CN213569259U - Detachable turnover super high-rise tower crane wall-attached device - Google Patents

Detachable turnover super high-rise tower crane wall-attached device Download PDF

Info

Publication number
CN213569259U
CN213569259U CN202021434263.0U CN202021434263U CN213569259U CN 213569259 U CN213569259 U CN 213569259U CN 202021434263 U CN202021434263 U CN 202021434263U CN 213569259 U CN213569259 U CN 213569259U
Authority
CN
China
Prior art keywords
plate
sleeve
mounting
fixedly connected
connecting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021434263.0U
Other languages
Chinese (zh)
Inventor
王敉鹏
贾炳辉
李应心
张业
李玉龙
刘王奇
康维
孟磊
晁自如
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202021434263.0U priority Critical patent/CN213569259U/en
Application granted granted Critical
Publication of CN213569259U publication Critical patent/CN213569259U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a can dismantle superelevation layer tower of turnover hangs attaches wall device, including pre-buried steel sheet, the left side of pre-buried steel sheet is equipped with the fixed plate, fixedly connected with link between fixed plate and the pre-buried steel sheet, the right side of pre-buried steel sheet is equipped with the connecting plate, the four sides department of connecting plate and pre-buried steel sheet all is equipped with the screw hole, the right side of connecting plate is equipped with the backup pad, two otic placodes of fixedly connected with in the backup pad, the centre of otic placode is equipped with the screw hole, threaded connection has fixing bolt in the middle of the otic placode, the side of two otic placodes all fixedly connected with floor, the side of otic placode is equipped with the mounting, the utility model discloses can reduce the damage.

Description

Detachable turnover super high-rise tower crane wall-attached device
Technical Field
The utility model relates to a building engineering field specifically is a can dismantle superelevation layer tower of turnover hangs attaches wall device.
Background
With the progress of social economy and the continuous development of construction technology, super high-rise buildings are continuously emerging. Because the height of the super high-rise building is high, the tower crane is used as an important tool for vertical transportation, the super high-rise building is often required to be installed by attaching a wall, the height of the super high-rise building is increased along with the rise of the height of the super high-rise building, the exposed part of the existing wall hanging and attaching device causes great difficulty to the construction of a template, and the damage to the template is great; the device cannot adjust the distance, so that the device cannot be connected with a tower crane; when the tower crane runs, vibration can be generated, and bolts at the connecting part of the tower crane are loosened.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a can dismantle turnover super high-rise tower hangs and attaches wall device to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a can dismantle superelevation layer tower of turnover hangs attaches wall device, includes pre-buried steel sheet, the left side of pre-buried steel sheet is equipped with the fixed plate, fixedly connected with link between fixed plate and the pre-buried steel sheet, the right side of pre-buried steel sheet is equipped with the connecting plate, the four sides department of connecting plate and pre-buried steel sheet all is equipped with the screw hole, the right side of connecting plate is equipped with the backup pad, two otic placodes of fixedly connected with in the backup pad, the centre of otic placode is equipped with the screw hole, threaded connection has fixing bolt, two in the middle of the otic placode the side of otic placode all fixedly connected with floor, the side of otic placode is equipped with the mounting, through bolt fixed connection between the both sides of mounting and.
Preferably, be equipped with first sleeve and second sleeve between connecting plate and the backup pad, first sleeve and second telescopic both sides all articulate there is the connecting rod, the left side the connecting rod is connected with the connecting plate is articulated, the right side the connecting rod is connected with the backup pad is articulated.
Preferably, a screw rod is arranged between the first sleeve and the second sleeve, the upper end of the screw rod is rotatably connected with the first sleeve, the second sleeve is in threaded connection with the screw rod, and a retaining ring is arranged at the top end of the screw rod.
Preferably, fixedly connected with cruciform structure's joint board on a joint section of thick bamboo's the inside wall, a joint section of thick bamboo and mounting junction ring arrangement have the teeth of a cogwheel, the mounting upper end is rotated and is connected with the limiting plate, the top of limiting plate supports and leans on between two teeth of a cogwheel clearances, be equipped with the spring between limiting plate and the mounting, fixing bolt's top is equipped with cruciform structure's recess, fixing bolt's screw direction and a joint section of thick bamboo rotation opposite direction.
Compared with the prior art, the beneficial effects of the utility model are that: only round holes which are slightly larger than the diameter of the threaded holes are formed in the template, so that damage to the template is reduced, the screw is rotated through the retaining ring on the screw, the second sleeve moves along the screw, the second sleeve drives the connecting rod to rotate when moving, the distance between the supporting plate and the connecting plate is adjusted, the connecting plate is conveniently connected with a tower crane, and the tower crane is supported; when otic placode and tower crane are connected, in advancing the recess of fixing bolt front end with the joint integrated circuit board, fixing bolt's a screw thread direction and a joint section of thick bamboo rotation opposite direction, a joint section of thick bamboo gyration can be avoided to the limiting plate, can fix fixing bolt, avoids fixing bolt not hard up, and the tower crane can demolish coupling part after climbing and carry out reuse, reduces the processing degree of difficulty of built-in fitting position shear force wall later stage repair simultaneously, is favorable to the construction in later stage to be handled.
Drawings
FIG. 1 is a schematic diagram of an explosive connection structure of a device;
FIG. 2 is a schematic perspective view of a clamping barrel;
fig. 3 is a schematic view of the connecting structure of the clamping cylinder and the fixing piece.
In the figure: the self-locking type steel plate fixing device comprises an embedded steel plate 1, a fixing plate 2, a connecting frame 3, a connecting plate 4, a first sleeve 5, a second sleeve 6, a connecting rod 7, a screw rod 8, a supporting plate 9, an ear plate 10, a fixing piece 11, a fixing bolt 12, a clamping cylinder 13, a clamping plate 14 and a limiting plate 15.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a can dismantle superelevation layer tower of turnover hangs attaches wall device, including pre-buried steel sheet 1, the left side of pre-buried steel sheet 1 is equipped with fixed plate 2, fixedly connected with link 3 between fixed plate 2 and the pre-buried steel sheet 1, pre-buried steel sheet 1's right side is equipped with connecting plate 4, connecting plate 4 all is equipped with the screw hole with pre-buried steel sheet 1's four sides department, connecting plate 4's right side is equipped with backup pad 9, two otic placodes of fixedly connected with 10 in the backup pad 9, the centre of otic placode 10 is equipped with the screw hole, threaded connection has fixing bolt 12 in the middle of the otic placode 10, the side of two otic placodes 10 is the fixedly connected with floor all, the side of otic placode 10 is equipped with mounting 11, pass through bolt fixed connection.
Be equipped with first sleeve 5 and second sleeve 6 between connecting plate 4 and the backup pad 9, the both sides of first sleeve 5 and second sleeve 6 all articulate there is connecting rod 7, and left side connecting rod 7 is connected with connecting plate 4 is articulated, and right side connecting rod 7 is connected with backup pad 9 is articulated, and when second sleeve 6 removed, it is rotatory to drive connecting rod 7 on first sleeve 5 and the second sleeve 6, and connecting rod 7 adjusts the distance between connecting plate 4 and the backup pad 9.
A screw 8 is arranged between the first sleeve 5 and the second sleeve 6, the upper end of the screw 8 is rotatably connected with the first sleeve 5, the second sleeve 6 is connected to the screw 8 in a threaded manner, a retaining ring is arranged at the top end of the screw 8, the screw 8 is driven to rotate through the retaining ring, and the screw 8 rotates to drive the second sleeve 6 to move along the screw 8.
Fixedly connected with cruciform structure's joint board 14 on a joint section of thick bamboo 13's the inside wall, joint section of thick bamboo 13 and 11 junction ring arrangements of mounting have the teeth of a cogwheel, 11 upper ends of mounting rotate and are connected with limiting plate 15, the top of limiting plate 15 supports and leans on between two teeth of a cogwheel clearances, be equipped with the spring between limiting plate 15 and the mounting 11, fixing bolt 12's top is equipped with cruciform structure's recess, fixing bolt 12's screw direction and joint section of thick bamboo 13 rotation opposite direction, joint section of thick bamboo 13 is when rotating, 15 joints of limiting plate are between the teeth of a cogwheel under the effect of spring, avoid joint section of thick bamboo 13 gyration, make a joint section of thick bamboo 13 can only be along a antiport, behind the recess joint of joint board 14 and fixing bolt 12 front end, connect mounting 11 and backup pad.
The working principle is as follows: the method comprises the steps of firstly embedding an embedded steel plate and a fixing plate into a wall, connecting the embedded steel plate with a connecting plate through bolts, driving a screw rod 8 to rotate through a buckle ring, driving a second sleeve 6 to move along the screw rod 8 through the rotation of the screw rod 8, driving a connecting rod 7 on a first sleeve 5 and the second sleeve 6 to rotate, adjusting the distance between the connecting plate 4 and a supporting plate 9 through the connecting rod 7, facilitating the connection between the connecting plate 4 and a tower crane, supporting the tower crane, connecting an ear plate 10 and the tower crane through a fixing bolt 12, rotating a clamping cylinder 13, clamping a limiting plate 15 between gear teeth under the action of a spring, avoiding the rotation of the clamping cylinder 13, enabling the clamping cylinder 13 to rotate only along one direction, enabling the thread direction of the fixing bolt 12 to be opposite to the rotation direction of the clamping cylinder 13, clamping the fixing piece 11 and the supporting plate 9 after the clamping plate 14 is clamped, loosening of the fixing bolt 12 can be avoided.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (4)

1. The utility model provides a can dismantle superelevation layer tower of turnover hangs attaches wall device, includes pre-buried steel sheet (1), its characterized in that: a fixed plate (2) is arranged on the left side of the embedded steel plate (1), a connecting frame (3) is fixedly connected between the fixed plate (2) and the embedded steel plate (1), the right side of the embedded steel plate (1) is provided with a connecting plate (4), the four sides of the connecting plate (4) and the embedded steel plate (1) are provided with threaded holes, a supporting plate (9) is arranged on the right side of the connecting plate (4), two ear plates (10) are fixedly connected to the supporting plate (9), the middle of the ear plate (10) is provided with a threaded hole, the middle of the ear plate (10) is in threaded connection with a fixing bolt (12), the side ends of the two ear plates (10) are fixedly connected with ribbed plates, the side of otic placode (10) is equipped with mounting (11), pass through bolt fixed connection between the both sides of mounting (11) and backup pad (9), the upper end of mounting (11) is rotated and is connected with joint section of thick bamboo (13).
2. The detachable turnover ultrahigh-rise tower wall-hanging device as claimed in claim 1, wherein: be equipped with first sleeve (5) and second sleeve (6) between connecting plate (4) and backup pad (9), the both sides of first sleeve (5) and second sleeve (6) all articulate there are connecting rod (7), the left side connecting rod (7) are connected with connecting plate (4) are articulated, the right side connecting rod (7) are connected with backup pad (9) are articulated.
3. The detachable turnover ultrahigh-rise tower hanging wall-attached device of claim 2, which is characterized in that: a screw rod (8) is arranged between the first sleeve (5) and the second sleeve (6), the upper end of the screw rod (8) is rotatably connected with the first sleeve (5), the second sleeve (6) is in threaded connection with the screw rod (8), and a retaining ring is arranged at the top end of the screw rod (8).
4. The detachable turnover ultrahigh-rise tower wall-hanging device as claimed in claim 1, wherein: fixedly connected with cruciform structure's joint board (14) on the inside wall of a joint section of thick bamboo (13), a joint section of thick bamboo (13) and mounting (11) junction ring array have the teeth of a cogwheel, mounting (11) upper end is rotated and is connected with limiting plate (15), the top of limiting plate (15) is supported and is leaned on between two teeth of a cogwheel clearances, be equipped with the spring between limiting plate (15) and mounting (11), the top of fixing bolt (12) is equipped with cruciform structure's recess, the screw direction and the joint section of thick bamboo (13) of fixing bolt (12) rotate opposite direction.
CN202021434263.0U 2021-03-24 2021-03-24 Detachable turnover super high-rise tower crane wall-attached device Active CN213569259U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021434263.0U CN213569259U (en) 2021-03-24 2021-03-24 Detachable turnover super high-rise tower crane wall-attached device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021434263.0U CN213569259U (en) 2021-03-24 2021-03-24 Detachable turnover super high-rise tower crane wall-attached device

Publications (1)

Publication Number Publication Date
CN213569259U true CN213569259U (en) 2021-06-29

Family

ID=76551892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021434263.0U Active CN213569259U (en) 2021-03-24 2021-03-24 Detachable turnover super high-rise tower crane wall-attached device

Country Status (1)

Country Link
CN (1) CN213569259U (en)

Similar Documents

Publication Publication Date Title
CN106975890B (en) Setting tool for the welding of fire hydrant connecting bend
CN213569259U (en) Detachable turnover super high-rise tower crane wall-attached device
CN210887210U (en) Spud pile hammer strikes device for construction
CN201334770Y (en) Wall-attached supporting seat
CN212318381U (en) Special connecting and fixing frame for large industrial ceiling fan
CN213585109U (en) Pipeline supporting mechanism for weak current engineering
CN115434524B (en) Sliding rail device for inclined wall construction and construction method thereof
CN215667038U (en) 180-degree overturning frame for large prefabricated part
CN212983875U (en) Building construction is with building foundation ditch bearing structure convenient to installation demolishs
CN220100608U (en) Novel attachment structure for bay window position
CN214941162U (en) Concrete prefabricated component slab joint adjustment structure for architectural design
CN210597762U (en) Outer hanging steel protection architecture
CN217379288U (en) Safe formula steel construction node component
CN212359145U (en) Flow aiding device for grouting material raw material conveying pipeline
CN214162776U (en) Positioning installation mechanism of steel structure
CN213015361U (en) Erection joint spare for construction
CN220101295U (en) Auxiliary pipe conveying clamping tool for tunnel pipe shed
CN214996004U (en) Municipal construction is with square design braced frame
CN217268207U (en) Hanging fixing piece for building stone curtain wall
CN217054303U (en) A building templates for building engineering's be convenient for aggregate erection
CN220467349U (en) Independent mast for lifting air pipe
CN214838929U (en) Protection device for high-pressure water pipe
CN221053235U (en) Temporary positioning structure of large-size thin-wall prefabricated external wall panel
CN220434315U (en) Building shift initiative deviation correcting device
CN220058875U (en) Aluminum template transfer device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant