CN213572928U - Operating platform connected with steel pipe pile - Google Patents

Operating platform connected with steel pipe pile Download PDF

Info

Publication number
CN213572928U
CN213572928U CN202022067961.8U CN202022067961U CN213572928U CN 213572928 U CN213572928 U CN 213572928U CN 202022067961 U CN202022067961 U CN 202022067961U CN 213572928 U CN213572928 U CN 213572928U
Authority
CN
China
Prior art keywords
pipe pile
steel pipe
steel
hoop device
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022067961.8U
Other languages
Chinese (zh)
Inventor
姚建峰
赵�卓
陈涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xingtu Co ltd
Original Assignee
Zhejiang Xingtu Bridge Temporary Steel Structure Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Xingtu Bridge Temporary Steel Structure Engineering Co ltd filed Critical Zhejiang Xingtu Bridge Temporary Steel Structure Engineering Co ltd
Priority to CN202022067961.8U priority Critical patent/CN213572928U/en
Application granted granted Critical
Publication of CN213572928U publication Critical patent/CN213572928U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

Operation platform who links to each other with the steel-pipe pile includes the staple bolt device of holding tightly the setting with the steel-pipe pile, locates the steel-pipe pile outside and with the fixed brace table that links to each other of staple bolt device, and the brace table below is equipped with the bracing, the bracing both ends link to each other with brace table and steel-pipe pile respectively.

Description

Operating platform connected with steel pipe pile
Technical Field
The utility model relates to a bridge equipment fixing's technical field especially relates to the operation platform who links to each other with the steel-pipe pile.
Background
In the bridge construction process, operations such as welding are needed among the piles of the steel pipe piles and plates, the lower part of the bridge steel pipe pile is located underwater, and therefore an operation platform needs to be arranged during welding.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that, it provides a simple structure, simple to operate, high operation platform who links to each other with the steel-pipe pile to solve not enough that prior art exists.
Operation platform who links to each other with steel-pipe pile, include the staple bolt device of holding tightly the setting with steel-pipe pile, locate the steel-pipe pile outside and with the fixed brace table that links to each other of staple bolt device, the brace table below is equipped with the bracing, the bracing both ends link to each other with brace table and steel-pipe pile respectively.
The utility model discloses staple bolt device includes two at least arcs, and two arcs press from both sides the steel-pipe pile adopts the fastener to press from both sides tightly at the steel-pipe pile.
The utility model discloses staple bolt device includes a frame, and it has the fastener to link on the frame, and the fastener links to each other a clamp plate, twists the fastener can make the clamp plate support tight steel-pipe pile.
Brace table includes crossbeam, longeron, crossbeam and longeron are crossing to be set up and link to each other with the staple bolt device is fixed, has laid the footboard above the crossbeam.
The utility model discloses staple bolt device includes that one adopts the channel-section steel to build the frame that forms, even has the fastener on the frame, and the fastener links to each other a clamp plate, twists the fastener can make the clamp plate support tight steel-pipe pile, and the channel-section steel is located to the crossbeam in.
Bracing one end links to each other with a supporting bench is fixed, and the bracing other end links to each other a backing plate, the backing plate contact the steel-pipe pile.
The utility model discloses keep away from a guardrail in succession on one side of the top of steel-pipe pile on the brace table, the vertical setting of guardrail.
Compared with the prior art, the beneficial effects of the utility model reside in that:
1. the utility model discloses a staple bolt device links to each other with the steel-pipe pile is fixed, replaces wire rope and steel-pipe pile welding to link to each other, simple to operate, improved operation platform's security.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a plan view of the present invention.
Fig. 3 is a schematic structural view of the steel pipe pile and the support platform of the present invention.
Detailed Description
The invention will be further explained by the embodiments with reference to the drawings.
As shown in fig. 1 to 3, the operation platform connected to the steel pipe pile according to this embodiment includes a hoop device 1 tightly clasped to the steel pipe pile 4, and a support platform 2 disposed outside the steel pipe pile 1 and fixedly connected to the hoop device 1, wherein an inclined strut 3 is disposed below the support platform 2, and two ends of the inclined strut 3 are respectively connected to the support platform 2 and the steel pipe pile 4. One end of the inclined strut 3 is fixedly connected with the supporting platform 2, the other end of the inclined strut 3 is connected with a base plate 5, and the base plate 5 is in contact with the steel pipe pile 4. The supporting platform 2 comprises a cross beam 21 and a longitudinal beam 22, the cross beam 21 and the longitudinal beam 22 are arranged in an intersecting mode and fixedly connected with the hoop device 1, and a pedal 23 is laid above the cross beam 21. One side of the supporting platform 2, which is far away from the upper part of the steel pipe pile 4, is connected with a guardrail 6, and the guardrail 6 is vertically arranged. The embodiment increases the stability of the support platform 2 through the intersection arrangement of the cross beam 21 and the longitudinal beam 22; the inclined strut 3 strengthens the stability of the support platform 2 and the steel pipe pile 4; the guardrail 6 is used for guaranteeing the personal safety of operators; the anchor ear device 1 is connected with the steel pipe pile 4 in a strand mode, the steel wire rope is replaced to be connected with the steel pipe pile 4 in a welding mode, installation is convenient, and safety of the operating platform is improved.
In this embodiment, the following combination modes are provided for the hoop device 1 and the steel pipe pile 4, and the first embodiment is as follows: the hoop device 1 comprises at least two arc-shaped plates, the steel pipe pile 4 is wrapped and clamped by the two arc-shaped plates, and the steel pipe pile 4 is clamped tightly by a fastener. The steel pipe pile 4 is fixed through the fastener after the steel pipe pile 4 is clamped through the two arc-shaped plates.
The second embodiment: the hoop device 1 comprises a frame 11, a fastener 12 is connected to the frame 11, the fastener 12 is connected to a pressing plate 13, and the pressing plate 13 can be tightly pressed against the periphery of the outer wall of the steel pipe pile 4 by screwing the fastener 12. In this embodiment, the fastener 12 of the hoop device 1 is screwed to tightly abut against the periphery of the outer wall of the steel pipe pile 4, so as to tightly hold the hoop device 1 and the steel pipe pile 4.
The third embodiment is as follows: the hoop device 1 comprises a frame 11 which is built by adopting channel steel, a fastening piece 12 is connected to the frame 11, the fastening piece 12 is connected with a pressing plate 13, the pressing plate 13 can be tightly abutted to the periphery of the outer wall of the steel pipe pile 4 by screwing the fastening piece 12, and the cross beam 21 is arranged in a groove body 111 of the channel steel. In this embodiment, the fastener 12 of the hoop device 1 is screwed to tightly abut against the periphery of the outer wall of the steel pipe pile 4, so as to tightly hold the hoop device 1 and the steel pipe pile 4. The frame 11 is built by channel steel, and the beam 21 is arranged in the groove body 111 of the channel steel, so that the stability of the combination of the beam 21 and the steel pipe pile 4 is enhanced.

Claims (7)

1. Operation platform who links to each other with the steel-pipe pile, its characterized in that includes hold hoop device (1) that sets up tightly with steel-pipe pile (4), locate the steel-pipe pile outside and with hoop device (1) fixed brace table (2) that link to each other, brace table (2) below is equipped with bracing (3), bracing (3) both ends link to each other with brace table (2) and steel-pipe pile (4) respectively.
2. The operating platform connected with the steel pipe pile according to claim 1, wherein the hoop device (1) comprises at least two arc-shaped plates, and the two arc-shaped plates clamp the steel pipe pile (4) and are clamped on the steel pipe pile (4) by fasteners.
3. The steel pipe pile connecting operation platform according to claim 1, wherein the hoop device (1) comprises a frame (11), a fastener (12) is connected to the frame (11), the fastener (12) is connected to a pressing plate (13), and the pressing plate (13) can be pressed against the steel pipe pile (4) by screwing the fastener (12).
4. The operating platform connected with the steel pipe pile is characterized in that the supporting platform (2) comprises a cross beam (21) and a longitudinal beam (22), the cross beam (21) and the longitudinal beam (22) are arranged in an intersecting mode and fixedly connected with the hoop device (1), and a pedal (23) is laid above the cross beam (21).
5. The operating platform connected with the steel pipe pile according to claim 4, wherein the hoop device (1) comprises a frame (11) built by adopting channel steel, a fastening piece (12) is connected to the frame (11), the fastening piece (12) is connected with a pressing plate (13), the pressing plate (13) can be tightly pressed against the steel pipe pile (4) by screwing the fastening piece (12), and the cross beam (21) is arranged in a groove body (111) of the channel steel.
6. The operation platform connected with the steel pipe pile according to claim 1, wherein one end of the inclined strut (3) is fixedly connected with the support platform (2), the other end of the inclined strut (3) is connected with a backing plate (5), and the backing plate (5) is in contact with the steel pipe pile (4).
7. The operation platform connected with the steel pipe pile as recited in claim 1, wherein a guardrail (6) is connected to one side of the support platform (2) far away from the upper part of the steel pipe pile (4), and the guardrail (6) is vertically arranged.
CN202022067961.8U 2020-09-21 2020-09-21 Operating platform connected with steel pipe pile Active CN213572928U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022067961.8U CN213572928U (en) 2020-09-21 2020-09-21 Operating platform connected with steel pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022067961.8U CN213572928U (en) 2020-09-21 2020-09-21 Operating platform connected with steel pipe pile

Publications (1)

Publication Number Publication Date
CN213572928U true CN213572928U (en) 2021-06-29

Family

ID=76576196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022067961.8U Active CN213572928U (en) 2020-09-21 2020-09-21 Operating platform connected with steel pipe pile

Country Status (1)

Country Link
CN (1) CN213572928U (en)

Similar Documents

Publication Publication Date Title
CN213572928U (en) Operating platform connected with steel pipe pile
CN209453864U (en) It is a kind of for producing the tensioning equipment of composite beam or superimposed sheet
CN212384455U (en) Bending device for reserved steel bars on two sides of bridge
CN106592436A (en) Manufacturing method of tool mold plate for city bridges
CN211007061U (en) Connecting device for jacking frame and ball joint of welding ball net rack
CN213836320U (en) Staple bolt jack support system construction equipment
CN213267894U (en) Steel support fixed knot constructs on stand is roof beam even
CN209868519U (en) Driving maintenance auxiliary device
CN213297372U (en) Simple turnover telegraph pole anti-toppling protection device
CN212562406U (en) Overhanging scaffold
CN209924415U (en) Steel beam holding reinforcing member for attached lifting scaffold
CN209942213U (en) Rear-mounted building overhanging scaffold anchor hoop
CN204571266U (en) A kind of anchor structure for builder's jack i iron
CN201786020U (en) Middle beam for building
CN212895938U (en) Jack support pad device for bridge cylindrical pier tie beam and capping beam construction
CN202559710U (en) Dismountable anchoring device for overhanging type steel-steel beam
CN216765614U (en) Construction platform for integrally protecting bent cap
CN102241381A (en) Hoist frame high-altitude grouping operation platform hanging bracket and using method thereof
CN217579817U (en) Reinforcing staple bolt structure
CN213953064U (en) Roof safety protection fence device
CN108626217A (en) A kind of steel structure connecting member
CN210615673U (en) Butt welding fixing device
CN219175927U (en) High altitude crossbeam safety protection prop up and establishes device
CN212178070U (en) Cable tower pump pipe counterfort fixing device
CN217439660U (en) Concrete pole structure with high prestress bearing effect

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 314000 Room 301, 251 Chengxiu Road, Xincheng street, Xiuzhou District, Jiaxing City, Zhejiang Province

Patentee after: Xingtu Co.,Ltd.

Address before: 314000 Room 301, 251 Chengxiu Road, Xincheng street, Xiuzhou District, Jiaxing City, Zhejiang Province

Patentee before: ZHEJIANG XINGTU BRIDGE TEMPORARY STEEL STRUCTURE ENGINEERING CO.,LTD.