CN213474973U - Water sluicegate construction is with pipe laying pay-off - Google Patents

Water sluicegate construction is with pipe laying pay-off Download PDF

Info

Publication number
CN213474973U
CN213474973U CN202021765862.0U CN202021765862U CN213474973U CN 213474973 U CN213474973 U CN 213474973U CN 202021765862 U CN202021765862 U CN 202021765862U CN 213474973 U CN213474973 U CN 213474973U
Authority
CN
China
Prior art keywords
wall
rigid coupling
rod
spring
sliding sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021765862.0U
Other languages
Chinese (zh)
Inventor
李贵荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Chenpei Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021765862.0U priority Critical patent/CN213474973U/en
Application granted granted Critical
Publication of CN213474973U publication Critical patent/CN213474973U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a water sluicegate is buried pipe pay-off for construction, which comprises a horizontal rod, horizontal pole outer wall right side rigid coupling has the handle, the top rigid coupling of montant has the commentaries on classics piece, the equal rigid coupling in the outer wall left and right sides of montant has a plurality of lugs, and is a plurality of the outer wall of lug and the inner wall clearance fit of cone, it is a plurality of the equal clearance fit of inner wall of through-hole has the nail body, the outer wall clearance fit of the nail body has first spring, the one end rigid coupling of first spring in the inner wall of cone, the other end rigid coupling of first spring in the outer wall of the nail body. This water sluicegate is pipe laying pay-off for construction for the cone pierces ground after, and the accessible commentaries on classics piece drives the montant and rotates, shifts out the through-hole with the nail body and pierces ground, strengthens the fixed of cone and ground, makes the line body can carry out stable unwrapping wire, makes the arc piece can support the line body tightly, and then carries on spacingly to a line section of thick bamboo, makes the line body can carry out stable wiring, relaxs when avoiding the line body to carry out the unwrapping wire, causes the wiring in a jumble.

Description

Water sluicegate construction is with pipe laying pay-off
Technical Field
The utility model relates to a water conservancy construction technical field specifically is a water sluicegate is buried pipe pay-off for construction.
Background
The term of water conservancy is originally seen in filial line exhibition and cautious man in Lushi spring and autumn invented at the end of the war, but the term of water conservancy taking refers to the benefit of fishing, and during pipe burying construction, paying-off and wiring are needed so as to facilitate pre-positioning of a pipeline.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a water sluicegate is buried pipe pay-off for construction to the cone that proposes in solving above-mentioned background art can be to the fixed on line and ground, but the cone probably produces not hard up, causes the cone to cancel the connection on line and ground, influences the problem of the work efficiency of unwrapping wire wiring.
In order to achieve the above object, the utility model provides a following technical scheme: a pipe-burying pay-off device for water conservancy gate construction comprises a cross rod, wherein a handle is fixedly connected to the right side of the outer wall of the cross rod, the left side of the cross rod is rotatably connected with a wire barrel through a connecting shaft, a handle is fixedly connected to the front end face of the wire barrel, a wire body is wound on the outer wall of the wire barrel, and a fixing mechanism is arranged on the left side of the wire body;
the fixing mechanism comprises a cone, a through hole, a vertical rod, a rotating block, a convex block, a nail body and a first spring;
the utility model discloses a nail, including the body of nail, cone rigid coupling in the left side of the line body, the through-hole has all been processed to the inner wall left and right sides of cone, the cone passes through the bearing and rotates and link to each other there is the montant, the top rigid coupling of montant has the commentaries on classics piece, the equal rigid coupling in the outer wall left and right sides of montant has a plurality of lugs, and is a plurality of the outer wall of lug and the inner wall clearance fit of cone, it is a plurality of the equal clearance fit in the inner wall of through-hole has the nail body, the outer wall clearance fit of the nail body has first spring, the one end rigid coupling of first spring in the.
Preferably, the outer wall of the rotating block is processed with grains.
Preferably, the top of the cross rod is provided with a propping mechanism;
the abutting mechanism comprises a first sliding rod, a first sliding sleeve, a curved rod and an arc-shaped plate;
the first sliding rod is fixedly connected to the left side of the top of the cross rod, the outer wall of the first sliding rod is connected with a first sliding sleeve in a sliding mode, the left side of the outer wall of the first sliding sleeve is fixedly connected with a curved bar, the bottom of the curved bar is fixedly connected with an arc-shaped plate, and the bottom of the arc-shaped plate is in contact with the outer wall of the line body.
Preferably, a rubber pad is fixedly connected to the joint of the arc-shaped plate and the line body.
Preferably, the top of the cross rod is provided with a trigger mechanism;
the trigger mechanism comprises a second sliding rod, a second sliding sleeve, a shifting piece, a second spring and a rod body;
the second slide bar rigid coupling is in the top of horizontal pole, the outer wall of second slide bar slides and links to each other and has the second sliding sleeve, the outer wall clearance fit of second slide bar has the second spring, the one end rigid coupling of second spring in the outer wall of second slide bar, the other end rigid coupling of second spring in the outer wall of second sliding sleeve, the top rigid coupling of second sliding sleeve has the plectrum, the top of second sliding sleeve rotates through the connecting axle and links to each other has the body of rod, the body of rod rotates through connecting axle and first sliding sleeve and links to each other.
Preferably, the second sliding rod and the second sliding sleeve form a sliding limiting structure.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model has the advantages of being scientific and reasonable in structure, convenience safe in utilization.
This water sluicegate is pipe laying pay-off for construction through cylinder, lug, montant, commentaries on classics piece, the nail body and the cooperation between the first spring for the cone pierces ground back, and the accessible commentaries on classics piece drives the montant and rotates, and then makes the montant drive the lug and contacts with the nail body, shifts out the through-hole with the nail body and pierces ground, strengthens the fixing on cone and ground, makes the line body can carry out stable unwrapping wire.
This water conservancy gate is pipe laying pay-off for construction through the cooperation between first slide bar, second slide bar, first sliding sleeve, second spring and the arc for the arc piece can support tightly to the line body, and then carries on spacingly to a line section of thick bamboo, makes the line body can carry out stable wiring, relaxs when avoiding the line body to carry out the unwrapping wire, causes the wiring in a jumble or disorderly.
Drawings
FIG. 1 is a schematic view of the connection relationship of the present invention;
FIG. 2 is a schematic structural view of the wire body, the rotary block and the through hole in FIG. 1;
FIG. 3 is a schematic structural view of the stem, the protrusion and the first spring of FIG. 1;
fig. 4 is a schematic structural view of the first slide bar, the second sliding sleeve and the second slide bar in fig. 1.
In the figure: 1. the device comprises a cross rod, 2, a handle, 3, a wire barrel, 4, a handle, 5, a wire body, 6, a fixing mechanism, 601, a cone, 602, a through hole, 603, a vertical rod, 604, a rotating block, 605, a bump, 606, a nail body, 607, a first spring, 7, a propping mechanism, 701, a first sliding rod, 702, a first sliding sleeve, 703, a curved bar, 704, an arc-shaped plate, 8, a trigger mechanism, 801, a second sliding rod, 802, a second sliding sleeve, 803, a shifting piece, 804, a second spring, 805 and a rod body.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a pipe-buried pay-off device for water conservancy gate construction comprises a cross rod 1, a handle 2 is fixedly connected to the right side of the outer wall of the cross rod 1, the left side of the cross rod 1 is rotatably connected with a wire barrel 3 through a connecting shaft, a handle 4 is fixedly connected to the front end face of the wire barrel 3, the handle 4 is used for driving the wire barrel 3 to rotate so as to take up or pay off a wire body 5, the wire body 5 is wound and installed on the outer wall of the wire barrel 3, a fixing mechanism 6 is arranged on the left side of the wire body 5, the fixing mechanism 6 comprises a cone 601, through holes 602, vertical rods 603, rotating blocks 604, a convex block 605, a nail body 606 and a first spring 607, the cone 601 is fixedly connected to the left side of the wire body 5, the cone 601 is used for being in contact and fixation with the outside ground, the through holes 602 are respectively processed on the left side and the right side of the inner wall of the cone 601, the rotating block 604 is used for driving a vertical rod 603 to rotate, a plurality of convex blocks 605 are fixedly connected to the left side and the right side of the outer wall of the vertical rod 603, the vertical rod 603 can drive the convex blocks 605 to rotate, the outer wall of the plurality of convex blocks 605 is in clearance fit with the inner wall of a cone 601, the inner wall of the plurality of through holes 602 is in clearance fit with a nail body 606, the nail body 606 is used for increasing the fixing stability of the cone 601 and soil, the outer wall of the nail body 606 is in clearance fit with a first spring 607, the first spring 607 gives the force for the nail body 606 to move into the inner wall of the through hole 602, one end of the first spring 607 is fixedly connected to the inner wall of the cone 601, the other end of the first spring 607 is fixedly connected to the outer wall of the nail body 606, the outer wall of the rotating.
The top of horizontal pole 1 is equipped with supports tight mechanism 7, support tight mechanism 7 and include first slide bar 701, first sliding sleeve 702, knee 703 and arc 704, first slide bar 701 rigid coupling is in the top left side of horizontal pole 1, the outer wall of first slide bar 701 slides and is linked with first sliding sleeve 702, make first sliding sleeve 702 can carry out elevating movement at first slide bar 701's outer wall, the outer wall left side rigid coupling of first sliding sleeve 702 has knee 703, the bottom rigid coupling of knee 703 has arc 704, arc 704 is used for spacing to line section of thick bamboo 3, the bottom of arc 704 contacts with the outer wall of line 5, the laminating department rigid coupling of arc 704 and line 5 has the rubber pad, the rubber pad is used for increasing line 5 and line section of thick bamboo 3 spacing.
The top of the cross bar 1 is provided with a trigger mechanism 8, the trigger mechanism 8 comprises a second sliding bar 801, a second sliding sleeve 802, a shifting sheet 803, a second spring 804 and a bar body 805, the second sliding bar 801 is fixedly connected to the top of the cross bar 1, the outer wall of the second sliding bar 801 is slidably connected with the second sliding sleeve 802, so that the second sliding sleeve 802 can move left and right on the outer wall of the second sliding bar 801, the outer wall of the second sliding bar 801 is in clearance fit with the second spring 804, the second spring 804 provides a force for the second sliding sleeve 802 to move right, one end of the second spring 804 is fixedly connected to the outer wall of the second sliding bar 801, the other end of the second spring 804 is fixedly connected to the outer wall of the second sliding sleeve 802, the top of the second sliding sleeve 802 is fixedly connected with the shifting sheet 803, the shifting sheet 803 is used for driving the second sliding sleeve 802 to move left and right, the top of the second sliding sleeve 802 is provided with the bar body 805, the rod body 805 is rotatably connected with the first sliding sleeve 702 through a connecting shaft, and the second sliding rod 801 and the second sliding sleeve 802 form a sliding limiting structure, so that the rod body 805 can stably pull the first sliding sleeve 702 to perform lifting movement on the outer wall of the first sliding rod 701.
When the pipe-laying and line-laying device for the water conservancy gate construction is used, a user fixes a cone 601 with the ground, after the fixing, the user rotates a rotating block 604, so that the rotating block 604 drives a vertical rod 603 to rotate, when the vertical rod 603 rotates, the vertical rod 603 drives a bump 605 to be in contact with a nail body 606, so that the bump 605 pushes the nail body 606 out of a through hole 602 to be in contact with soil, and the fixing stability of the cone 601 is enhanced, after the fixing, the user can hold a handle 2 by hand and press a shifting sheet 803, so that the shifting sheet 803 drives a second sliding sleeve 802 to move leftwards on the outer wall of a second sliding rod 801, when the second sliding sleeve 802 moves leftwards, the second sliding sleeve 802 drives a rod body 805 to rotate, so that the rod body 805 drives a first sliding sleeve 702 to ascend on the outer wall of the first sliding rod 701, the first sliding sleeve 702 drives a curved rod 703 and an arc-shaped plate to cancel the limit of a line barrel 3 and a line body 5, the line laying is carried out, the working stability of paying-off and wiring is ensured.
In the description of the present invention, it is to be understood that the terms "coaxial", "bottom", "one end", "top", "middle", "other end", "upper", "one side", "top", "inner", "front", "center", "both ends", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "disposed," "connected," "fixed," "screwed" and the like are to be construed broadly, e.g., as meaning fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; they may be directly connected or indirectly connected through an intermediate medium, and may be connected through the inside of two elements or in an interaction relationship between two elements, unless otherwise specifically defined, and the specific meaning of the above terms in the present invention will be understood by those skilled in the art according to specific situations.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a water sluicegate construction is with pipe laying pay-off, includes horizontal pole (1), horizontal pole (1) outer wall right side rigid coupling has handle (2), the left side of horizontal pole (1) is rotated through the connecting axle and is linked to each other to have bobbin (3), the preceding terminal surface rigid coupling of bobbin (3) has handle (4), the outer wall winding of bobbin (3) is installed line body (5), its characterized in that: a fixing mechanism (6) is arranged on the left side of the wire body (5);
the fixing mechanism (6) comprises a cone (601), a through hole (602), a vertical rod (603), a rotating block (604), a convex block (605), a nail body (606) and a first spring (607);
cone (601) rigid coupling in the left side of line body (5), through-hole (602) have all been processed to the inner wall left and right sides of cone (601), cone (601) rotate through the bearing and link to each other has montant (603), the top rigid coupling of montant (603) has commentaries on classics piece (604), the equal rigid coupling in outer wall left and right sides of montant (603) has a plurality of lugs (605), and is a plurality of the outer wall of lug (605) and the inner wall clearance fit of cone (601), it is a plurality of the equal clearance fit in inner wall of through-hole (602) has nail body (606), the outer wall clearance fit of nail body (606) has first spring (607), the one end rigid coupling of first spring (607) is in the inner wall of cone (601), the other end rigid coupling of first spring (607) is in the outer wall of nail body (606).
2. The pipe laying and paying-off device for the water conservancy gate construction according to claim 1, wherein: the outer wall of the rotating block (604) is processed with grains.
3. The pipe laying and paying-off device for the water conservancy gate construction according to claim 1, wherein: the top of the cross rod (1) is provided with a propping mechanism (7);
the abutting mechanism (7) comprises a first sliding rod (701), a first sliding sleeve (702), a curved rod (703) and an arc-shaped plate (704);
the first sliding rod (701) is fixedly connected to the left side of the top of the cross rod (1), the outer wall of the first sliding rod (701) is connected with a first sliding sleeve (702) in a sliding mode, the left side of the outer wall of the first sliding sleeve (702) is fixedly connected with a curved rod (703), the bottom of the curved rod (703) is fixedly connected with an arc-shaped plate (704), and the bottom of the arc-shaped plate (704) is in contact with the outer wall of the wire body (5).
4. The pipe laying and paying-off device for the water conservancy gate construction according to claim 3, wherein the device comprises: and a rubber pad is fixedly connected at the joint of the arc-shaped plate (704) and the line body (5).
5. The pipe laying and paying-off device for the water conservancy gate construction according to claim 1, wherein: the top of the cross rod (1) is provided with a trigger mechanism (8);
the trigger mechanism (8) comprises a second sliding rod (801), a second sliding sleeve (802), a shifting sheet (803), a second spring (804) and a rod body (805);
second slide bar (801) rigid coupling is in the top of horizontal pole (1), the outer wall of second slide bar (801) slides and links to each other has second sliding sleeve (802), the outer wall clearance fit of second slide bar (801) has second spring (804), the one end rigid coupling of second spring (804) is in the outer wall of second slide bar (801), the other end rigid coupling of second spring (804) is in the outer wall of second sliding sleeve (802), the top rigid coupling of second sliding sleeve (802) has plectrum (803), the top of second sliding sleeve (802) rotates through the connecting axle and links to each other there is body of rod (805), body of rod (805) rotate through connecting axle and first sliding sleeve (702) and link to each other.
6. The pipe laying and paying-off device for the water conservancy gate construction according to claim 5, wherein: the second sliding rod (801) and the second sliding sleeve (802) form a sliding limiting structure.
CN202021765862.0U 2020-08-21 2020-08-21 Water sluicegate construction is with pipe laying pay-off Expired - Fee Related CN213474973U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021765862.0U CN213474973U (en) 2020-08-21 2020-08-21 Water sluicegate construction is with pipe laying pay-off

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021765862.0U CN213474973U (en) 2020-08-21 2020-08-21 Water sluicegate construction is with pipe laying pay-off

Publications (1)

Publication Number Publication Date
CN213474973U true CN213474973U (en) 2021-06-18

Family

ID=76361352

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021765862.0U Expired - Fee Related CN213474973U (en) 2020-08-21 2020-08-21 Water sluicegate construction is with pipe laying pay-off

Country Status (1)

Country Link
CN (1) CN213474973U (en)

Similar Documents

Publication Publication Date Title
CN210134692U (en) Multifunctional emergency wire pole for power communication
CN213474973U (en) Water sluicegate construction is with pipe laying pay-off
CN116006776A (en) Reinforced concrete pipeline with base
CN101229641A (en) Line driven ultra-redundant degree of freedom robot
CN211286904U (en) Wire pole that stability is good
CN211143072U (en) Underwater steel pipe pile sinking auxiliary positioning device
CN216344303U (en) Water conservancy water and electricity construction fastening processing apparatus
CN207346885U (en) Cable placing support and actinobacillus device
CN211248599U (en) Foldable convenient plate cutting machine
CN213627577U (en) Jacking mechanism of miniature push bench
CN211197279U (en) Construction equipment storing compartment with shock-absorbing function
CN210468614U (en) Traction equipment for laying power construction cable
CN207398721U (en) A kind of quick laying apparatus of cable
CN207176919U (en) A kind of skyscraper steel beam structure
CN212763268U (en) Bellows socket joint auxiliary device
CN213086595U (en) Road and bridge crack reinforced structure
CN207160236U (en) A kind of combined steel structure
CN208337037U (en) One kind is novel to mention cable car
CN210419020U (en) Hoisting device for ocean platform
CN206925178U (en) It is portable to hold curved instrument
CN216828397U (en) Cable bending straightener
CN114221259B (en) Portable bending device on cable high-voltage tower
CN220687267U (en) Casing clamping device for full-circle drilling machine
CN211568004U (en) Pipe rod storage device for oil field well repairing operation
CN220898474U (en) Water bucket fixing structure of hydrogen-rich water station

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220601

Address after: 610000 Room 102, second floor, No. 115, Section 1, Jinhua Road, Jinjiang District, Chengdu, Sichuan (self numbering)

Patentee after: Sichuan chenpei Construction Engineering Co.,Ltd.

Address before: Binhai Industrial Park, No.17, erdaoliu Road, Yongqiang Binhai Industrial Park, Wenzhou City, Zhejiang Province

Patentee before: Li Guirong

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210618

CF01 Termination of patent right due to non-payment of annual fee