CN213509547U - Scaffold frame that engineering construction used links wall spare - Google Patents

Scaffold frame that engineering construction used links wall spare Download PDF

Info

Publication number
CN213509547U
CN213509547U CN202022189127.6U CN202022189127U CN213509547U CN 213509547 U CN213509547 U CN 213509547U CN 202022189127 U CN202022189127 U CN 202022189127U CN 213509547 U CN213509547 U CN 213509547U
Authority
CN
China
Prior art keywords
wall
pipe
plate
rotating
coupling mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022189127.6U
Other languages
Chinese (zh)
Inventor
赵子帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022189127.6U priority Critical patent/CN213509547U/en
Application granted granted Critical
Publication of CN213509547U publication Critical patent/CN213509547U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a scaffold frame even wall spare that engineering construction used, including connecting pipe and connecting plate, the connecting pipe is pre-buried in the building subject, and the connecting hole has been seted up to the upper surface of connecting plate, still includes coupling mechanism, and coupling mechanism is located the connecting hole, is equipped with the rotor plate in the coupling mechanism, and coupling mechanism is assembled for through applying effort in coupling mechanism, makes the rotor plate keep moving to make connecting plate and connecting pipe keep fixed. The utility model provides a scaffold frame of engineering construction usefulness links wall spare, can save the workman in the time that the erection joint board consumeed, can improve workman's work efficiency, fix fixing base and scaffold frame main part pipe through the turning block, accomplish the fixing of scaffold frame main part pipe and connecting plate, can save the workman in the time of connecting the scaffold frame main part with linking the wall spare, can improve workman's work efficiency, save workman's physical power, moreover, the steam generator is simple in structure, the workman of being convenient for uses, the producer that can be convenient for simultaneously produces.

Description

Scaffold frame that engineering construction used links wall spare
Technical Field
The utility model relates to a scaffold frame is wall spare technical field even, relates to a scaffold frame is wall spare even that engineering construction used particularly.
Background
The wall connecting member generally means a member for reinforcing stability of other structures by being connected to a reliable fixing end, and a member for connecting a scaffold body to a building main structure in a construction work, capable of transferring a tensile force and a compressive force. Can build the scaffold frame when building engineering and make things convenient for the workman to be under construction, when building the scaffold frame, need use even wall spare to connect scaffold frame body and building wall to prevent that scaffold frame body and building wall break away from when the construction, cause the incident.
The existing wall connecting piece is mostly installed by adopting an embedded method during installation, the existing embedded method needs to precast a long section of steel pipe in a building main body, when the other part of the wall connecting piece is connected with the precast steel pipe, the connection mode is too complicated, the wall connecting piece cannot be quickly disassembled during disassembly, and simultaneously after the pouring is finished, a scaffold frame body is connected with the wall connecting piece, the existing connection method is more complicated, a large amount of manpower is consumed during the disassembly and installation, the working efficiency of workers is reduced, and the engineering is delayed, so that when the other part of the wall connecting piece is connected with the precast steel pipe, the connection mode is too complicated, the wall connecting piece cannot be quickly disassembled during the disassembly and the existing connection method is more complicated, a large amount of manpower is consumed during the disassembly and installation, and the working efficiency of workers is reduced, leading to the problem of engineering delay.
SUMMERY OF THE UTILITY MODEL
In view of the above-mentioned problem that prior art exists, an aspect aim at provides a scaffold frame of engineering construction usefulness is wall spare even, when the scaffold frame that aims at solving current engineering construction usefulness is wall spare even has another part of wall spare and is connected with the steel pipe of pouring in advance, connected mode is too loaded down with trivial details, can not dismantle fast when dismantling and current connected method is comparatively loaded down with trivial details, can consume a large amount of manpowers when demolising and installing, cause workman work efficiency to descend, lead to the problem of engineering delay.
Technical scheme
In order to realize the above-mentioned purpose, the utility model provides a pair of scaffold frame even wall spare that engineering construction used, including connecting pipe and connecting plate, the connecting pipe is pre-buried in building subject, the connecting hole has been seted up to the upper surface of connecting plate, still includes coupling mechanism, coupling mechanism is located in the connecting hole, be equipped with the rotor plate in the coupling mechanism, coupling mechanism is assembled for through applying the effort in coupling mechanism makes the rotor plate keeps moving, so that connecting plate and connecting pipe keep fixed.
Preferably, the scaffold device further comprises a fixing mechanism and a scaffold main body tube, wherein the fixing mechanism is fixedly installed at a center shaft of the outer wall of one side of the connecting plate, square grooves are symmetrically formed in the outer wall of the scaffold main body tube, pushing blocks are fixedly installed on the side walls of the square grooves, and the fixing mechanism is assembled to enable the scaffold main body tube and the fixing mechanism to be kept fixed through applying acting force to the fixing mechanism.
Preferably, a clamping groove is formed in the connecting pipe, the connecting mechanism comprises a fixed pipe, a connecting ring and a threaded nail, a rotating groove is formed in an annular array of the outer wall of the fixed pipe, the threaded nail is connected in the fixed pipe in a threaded mode, the connecting ring is connected to the outer wall of the threaded nail in a threaded mode, a connecting rod is hinged to the annular array of the outer wall of the connecting ring, the rotating plate is hinged to the rotating groove, one end, far away from the connecting ring, of the connecting rod is hinged to the inner wall of one side of the rotating plate, and a sliding groove piece is arranged in the annular array of the outer.
Preferably, the fixing mechanism comprises a fixing seat and a rotating block, a rotating square groove is symmetrically formed in the outer wall of the fixing seat, the rotating block is hinged in the rotating square groove, and a clamping block is fixedly mounted on the outer wall of one side of the rotating block.
Preferably, the rotating plate is made of iron-carbon alloy integrally.
Preferably, the fixing pipe is made of iron-carbon alloy integrally.
Advantageous effects
Compared with the prior art, the utility model provides a pair of scaffold frame of engineering construction usefulness is wall spare even possesses following beneficial effect:
1. the utility model discloses a, when the installation, the workman makes the rotor plate keep rotating through the screw thread nail that rotates coupling mechanism, with the joint groove joint in rotor plate and the fixed tube, makes connecting plate and building subject wall keep fixed to realize the quick installation and the dismantlement of the connection of connecting plate and building subject wall, can save the workman in the time that the erection joint board consumes, can improve workman's work efficiency.
2. The utility model discloses a, fix fixing base and scaffold frame main part pipe through the turning block, accomplish the fixed of scaffold frame main part pipe and connecting plate, can save the workman in the time of connecting scaffold frame main part and even wall spare, can improve workman's work efficiency, save workman's physical power.
3. The utility model discloses a, simple structure, the workman of being convenient for uses, and the producer that can be convenient for simultaneously produces.
It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the disclosure.
This document provides an overview of various implementations or examples of the technology described in this disclosure, and is not a comprehensive disclosure of the full scope or all features of the disclosed technology.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic view of the connection structure of the connection mechanism and the connection pipe of the present invention;
fig. 3 is a schematic view of the connection structure of the scaffold main body tube and the fixing mechanism of the present invention;
FIG. 4 is a schematic view of the connection structure of the connection mechanism and the connection plate of the present invention;
fig. 5 is an exploded view of the connection mechanism of the present invention.
The main reference numbers:
1. a connecting pipe; 2. a connecting plate; 3. a connecting mechanism; 31. a rotating plate; 32. a fixed tube; 33. a connecting ring; 34. a threaded nail; 35. a connecting rod; 36. a chute member; 4. a fixing mechanism; 41. a fixed seat; 42. rotating the block; 43. a clamping block; 5. scaffold frame main part pipe.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present disclosure more clear, the technical solutions of the embodiments of the present disclosure will be described below clearly and completely with reference to the accompanying drawings of the embodiments of the present disclosure. It is to be understood that the described embodiments are only a few embodiments of the present disclosure, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the described embodiments of the disclosure without any inventive step, are within the scope of protection of the disclosure.
Unless otherwise defined, technical or scientific terms used herein shall have the ordinary meaning as understood by one of ordinary skill in the art to which this disclosure belongs. The use of the word "comprising" or "comprises", and the like, in this disclosure is intended to mean that the elements or items listed before that word, include the elements or items listed after that word, and their equivalents, without excluding other elements or items. The terms "connected" or "coupled" and the like are not restricted to physical or mechanical connections, but may also include electrical connections, whether direct or indirect. "upper", "lower", "left", "right", and the like are used merely to indicate relative positional relationships, and when the absolute position of the object being described is changed, the relative positional relationships may also be changed accordingly.
To maintain the following description of the embodiments of the present disclosure clear and concise, a detailed description of known functions and known components have been omitted from the present disclosure.
Referring to fig. 1 to 5, a scaffold wall connecting member for engineering construction includes a connecting pipe 1 and a connecting plate 2, the connecting pipe 1 is pre-embedded in a building body, a connecting hole is formed in an upper surface of the connecting plate 2, the connecting mechanism 3 is located in the connecting hole, a rotating plate 31 is provided in the connecting mechanism 3, and the connecting mechanism 3 is assembled to keep the rotating plate 31 moving by applying an acting force to the connecting mechanism 3, so that the connecting plate 2 and the connecting pipe 1 are kept fixed. The rotating plate 31 is made of iron-carbon alloy integrally, when the connecting structure is installed, a worker can rotate the rotating plate 31 by rotating the threaded nail 34 of the connecting mechanism 3, the rotating plate 31 is clamped with the clamping groove in the fixing pipe 32, the connecting plate 2 and the building main wall can be fixed, the connecting plate 2 and the building main wall can be quickly installed and detached, the time consumed by the worker in installing the connecting plate 2 can be saved, and the working efficiency of the worker can be improved.
Referring to fig. 1-5, the present invention further provides a fixing mechanism 4 and a main body tube 5, wherein the fixing mechanism 4 is fixedly mounted at the middle axis of the outer wall of one side of the connecting plate 2, a square groove is symmetrically formed on the outer wall of the main body tube 5, a pushing block 6 is fixedly mounted on the side wall of the square groove, and the fixing mechanism 4 is assembled to fix the main body tube 5 and the fixing mechanism 4 by applying an acting force to the fixing mechanism 4. When the scaffold is installed, the scaffold main body pipe 5 is inserted into the fixing seat 41 of the fixing mechanism 4, the fixing seat 41 and the scaffold main body pipe 5 are fixed through the rotating block 42, the scaffold main body pipe 5 and the connecting plate 2 are fixed, the time for connecting the scaffold main body and the wall connecting piece by a worker can be saved, the working efficiency of the worker can be improved, and the physical strength of the worker can be saved.
Please refer to fig. 1-5, in the further proposed technical solution of the present invention, the inside joint groove that is equipped with of connecting pipe 1, coupling mechanism 3 includes fixed pipe 32, go-between 33 and screw nail 34, the outer wall annular array of fixed pipe 32 has seted up the rotation groove, screw nail 34 threaded connection is in fixed pipe 32, go-between 33 threaded connection is in screw nail 34's outer wall, the outer wall annular array of go-between 33 articulates there is connecting rod 35, rotor plate 31 articulates in rotating the inslot, the one end that connecting rod 35 kept away from go-between 33 articulates in the inner wall of rotor plate 31 one side, the outer wall annular array of fixed pipe 32 is provided with chute piece 36. The fixing tube 32 is integrally made of iron-carbon alloy. When the connecting plate is used, the connecting plate 2 and a building wall are supported, the connecting mechanism 3 penetrates through the connecting hole, the connecting mechanism 3 is located in the connecting pipe 1, the screw 34 is rotated by using a wrench, the connecting ring 33 keeps moving on the outer wall of the screw 34 while the screw 34 rotates, the connecting rod 35 enables the rotating plate 31 to keep rotating while the screw 34 keeps moving, one end of the rotating plate 31 is located in the clamping groove of the connecting pipe 1, the connecting plate 2 is fixed on the wall of a building main body after the connecting plate 2 is fixed, and the sliding groove piece 36 can be matched with the connecting plate 2 to position the fixing pipe 32.
Referring to fig. 1-5, in the further proposed technical solution of the present invention, the fixing mechanism 4 includes a fixing base 41 and a rotating block 42, a rotating square groove is symmetrically formed on the outer wall of the fixing base 41, the rotating block 42 is hinged in the rotating square groove, and a clamping block 43 is fixedly mounted on the outer wall of one side of the rotating block 42. When the scaffold main body pipe pushing device is used, the scaffold main body pipe 5 is inserted into the fixing seat 41, the pushing block 6 is made to push the rotating block 42 to rotate, the clamping blocks 43 on the rotating block 42 are made to rotate to the clamping grooves in the scaffold main body pipe 5, fixing of the connecting plate 2 and the scaffold main body pipe 5 is completed, when the scaffold main body pipe pushing device needs to be detached, the rotating block 42 is rotated, one end of the rotating block 42 pushes the pushing block 6, and the scaffold main body pipe 5 is pushed out of the fixing seat 41.
The working principle is as follows:
the first step is as follows: when the connecting plate is used, the connecting plate 2 and a building wall are supported, the connecting mechanism 3 penetrates through the connecting hole, the connecting mechanism 3 is located in the connecting pipe 1, the threaded nail 34 is rotated by using a wrench, the connecting ring 33 keeps moving on the outer wall of the threaded nail 34 while the threaded nail 34 rotates, the connecting rod 35 enables the rotating plate 31 to keep rotating while the threaded nail 34 keeps moving, one end of the rotating plate 31 is located in the clamping groove of the connecting pipe 1, and the connecting plate 2 is fixed on the wall of a building main body.
The second step is that: when fixing scaffold main body pipe 5 and fixing base 41 fixedly in needs, insert scaffold main body pipe 5 in fixing base 41, make and promote 6 promotion turning blocks 42 and rotate, make the joint piece 43 on the turning blocks 42 rotate to the joint inslot on scaffold main body pipe 5, accomplish the fixed to connecting plate 2 and scaffold main body pipe 5.
The third step: when the scaffold is required to be detached, the rotating block 42 is rotated, so that one end of the rotating block 42 pushes the pushing block 6, and the scaffold main body pipe 5 is pushed out of the fixing seat 41.
It will be appreciated by those skilled in the art that other similar connections may be used to implement the present invention. Such as welding, bonding, or screwing.
The above embodiments are merely exemplary embodiments of the present invention, which is not intended to limit the present invention, and the scope of the present invention is defined by the appended claims. Various modifications and equivalents may be made by those skilled in the art to the present invention without departing from the spirit and scope of the invention, and such modifications and equivalents should be considered to be within the scope of the invention.

Claims (6)

1. The utility model provides a scaffold frame even wall spare that engineering construction used, includes connecting pipe (1) and connecting plate (2), connecting pipe (1) is pre-buried in the building subject, the connecting hole has been seted up to the upper surface of connecting plate (2), its characterized in that still includes coupling mechanism (3), coupling mechanism (3) are located in the connecting hole, be equipped with rotor plate (31) in coupling mechanism (3), coupling mechanism (3) be assembled for through applying effort in coupling mechanism (3), make rotor plate (31) keep moving, so that connecting plate (2) and connecting pipe (1) keep fixed.
2. The scaffold wall connecting piece for engineering construction according to claim 1, further comprising a fixing mechanism (4) and a scaffold main body tube (5), wherein the fixing mechanism (4) is fixedly installed at the central axis of the outer wall of one side of the connecting plate (2), the outer wall of the scaffold main body tube (5) is symmetrically provided with square grooves, the side walls of the square grooves are fixedly provided with pushing blocks (6), and the fixing mechanism (4) is assembled to enable the scaffold main body tube (5) and the fixing mechanism (4) to be kept fixed by applying an acting force on the fixing mechanism (4).
3. A scaffolding wall element for use in construction works as claimed in claim 1, a clamping groove is arranged in the connecting pipe (1), the connecting mechanism (3) comprises a fixed pipe (32), a connecting ring (33) and a threaded nail (34), the outer wall of the fixed pipe (32) is provided with a rotary groove in an annular array, the screw nail (34) is connected in the fixed pipe (32) in a threaded manner, the connecting ring (33) is in threaded connection with the outer wall of the threaded nail (34), the outer wall of the connecting ring (33) is hinged with connecting rods (35) in an annular array, the rotating plate (31) is hinged in the rotating groove, one end of the connecting rod (35) far away from the connecting ring (33) is hinged on the inner wall of one side of the rotating plate (31), the outer wall of the fixed pipe (32) is provided with a sliding groove piece (36) in an annular array.
4. The scaffold wall connecting piece for engineering construction according to claim 2, wherein the fixing mechanism (4) comprises a fixing seat (41) and a rotating block (42), a rotating square groove is symmetrically formed in the outer wall of the fixing seat (41), the rotating block (42) is hinged in the rotating square groove, and a clamping block (43) is fixedly mounted on the outer wall of one side of the rotating block (42).
5. The scaffolding wall element for engineering work as claimed in claim 1, wherein the rotating plate (31) is formed of iron carbon alloy in one piece.
6. A scaffolding element for use in connection with wall work according to claim 3, wherein said fixing tube (32) is made of iron carbon alloy in one piece.
CN202022189127.6U 2020-09-29 2020-09-29 Scaffold frame that engineering construction used links wall spare Active CN213509547U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022189127.6U CN213509547U (en) 2020-09-29 2020-09-29 Scaffold frame that engineering construction used links wall spare

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022189127.6U CN213509547U (en) 2020-09-29 2020-09-29 Scaffold frame that engineering construction used links wall spare

Publications (1)

Publication Number Publication Date
CN213509547U true CN213509547U (en) 2021-06-22

Family

ID=76463858

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022189127.6U Active CN213509547U (en) 2020-09-29 2020-09-29 Scaffold frame that engineering construction used links wall spare

Country Status (1)

Country Link
CN (1) CN213509547U (en)

Similar Documents

Publication Publication Date Title
CN213509547U (en) Scaffold frame that engineering construction used links wall spare
CN102979183B (en) Embedded cylindrical nut anchor bed and use method thereof
CN111236475B (en) Anti-seismic assembled shear wall structure convenient to install
CN106592872B (en) Steel concrete supporting structure and installation method
CN113757452B (en) Design and construction method for fabricated building earthquake-resistant support and hanger
CN212336742U (en) Building templates that be convenient for aggregate erection that building engineering used
CN215564386U (en) Assembled structure of building main body engineering
CN110043033A (en) Aluminum alloy mould plate system accepts template pre-embedded device
CN212715928U (en) Template component for hydraulic and hydroelectric engineering construction
CN212287466U (en) Deep well pump coupling dismantles calliper
CN201152014Y (en) Scaffolding connector
CN108442682B (en) Connecting structure and mounting method of scaffold steel pipes
CN202290253U (en) Self-pressing and self-pulling device of large-size expansion sleeve
CN214220620U (en) Aluminum template connecting piece
CN215631539U (en) Building engineering external scaffolding is wall spare even
CN216553038U (en) Concrete building template for civil engineering
CN216616837U (en) Aluminum mould K board reinforcing apparatus
CN214272651U (en) Strengthening rib structure for building engineering construction
CN214195135U (en) Curtain convenient to dismantle and installation
CN219794614U (en) Easily-installed outer scaffold wall connecting piece
CN215978469U (en) Aluminum template sleeve fixing device
CN109518969B (en) Semi-solid forming diagonal bracing mechanism
CN219993119U (en) Supporting device for building stair templates
CN219993214U (en) Assembled ring beam reinforcing structure with pretightening force
CN212836764U (en) Anchor clamps are used in preparation of steel bar sleeve grout attach fitting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant