

Country Status (1)

Country Link
CN (1) CN213579255U (en)

Similar Documents

Publication Publication Date Title
CN110492418B (en) Weight piece that can install fast
CN103233479B (en) Method for pouring concrete cup foundation
CN107724669A (en) A kind of aluminum alloy frame formwork structure of fast assembling-disassembling
CN213579255U (en) Building site is with climbing frame weight monitoring early warning system
CN211813077U (en) Prefabricated component hoist of assembly type structure
CN210133816U (en) Pneumatic lifting appliance for prestressed high-strength concrete pipe pile
CN204800838U (en) A built -up plate for parapet production
CN214737977U (en) Transverse joint of prefabricated underground continuous wall
CN213573080U (en) Prefabricated plate installation auxiliary device
CN213411827U (en) Mounting device for civil air defense door
CN213569249U (en) Tower crane attaches wall support mounting structure
CN206903206U (en) A kind of electric climbing formwork system
CN210151588U (en) High mound rollover construction reinforcement bar ligature protection frame
CN208005957U (en) A kind of reinforced bar stretching equipment
CN209817412U (en) Detachable formwork device for joint of outer wall
CN110067207B (en) Reinforcing steel bar binding protection frame for high pier turnover formwork construction
CN113931439A (en) Steel-aluminum combined template system for double shear walls at structural deformation joints and construction method
CN209891072U (en) Box girder roof reserved hole seals anchor regularization handling frame
CN206927511U (en) A kind of tower crane safety monitoring system
CN202865743U (en) Dragline device of large-scale bridge girder
CN221346437U (en) Conveniently-detached personnel up-down ladder stand attaching device
CN219794619U (en) Wall-attached support mounting device for climbing frame
CN114920157B (en) Hoisting device and hoisting method for curtain wall glass ribs
CN220373531U (en) Demolding device for T-beam end mold
CN213626746U (en) Aluminum mould system construction PC floor hoist and mount entrance to a cave apron protective structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant