CN213571562U - Highway engineering bridge construction bridge face concrete health preserving device - Google Patents

Highway engineering bridge construction bridge face concrete health preserving device Download PDF

Info

Publication number
CN213571562U
CN213571562U CN202021735747.9U CN202021735747U CN213571562U CN 213571562 U CN213571562 U CN 213571562U CN 202021735747 U CN202021735747 U CN 202021735747U CN 213571562 U CN213571562 U CN 213571562U
Authority
CN
China
Prior art keywords
water
bottom plate
seted
block
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021735747.9U
Other languages
Chinese (zh)
Inventor
李欣然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021735747.9U priority Critical patent/CN213571562U/en
Application granted granted Critical
Publication of CN213571562U publication Critical patent/CN213571562U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a highway engineering bridge construction bridge face concrete health preserving device, comprising a base plate, the bottom plate facial make-up is equipped with the storage water tank, the water inlet has been seted up to the upper end of storage water tank, the water inlet facial make-up is equipped with end block, the screw cap has been put to the cover on the end block, the delivery port has been seted up to one side of storage water tank, the pipe that absorbs water has been set in the delivery port, the pipe cover that absorbs water is put on the input of suction pump, the suction pump is installed on the bottom plate, the output of suction pump has set the drain pipe, the connecting block has been placed to one side of bottom plate, the through-hole has been seted up. The operation suction pump is put the pipe that absorbs water in the mouth of a river through the cover and is inhaled water, and the rethread drain pipe is discharged water to the through-hole of connecting block in, discharges through the shower nozzle at last, can be even spray the bridge floor concrete, can improve work efficiency, makes the bridge floor can satisfy operation requirement.

Description

Highway engineering bridge construction bridge face concrete health preserving device
Technical Field
The utility model belongs to the technical field of highway engineering bridge construction, concretely relates to highway engineering bridge construction bridge deck concrete health preserving device.
Background
In the construction of highway engineering bridges, the importance of good and bad quality of bridge deck concrete is undoubted, the quality of the bridge deck concrete directly determines the durability of an asphalt layer attached to the bridge deck concrete, so that the driving safety and driving comfort are influenced, the demand of cement gel on water in the hardening process can be guaranteed by timely and correctly using the bridge deck concrete curing device, and meanwhile, the generation of shrinkage cracks is prevented, and the influence on the quality of the bridge deck concrete is of great importance.
Present highway engineering bridge construction bridge face concrete health preserving device needs artifical manual watering maintenance to the concrete, because concrete exposes for a long time, can reduce the moisture of concrete face just, just needs constructor manual to spray the bridge face concrete this moment, can avoid the concrete to take place the season check in the hardening process, and the weak point of existence has: because need constructor manual to spray the bridge face concrete, it is inhomogeneous easily to lead to the watering, causes to leak and spills and repeated spraying, influences bridge face concrete health preserving effect, needs the workman to carry out watering many times, reduces work efficiency, can't satisfy the user demand of bridge floor.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a highway engineering bridge construction bridge face concrete health preserving device to solve the inhomogeneous problem of watering of current highway engineering bridge construction bridge face concrete health preserving device.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a highway engineering bridge construction bridge face concrete health preserving device, includes the bottom plate, the bottom plate facial make-up is equipped with the storage water tank, the water inlet has been seted up to the upper end of storage water tank, the water inlet facial make-up is equipped with end block, threaded cover has been put to the cover on the end block, the delivery port has been seted up to one side of storage water tank, the pipe that absorbs water has been set in the delivery port, the pipe cover that absorbs water is put on the input of suction pump, the suction pump is installed on the bottom plate, the output of suction pump is set the drain pipe, the connecting block has been placed to one side of bottom plate, the through-hole has been seted up on the connecting block, the nested piece has
Preferably, the end block is internally provided with a placing groove, and a filter screen is placed in the placing groove.
Preferably, the lower end of the connecting block is provided with a rotating groove, a bearing is arranged in the rotating groove, a bump is inserted in the bearing, the bump is arranged on the supporting plate, the lower end of the supporting plate is provided with a connecting rod, a connecting plate is arranged below the connecting rod, the connecting plate is provided with a through hole, the connecting rod is inserted in the through hole, a first fixing hole is formed in the lower part of the connecting block, a second fixing hole is formed in the supporting plate, a fixing rod is inserted in the first fixing hole and the second fixing hole, the fixing rod is arranged on the connecting plate, and a spring is sleeved on the fixing rod.
Preferably, a vertical rod is placed below the connecting rod, a clamping groove is formed in the upper end of the vertical rod, the connecting rod is placed in the clamping groove, openings are formed in two ends of the clamping groove, screw rods are installed at two ends of the connecting rod, screw rods are inserted in the openings in a penetrating mode, and washers are sleeved on the screw rods and locked through nuts.
Preferably, the lower end of the bottom plate is provided with a roller seat, one side of the bottom plate is provided with push rods, and cross rods are arranged among the push rods.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model provides a highway engineering bridge construction bridge face concrete health preserving device, compare with prior art, through end block and the screw thread fit of screw thread lid on the storage water tank, the constructor of being convenient for opens the screw thread lid and intakes to the storage water tank in, the operation suction pump, put the pipe that absorbs water in the outlet through the cover and absorb water, the rethread drain pipe will log raft to the through-hole of connecting block in, discharge through the shower nozzle at last, can be even spray bridge face concrete, can improve work efficiency, make the bridge floor can satisfy the operation requirement.
The utility model provides a highway engineering bridge construction bridge face concrete health preserving device, through the bearing of changeing the inslot, the connecting block that makes can carry out radial rotation on the connecting rod, can adjust the radial position of shower nozzle, again through the tensile effect of spring, can be that the dead lever on the connecting plate tightly alternates in fixed orifices one and fixed orifices two, can fix the position of shower nozzle, can avoid the shower nozzle phenomenon of rotating at will to take place.
The utility model provides a highway engineering bridge construction bridge face concrete health preserving device because the centre gripping groove of connecting rod and pole setting is clearance fit for the connecting rod can swing at the centre gripping inslot, through swivel nut, can make the tight laminating of packing ring in the pole setting, makes the pole setting press from both sides tight connecting rod, thereby can adjust the vertical ascending watering angle of shower nozzle.
Drawings
Fig. 1 is a schematic front view of the present invention;
fig. 2 is a schematic top view of the present invention;
fig. 3 is a schematic view of the structure of the present invention;
fig. 4 is a right side view schematic structural diagram of the present invention;
FIG. 5 is an enlarged view of a portion a of FIG. 3;
FIG. 6 is an enlarged view of the point b in FIG. 3;
fig. 7 is an enlarged schematic view of fig. 4 at c.
In the figure: the water pump water-saving device comprises a base plate 1, a water storage tank 2, a water inlet 3, a 4-end block, a 5-thread cover, a 6-water outlet, a 7-water suction pipe, a 8-water suction pump, a 9-water discharge pipe, a 10-connecting block, 11-through holes, 12-set blocks, 13-spray heads, 14-placing grooves, 15-filter screens, 16-rotating grooves, 17-bearings, 18-convex blocks, 19-supporting plates, 20-connecting rods, 21-connecting plates, 22-through holes, 23-fixing holes I, 24-fixing holes II, 25-fixing rods, 26-springs, 27-vertical rods, 28-clamping grooves, 29-open holes, 30-screw rods.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Referring to fig. 1, 2, 3, 4 and 5, a bridge construction bridge deck concrete curing device for highway engineering comprises a bottom plate 1 which is a square plate, and a water storage tank 2 welded and connected with the upper end of the bottom plate 1, wherein the water storage tank 2 is a square tank and is positioned at the middle position on the left side of the bottom plate 1, the top of the upper end of the water storage tank 2 is provided with a water inlet hole 3 which is a circular hole and is positioned at the middle position, an end block 4 is welded and connected above the water inlet hole 3, the end block 4 is of a circular ring structure and positioned at the middle position, threads are arranged on the periphery of the upper part of the end block 4, a thread cover 5 is sleeved on the end block 4, the end block 4 is in thread fit with the thread cover 5, a placement groove 14 is formed in the end block 4 and is an L-shaped annular groove, a filter screen 15 is placed in the placement groove 14, impurities in water can be, through rotating the threaded cover 5, the end block 4 can be opened,A constructor can conveniently add water into the water storage tank 2, the lower part of the right side of the water storage tank 2 is provided withA water outlet 6 which isA circular hole and is positioned at the middle position,A water suction pipe 7 is sleeved in the water outlet 6, the outer wall of the water suction pipe 7 is in interference fit with the inner wall of the water outlet 6, the left port of the water suction pipe 7 is positioned at the lower end inside the water storage tank 2, the right port of the water suction pipe 7 is sleeved on the input end ofA water suction pump 8, the inner wall of the water suction pipe 7 is in interference fit with the outer wall of the input end of the water suction pump 8, the water suction pump 8 is welded on the upper end surface of the bottom plate 1 and is positioned at the middle position, the type of the water suction pump 8 is CYZ-A, the output end of the water suction pump 8 is sleeved withA drain, for square piece, through-hole 11 has been seted up in the left side of connecting block 10, for the circular port, be located the intermediate position, the left side welded connection of connecting block 10 has collets 12, collets 12 is the ring structure, welded connection is in the left port department of through-hole 11, drain pipe 9 has been put to collets 12 upper cover, the outer wall of collets 12 is interference fit with the inner wall of drain pipe 9, the right side welded connection of connecting block 10 has shower nozzle 13, the model is CYRUS-01, be located the right port department of through-hole 11, operation suction pump 8, it absorbs water to put the suction tube 7 in delivery port 6 through the cover, the rethread drain pipe 9 will be discharged to the through-hole 11 of connecting block 10 in, discharge through shower nozzle 13 at last, can be even spray the bridge face concrete, can improve work efficiency, make the bridge floor.
Referring to fig. 1, 2, 3, 4, 6 and 7, a rotary groove 16, which is a circular groove, is formed at the lower end of a connecting block 10, a bearing 17 is disposed in the rotary groove 16, the outer wall of the bearing 17 is in interference fit with the inner wall of the rotary groove 16, a convex block 18 is inserted in the bearing 17, the convex block 18 is a cylindrical block, the outer wall of the convex block 18 is in interference fit with the inner wall of the bearing 17, the convex block 18 is welded to the upper end surface of a supporting plate 19, the supporting plate 19 is a circular plate, the lower end of the supporting plate 19 is welded and connected with a connecting rod 20, the connecting rod 20 is a cylindrical rod, the connecting rod 20 is in a middle position, a connecting plate 21 is sleeved on the connecting rod 20, the connecting plate 21 is a circular plate, a through hole 22 is formed in the connecting plate 21, the through hole 22 is a circular hole, the connecting rod 20 is inserted in the middle position, the number of the round holes is 8, the supporting plate 19 is provided with a second fixing hole 24 which is a round hole and 4, the positions of the round holes correspond to the first fixing holes 23 one by one, fixing rods 25 are inserted into the first fixing holes 23 and the second fixing holes 24, the fixing rods 25 are cylindrical rods and 4, the lower ends of the fixing rods 25 are welded and connected on the upper end surface of the connecting plate 21, springs 26 are sleeved on the fixing rods 25 and 4, the upper ends of the springs 26 are welded and connected on the lower end surface of the supporting plate 19, the lower ends of the springs 26 are welded and connected on the upper end of the connecting plate 21, the fixing rods 25 can be tightly inserted into the first fixing holes 23 under the normal state of the springs 26, the springs 26 are elastically deformed when being subjected to the force of more than or equal to 20N, the connecting block 10 can radially rotate on the connecting rod 20 through the bearings 17 in the rotary grooves 16, and the radial position of the spray head 13 can, and through the stretching action of the spring 26, the fixing rod 25 on the connecting plate 21 can be tightly inserted into the first fixing hole 23 and the second fixing hole 24 to fix the position of the spray head 13, so as to avoid the occurrence of the random rotation of the spray head 13, the upright rod 27 is placed below the connecting rod 20, the upright rod 27 is a square rod, the lower end of the upright rod 27 is welded and connected to the front part of the right side of the upper end of the bottom plate 1, the top of the upper end of the upright rod 27 is provided with a clamping groove 28 which is a square groove and is located at the middle position, the connecting rod 20 is placed in the clamping groove 28, the clamping groove 28 is in clearance fit with the connecting rod 20, the front end and the rear end of the groove wall of the clamping groove 28 are both provided with open holes 29, the open holes 29 are circular holes, the number is 2, the middle position is located, the front end and the rear end of the connecting rod 20 are welded and, because the connecting rod 20 is in clearance fit with the clamping groove 28 of the upright rod 27, the connecting rod 20 can swing in the clamping groove 28, the washer 31 can be tightly attached to the upright rod 27 by rotating the nut 32, the upright rod 27 clamps the connecting rod 20 tightly, so that the longitudinal sprinkling angle of the sprayer 13 can be adjusted, the periphery of the lower end of the bottom plate 1 is uniformly welded and connected with 4 roller seats 33, the types of the roller seats 33 are DS21, the left side of the bottom plate 1 is welded and connected with the push rod 34, the push rods 34 are L-shaped rods, the number of the push rods is 2, the cross rods 35 are welded and connected among the push rods 34, the cross rods 35 are cylindrical rods, the force can be transmitted to the lower roller seats 33 of the bottom plate 1 through holding the cross rods 35 and pushing, and the constructors can move conveniently through the rotating action of the rollers in the roller seats 33.
During implementation, a constructor can rotate the threaded cover 5 by hand to open the end block 4, so that the constructor can conveniently add water into the water storage tank 2 through the water inlet 3 and filter sundries in the water through the filter screen 15 in the end block 4 to avoid blocking a pipeline, after the water storage tank 2 is filled with water, the constructor can transversely push the cross rod 35 by holding the cross rod, force is transmitted to the lower roller seat 33 of the bottom plate 1 through the push rod 34, the constructor can conveniently move the whole curing device through the rotating action of the rollers in the roller seat 33, before the work is started, the direction of spraying water by the spray head 13 can be adjusted, as the bearing 17 in the rotating groove 16 enables the connecting block 10 to radially rotate on the connecting rod 20, the radial position of the spray head 13 can be adjusted, and the fixing rod 25 on the connecting plate 21 can be inserted into the first fixing hole 23 and the second fixing hole 24 through the stretching action of the spring 26, the position of the spray head 13 can be fixed, the phenomenon that the spray head 13 rotates randomly can be avoided, and because the connecting rod 20 is in clearance fit with the clamping groove 28 of the upright rod 27, so that the connecting rod 20 can swing within the clamping groove 28, by rotating the nut 32, the washer 31 can be made to fit tightly on the upright 27, so that the upright 27 clamps the connecting rod 20, thereby adjusting the longitudinal sprinkling angle of the spray head 13, inserting the plug of the water pump 8 into the external power supply after the adjustment is finished, operating the water pump 8, water is absorbed through a water absorption pipe 7 sleeved in a water outlet 6, then the water is discharged into a through hole 11 of a connecting block 10 through a water discharge pipe 9 and finally is discharged through a spray head 13, can evenly spray the concrete on the bridge deck, can improve the working efficiency, enables the bridge deck to meet the use requirements, thereby solve current public road engineering bridge construction bridge face concrete health preserving device uneven problem of watering.

Claims (5)

1. The utility model provides a highway engineering bridge construction bridge face concrete health preserving device, includes bottom plate (1), its characterized in that: a water storage tank (2) is arranged on the bottom plate (1), a water inlet (3) is arranged at the upper end of the water storage tank (2), an end block (4) is arranged on the water inlet (3), a threaded cover (5) is sleeved on the end block (4), a water outlet (6) is arranged on one side of the water storage tank (2), a water suction pipe (7) is sleeved in the water outlet (6), the water suction pipe (7) is sleeved on the input end of the water suction pump (8), the water suction pump (8) is arranged on the bottom plate (1), a drain pipe (9) is sleeved at the output end of the water suction pump (8), a connecting block (10) is arranged at one side of the bottom plate (1), a through hole (11) is arranged on the connecting block (10), a sleeve block (12) is arranged at the through hole (11), the water discharge pipe (9) is sleeved on the sleeve block (12), and a spray head (13) is arranged on one side of the connecting block (10).
2. The highway engineering bridge construction bridge deck concrete curing device of claim 1, which is characterized in that: a placing groove (14) is formed in the end block (4), and a filter screen (15) is placed in the placing groove (14).
3. The highway engineering bridge construction bridge deck concrete curing device of claim 1, which is characterized in that: the lower extreme of connecting block (10) has been seted up and has been changeed groove (16), bearing (17) have been set in commentaries on classics groove (16), bearing (17) interlude has lug (18), lug (18) are installed on layer board (19), connecting rod (20) have been installed to the lower extreme of layer board (19), connecting plate (21) have been put under connecting rod (20), perforation (22) have been seted up on connecting plate (21), perforation (22) interlude has connecting rod (20), connecting block (10) under is seted up fixed orifices one (23), fixed orifices two (24) have been seted up on layer board (19), fixed rod (25) have been interlude in fixed orifices one (23) and fixed orifices two (24), fixed rod (25) are installed on connecting plate (21), spring (26) have been put to cover on fixed rod (25).
4. The highway engineering bridge construction bridge deck concrete curing device of claim 3, which is characterized in that: upright stanchion (27) have been placed under connecting rod (20), centre gripping groove (28) have been seted up to the upper end of upright stanchion (27), connecting rod (20) have been placed in centre gripping groove (28), trompil (29) have been seted up at the both ends in centre gripping groove (28), screw rod (30) have been installed at the both ends of connecting rod (20), screw rod (30) have been alternate in trompil (29), packing ring (31) have been put and are locked with nut (32) to the cover on screw rod (30).
5. The highway engineering bridge construction bridge deck concrete curing device of claim 1, which is characterized in that: the lower end of the bottom plate (1) is provided with a roller seat (33), one side of the bottom plate (1) is provided with push rods (34), and cross rods (35) are arranged among the push rods (34).
CN202021735747.9U 2020-08-19 2020-08-19 Highway engineering bridge construction bridge face concrete health preserving device Expired - Fee Related CN213571562U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021735747.9U CN213571562U (en) 2020-08-19 2020-08-19 Highway engineering bridge construction bridge face concrete health preserving device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021735747.9U CN213571562U (en) 2020-08-19 2020-08-19 Highway engineering bridge construction bridge face concrete health preserving device

Publications (1)

Publication Number Publication Date
CN213571562U true CN213571562U (en) 2021-06-29

Family

ID=76555794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021735747.9U Expired - Fee Related CN213571562U (en) 2020-08-19 2020-08-19 Highway engineering bridge construction bridge face concrete health preserving device

Country Status (1)

Country Link
CN (1) CN213571562U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116789463A (en) * 2022-12-23 2023-09-22 裴继娟 Winter maintenance device and method for bridge concrete

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116789463A (en) * 2022-12-23 2023-09-22 裴继娟 Winter maintenance device and method for bridge concrete

Similar Documents

Publication Publication Date Title
CN213571562U (en) Highway engineering bridge construction bridge face concrete health preserving device
CN110694833A (en) Inside raw materials injection apparatus for spraying paint of pipeline pore structure
CN213222929U (en) Rotary spraying device with swinging function for dust suppressant
CN211873875U (en) Concrete vibrating device for building construction
CN107769721A (en) A kind of cell panel for new energy solar power generation
CN210827781U (en) Emergency drainage device for sponge city construction
CN208776323U (en) A kind of ammonia scrubbing tower
CN206941497U (en) A kind of construction streets watering device
CN207227294U (en) A kind of rotary pier shaft spray equipment
CN212975546U (en) Polyhedral panel paint spraying apparatus is used to building engineering fitment
CN214362752U (en) Town road maintenance of equipment
CN210522848U (en) Water-saving spraying equipment
CN214272862U (en) Movable climbing frame
CN212589369U (en) Automatic sprinkling irrigation equipment in greenbelt
CN111842467A (en) Portable spray set for soil remediation
CN110900804B (en) Concrete water-saving irrigation device
CN207191781U (en) A kind of construction portable pond
CN220760248U (en) Cleaning device for glass production
CN208193449U (en) A kind of adjustable fire-fighting spray gun of multistage
CN209438271U (en) Metro station excavation construction sprinkling dust-removing device
CN207854705U (en) A kind of water sprayer for pouring ornamental trees and shrubs
CN219241206U (en) Waterproof coating construction roller brush
CN207000415U (en) A kind of engineering truck auto-flushing apparatus for drying
CN215926118U (en) Hydraulic injection device for storage tank
CN215335177U (en) Water leakage repairing device for hydraulic engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210629