CN213539933U - Rail guard is used in water supply and drainage pipe construction - Google Patents

Rail guard is used in water supply and drainage pipe construction Download PDF

Info

Publication number
CN213539933U
CN213539933U CN202021150758.0U CN202021150758U CN213539933U CN 213539933 U CN213539933 U CN 213539933U CN 202021150758 U CN202021150758 U CN 202021150758U CN 213539933 U CN213539933 U CN 213539933U
Authority
CN
China
Prior art keywords
strut
groups
water supply
plate
support column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021150758.0U
Other languages
Chinese (zh)
Inventor
吕昌旭
吕礼红
青华吕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021150758.0U priority Critical patent/CN213539933U/en
Application granted granted Critical
Publication of CN213539933U publication Critical patent/CN213539933U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a protective guard for construction of a water supply and drainage pipeline, which comprises a first strut and a second strut, wherein a base is arranged at the bottom end of the first strut and the second strut, two groups of transverse rods are arranged at one side of the first strut relative to the second strut, a plurality of groups of telescopic vertical rods are arranged between the two groups of transverse rods, a sleeve plate is arranged at one side of the second strut relative to the first strut, a first chute is arranged at one side of the second strut relative to the first strut, a limiting hole is arranged at the other side of the second strut, a second chute is arranged at two sides of the inner wall of the sleeve plate, and two groups of sponge layers are arranged at two sides; two groups of fixed plates are arranged on one side of the sleeve plate and are arranged in parallel at the top end of one side of the sleeve plate, a fixed rotating plate is arranged at the top end of each fixed plate, and a rotating shaft bubble is arranged at the top end inside each fixed rotating plate; the utility model discloses can adjust the height and the length of rail guard, increase the practicality, can improve the factor of safety of construction evening.

Description

Rail guard is used in water supply and drainage pipe construction
Technical Field
The utility model relates to a rail guard field specifically is a rail guard is used in water supply and drainage pipe construction.
Background
The existing construction protective guard is generally divided into two types, one type is protected by a fixed upright post and an iron sheet, the installation is complicated, the other type is a single type and is generally used for temporary protection, however, the single type guardrails are mutually provided with neutral positions, and people riding bicycles or battery cars easily rush into a construction area under the dark condition, so that the improvement is needed.
The existing protective guard for drainage pipeline construction has certain disadvantages in use, is huge in problem type, cannot adjust length and height, cannot be disassembled, is labor-consuming to carry, low in practicability and not convenient enough; the existing protective guard for drainage pipeline construction does not have light irradiation in the using process, people riding bicycles or battery cars easily break into a construction area under the dark condition, improvement is needed, and certain influence is brought to practical use.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a protective guard for the construction of water supply and drainage pipelines, which can effectively solve the problems that the existing protective guard for the construction of the drainage pipelines has huge problem types, can not adjust the length and the height, can not be disassembled, is difficult to carry, has lower practicability and is not convenient enough; the existing protective guard for drainage pipeline construction does not have light irradiation in the using process, and people riding bicycles or battery cars easily break into a construction area under the dark condition, so that the technical problem needs to be improved.
The purpose of the utility model can be realized by the following technical scheme:
a protective guard for construction of a water supply and drainage pipeline comprises a first support and a second support, wherein a base is mounted at the bottom end of the first support and the second support, two groups of transverse rods are mounted on one side of the first support relative to the second support, a plurality of groups of telescopic vertical rods are mounted between the two groups of transverse rods, a sleeve plate is mounted on one side of the second support relative to the first support, a first sliding groove is formed in one side of the second support relative to the first support, a limiting hole is formed in the other side of the second support, two sliding grooves are formed in two sides of the inner wall of the sleeve plate, and two sponge layers are mounted on two sides of the;
two sets of fixed plates are installed to one side of lagging, and two sets of fixed plates parallel set up and lean on the top in lagging one side, fixed commentaries on classics board is installed on the top of fixed plate, the pivot is installed on the inside top of fixed commentaries on classics board, the blank is installed to the front end of lagging, the panel is installed on blank one side top, a plurality of groups bulb are installed to the bottom of panel.
As a further aspect of the present invention, the first pillar and the second pillar are parallel, and the rubber pad is installed at the bottom of the two sets of bases.
As a further aspect of the utility model, a plurality of groups flexible montant parallel arrangement is between two sets of horizontal poles, and the interval between the flexible montant of a plurality of groups equals.
As a further aspect of the present invention, it is two sets of the horizontal rods are parallelly disposed between the first pillar and the second pillar, and the two ends of the two sets of horizontal rods are movably connected to one side of the first pillar and one side of the second pillar.
As a further aspect of the present invention, the length and the width of the one end of the horizontal rod are both smaller than the length and the width of the one end of the sheathing plate, and the round hole is provided on the top of the horizontal rod and the sheathing plate.
As a further aspect of the present invention, the fluorescent layer is installed at the front end of the white board, and the rear end of the white board is fixedly connected to the front end of the sleeve plate through the fixed rotating plate.
The utility model has the advantages that:
the utility model discloses a set up flexible montant and lagging, utilize the lagging can be with flexible montant and horizontal pole retraction inside, reach the purpose of adjusting guardrail length, utilize the round hole that horizontal pole and lagging top were seted up, length after adjusting is fixed, spout one that sets up through pillar two and pillar one relative side, spout two that utilizes the lagging inner wall to install can carry out height control to lagging and horizontal pole, utilize spacing hole to fix the height after adjusting, protect the flexible montant after the retraction through setting up the sponge layer, increase the practicality of rail guard;
through setting up the fixed plate, utilize the fixed board that changes of fixed plate top installation, can make fixed board that changes upwards to rotate downwards through the pivot, utilize the fixed plate to fix the blank, through panel and the bulb of blank front end installation, expose the blank, utilize to set up the fluorescent layer, increase the visibility, remind passerby to notice.
Drawings
In order to facilitate understanding for those skilled in the art, the present invention will be further described with reference to the accompanying drawings.
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is an enlarged view of the region a in fig. 1 according to the present invention.
Fig. 3 is a side cross-sectional view of the race plate of the present invention.
In the figure: 1. a first support column; 2. a base; 3. a telescopic vertical rod; 4. a cross bar; 5. sheathing; 6. a first sliding chute; 7. a second support column; 8. a limiting hole; 9. fixing the rotating plate; 10. a rotating shaft; 11. a fixing plate; 12. a battery plate; 13. a bulb; 14. a white board; 15. a second chute; 16. a sponge layer.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the following embodiments, and it should be understood that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
As shown in fig. 1-3, a protective guard for construction of a water supply and drainage pipeline comprises a first support column 1 and a second support column 7, wherein a base 2 is installed at the bottom end of the first support column 1 and the second support column 7, two groups of cross rods 4 are installed on one side of the first support column 1 opposite to the second support column 7, a plurality of groups of telescopic vertical rods 3 are installed between the two groups of cross rods 4, a sleeve plate 5 is installed on one side of the second support column 7 opposite to the first support column 1, a first sliding groove 6 is formed on one side of the second support column 7 opposite to the first support column 1, a limiting hole 8 is formed on the other side of the second support column 7, two sliding grooves 15 are formed on two sides of the;
two sets of fixed plates 11 are installed to one side of lagging 5, and two sets of fixed plates 11 parallel arrangement lean on the top in lagging 5 one side, and fixed commentaries on classics board 9 is installed on the top of fixed plate 11, and pivot 10 is installed on the inside top of fixed commentaries on classics board 9, and blank 14 is installed to the front end of lagging 5, and panel 12 is installed on 14 one side tops of blank, and a plurality of group's bulbs 13 are installed to the bottom of panel 12.
The first support column 1 and the second support column 7 are arranged in parallel, rubber pads are installed at the bottom ends of the two groups of bases 2, the rubber pads are arranged to increase friction force, and stability is improved.
The telescopic vertical rods 3 of the plurality of groups are arranged between the two groups of the cross rods 4 in parallel, the distance between the telescopic vertical rods 3 of the plurality of groups is equal, the telescopic vertical rods 3 can conveniently adjust the height, and the practicability is improved.
Two sets of horizontal poles 4 parallel arrangement are between pillar one 1 and pillar two 7, and the equal swing joint in one side of pillar one 1 and pillar two 7 in both ends of two sets of horizontal poles 4, set up horizontal pole 4 and improve the stability of rail guard.
The length and the width of 4 one ends of horizontal pole all are less than the length and the width of 5 one ends of lagging, and the round hole has all been seted up on the top of horizontal pole 4 and lagging 5, sets up the round hole and can fix the length after adjusting.
The fluorescent layer is installed to whiteboard 14's front end, and whiteboard 14's rear end passes through fixed commentaries on classics board 9 fixed connection at the front end of lagging 5, sets up the fluorescent layer and improves the exposure, can remind better seeing.
When the utility model is used, when a drainage pipeline is constructed, the protective guard is placed on the periphery of a construction site by the protective guard, the protective guard can stand up by the base 2 at the bottom ends of the first support 1 and the second support 7, the telescopic vertical rods 3 and the cross rods 4 can be retracted into the inner part by the sleeve plate 5 by arranging the telescopic vertical rods 3 and the sleeve plate 5, the length of the protective guard can be adjusted by the round holes arranged at the top ends of the cross rods 4 and the sleeve plate 5, the adjusted length is fixed by the first sliding grooves 6 arranged at the opposite side of the first support 7 and the first support 1, the sleeve plate 5 and the cross rods 4 can be adjusted by the second sliding grooves 15 arranged on the inner wall of the sleeve plate 5, the adjusted height is fixed by the limiting holes 8, the retracted telescopic vertical rods 3 are protected by arranging the sponge layer 16, the practicability of the protective guard is increased, the fixed rotating plate 9 is arranged at the top end of the fixed plate 11 by arranging the fixed plate, can make fixed commentaries on classics board 9 upwards rotate downwards through pivot 10, utilize fixed commentaries on classics board 9 to fix blank 14, through panel 12 and bulb 13 of 14 front ends installations of blank, expose blank 14, utilize to set up the fluorescent layer, increase the visibility, remind passerby to notice, avoid the pedestrian to rush into the construction site, increase factor of safety.
The utility model discloses a set up flexible montant 3 and lagging 5, utilize lagging 5 can be with flexible montant 3 and horizontal pole 4 retraction inside, reach the purpose of adjusting guardrail length, utilize the round hole that horizontal pole 4 and lagging 5 top were seted up, fix the length after adjusting, spout one 6 that one side was seted up through pillar two 7 and pillar one 1 is relative, utilize spout two 15 of lagging 5 inner wall installation, can adjust lagging 5 and horizontal pole 4, utilize spacing hole 8 to fix the height after adjusting, protect flexible montant 3 after the income through setting up sponge layer 16, increase the practicality of rail guard; through setting up fixed plate 11, utilize fixed plate 11 top installation to change board 9, can make fixed board 9 that changes rotate downwards upwards through pivot 10, utilize fixed board 9 that changes to fix blank 14, through panel 12 and the bulb 13 of 14 front ends installations of blank, expose blank 14, utilize to set up the fluorescent layer, increase the visibility, remind passerby's attention.
The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical applications, to thereby enable others skilled in the art to best understand the invention for and utilize the invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims (6)

1. The protective guard for the construction of the water supply and drainage pipeline is characterized by comprising a first strut (1) and a second strut (7), wherein a base (2) is installed at the bottom end of the first strut (1) and the second strut (7), two groups of cross rods (4) are installed on one side, opposite to the first strut (7), of the first strut (1), a plurality of groups of telescopic vertical rods (3) are installed between the two groups of cross rods (4), a sleeve plate (5) is installed on one side, opposite to the first strut (1), of the second strut (7), a first sliding groove (6) is formed in each side, opposite to the first strut (1), of the second strut (7), a limiting hole (8) is formed in the front end of the second strut (7), two sliding grooves (15) are formed in two sides of the inner wall of the sleeve plate (5), and two sponge layers (16) are installed on two sides of the inner;
two sets of fixed plates (11) are installed to one side of lagging (5), and two sets of fixed plates (11) parallel arrangement lean on the top in lagging (5) one side, fixed commentaries on classics board (9) are installed on the top of fixed plate (11), pivot (10) are installed on the inside top of fixed commentaries on classics board (9), blank (14) are installed to the front end of lagging (5), panel (12) are installed on blank (14) one side top, a plurality of groups bulb (13) are installed to the bottom of panel (12).
2. The protective guard for water supply and drainage pipeline construction according to claim 1, wherein the first support column (1) and the second support column (7) are arranged in parallel, and rubber pads are installed at the bottom ends of the two sets of bases (2).
3. The protective fence for the construction of the water supply and drainage pipelines as claimed in claim 1, wherein a plurality of groups of the telescopic vertical rods (3) are arranged between two groups of the cross rods (4) in parallel, and the distance between the groups of the telescopic vertical rods (3) is equal.
4. The protective guard for water supply and drainage pipeline construction according to claim 1, wherein two groups of cross rods (4) are arranged in parallel between the first support column (1) and the second support column (7), and two ends of the two groups of cross rods (4) are movably connected to one side of the first support column (1) and one side of the second support column (7).
5. The protective guard for the water supply and drainage pipeline construction according to claim 1, wherein the length and the width of one end of the cross rod (4) are both smaller than those of one end of the sleeve plate (5), and round holes are formed in the top ends of the cross rod (4) and the sleeve plate (5).
6. The protective guard for water supply and drainage pipeline construction according to claim 1, wherein the front end of the white plate (14) is provided with a fluorescent layer, and the rear end of the white plate (14) is fixedly connected to the front end of the sleeve plate (5) through a fixed rotating plate (9).
CN202021150758.0U 2020-06-19 2020-06-19 Rail guard is used in water supply and drainage pipe construction Active CN213539933U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021150758.0U CN213539933U (en) 2020-06-19 2020-06-19 Rail guard is used in water supply and drainage pipe construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021150758.0U CN213539933U (en) 2020-06-19 2020-06-19 Rail guard is used in water supply and drainage pipe construction

Publications (1)

Publication Number Publication Date
CN213539933U true CN213539933U (en) 2021-06-25

Family

ID=76475408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021150758.0U Active CN213539933U (en) 2020-06-19 2020-06-19 Rail guard is used in water supply and drainage pipe construction

Country Status (1)

Country Link
CN (1) CN213539933U (en)

Similar Documents

Publication Publication Date Title
CN216445833U (en) Municipal garden construction is with preventing wind support
CN213539933U (en) Rail guard is used in water supply and drainage pipe construction
CN206090413U (en) A portable rail guard for road or building site
CN210066543U (en) Wind-proof sound barrier
CN111519975A (en) Security fence with warning function
CN209874658U (en) Rail guard is used in bridge construction
CN212671395U (en) Fence for municipal works convenient to installation
CN213653304U (en) Traffic construction is with crashproof formula guardrail
CN203654207U (en) Sound barrier convenient to maintain
CN207052209U (en) A kind of traffic indication board mounting bracket of overturning-preventing
CN213476668U (en) Strutting arrangement is used in construction of highway culvert
CN212077691U (en) Bend warning equipment for urban highway
CN211596394U (en) Safety guardrail for bridge
CN217001855U (en) Pavement board support for pedestrian passageway of shield tunnel
CN211773123U (en) Town road safety protection equipment
CN219973034U (en) Temporary traffic guide and change guardrail for road surface detection
CN221372990U (en) Building engineering safety guard rail
CN221143820U (en) Landscape guardrail
CN216339209U (en) Novel municipal works road jube
CN206941475U (en) A kind of multi-functional sidewalk guardrail
CN215441631U (en) Rail guard structure convenient to equipment on both sides of road
CN214943076U (en) High-speed railway isolation protective fence
CN214996661U (en) Subway engineering protection rail
CN220790377U (en) Stair railing structure of double-track stair
CN214152333U (en) Luminous guide board convenient to adjust

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant