CN213508884U - Board is placed to air conditioner of job site hoist and mount of being convenient for - Google Patents

Board is placed to air conditioner of job site hoist and mount of being convenient for Download PDF

Info

Publication number
CN213508884U
CN213508884U CN202022182765.5U CN202022182765U CN213508884U CN 213508884 U CN213508884 U CN 213508884U CN 202022182765 U CN202022182765 U CN 202022182765U CN 213508884 U CN213508884 U CN 213508884U
Authority
CN
China
Prior art keywords
air conditioner
limiting
limiting hole
placing plate
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022182765.5U
Other languages
Chinese (zh)
Inventor
胡志彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Hongsheng Construction Group Co ltd
Original Assignee
Fujian Hongsheng Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Hongsheng Construction Group Co ltd filed Critical Fujian Hongsheng Construction Group Co ltd
Priority to CN202022182765.5U priority Critical patent/CN213508884U/en
Application granted granted Critical
Publication of CN213508884U publication Critical patent/CN213508884U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Air Filters, Heat-Exchange Apparatuses, And Housings Of Air-Conditioning Units (AREA)

Abstract

The utility model relates to an air conditioner placing plate convenient for hoisting in construction site, which comprises an air conditioner placing plate, wherein the air conditioner placing plate is provided with hoisting holes, the air conditioner placing plate is provided with a plurality of elastic devices, each elastic device comprises a first limiting hole, a second limiting hole and a limiting plate, L-shaped clamping blocks are respectively arranged on two sides of the first limiting hole, a U-shaped limiting frame is arranged below the L-shaped clamping block, and a second limiting hole is arranged in the U-shaped limiting frame; the head of limiting plate passes L type clamp splice, penetrates in the spacing frame of U type, the utility model provides a board is placed to the air conditioner of job site hoist and mount of being convenient for, two hole for hoist are reserved respectively to front side and rear side when the board is placed to the preparation air conditioner, reduce the risk that the threaded rod drops or removes, the left and right sides face all has the embedded bar embedding, be connected the back with embedded bar and outside support, the platform is just more stable firm, improve the bearing capacity of prefabricated platform, the setting of boss can increase stability, it drops to block the outer machine of air conditioner when strong wind.

Description

Board is placed to air conditioner of job site hoist and mount of being convenient for
Technical Field
The utility model relates to a construction technical field, especially a board is placed to air conditioner of job site hoist and mount of being convenient for.
Background
Along with the development of the times, air conditioners are installed in families, when floor construction is carried out, architects can reserve places where air conditioner outdoor units are placed, the air conditioner outdoor units can be conveniently placed when the air conditioners are installed in house owners in decoration, the height of the floors is increased, the air conditioner placing plates in the traditional hoisting mode are provided with threaded holes in the upper surfaces and then hoisted to a specified place through tower cranes, the risk that threaded rods fall off or move exists, the left side face and the right side face of the traditional scheme are not embedded with embedded steel bars, and the stability and the bearing capacity of the platform are reduced.
SUMMERY OF THE UTILITY MODEL
In order to solve the problems, the utility model aims at providing a board is placed to air conditioner of job site hoist and mount of being convenient for, when the board is placed to the preparation air conditioner front side and rear side reserve the embedded bar of two hole for hoist and left and right sides face respectively, reduce the risk that the threaded rod drops or removes, increase the stability and the bearing capacity of platform.
The embodiment of the utility model provides an in adopt following scheme to realize: the air conditioner placing plate convenient to hoist in a construction site comprises an air conditioner placing plate, wherein two hoisting holes are symmetrically formed in the front side and the rear side of the air conditioner placing plate respectively, a plurality of elastic devices are arranged on the front surface and the rear surface of the air conditioner placing plate in an array mode, each elastic device comprises a first limiting hole, a second limiting hole and a limiting plate, the first limiting hole and the second limiting hole are formed in the front surface and the rear surface of the air conditioner placing plate, the second limiting hole is located under the first limiting hole, L-shaped clamping blocks are arranged on two sides of the first limiting hole respectively, a U-shaped limiting frame is arranged below the L-shaped clamping blocks, the second limiting holes are arranged in the U-shaped limiting frame, first reinforcing steel bars are arranged in the first limiting holes, a first limiting groove is formed in the rear portion of the first limiting hole, a first spring cavity is formed in the rear portion of the first limiting groove, a first return spring is arranged in the first spring cavity, the head of the first return spring is connected with the tail of the first steel bar, and a first limiting ring is arranged at the tail of the first steel bar; a second steel bar is arranged in the second limiting hole, a second limiting groove is formed in the rear portion of the second limiting hole, a second spring cavity is formed in the rear portion of the second limiting groove, a second reset spring is arranged in the second spring cavity, the head of the second reset spring is connected with the tail of the second steel bar, and a second limiting ring is arranged at the tail of the second steel bar; the head of the limiting plate penetrates through the L-shaped clamping block and penetrates into the U-shaped limiting frame.
In an embodiment of the present invention, the diameter of the outer ring of the first limiting ring is larger than the diameter of the first limiting hole, and the diameter of the first limiting hole is larger than the diameter of the first steel bar; the diameter of the outer ring of the second limiting ring is larger than that of the second limiting hole, and the diameter of the second limiting hole is larger than that of the second reinforcing steel bar.
The utility model relates to an embodiment, many third reinforcing bars are installed in the left side that the board was placed to the air conditioner, there is the boss on the right side that the board was placed to the air conditioner.
The utility model relates to an embodiment, three resilient means are respectively installed to the front and back side that the board was placed to the air conditioner.
The utility model has the advantages that: the utility model provides a board is placed to air conditioner of job site hoist and mount of being convenient for, two hole for hoist are reserved respectively to front side and rear side when board is placed to the preparation air conditioner, reduce the risk that the threaded rod drops or removes, and the left and right sides face all has the embedded bar embedding, is connected the back with embedded bar and outside support, and the platform is just more stable firm, improves the bearing capacity of prefabricated platform, and the setting of boss can increase stability, blocks the outer machine of air conditioner and drops when strong wind.
Drawings
Fig. 1 is a perspective view of a preferred embodiment of an air conditioner placing plate convenient to hoist in a construction site.
Fig. 2 is a sectional view of an air conditioner placing plate convenient to hoist in a construction site in the direction of A-A.
Fig. 3 is a partially enlarged view of fig. 2.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings.
Referring to fig. 1 to 3, the utility model provides an air conditioner placing plate convenient for hoisting in construction site, comprising an air conditioner placing plate 1, wherein two hoisting holes 11 are symmetrically formed on the front and back sides of the air conditioner placing plate 1, a plurality of elastic devices 2 are arranged on the front surface and the back surface of the air conditioner placing plate 1 in an array manner, each elastic device 2 comprises a first limiting hole 3, a second limiting hole 4 and a limiting plate 21, the first limiting hole 3 and the second limiting hole 4 are formed on the front and back surfaces of the air conditioner placing plate 1, the second limiting hole 4 is positioned under the first limiting hole 3, L-shaped clamping blocks 31 are respectively arranged on the two sides of the first limiting hole 3, a U-shaped limiting frame 41 is arranged under the L-shaped clamping blocks 31, the second limiting hole 4 is arranged in the U-shaped limiting frame 41, first reinforcing steel bars 35 are arranged in the first limiting hole 3, a first limiting groove 32 is formed in the rear portion of the first limiting hole 3, a first spring cavity 33 is formed in the rear portion of the first limiting groove 32, a first return spring 34 is installed in the first spring cavity 33, the head of the first return spring 34 is connected with the tail of a first steel bar 35, and a first limiting ring 36 is installed at the tail of the first steel bar 35; a second steel bar 45 is installed in the second limiting hole 4, a second limiting groove 42 is formed in the rear portion of the second limiting hole 4, a second spring cavity 43 is formed in the rear portion of the second limiting groove 42, a second return spring 44 is installed in the second spring cavity 43, the head of the second return spring 44 is connected with the tail of the second steel bar 45, and a second limiting ring 46 is installed at the tail of the second steel bar 45; the head of the limiting plate 21 penetrates through the L-shaped clamping block 31 and penetrates into the U-shaped limiting frame 41, and the first steel bar 35 and the second steel bar 45 pop out after the limiting plate 21 is pulled away.
With reference to fig. 2 and fig. 3, the diameter of the outer ring of the first position-limiting ring 36 is larger than the diameter of the first position-limiting hole 3, and the diameter of the first position-limiting hole 3 is larger than the diameter of the first reinforcing bar 35, so as to prevent the first reinforcing bar 35 from popping out of the first position-limiting ring 3; the diameter of the outer ring of the second limiting ring 46 is larger than that of the second limiting hole 4, the diameter of the second limiting hole 4 is larger than that of the second reinforcing steel bar 45, and the second reinforcing steel bar 45 is prevented from popping out of the second limiting hole 4.
Referring to fig. 1, a plurality of third reinforcing bars 12 are installed on the left side of the air conditioner placing plate 1 and connected to an external bracket, and a boss 13 is installed on the right side of the air conditioner placing plate 1 to prevent an air conditioner external unit from sliding down.
With continued reference to fig. 1 to 3, three elastic devices 2 are respectively installed on the front and rear sides of the air-conditioning board 1.
The utility model discloses the theory of operation below has: place board 1 with the air conditioner through the tower crane and hang to when being close to the assigned position, place board 1 with the air conditioner and lift off, take out limiting plate 21 in U type spacing frame 41 and the L type clamp splice 31, first reset spring 34 in the first spacing hole 3 pops out first reinforcing bar 35 this moment, until first spacing ring 36 card in the junction of first spacing groove 32 and first spacing hole 3, second reset spring 44 in the spacing hole 4 of second pops out second reinforcing bar 45, until second spacing ring 46 card in the junction of spacing groove 42 of second and spacing hole 4 of second, after all first reinforcing bar 35 and second reinforcing bar 45 popped out, connect first reinforcing bar 35, second reinforcing bar 45, third reinforcing bar 12 and external support fixedly.
Compared with the traditional scheme, the four threaded holes are drilled in the upper surface of the air conditioner placing plate 1 and then are connected through the threaded rods for hoisting, so that the risk of falling off or moving of the threaded rods exists; the utility model discloses a two hole for hoist 11 are respectively reserved on the two sides around when board 1 is placed in the preparation air conditioner, and the threaded rod is in hole for hoist 11 at the in-process chucking of hoist and mount, and the threaded rod is difficult for droing and takes place to remove.
The above description is only for the preferred embodiment of the present invention, and should not be interpreted as limiting the scope of the present invention, which is intended to cover all the equivalent changes and modifications made in accordance with the claims of the present invention.

Claims (4)

1. The utility model provides a board is placed to air conditioner of job site hoist and mount of being convenient for which characterized in that: the air conditioner placing plate comprises an air conditioner placing plate, wherein two hoisting holes are symmetrically formed in the front side and the rear side of the air conditioner placing plate respectively, a plurality of elastic devices are arranged on the front surface and the rear surface of the air conditioner placing plate in an array mode and comprise a first limiting hole, a second limiting hole and a limiting plate, the first limiting hole and the second limiting hole are formed in the front surface and the rear surface of the air conditioner placing plate, the second limiting hole is located right below the first limiting hole, L-shaped clamping blocks are arranged on the two sides of the first limiting hole respectively, a U-shaped limiting frame is arranged below the L-shaped clamping blocks, and the second limiting hole is formed in the U-shaped limiting frame; a first steel bar is arranged in the first limiting hole, a first limiting groove is formed in the rear portion of the first limiting hole, a first spring cavity is formed in the rear portion of the first limiting groove, a first return spring is arranged in the first spring cavity, the head of the first return spring is connected with the tail of the first steel bar, and a first limiting ring is arranged at the tail of the first steel bar; a second steel bar is arranged in the second limiting hole, a second limiting groove is formed in the rear portion of the second limiting hole, a second spring cavity is formed in the rear portion of the second limiting groove, a second reset spring is arranged in the second spring cavity, the head of the second reset spring is connected with the tail of the second steel bar, and a second limiting ring is arranged at the tail of the second steel bar; the head of the limiting plate penetrates through the L-shaped clamping block and penetrates into the U-shaped limiting frame.
2. An air conditioner placing plate convenient to hoist in a construction site as claimed in claim 1, characterized in that: the diameter of the outer ring of the first limiting ring is larger than that of the first limiting hole, and the diameter of the first limiting hole is larger than that of the first reinforcing steel bar; the diameter of the outer ring of the second limiting ring is larger than that of the second limiting hole, and the diameter of the second limiting hole is larger than that of the second reinforcing steel bar.
3. An air conditioner placing plate convenient to hoist in a construction site as claimed in claim 1, characterized in that: a plurality of third steel bars are installed on the left side of the air conditioner placing plate, and a boss is arranged on the right side of the air conditioner placing plate.
4. An air conditioner placing plate convenient to hoist in a construction site as claimed in claim 1, characterized in that: three elastic devices are respectively installed on the front side and the rear side of the air conditioner placing plate.
CN202022182765.5U 2020-09-29 2020-09-29 Board is placed to air conditioner of job site hoist and mount of being convenient for Active CN213508884U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022182765.5U CN213508884U (en) 2020-09-29 2020-09-29 Board is placed to air conditioner of job site hoist and mount of being convenient for

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022182765.5U CN213508884U (en) 2020-09-29 2020-09-29 Board is placed to air conditioner of job site hoist and mount of being convenient for

Publications (1)

Publication Number Publication Date
CN213508884U true CN213508884U (en) 2021-06-22

Family

ID=76463462

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022182765.5U Active CN213508884U (en) 2020-09-29 2020-09-29 Board is placed to air conditioner of job site hoist and mount of being convenient for

Country Status (1)

Country Link
CN (1) CN213508884U (en)

Similar Documents

Publication Publication Date Title
CN213508884U (en) Board is placed to air conditioner of job site hoist and mount of being convenient for
CN88210901U (en) Miniature foldable remote control hoist
CN206427951U (en) A kind of finishing material simple and easy hoisting equipment
CN213011578U (en) Multifunctional sling
CN113003390A (en) Adjustable assembled hoisting sling
CN112376698A (en) Corridor construction method
CN212581331U (en) Shaft bus duct hoisting mechanism
CN209306848U (en) A kind of super high-rise building large scale equipment handling apparatus
CN103058083B (en) Bolt sphere truss gig
CN204416960U (en) A kind of bipod mast Lift-on/Lift-off System being convenient to movement
CN2141425Y (en) Lifting airing device
CN220725522U (en) Prefabricated interior wallboard convenient to hang and get
CN218344972U (en) Balanced hoisting accessory of slidingtype superimposed sheet
CN215107456U (en) ALC panel hoist system in H shaped steel roof beam structural style is applicable to
CN209367668U (en) A kind of rollover stand for prefabricated toilet
CN215626326U (en) Prefabricated assembled floor hoisting machine
CN221420389U (en) Prefabricated superimposed sheet drawing of patterns hoist device
CN111717776B (en) Pre-collision-prevention early warning device based on building construction tower crane
CN203033690U (en) Bolt sphere truss elevator
CN213415993U (en) Prefabricated superimposed sheet hoist device
CN210766353U (en) Temporary support for placing prefabricated T-shaped beam
CN211393569U (en) Building hoisting equipment lifting hook convenient to installation
CN218516093U (en) Mounting frame structure based on large model
CN216945838U (en) Building engineering polylith superimposed sheet handling instrument simultaneously
CN211034903U (en) Self-locking lifting appliance for prefabricated parts of prefabricated building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant