CN213508566U - Earth pipe gallery structure is mixed to prefabricated pin-connected panel of high strength - Google Patents
Earth pipe gallery structure is mixed to prefabricated pin-connected panel of high strength Download PDFInfo
- Publication number
- CN213508566U CN213508566U CN202021387430.0U CN202021387430U CN213508566U CN 213508566 U CN213508566 U CN 213508566U CN 202021387430 U CN202021387430 U CN 202021387430U CN 213508566 U CN213508566 U CN 213508566U
- Authority
- CN
- China
- Prior art keywords
- piping lane
- wallboard
- pipe gallery
- seat
- lid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a prefabricated pin-connected panel of high strength mixes earth piping lane structure, including piping lane seat, first piping lane lateral wall board, second piping lane lateral wall board and piping lane lid, the wallboard spacing groove has all been seted up to the top both sides of piping lane seat, the wallboard installation half groove has all been seted up to the piping lane seat in the both ends below of two wallboard spacing grooves, the wallboard mounting groove has all been seted up near both ends middle part in two wallboard spacing groove below to the piping lane seat, the base steel column hole has all been seted up to the piping lane seat in the below of two wallboard spacing grooves, the inside drainage tube hole of having seted up in one side of piping lane seat. The utility model discloses in, it is main spacing to install fixedly through the cooperation of limit groove, utilizes base steel column hole and wallboard steel column hole that piping lane seat and wallboard installation piece set up, and the steel column reinforced connection intensity is gone into to the accessible nail, and the support frame is cooperated to both sides piping lane lateral wall board, can improve the bulk strength of piping lane greatly, has strengthened the practicality of piping lane.
Description
Technical Field
The utility model relates to a piping lane technical field especially relates to a prefabricated pin-connected panel of high strength mixes earth piping lane structure.
Background
Pipe gallery, i.e. the corridor of the pipeline. Many of the pipes in chemical and related plants are grouped together and arranged along the outside of the plant or building, typically in the air, supported by supports, in a manner similar to a corridor. The underground comprehensive pipe gallery is a public tunnel which is built under the city and is used for intensively laying municipal pipelines such as electric power, communication, broadcast television, water supply and the like, the underground comprehensive pipe gallery can effectively avoid the phenomenon of a zipper road, technicians can carry out rush repair, maintenance, expansion transformation and the like on various pipelines without repeatedly excavating road surfaces; meanwhile, the first-aid repair time of the pipeline is greatly shortened.
The existing concrete pipe gallery is generally cast in place or is an integral prefabricated pipe gallery, but the integral prefabricated pipe gallery is often heavy, which brings inconvenience to transportation and on-site hoisting, and the construction efficiency of cast in place is lower, so that the construction requirement can not be met.
Disclosure of Invention
The utility model aims at solving the defects existing in the prior art and providing a high-strength prefabricated assembled concrete pipe gallery structure.
In order to achieve the above purpose, the utility model adopts the following technical scheme: a high-strength prefabricated assembled concrete pipe gallery structure comprises a pipe gallery seat, first pipe gallery side wall plates, second pipe gallery side wall plates and a pipe gallery cover, wherein wall plate limiting grooves are formed in two sides above the pipe gallery seat, wall plate mounting half grooves are formed in the pipe gallery seat below two ends of the two wall plate limiting grooves, wall plate mounting grooves are formed in the pipe gallery seat below the two wall plate limiting grooves and close to the middle parts of the two ends, base steel column holes are formed in the pipe gallery seat below the two wall plate limiting grooves, drain pipe holes are formed in one side of the pipe gallery seat, drain grooves are formed in the middle parts of the upper portion of the pipe gallery seat and correspond to the drain pipe holes, four wall plate mounting blocks are arranged at the equal distance of the bottom of the first pipe gallery side wall plates, wall plate steel column holes are formed in the middle parts of the four wall plate mounting blocks, a wall plate side assembling edge is arranged on the outer side of one end of the first pipe gallery plate, first piping lane lateral wall board is kept away from the one end on wallboard side amalgamation limit and has been seted up wallboard side amalgamation groove, the groove of assembling on the wallboard has been seted up to the top of first piping lane lateral wall board, middle part position fixedly connected with support frame of the top below of piping lane lid, the one end that the piping lane lid is close to wallboard side amalgamation groove is provided with lid amalgamation limit, the one end that wallboard side amalgamation groove was kept away from to the piping lane lid is provided with lid amalgamation groove, piping lane lid below both sides all are provided with down amalgamation limit lid.
As a further description of the above technical solution:
first pipe gallery side wall plate with the structure of second pipe gallery side wall plate is the same and for the central line mutual symmetry of pipe gallery seat.
As a further description of the above technical solution:
the bottom both sides top of support frame respectively with the below both sides fixed connection of piping lane lid.
As a further description of the above technical solution:
the both sides of piping lane seat are respectively through two wallboard spacing grooves and four wallboard mounting grooves and first piping lane lateral wall board and the spacing connection of second piping lane lateral wall board.
As a further description of the above technical solution:
the shape of the cover body assembling groove is matched with that of the cover body assembling edge.
As a further description of the above technical solution:
and steel pile holes are formed in trisection positions of the first pipe gallery side wall plate on the wallboard side assembling groove and trisection positions of the wallboard side assembling edge.
The utility model discloses following beneficial effect has:
1. the utility model discloses divide into the prefabricated module of four components of a whole that can function independently of piping lane seat, first piping lane lateral wall board, second piping lane lateral wall board and piping lane lid, the pressure of transportation that can significantly reduce and on-the-spot hoist and mount, and the efficiency of construction is than the on-the-spot pouring higher, has improved the practicality of piping lane.
2. The utility model discloses it is fixed mainly to install through the cooperation of limit groove is spacing, utilizes base steel column hole and wallboard steel column hole that piping lane seat and wallboard installation piece set up, and the steel column reinforced connection intensity is gone into to the accessible nail, and the support frame is cooperated, to the support of both sides piping lane lateral wall board, can improve the bulk strength of piping lane greatly, has strengthened the practicality of piping lane.
Drawings
Fig. 1 is a front view of a high-strength prefabricated assembled concrete pipe gallery structure provided by the present invention;
fig. 2 is a side view of a high-strength prefabricated assembled concrete pipe gallery structure provided by the present invention;
fig. 3 is a top view of a pipe gallery seat of a high-strength prefabricated assembled concrete pipe gallery structure provided by the present invention;
fig. 4 is a sectional view of a pipe gallery seat of a high-strength prefabricated assembled concrete pipe gallery structure provided by the utility model;
fig. 5 is a side view of a first pipe gallery side wall plate of a high-strength prefabricated assembled concrete pipe gallery structure provided by the present invention;
fig. 6 is the utility model provides a pair of prefabricated pin-connected panel of high strength mixes earth piping lane structure's a pipe gallery side wall plate's top view.
Illustration of the drawings:
1. a pipe gallery seat; 2. a first tube lane sidewall plate; 3. a second tube lane sidewall plate; 4. a pipe gallery cover; 5. a wallboard limiting groove; 6. installing a half groove on the wall plate; 7. a wall plate mounting groove; 8. a base steel column hole; 9. a drain pipe hole; 10. draining and grooving; 11. a wall plate mounting block; 12. a wallboard steel column hole; 13. assembling edges at the side of the wall plate; 14. assembling grooves on the side of the wall plate; 15. assembling grooves on the wall plate; 16. a support frame; 17. the cover body is provided with an assembling edge; 18. the cover body is assembled with the groove; 19. the side lid is assembled down.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance, and furthermore, unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "connected" are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-6, the present invention provides an embodiment: a high-strength prefabricated assembled concrete pipe gallery structure comprises a pipe gallery seat 1, first pipe gallery side wall plates 2, second pipe gallery side wall plates 3 and a pipe gallery cover 4, wherein wall plate limiting grooves 5 are respectively formed in two sides of the upper portion of the pipe gallery seat 1, wall plate mounting half grooves 6 are respectively formed in the pipe gallery seat 1 below two ends of the two wall plate limiting grooves 5, wall plate mounting grooves 7 are respectively formed in the pipe gallery seat 1 below the two wall plate limiting grooves 5 and close to the middle portions of the two ends, base steel column holes 8 are respectively formed in the pipe gallery seat 1 below the two wall plate limiting grooves 5, drainage tube holes 9 are formed in one side of the pipe gallery seat 1 and used for mounting a pipe gallery drainage pipe, drainage grooves 10 are formed in the middle portion of the upper portion of the pipe gallery seat 1 and correspond to the drainage tube holes 9 and used for water leakage, four wall plate mounting blocks 11 are arranged at equal intervals at the bottom of the first pipe gallery side wall plates 2, wall plate steel column holes 12 are respectively formed in the middle portions of the four mounting, be used for with 8 cooperation nail income steel columns in base steel column hole, strengthen connection strength, the one end outside of first piping lane side wall plate 2 is provided with wallboard side amalgamation limit 13, wallboard side wall plate 2 keeps away from wallboard side amalgamation limit 13 one end has seted up wallboard side amalgamation groove 14, be used for with the cooperation of wallboard side amalgamation limit 13, assemble groove 15 on the wallboard has been seted up to first piping lane side wall plate 2's top, middle part position fixedly connected with support frame 16 of top below of piping lane lid 4, the one end that piping lane lid 4 is close to wallboard side amalgamation groove 14 is provided with lid amalgamation limit 17, the one end that wallboard side amalgamation groove 14 was kept away from to piping lane lid 4 is provided with lid amalgamation groove 18, piping lane lid 4 below both sides all are provided with down and assemble lid 19, be used for with assemble 15 cooperations on the wallboard.
First piping lane side wall board 2 is the same with second piping lane side wall board 3's structure and for the mutual symmetry of central line of piping lane seat 1, bottom both sides top of support frame 16 respectively with the below both sides fixed connection of piping lane lid 4, both sides bottom below can carry out inboard support to both sides wall board, the both sides of piping lane seat 1 are respectively through two wallboard spacing grooves 5 and four wallboard mounting grooves 7 and first piping lane side wall board 2 and the spacing connection of second piping lane side wall board 3, the shape of lid concatenation groove 18 suits with the shape of lid concatenation limit 17, first piping lane side wall board 2 has all seted up the steel pile hole in the trisection department of wallboard side concatenation groove 14 and the trisection department of wallboard side concatenation limit 13, be used for the nail to connect the steel pile, improve wallboard joint strength.
The working principle is as follows: the utility model discloses during the installation, it is spacing and go into the piling bar at the piling bar hole nail and install fixedly mainly through the cooperation of wallboard side amalgamation groove 14 and wallboard side amalgamation limit 13 between the pipe gallery lateral wall board, pipe gallery lateral wall board and 1 cooperation that mainly utilizes pipe gallery seat 1 and wallboard installation piece 11 of pipe gallery seat are connected, go into steel column reinforced connection intensity through nailing the steel column with the base steel column hole 8 and the wallboard steel column hole 12 that it set up, the bottom below both sides of support frame can carry out inside support to first pipe gallery lateral wall board and second pipe gallery lateral wall board, can improve the bulk strength of pipe gallery greatly, just the utility model discloses divide into four components of a whole that can function independently prefabricated modules of pipe gallery seat 1, first pipe gallery lateral wall board 2, second pipe gallery lateral wall board 3 and pipe gallery lid 4, the pressure of transportation and site hoisting that can significantly reduce, and efficiency than pour the scene higher, improved the practicality of pipe gallery.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.
Claims (6)
1. The utility model provides a prefabricated pin-connected panel of high strength mixes earth pipe gallery structure, includes pipe gallery seat (1), first pipe gallery side wall board (2), second pipe gallery side wall board (3) and pipe gallery lid (4), its characterized in that: wallboard limiting grooves (5) are formed in two sides of the upper portion of the pipe gallery seat (1), wallboard mounting half grooves (6) are formed in the pipe gallery seat (1) below two ends of the two wallboard limiting grooves (5), wallboard mounting grooves (7) are formed in the pipe gallery seat (1) below the two wallboard limiting grooves (5) and close to the middle portions of the two ends, base steel column holes (8) are formed in the pipe gallery seat (1) below the two wallboard limiting grooves (5), drainage pipe holes (9) are formed in one side of the pipe gallery seat (1), drainage grooves (10) are formed in the position, corresponding to the drainage pipe holes (9), of the middle portion of the upper portion of the pipe gallery seat (1), four wallboard mounting blocks (11) are arranged at equal intervals at the bottom of a first pipe gallery side wall plate (2), and wallboard steel column holes (12) are formed in the middle portions of the four wallboard mounting blocks (11), the one end outside of first piping lane side wall board (2) is provided with wallboard side amalgamation limit (13), wallboard side amalgamation groove (14) have been seted up to the one end that wallboard side amalgamation limit (13) was kept away from in first piping lane side wall board (2), amalgamation groove (15) on the wallboard have been seted up to the top of first piping lane side wall board (2), middle part position fixedly connected with support frame (16) of the top below of piping lane lid (4), the one end that piping lane lid (4) are close to wallboard side amalgamation groove (14) is provided with lid amalgamation limit (17), the one end that wallboard side amalgamation groove (14) were kept away from in piping lane lid (4) is provided with lid amalgamation groove (18), piping lane lid (4) below both sides all are provided with down amalgamation limit lid (19).
2. The prefabricated pin-connected panel concrete piping lane structure of high strength according to claim 1, its characterized in that: first pipe gallery side wall plate (2) with the structure of second pipe gallery side wall plate (3) is the same and for the central line mutual symmetry of pipe gallery seat (1).
3. The prefabricated pin-connected panel concrete piping lane structure of high strength according to claim 1, its characterized in that: the two sides of the bottom of the support frame (16) are respectively fixedly connected with the two sides of the lower part of the pipe gallery cover (4).
4. The prefabricated pin-connected panel concrete piping lane structure of high strength according to claim 1, its characterized in that: the both sides of piping lane seat (1) are respectively through two wallboard spacing grooves (5) and four wallboard mounting grooves (7) with first piping lane lateral wall board (2) and second piping lane lateral wall board (3) spacing connection.
5. The prefabricated pin-connected panel concrete piping lane structure of high strength according to claim 1, its characterized in that: the shape of the cover body assembling groove (18) is matched with the shape of the cover body assembling edge (17).
6. The prefabricated pin-connected panel concrete piping lane structure of high strength according to claim 1, its characterized in that: and steel pile holes are formed in the trisection positions of the wallboard side assembling grooves (14) and the trisection positions of the wallboard side assembling edges (13) of the first pipe gallery side wall plate (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021387430.0U CN213508566U (en) | 2020-07-15 | 2020-07-15 | Earth pipe gallery structure is mixed to prefabricated pin-connected panel of high strength |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021387430.0U CN213508566U (en) | 2020-07-15 | 2020-07-15 | Earth pipe gallery structure is mixed to prefabricated pin-connected panel of high strength |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213508566U true CN213508566U (en) | 2021-06-22 |
Family
ID=76434922
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021387430.0U Active CN213508566U (en) | 2020-07-15 | 2020-07-15 | Earth pipe gallery structure is mixed to prefabricated pin-connected panel of high strength |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213508566U (en) |
-
2020
- 2020-07-15 CN CN202021387430.0U patent/CN213508566U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210562299U (en) | Prefabricated assembled underground comprehensive pipe gallery | |
CN213508566U (en) | Earth pipe gallery structure is mixed to prefabricated pin-connected panel of high strength | |
CN218204555U (en) | Assembled cable working well | |
CN116607558A (en) | Prefabricated assembled foundation of main transformer equipment of transformer substation and construction method of prefabricated assembled foundation | |
CN208309637U (en) | A kind of assembled monolithic concrete structure pipe gallery standard paragraphs | |
CN203782874U (en) | Support assembly for light steel residence | |
CN110318420B (en) | Prefabricated assembled underground utility tunnel | |
CN212582739U (en) | Prefabricated grout of concrete seals assembled inspection shaft | |
CN210482379U (en) | Highway underpass pipe gallery structure | |
CN205530345U (en) | Modular many storehouses utility tunnel structure | |
CN210868914U (en) | Assembled flower bed and jar body | |
CN208501735U (en) | Prefabricated piping lane | |
CN106088398A (en) | A kind of combined wall board | |
CN112814019A (en) | Prefabricated formula steel concrete combination looped netowrk cabinet basis | |
KR20110011444A (en) | A prefabricated house construction method and the construction device | |
CN111764435A (en) | Prefabricated grout of concrete seals assembled inspection shaft | |
CN201908319U (en) | Support member for energy-storing underground cistern | |
CN215518865U (en) | Novel prefabricated inspection shaft on horse | |
CN210712933U (en) | Assembled concrete utility tunnel is connected to cell-type | |
CN218090954U (en) | Prefabricated assembled concrete utility tunnel | |
CN216475136U (en) | Combined caisson for underground diaphragm wall of subway station | |
CN217232135U (en) | Prefabricated assembled drainage system for house | |
CN110284523A (en) | Tube wall divides assembly concrete underground pipe gallery | |
CN220666460U (en) | Assembled ditch | |
CN210621753U (en) | Rectangular steel structure comprehensive pipe gallery |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |