CN213512432U - Support assembly - Google Patents

Support assembly Download PDF

Info

Publication number
CN213512432U
CN213512432U CN202021717496.1U CN202021717496U CN213512432U CN 213512432 U CN213512432 U CN 213512432U CN 202021717496 U CN202021717496 U CN 202021717496U CN 213512432 U CN213512432 U CN 213512432U
Authority
CN
China
Prior art keywords
support
bracket
fixedly connected
assembly
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021717496.1U
Other languages
Chinese (zh)
Inventor
朱中静
冯强
林盛正
李玮
胡成
李威航
李光为
杨帆
吴曦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Industry Corp Ltd
Original Assignee
China Construction Science and Industry Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Science and Industry Corp Ltd filed Critical China Construction Science and Industry Corp Ltd
Priority to CN202021717496.1U priority Critical patent/CN213512432U/en
Application granted granted Critical
Publication of CN213512432U publication Critical patent/CN213512432U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a bracket assembly for supporting the pipeline of a temporary building, which comprises a first bracket group, wherein the first bracket group can support the pipeline in the room of the temporary building, the first bracket group comprises a first bracket and a second bracket, the first bracket is arranged along the height direction of the temporary building, and the first end of the first bracket is fixedly connected with the ground; the second support sets up along the width or the length direction of interim building, the second end fixed connection of second support and first support, the second support has with ground and predetermines the distance, need not to rely on interim building body to support the pipeline, can not cause the harm to the body of interim building, can improve the life of interim building.

Description

Support assembly
Technical Field
The utility model belongs to the technical field of the temporary architecture and specifically relates to a support assembly is related to.
Background
The present emergency hospital adopts interim building material to splice fast and forms, needs to use multiple pipeline in the emergency hospital, for example fire-fighting pipeline, air pipe, water pipe, strong and weak electric crane span structure, oxygen hose, negative pressure pipe etc. these pipelines if adopt with fixed building on the same mounting means, interim building body can't provide sufficient holding power, can cause tearing of interim building body even, influence emergency hospital's use.
SUMMERY OF THE UTILITY MODEL
The utility model discloses aim at solving one of the technical problem that exists among the prior art at least. Therefore, the utility model provides a support assembly can install the pipeline on support assembly, can not cause the harm to the body of temporary building.
According to the utility model discloses a support assembly for supporting temporary building's pipeline, include, first support group, the pipeline can be supported in the indoor of temporary building to the first support group;
the first support group comprises a first support and a second support, the first support is arranged along the height direction of the temporary building, and the first end of the first support is fixedly connected with the ground;
the second support is arranged along the width direction or the length direction of the temporary building, the second support is fixedly connected with the second end of the first support, and a preset distance is reserved between the second support and the ground.
According to the utility model discloses support assembly has following technological effect at least: through the one end with first support fixed with ground, the other end fixed connection of second support and first support sets up the second support at predetermined height to fix the pipeline on the second support, need not to rely on the body of interim building to support the pipeline, can not lead to the fact the harm to the wall of interim building, can improve the life of interim building.
According to some embodiments of the invention, the first support is connected to the second support.
According to some embodiments of the invention, the first bracket set further comprises a third bracket located at a lower side of the second bracket.
According to some embodiments of the utility model, the third support with the quantity of first support is the same, the one end of third support with correspond first support fixed connection, the other end of third support with second leg joint.
According to some embodiments of the invention, the height of the third support from the ground is at least higher than the height of the door of the temporary building.
According to some embodiments of the present invention, the first bracket set comprises a plurality of pipe clamps, a plurality of the pipe clamps and the second bracket fixed connection.
According to some embodiments of the invention, the first support with the second support passes through fastener fixed connection.
According to some embodiments of the utility model, second support group can the outdoor supporting of temporary building the pipeline, second support group includes fourth support and fifth support, the fourth support is followed the direction of height setting of temporary building and with ground fixed connection, the fifth support with the upper end fixed connection of fourth support.
According to some embodiments of the utility model, the second support group still includes the bearing diagonal support, the one end of bearing diagonal support with fourth support fixed connection, the other end of bearing diagonal support with fifth support fixed connection.
According to some embodiments of the invention, the fourth support with be provided with the parallels between the ground.
Additional aspects and advantages of the invention will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention.
Drawings
Fig. 1 is a cross-sectional view of a bracket assembly according to an embodiment of the present invention;
FIG. 2 is a schematic view of the support lines of the rack assembly of FIG. 1;
FIG. 3 is a cross-sectional view of a bracket assembly according to another embodiment of the present invention;
fig. 4 is a schematic view of the support lines of the rack assembly of fig. 3.
Reference numerals:
a first bracket set 100, a first bracket 110, a first end 111, a second end 112, a second bracket 120, a third bracket 130, a boom 140, a pipe clamp 150;
a second bracket group 200, a fourth bracket 210, a fifth bracket 220, a sizing block 230, and an inclined support bracket 240;
the system comprises an air supply pipeline 300, a weak current bridge 400, a strong current bridge 500, a water supply pipe 600, a fire fighting pipe 700, an external exhaust pipe 800 and a fresh air pipe 900;
and C, temporary building A.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present invention, and should not be construed as limiting the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "axial", "radial", "circumferential", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention. Furthermore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless otherwise specified.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
A cradle assembly according to an embodiment of the present invention is described below with reference to fig. 1 to 2.
As shown in fig. 1 and 2, the bracket assembly according to the present invention includes a first bracket set 100, and the first bracket set 100 includes a first bracket 110 and a second bracket 120.
The first bracket group 100 is arranged indoors in the temporary building a, the first bracket group 100 includes a first bracket 110 and a second bracket 120, the first bracket 110 is arranged along the height direction of the temporary building a, the first end 111 of the first bracket 110 is fixedly connected with the ground, as shown in fig. 1, the second bracket 120 is arranged along the width direction of the temporary building a, the second bracket 120 can also be arranged along the length direction of the temporary building a, the second bracket 120 is fixedly connected with the second end 112 of the first bracket 110, and the second bracket 120 is at a preset distance from the ground.
As shown in fig. 1, the first bracket 110 is fixedly connected to the ground, and the first bracket 110 may be connected to the ground by embedding a bolt in the ground, then pouring concrete into the ground, or drilling a hole in the concrete ground, inserting the bolt into the drilled hole, pouring the bar-planting glue into the hole until the bar-planting glue is solidified, inserting the bolt into the mounting hole of the first bracket 110, and fixing the first bracket 110 to the ground by using a nut.
The first support 110 may directly extend from the ground to the ceiling, the second support 120 is fixedly connected to the second end 112 of the first support 110, the second support 120 has a certain gap from the ceiling, so that there is a sufficient gap between the second support 120 and the ceiling to place the air supply duct 300, the weak current bridge 400, the strong current bridge 500, the water supply pipe 600, the fire fighting pipe 700, etc., and the air supply duct 300, the weak current bridge 400, the strong current bridge 500, the water supply pipe 600, the fire fighting pipe 700, etc., may be directly placed on the second support 120, or may be fixedly connected by fasteners, etc. The first bracket 110 may also extend from the ground to the height of the second bracket 120, and the second bracket 120 may be fixed to the end of the second end 112 of the first bracket 110 such that the second bracket 120 has a predetermined distance from the ceiling. Through setting up first support group indoor, the pipeline installation of the temporary building of being convenient for prevents to cause tearing of temporary building body with the pipeline installation on the body of temporary building.
The first support group is arranged indoors in the temporary building A, the first support group is arranged at intervals along the moving direction of the pipeline, so that the pipeline can be supported sufficiently, the first support group is arranged at intervals of a fixed distance for enabling the stress of the pipeline to be uniform, and the distance between every two adjacent first support groups is not more than 2 meters for ensuring that the supports have sufficient supporting force.
In a further embodiment of the present invention, the first bracket 110 is connected to both ends of the second bracket 120. As shown in fig. 1, the first bracket 110 is disposed adjacent to the body of the temporary building a and disposed at both ends of the second bracket 120, so that the first bracket 110 and the second bracket 120 can form a door-shaped structure, the supporting force of the second bracket is increased, and the first bracket 110 is disposed adjacent to the body, thereby increasing the indoor space.
In a further embodiment of the present invention, the first bracket set further includes a third bracket 130, the third bracket 130 is located at the lower side of the second bracket 120, and the third bracket 130 is fixedly connected to the first bracket 110. The third support 130 and the second support 120 have a certain distance, so that the exhaust pipe 800 can be conveniently placed on the third support 130, and the accumulation of pipelines on the second support 120 can be reduced through the arrangement of the third support 130, so that the pipelines can be conveniently overhauled.
In a further embodiment of the present invention, the number of the third brackets 130 is the same as that of the first brackets 110, one end of the third bracket 130 is fixedly connected to the corresponding position of the first bracket 110, and the other end of the third bracket 130 is connected to the second bracket 120, specifically, as shown in fig. 1, one end of the third bracket 130 is fixedly connected to the first bracket 110, and the other end of the third bracket 130 is fixedly connected to the second bracket 120 through the suspension rod 140, so that the stability of the third bracket 130 can be improved by fixedly connecting the two ends of the third bracket 130. The length of the two third brackets 130 is longer than the width of the exhaust duct 800, and a certain interval is formed between the two third brackets 130, so that the space occupied by the bracket assembly in the temporary building room can be reduced.
In a further embodiment of the present invention, the height of the third bracket 130 from the ground is at least higher than the height of the door of the temporary building a. In order to ensure the normal opening of the door of the temporary building, the height of the third bracket 130 from the ground is set to be greater than 2080 mm.
In a further embodiment of the present invention, the first bracket set includes a plurality of pipe clamps 150, the pipe clamps 150 are fixedly connected to the second bracket 120, as shown in fig. 3 and 4, fig. 4 shows a cross-sectional view of the doctor-patient walkway, a ventilation pipe, a fire hose, an oxygen hose and a negative pressure hose are required to be used in the doctor-patient walkway, the ventilation pipe, the fire hose, the oxygen hose and the negative pressure hose are fixedly mounted on the second bracket 120 by providing a plurality of pipe clamps 150 below the second bracket 120, and the size of the pipe clamps 150 can be selected according to the thickness of the pipeline.
In a further embodiment of the present invention, the first bracket 110 is fixedly connected to the second bracket 120 through a fastener, so that the first bracket 110 and the second bracket 120 can be detachably connected through the fastener, and the reliability of the connection can be ensured. Also can adopt fastener fixed connection between first support 110 and the third support 130, the indoor stand passes through the fastener and connects, compares in welded connected mode, can reduce the possibility of the conflagration of taking place, improves the security of construction.
In the utility model discloses a further embodiment, as shown in fig. 3 to 4, still include second support group 200, second support group 200 sets up in temporary building a's the outdoor, and with ground fixed connection, second support group 200 includes fourth support 210 and fifth support 220, fourth support 210 sets up along temporary building a's direction of height, fifth support 220 sets up along temporary building's width direction and with fourth support 210 fixed connection, outside exhaust pipe 800 and new tuber pipe 900 are placed on fifth support 220, the height of fourth support 210 is higher than temporary building's height, be convenient for arrange new tuber pipe 900 indoor to temporary building. Fourth bracket 210 is a tubular bracket, and may be an N65 hot-dip galvanized pipe, and fifth bracket 220 may be a No. 6 hot-dip galvanized angle steel or other structural steel.
In the utility model discloses a further embodiment, second support group 200 still includes the bearing diagonal support (not shown in the figure), the one end and the fourth support 210 fixed connection of bearing diagonal support, the other end and the fifth support 220 of bearing diagonal support, it is specific, the middle part fixed connection of fourth support 210 and fifth support 220, the bearing diagonal support sets up the both sides at fourth support 210, the one end and the fourth support 210 fixed connection of bearing diagonal support, the other end and the fifth support 220 fixed connection of bearing diagonal support, can adopt welding mode fixed connection or adopt detachable mode fixed connection between bearing diagonal support and fourth support 210, the fifth support 220. The inclined support bracket, the fourth bracket 210 and the fifth bracket 220 form a triangle, so that the supporting force and the stability of the second bracket set 200 can be improved.
In a further embodiment of the present invention, a pad 230 is disposed between the fourth bracket 210 and the ground, and the elevation or the levelness can be adjusted by using the pad 230, so as to further ensure the stability of the second bracket set 200.
While embodiments of the present invention have been shown and described, it will be understood by those of ordinary skill in the art that: various changes, modifications, substitutions and alterations can be made to the embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the claims and their equivalents.

Claims (10)

1. A support assembly for supporting a pipeline of a temporary structure, comprising,
a first set of racks capable of supporting the pipeline within the interior of the temporary building;
the first support group comprises a first support and a second support, the first support is arranged along the height direction of the temporary building, and the first end of the first support is fixedly connected with the ground;
the second support is arranged along the width direction or the length direction of the temporary building, the second support is fixedly connected with the second end of the first support, and a preset distance is reserved between the second support and the ground.
2. The bracket assembly of claim 1, wherein the first bracket is attached to both ends of the second bracket.
3. The cradle assembly of claim 1, wherein the first cradle set further comprises a third cradle located on an underside of the second cradle.
4. The support assembly of claim 3, wherein the number of the third supports is the same as that of the first supports, one end of each third support is fixedly connected with the corresponding first support, and the other end of each third support is connected with the corresponding second support.
5. The bracket assembly of claim 4 wherein the third bracket is at a height from the ground that is at least higher than a height of a door of the temporary building.
6. The mount assembly of any one of claims 1-4, the first mount set comprising a plurality of tube clamps fixedly connected to the second mount.
7. The bracket assembly of any one of claims 1 to 4, said first bracket being fixedly connected to said second bracket by fasteners.
8. The cradle assembly of claim 1, comprising,
the second support group can support the pipeline outdoors of the temporary building, the second support group comprises a fourth support and a fifth support, the fourth support is arranged along the height direction of the temporary building and fixedly connected with the ground, and the fifth support is fixedly connected with the upper end of the fourth support.
9. The support assembly of claim 8, wherein the second support set further comprises an inclined support, one end of the inclined support is fixedly connected with the fourth support, and the other end of the inclined support is fixedly connected with the fifth support.
10. The cradle assembly of claim 8, wherein a back iron is disposed between the fourth cradle and the ground.
CN202021717496.1U 2020-08-14 2020-08-14 Support assembly Active CN213512432U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021717496.1U CN213512432U (en) 2020-08-14 2020-08-14 Support assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021717496.1U CN213512432U (en) 2020-08-14 2020-08-14 Support assembly

Publications (1)

Publication Number Publication Date
CN213512432U true CN213512432U (en) 2021-06-22

Family

ID=76440294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021717496.1U Active CN213512432U (en) 2020-08-14 2020-08-14 Support assembly

Country Status (1)

Country Link
CN (1) CN213512432U (en)

Similar Documents

Publication Publication Date Title
CN213512432U (en) Support assembly
CN111720626A (en) Adjustable support and hanger
CN213684245U (en) Pipeline support for duct piece
CN213390229U (en) A hang in midair piping lane for laying pipeline in room
JP3150922U (en) Drain-up piping for air conditioning indoor units
CN211599746U (en) Fire control riser bearing support
CN220768798U (en) Prefabricated post construction platform with adjustable
JP4494059B2 (en) Unit construction method for horizontal duct
JP5284912B2 (en) Exposed duct support structure
CN220539120U (en) Connection fixing device and smoke exhaust system
CN211126936U (en) Adjustable cable bridge fixing device
CN218205285U (en) Siphon drainage device
CN215635423U (en) Connecting piece of anti-seismic support and hanger structure and anti-seismic support and hanger structure
CN215293871U (en) A gallows for installation of many pipeline modularization of level
CN218236382U (en) Whole prefabricated frame construction of complicated node of pipeline
CN220598749U (en) Support and hanger embedded part suitable for steel structure engineering of steel bar truss building carrier plate
CN213018107U (en) High-strength flue hanger
CN217273363U (en) Steel construction suspension screw support that takes precautions against earthquakes
CN219388819U (en) Rectangular air pipe bidirectional supporting structure
CN219413788U (en) Single truss support structure with unidirectional side support
CN220770331U (en) Interval pipeline comprehensive support suitable for embedded sleeve
CN219530094U (en) Ventilation pipe mounting structure based on space is restricted
CN219755572U (en) Combined water pipe side longitudinal anti-seismic support and hanger capable of being supported by multiple pipes
CN215635422U (en) Connecting component of steel cable type anti-seismic support and anti-seismic support hanging structure
CN212509818U (en) Adjustable air conditioner water pipe mounting support hanger below dn100

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant