CN213449664U - Modularized gradient assembly simulation exploration device - Google Patents

Modularized gradient assembly simulation exploration device Download PDF

Info

Publication number
CN213449664U
CN213449664U CN202021670399.1U CN202021670399U CN213449664U CN 213449664 U CN213449664 U CN 213449664U CN 202021670399 U CN202021670399 U CN 202021670399U CN 213449664 U CN213449664 U CN 213449664U
Authority
CN
China
Prior art keywords
platform
area
exploration
wading
gradient assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021670399.1U
Other languages
Chinese (zh)
Inventor
林霖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Yujing Architectural Planning And Design Co ltd
Original Assignee
Shanghai Yujing Architectural Planning And Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Yujing Architectural Planning And Design Co ltd filed Critical Shanghai Yujing Architectural Planning And Design Co ltd
Priority to CN202021670399.1U priority Critical patent/CN213449664U/en
Application granted granted Critical
Publication of CN213449664U publication Critical patent/CN213449664U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

The utility model discloses a modularization gradient equipment simulation device of exploring, including first platform, second platform, third platform, fourth platform, fifth platform and originated platform, first platform the place ahead is equipped with the second platform, second platform the place ahead is equipped with the third platform, third platform the place ahead is equipped with the fourth platform, be equipped with around the fourth platform the fifth platform, fifth platform the place ahead is equipped with originated platform. This application can use and use the modularized device to build the exploration facility of different gradients, uses the steel construction to erect, sets up comparatively portably, and is less to the requirement of topography, still covers the natural rock of cement imitation and cliff outward, presses close to nature view more, and the exploration device of different gradients also can bring multiple project of travelling for the visitor simultaneously, can oneself select the difficult and easy degree, has richened and has played the experience, has reduced the cost of playing moreover.

Description

Modularized gradient assembly simulation exploration device
Technical Field
The utility model relates to an amusement equipment field, concretely relates to modularization gradient equipment simulation exploration device.
Background
General exploration entertainment activities are in a desolate and cool deep mountain old forest, safety facilities cannot be perfect, access is inconvenient, and meanwhile due to the geographic principle of exploration entertainment, multiple different exploration entertainment facilities can be dispersed in different places, so that exploration experiences of tourists are single.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a modularization gradient equipment simulation exploration device solves one or more among the above-mentioned prior art problem.
According to the utility model discloses a modularization gradient equipment simulation device of exploring, including first platform, second platform, third platform, fourth platform, fifth platform and originated platform, first platform the place ahead is equipped with the second platform, second platform the place ahead is equipped with the third platform, third platform the place ahead is equipped with the fourth platform, be equipped with around the fourth platform the fifth platform, fifth platform the place ahead is equipped with originated platform.
In some embodiments, the first platform is higher than the second platform, the second platform is higher than the third platform, the third platform is higher than the fourth platform, the fourth platform is at the same height as the fifth platform, and the fifth platform is higher than the starting platform.
In some embodiments, a waterfall area is arranged in the middle of the front side wall of the first platform, a hole exploring area is arranged inside the first platform, and an internal water pump is arranged in the waterfall area.
In some embodiments, an upper wading area is arranged in the middle of the second platform, the upper wading area is located right below the waterfall area, and an upper wading area water outlet is arranged in the middle of the front of the second platform.
In some embodiments, a side wall of one side of the second platform is provided with a probe hole inlet, and the upper end of the other side of the first platform is provided with a probe hole outlet.
In some embodiments, a swimming pool is arranged in the middle of the third platform, the water outlet of the upper wading area is positioned at the rear upper part of the swimming pool, diving pools are arranged at two sides of the third platform, diving platforms are arranged at the outer sides of the diving pools, and the water outlet of the diving pools is arranged in the front middle part of the diving pools.
In some embodiments, a lower wading area is arranged in the middle of the fourth platform, and a torrent wading area is arranged in the middle of the lower wading area.
In some embodiments, the fourth platform is further provided with a lower wading area water outlet, and the lower wading area water outlet is located in the middle of the platforms on two sides in front of the torrent wading area.
In some embodiments, a drift zone is disposed between the fourth and fifth platforms.
In some embodiments, the first platform, the second platform, the third platform, the fourth platform, the fifth platform and the starting platform are erected by steel structures, and the appearance is built by reinforcing mesh and iron wire mesh and coating cement outside the reinforcing mesh and iron wire mesh to imitate natural landscapes.
The utility model provides a pair of modularization gradient equipment simulation exploration device, its beneficial effect lies in can using the device of using the modularization to build the exploration facility of different gradients, use the steel construction to erect, it is comparatively simple and convenient to set up, requirement to the topography is less, still the outer rock and the cliff of coating cement imitation nature, press close to nature view more, the exploration device of different gradients also can bring multiple amusement items for the visitor simultaneously, can oneself select difficult and easy degree, richened the play and experienced, and reduced the cost of playing.
Drawings
Fig. 1 is a schematic structural diagram of a modular gradient assembly simulation exploration apparatus according to an embodiment of the present invention;
fig. 2 is a schematic cross-sectional view of a modular gradient assembly simulation exploration apparatus according to an embodiment of the present invention;
fig. 3 is a schematic structural diagram of a exploratory area of a modular gradient assembly simulation exploration apparatus according to an embodiment of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
As shown in fig. 1 to 3:
according to the utility model discloses a modularization gradient equipment simulation device of exploring, including first platform 1, second platform 2, third platform 3, fourth platform 4, fifth platform 5 and originated platform 6, 1 the place ahead of first platform is equipped with second platform 2, and 2 the place ahead of second platform is equipped with third platform 3, and 3 the place ahead of third platform are equipped with fourth platform 4, are equipped with fifth platform 5 around the fourth platform 4, and 5 the place ahead of fifth platform are equipped with originated platform 6, and the platform of many gradients is favorable to setting up multiple exploration project.
The first platform 1 is higher than the second platform 2, the second platform 2 is higher than the third platform 3, the third platform 3 is higher than the fourth platform 4, the fourth platform 4 and the fifth platform 5 are the same in height, the fifth platform 5 is higher than the starting platform 6, the heights are gradually decreased layer by layer to ensure the difficulty and the easiness balance of exploration projects, the first platform is maximally suitable for players at all levels, and the back of the first platform 1 can also be used as a rock climbing wall.
The front side wall middle part of the first platform 1 is provided with a waterfall area 11, the inside exploratory hole area 13 that is provided with of the first platform 1, the waterfall area 11 is provided with an internal water pump, rock climbing and rope descending projects can be arranged on two sides of the waterfall area 11, meanwhile, the internal space of the first platform 1 is fully utilized to carry out the exploratory hole project, and the waterfall area of the first platform 1 can control the water impact strength through the internal water pump so as to adjust the entertainment difficulty.
An upper wading area 21 is arranged in the middle of the second platform 2, the upper wading area 21 is located right below the waterfall area 11, an upper wading area water outlet 22 is arranged in the middle of the front of the second platform 2, and the upper wading area 21 is located below the waterfall area 11 so that personnel safety of rock climbing and rope descending projects can be guaranteed.
The side wall of one side of the second platform 2 is provided with a cave entrance 23, and the upper end of the other side of the first platform 1 is provided with a cave exit 12, so that a cave project can easily enter, and meanwhile, the cave entrance has higher challenge.
A swimming pool 31 is arranged in the middle of the third platform 3, the water outlet 22 of the upper wading area is positioned at the rear upper part of the swimming pool 31, diving pools 32 are arranged at two sides of the third platform 3, a diving platform 33 is arranged at the outer side of the diving pool 32, a diving pool water outlet 34 is arranged at the front middle part of the diving pool 32, and a player can choose to swim in the swimming pool 31 or jump in the diving pool 32.
The middle part of the fourth platform 4 is provided with a lower wading area 41, and the middle part of the lower wading area 41 is provided with a torrent wading area 42, so that torrent wading projects can be carried out.
The fourth platform 4 is further provided with a lower wading area water outlet 43, and the lower wading area water outlet 43 is located in the middle of the platforms on the two sides in front of the torrent wading area 42, so that the water source can conveniently circulate, and the water source can also be used as an inlet from the drift area 51 to the lower wading area 41.
A drift area 51 is arranged between the fourth platform 4 and the fifth platform 5, and a life jacket drift project can be carried out.
First platform 1, second platform 2, third platform 3, fourth platform 4, fifth platform 5 and initial platform 6 are all erect through the steel construction, and the outward appearance is put up through reinforcing bar net and the imitative natural landscape of iron mesh outer cladding cement, more presses close to natural structure for experience is better.
In the specific amusement process, the amusement park can start from the starting platform 6, enter the fifth platform 5, can perform drifting project experience in the drifting area 51, cross the drifting area 51 to enter the fourth platform 4, perform torrent wading project experience in the middle torrent wading area 42, climb to the third platform 3, perform swimming or other water projects in the middle swimming pool, perform diving experience on the diving platforms 33 on two sides, perform stream slide-down projects from the diving pool water outlet 34, then climb to the second platform 2, enter the exploratory hole area 13 from the lateral exploratory hole inlet 23 to perform exploratory hole projects, or perform rock climbing and rope descending projects along two sides of the waterfall area 11 of the first platform 1, ensure safe landing in the upper wading area 21 below, and ensure the exploratory hole outlet 12 of the exploratory hole area 13 on the first platform, other project experiences may then be undertaken from the first platform 1 down again, returning to the starting platform 6 to complete the cycle of quest play. The back of the first platform can also be used as a rock climbing wall for rock climbing movement.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, similar modifications and improvements can be made without departing from the inventive concept of the present invention, and these are also considered to be within the protection of the present invention.

Claims (10)

1. A modular gradient assembly simulated exploration apparatus, comprising: first platform (1), second platform (2), third platform (3), fourth platform (4), fifth platform (5) and originated platform (6), first platform (1) the place ahead is equipped with second platform (2), second platform (2) the place ahead is equipped with third platform (3), third platform (3) the place ahead is equipped with fourth platform (4), be equipped with around fourth platform (4) fifth platform (5), fifth platform (5) the place ahead is equipped with originated platform (6).
2. A modular gradient assembly simulated exploration apparatus according to claim 1, characterized in that said first platform (1) is higher than said second platform (2), said second platform (2) is higher than said third platform (3), said third platform (3) is higher than said fourth platform (4), said fourth platform (4) is at the same height as said fifth platform (5), said fifth platform (5) is higher than said starting platform (6).
3. The modular gradient assembly simulation exploration device according to claim 2, wherein a waterfall area (11) is arranged in the middle of the front side wall of the first platform (1), an exploration area (13) is arranged inside the first platform (1), and an internal water pump is arranged in the waterfall area (11).
4. The modular gradient assembly simulation exploration device according to claim 3, wherein an upper wading area (21) is arranged in the middle of the second platform (2), the upper wading area (21) is located right below the waterfall area (11), and an upper wading area water outlet (22) is arranged in the middle of the front of the second platform (2).
5. A modular gradient assembly simulation exploration device according to claim 4, wherein a side wall of one side of said second platform (2) is provided with a exploration hole inlet (23), and an upper end of the other side of said first platform (1) is provided with an exploration hole outlet (12).
6. A modular gradient assembly simulation exploration device according to claim 4, wherein a swimming pool (31) is arranged in the middle of the third platform (3), the upper wading area water outlet (22) is positioned at the rear upper part of the swimming pool (31), diving pools (32) are arranged at two sides of the third platform (3), a diving platform (33) is arranged at the outer sides of the diving pools (32), and a diving pool water outlet (34) is arranged at the front middle part of the diving pools (32).
7. A modular gradient assembly simulation exploration device according to claim 1, wherein a lower wading area (41) is arranged in the middle of the fourth platform (4), and a torrent wading area (42) is arranged in the middle of the lower wading area (41).
8. A modular gradient assembly simulated exploration apparatus according to claim 7, characterized in that said fourth platform (4) is further provided with lower wading area water outlets (43), said lower wading area water outlets (43) being located in the middle of the platform on both sides in front of said torrent wading area (42).
9. A modular gradient assembly simulated exploration apparatus according to claim 7, characterized in that a drift zone (51) is provided between said fourth platform (4) and said fifth platform (5).
10. A modular gradient assembly simulation exploration device according to claim 7, characterized in that said first platform (1), said second platform (2), said third platform (3), said fourth platform (4), said fifth platform (5) and said starting platform (6) are all erected by steel structure, the appearance is constructed by reinforcing mesh and iron mesh covered with cement to imitate natural landscapes.
CN202021670399.1U 2020-08-12 2020-08-12 Modularized gradient assembly simulation exploration device Active CN213449664U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021670399.1U CN213449664U (en) 2020-08-12 2020-08-12 Modularized gradient assembly simulation exploration device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021670399.1U CN213449664U (en) 2020-08-12 2020-08-12 Modularized gradient assembly simulation exploration device

Publications (1)

Publication Number Publication Date
CN213449664U true CN213449664U (en) 2021-06-15

Family

ID=76309901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021670399.1U Active CN213449664U (en) 2020-08-12 2020-08-12 Modularized gradient assembly simulation exploration device

Country Status (1)

Country Link
CN (1) CN213449664U (en)

Similar Documents

Publication Publication Date Title
US8047926B2 (en) Fluid chamber inflatable apparatus
KR101376703B1 (en) Structure of tower type for extreme leisure sports
CN213449664U (en) Modularized gradient assembly simulation exploration device
CN208176948U (en) A kind of jellyfish shape theme amusement facility
JP6688493B1 (en) 3D inner wall play equipment
KR102404799B1 (en) A maze slide system
CN212439844U (en) Three-dimensional physical ability unit and children physical ability amusement education facility comprising same
CN213667888U (en) Multilayer structure amusement facility
CN212166464U (en) Experience version climbing tower
CN211705747U (en) Combined type wooden child expansion training device with horizontal bar
CN208244088U (en) A kind of amusement slide
CN210583619U (en) Outdoor inflatable water slide
CN218685991U (en) Ride-through and challenge type combined amusement device
CN206167891U (en) Modular children exercise and entertainment prefabricated house
CN212593942U (en) Outdoor underwater recreation facility simulating volcanic scene
CN205598642U (en) Amusement equipment on shower water
CN211705836U (en) Multifunctional climbing tower
CN215781459U (en) Combined slide for rescue theme
CN217661457U (en) Space theme park
CN220110395U (en) Unpowered expansion equipment
CN212700504U (en) Large-scale network array entertainment facility
CN214714295U (en) Bow runway with inner pull belt
CN219662846U (en) Recreation facility with water drop aircraft structure
CN212187775U (en) Large-scale entertainment facility
CN206715293U (en) Amusement of children ladder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant