Aerial work platform for bridge construction Download PDFInfo
- Publication number
- CN213572914U CN213572914U CN202021916658.4U CN202021916658U CN213572914U CN 213572914 U CN213572914 U CN 213572914U CN 202021916658 U CN202021916658 U CN 202021916658U CN 213572914 U CN213572914 U CN 213572914U
- Authority
- CN
- China
- Prior art keywords
- fixed mounting
- mounting
- bridge construction
- plate
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to a technical field is executed to bridge, and discloses an aerial working platform for bridge construction, comprising a base plate, the equal fixed mounting in the left and right sides of bottom plate bottom has the base, the top fixed mounting of bottom plate has the collar, the top fixed mounting of collar has the fixed plate, the top fixed mounting of fixed plate has the hydraulic stem, the top fixed mounting of hydraulic stem has the guardrail, the top fixed mounting of fixed plate has the telescopic link that is located the fixed plate left and right sides. This an aerial working platform for bridge construction, the installation pole removes the inside of mounting groove to fix the collar on the bottom plate, loosen the pull ring at last can, spacing spring will release, and the gag lever post will move in the rolling disc and fix it, thereby reaches the installation effect, and whole process is comparatively simple, and convenient to detach simultaneously, and then convenient to detach accomodates and transports it or carries, and it is comparatively convenient to use.
Description
Technical Field
The utility model relates to a bridge construction technical field specifically is an aerial working platform for bridge construction.
Background
The high-altitude operation platform is a product which can be used during high-altitude operation, is convenient to use in building activities, is more and more widely applied along with the development of social science and technology, can not leave lifting machinery regardless of buildings, civil engineering and daily life of people, is developed rapidly in the current society, drives the development of the whole industry and the requirements of people, and is often required to be used for auxiliary operation in the construction process of bridges.
At present, most of overhead working platforms for bridge construction on the market are inconvenient to disassemble and assemble, the existing overhead working platforms are mostly fixed through bolts, more time is needed for disassembling and transporting, and therefore disassembling efficiency is reduced, and the overhead working platforms for bridge construction are inconvenient to store and transport, so that the problems are solved.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides an aerial working platform for bridge construction possesses advantages such as the dismouting of being convenient for, has solved the aerial working platform that is used for bridge construction on the present market, and the dismouting of being difficult for mostly, current most fix through the bolt, need more time when dismantling the transportation dismantle to reduced and dismantled efficiency, be not convenient for accomodate the problem of transportation.
(II) technical scheme
For the purpose of realizing the dismouting of being convenient for of the aforesaid, the utility model provides a following technical scheme: an aerial working platform for bridge construction comprises a bottom plate, wherein bases are fixedly mounted on the left side and the right side of the bottom plate, a mounting ring is fixedly mounted at the top of the bottom plate, a fixing plate is fixedly mounted at the top of the mounting ring, a hydraulic rod is fixedly mounted at the top of the fixing plate, guardrails are fixedly mounted at the top of the hydraulic rod, telescopic rods positioned on the left side and the right side of the fixing plate are fixedly mounted at the top of the fixing plate, a rotating rod is movably mounted in the bottom plate, a mounting rod is fixedly mounted at the top of the rotating rod, a rotating disc is fixedly mounted at the bottom of the rotating disc, an adjusting rod is fixedly mounted at the bottom of the adjusting rod, a fixing pipe is fixedly mounted at the bottom of the adjusting rod, a movable plate is movably mounted in the fixing pipe, the right side of the fixed pipe is spliced with an insertion rod fixedly connected with the movable plate, the outer side of the insertion rod is sleeved with a limiting spring, and the right side of the insertion rod is fixedly provided with a pull ring.
Preferably, the inner side of the mounting ring is provided with a mounting groove, and the mounting rod is matched with the mounting groove.
Preferably, the outer side of the rotating disc is provided with four limiting grooves, and the limiting rods are matched with the limiting grooves.
Preferably, the inner side of the fixed pipe is provided with a sliding groove, and the movable plate is movably connected with the fixed pipe through the sliding groove.
Preferably, the outer side of the adjusting rod is provided with anti-skidding lines which are uniformly distributed on the outer side of the adjusting rod.
Preferably, the rubber sleeve is adjusted on the outer side of the pull ring, and the diameter of the rubber sleeve is two centimeters.
(III) advantageous effects
Compared with the prior art, the utility model provides an aerial working platform for bridge construction possesses following beneficial effect:
this an aerial working platform for bridge construction, through setting up rolling disc and fixed pipe, when needs are installed, at first place the collar in corresponding position, the pulling pull ring, the inserted bar can stimulate the fly leaf and extrude spacing spring, thereby make spacing spring atress compression, then the fly leaf can remove right and drive the gag lever post and rotate with the rolling disc, the dwang will drive the installation pole and rotate, thereby make the installation pole remove the inside of mounting groove, thereby fix the collar on the bottom plate, loosen the pull ring at last can, spacing spring will release, the gag lever post will remove in the rolling disc and fix it, thereby reach the installation effect, whole process is comparatively simple, and simultaneously convenient to detach, and then convenient to detach accomodates and transports or carries it, it is comparatively convenient to use.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged schematic view of the utility model at A;
fig. 3 is a schematic view of the structure of the rotating disc of the present invention.
In the figure: the device comprises a base plate 1, a base 2, a mounting ring 3, a fixing plate 4, a hydraulic rod 5, a guardrail 6, a telescopic rod 7, a rotating rod 8, a mounting rod 9, a rotating disc 10, an adjusting rod 11, a fixing tube 12, a movable plate 13, a limiting rod 14, an inserting rod 15, a limiting spring 16 and a pull ring 17.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, an aerial work platform for bridge construction comprises a base plate 1, wherein bases 2 are fixedly installed on the left side and the right side of the bottom of the base plate 1, a mounting ring 3 is fixedly installed on the top of the base plate 1, a mounting groove is formed in the inner side of the mounting ring 3, a mounting rod 9 is matched with the mounting groove, a fixing plate 4 is fixedly installed on the top of the mounting ring 3, a hydraulic rod 5 is fixedly installed on the top of the fixing plate 4, a guardrail 6 is fixedly installed on the top of the hydraulic rod 5, telescopic rods 7 positioned on the left side and the right side of the fixing plate 4 are fixedly installed on the top of the fixing plate 4, a rotating rod 8 is movably installed in the base plate 1, a mounting rod 9 is fixedly installed on the top of the rotating rod 8, a rotating disc 10 is fixedly installed at the bottom of the rotating rod 8, four limiting grooves are formed in the outer side of the rotating, the outer side of the adjusting rod 11 is provided with anti-skid grains which are uniformly distributed on the outer side of the adjusting rod 11, the bottom of the adjusting rod 11 is fixedly provided with a fixed tube 12, the inner side of the fixed tube 12 is provided with a sliding groove, a movable plate 13 is movably connected with the fixed tube 12 through the sliding groove, the inner part of the fixed tube 12 is movably provided with the movable plate 13, the left side of the movable plate 13 is fixedly provided with a limit rod 14 positioned inside the rotating disc 10, the right side of the fixed tube 12 is inserted with an insertion rod 15 fixedly connected with the movable plate 13, the outer side of the insertion rod 15 is sleeved with a limit spring 16, the right side of the insertion rod 15 is fixedly provided with a pull ring 17, the outer side of the pull ring 17 is adjusted with a rubber sleeve, the diameter of the rubber sleeve is two centimeters, by arranging the rotating disc 10 and the fixed tube 12, when installation is needed, the installation is firstly to place the installation ring 3 at a corresponding, thereby make spacing spring 16 atress compression, then fly leaf 13 can move right and drive gag lever post 14 and rolling disc 10 and rotate, dwang 8 will drive installation pole 9 and rotate, thereby make installation pole 9 move the inside of mounting groove, thereby fix collar 3 on bottom plate 1, loosen pull ring 17 at last can, spacing spring 16 will release, gag lever post 14 will move in rolling disc 10 and fix it, thereby reach the installation effect, whole process is comparatively simple, and simultaneously convenient to detach, and then convenient to detach accomodates and transports it or carries, it is comparatively convenient to use.
To sum up, the aerial work platform for bridge construction is provided with the rotating disc 10 and the fixed pipe 12, when installation is needed, the installation ring 3 is firstly placed at a corresponding position, the pull ring 17 is pulled, the inserted link 15 pulls the movable plate 13 to extrude the limiting spring 16, so that the limiting spring 16 is stressed and compressed, then the movable plate 13 moves rightwards and drives the limiting rod 14 and the rotating disc 10 to rotate, the rotating rod 8 drives the installation rod 9 to rotate, so that the installation rod 9 moves to the inside of the installation groove, so that the installation ring 3 is fixed on the bottom plate 1, finally the pull ring 17 is loosened, the limiting spring 16 is released, the limiting rod 14 moves into the rotating disc 10 and fixes the same, so that the installation effect is achieved, the whole process is simple, and meanwhile, disassembly is convenient, and further, disassembly and storage are convenient for transporting or carrying the platform, use comparatively conveniently, solved the high altitude construction platform that is used for the bridge construction on the present market, the dismouting of being mostly inconvenient for, current most fix through the bolt, need more time when dismantling the transportation dismantle to reduced and dismantled efficiency, be not convenient for accomodate the problem of transportation.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides an aerial working platform for bridge construction, includes bottom plate (1), its characterized in that: the all-fixed mounting of the left and right sides of bottom plate (1) bottom has base (2), the top fixed mounting of bottom plate (1) has collar (3), the top fixed mounting of collar (3) has fixed plate (4), the top fixed mounting of fixed plate (4) has hydraulic stem (5), the top fixed mounting of hydraulic stem (5) has guardrail (6), the top fixed mounting of fixed plate (4) has telescopic link (7) that are located the fixed plate (4) left and right sides, the inside movable mounting of bottom plate (1) has dwang (8), the top fixed mounting of dwang (8) has installation pole (9), the bottom fixed mounting of dwang (8) has rolling disc (10), the bottom fixed mounting of rolling disc (10) has regulation pole (11), the bottom fixed mounting of adjusting pole (11) has fixed tube (12), the inside movable mounting of fixed pipe (12) has fly leaf (13), the left side fixed mounting of fly leaf (13) has gag lever post (14) that is located rolling disc (10) inside, the right side of fixed pipe (12) is pegged graft and is had inserted bar (15) with fly leaf (13) fixed connection, spacing spring (16) have been cup jointed in the outside of inserted bar (15), the right side fixed mounting of inserted bar (15) has pull ring (17).
2. The aerial work platform for bridge construction according to claim 1, wherein: the mounting groove is formed in the inner side of the mounting ring (3), and the mounting rod (9) is matched with the mounting groove.
3. The aerial work platform for bridge construction according to claim 1, wherein: the outer side of the rotating disc (10) is provided with four limiting grooves, and the limiting rods (14) are matched with the limiting grooves.
4. The aerial work platform for bridge construction according to claim 1, wherein: the inner side of the fixed pipe (12) is provided with a sliding chute, and the movable plate (13) is movably connected with the fixed pipe (12) through the sliding chute.
5. The aerial work platform for bridge construction according to claim 1, wherein: the anti-skidding lines are arranged on the outer side of the adjusting rod (11) and are uniformly distributed on the outer side of the adjusting rod (11).
6. The aerial work platform for bridge construction according to claim 1, wherein: the rubber sleeve is adjusted on the outer side of the pull ring (17), and the diameter of the rubber sleeve is two centimeters.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021916658.4U CN213572914U (en) | 2020-09-04 | 2020-09-04 | Aerial work platform for bridge construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021916658.4U CN213572914U (en) | 2020-09-04 | 2020-09-04 | Aerial work platform for bridge construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213572914U true CN213572914U (en) | 2021-06-29 |
Family
ID=76569482
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021916658.4U Active CN213572914U (en) | 2020-09-04 | 2020-09-04 | Aerial work platform for bridge construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213572914U (en) |
-
2020
- 2020-09-04 CN CN202021916658.4U patent/CN213572914U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105442934B (en) | Bi-directional torque cement pole pole centralizing device | |
CN105766543A (en) | Windproof anti-lodging fixing and supporting device for tree | |
CN106025957B (en) | Cable support device | |
CN104532850B (en) | Foundation pit support system | |
CN103437283B (en) | A kind of hanging basket truss of energy rapid-assembling | |
CN205445099U (en) | Pole orthotic devices | |
CN213572914U (en) | Aerial work platform for bridge construction | |
CN210530715U (en) | Crawling ladder for electric power laying | |
CN213015777U (en) | Movable protective fence for building construction | |
CN107269010B (en) | Device and method for dismantling track during construction of large-span truss type steel structure roof | |
CN202117077U (en) | Manhole cover opening device | |
CN103556818A (en) | Building template floor quick-disassembly system | |
CN211974421U (en) | Safety anti-falling net for constructional engineering | |
CN221053148U (en) | Reinforced structure that scaffold frame used | |
CN221461753U (en) | Building construction frame | |
CN219826208U (en) | Portable building block and mortar lifting auxiliary appliance | |
CN221168801U (en) | Protective net structure of building climbing frame | |
CN216006959U (en) | A low pipe device for construction | |
CN218161605U (en) | Municipal works protection cable device that crosses way | |
CN220078302U (en) | Building chain block fixer | |
CN219450819U (en) | Anti-falling structure of inspection well | |
CN211172780U (en) | Prefabricated staircase | |
CN215352691U (en) | Building construction dust collector | |
CN210738450U (en) | Engineering ladder for electromechanical equipment installation for building | |
CN215165586U (en) | Bridge pile foundation protects a section of thick bamboo and pulls out device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |