CN213449588U - A wall levelling equipment for building decoration - Google Patents

A wall levelling equipment for building decoration Download PDF

Info

Publication number
CN213449588U
CN213449588U CN202022212924.1U CN202022212924U CN213449588U CN 213449588 U CN213449588 U CN 213449588U CN 202022212924 U CN202022212924 U CN 202022212924U CN 213449588 U CN213449588 U CN 213449588U
Authority
CN
China
Prior art keywords
head
connecting block
connecting rod
threaded connection
spiller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022212924.1U
Other languages
Chinese (zh)
Inventor
官俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022212924.1U priority Critical patent/CN213449588U/en
Application granted granted Critical
Publication of CN213449588U publication Critical patent/CN213449588U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Toys (AREA)

Abstract

The utility model discloses a wall levelling equipment for building decoration, including spiller and connecting rod, the spiller includes shovel head and connecting block, and the shovel head is equipped with dovetail and dovetail piece respectively with the connection terminal surface of connecting block, and the terminal surface that dovetail piece was kept away from to the connecting block is equipped with the screw thread head, and the connecting rod all is equipped with the internal thread for cavity setting and both ends, and screw thread head and connecting block threaded connection are passed through to connecting rod one end, the one end of other end threaded connection end cap, and the other end of end cap is equipped with the pull ring, and the connecting rod surface is equipped with a plurality of crisscross non slipping spur grooves each other and forms diamond-shaped. The utility model discloses be used in the spiller and damage the back, need not change whole spiller, can not cause extravagant resource, practiced thrift the cost.

Description

A wall levelling equipment for building decoration
Technical Field
The utility model relates to a building decoration technical field, concretely relates to wall levelling equipment for building decoration.
Background
Building decoration is a short for building decoration project. The architectural decoration is a variety of processes for the interior and exterior surfaces and spaces of buildings by using decorative materials or ornaments in order to protect the main structure of the buildings, improve the physical properties and use functions of the buildings and beautify the buildings. Architectural decoration is an indispensable part of people's life. Is an important friend of human taste life and taste life.
In the process of building decoration, dirt on the surface of a base body or a base layer cannot be removed in an inevitable way, but the existing paint scraper has single function and can only carry out one paint scraping step, and the scraping of loosening a rough surface layer of a wall surface, knocking a hard rough surface, the scraping of the wall surface at a higher position and the like cannot be realized; and all parts of the scraper knife are fixedly connected, so that once the scraper knife parts are damaged, the whole scraper knife needs to be replaced, resources are wasted, and the cost is high.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a wall levelling equipment for building decoration for solve the spiller and damage the back, need change whole spiller, cause extravagant resource, the higher problem of cost.
In order to solve the technical problem, the utility model discloses a following scheme:
the utility model provides a wall shovels flat equipment for building decoration, includes spiller and connecting rod, the spiller includes shovel head and connecting block, and the shovel head is equipped with dovetail and dovetail piece respectively with the connection terminal surface of connecting block, and the terminal surface that dovetail piece was kept away from to the connecting block is equipped with the screw thread head, and the connecting rod all is equipped with the internal thread for cavity setting and both ends, and screw thread head and connecting block threaded connection are passed through to connecting rod one end, the one end of other end threaded connection end cap, the other end of end cap is equipped with the pull ring, and the connecting rod surface is equipped with a plurality of crisscross anti-skidding grooves each.
Preferably, first nuts are fixed on two sides of the shovel head and the connecting block, the two first nuts on the same side are located on the same straight line, the two first nuts on the same side are in threaded connection with a limiting bolt, and one end of the limiting bolt is in threaded connection with a second nut. The screw-thread fit of first nut and spacing bolt has restricted the lateral displacement of shovel head and connecting block for the shovel head is difficult to break away from with the connecting block, and the second nut is used for locking spacing bolt and being connected of two first nuts, strengthens its fastness of connecting.
Preferably, a hollow extension bar is placed in the connecting rod, the plug is arranged in a left-large mode and a right-small mode, external threads are arranged on the plug, and one end of the extension bar can be in threaded connection with the smaller end of the plug. The extension bar enables an operator to carry out leveling operation on a higher wall surface, and an external heightening device is not required to be added, so that the operation efficiency is improved.
Preferably, the surface of the extension bar is sleeved with an anti-slip rubber sleeve. The multifunctional electric bicycle can be used by an operator more comfortably and conveniently, achieves the purpose of convenient use, and embodies the rationality of design.
Preferably, the welding has tup and broken head on the connecting block, and tup and broken head lie in the connecting block both sides respectively and are relative setting, and tup and broken head are close to the screw thread head setting. Can the person of facilitating the use become flexible, strike harder rough surface to the rough surface course of wall, embody the multifunctionality of this equipment.
Preferably, the connecting rod is provided with a miniature blower and a battery box at a position close to the connecting block, the miniature blower is connected with a battery in the battery box through a wire, and a switch button for controlling the miniature blower to start and stop is arranged between the miniature blower and the battery box. The switch button is turned on, and the miniature blower can blow the shoveled dust to the direction far away from the operator when the operator carries out wall shoveling, so that the dust is prevented from falling to eyes and body.
The utility model discloses beneficial effect who has:
1. the shovel head passes through dovetail and forked tail piece looks accordant connection with the connecting block, because in frequent use, the shovel head is the easiest damage, this scheme makes the spiller when damaging, only need with the shovel head from the roll-off in the dovetail, alright change the shovel head, it is also very convenient to install, when the spiller damages like this, need not to change whole spiller, resources and cost are practiced thrift, the connecting block passes through screw thread head threaded connection with the connecting rod, the change and the installation of whole spiller of being convenient for like this, the change efficiency has been improved.
2. The welding has tup and broken head on the connecting block, can the person of facilitating the use to the coarse surface course of wall become flexible, strike harder rough surface, has embodied the multifunctionality of this equipment.
3. Extension bar one end can with the direct threaded connection of end cap, the extension bar enables the operator to the operation of leveling of carrying on of higher wall, need not to be adding outside bed hedgehopping device for the operating efficiency.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic top view of the present invention;
fig. 3 is a schematic top view of the plug connected to the extension rod.
Reference numerals: 1-shovel head, 2-connecting block, 3-connecting rod, 4-screw head, 5-extension rod, 6-plug, 7-pull ring, 8-dovetail groove, 9-dovetail block, 10-first nut, 11-antiskid rubber sleeve, 12-limit bolt, 13-second nut, 14-hammer head, 15-crushing head, 16-micro blower, 17-switch button, 18-battery box, 19-diamond block and 20-antiskid groove.
Detailed Description
The present invention will be described in further detail with reference to the following examples and drawings, but the present invention is not limited thereto.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "longitudinal", "lateral", "horizontal", "inner", "outer", "front", "rear", "top", "bottom", and the like indicate the position or positional relationship based on the position or positional relationship shown in the drawings, or the position or positional relationship which is usually placed when the product of the present invention is used, and the terms are only for convenience of description of the present invention and simplifying the description, but do not indicate or imply that the device or element to which the term refers must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as limiting the present invention.
In the description of the present invention, it should be further noted that, unless otherwise explicitly specified or limited, the terms "disposed," "opened," "mounted," "connected," and "connected" are to be construed broadly, e.g., as either a fixed connection, a detachable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Examples
As shown in fig. 1-3, a wall surface leveling device for building decoration comprises a scraper knife and a connecting rod 3, wherein the scraper knife comprises a scraper head 1 and a connecting block 2, the connecting end surfaces of the scraper head 1 and the connecting block 2 are respectively provided with a dovetail groove 8 and a dovetail block 9, the scraper head 1 and the connecting block 2 are mutually matched and connected through the dovetail groove 8 and the dovetail block 9, because the scraper knife is frequently used, the scraper head 1 is most easily damaged, when the scraper knife is damaged, the scraper head 1 can be replaced only by sliding out along the length direction of the dovetail block 9, the installation is very convenient, when the scraper knife is damaged, the whole scraper knife does not need to be replaced, the resource and cost are saved, the end surface of the connecting block 2, which is far away from the dovetail block 9, is provided with a thread head 4, the connecting rod 3 is hollow, both ends of the connecting block 2 and the connecting rod 3 are provided with internal threads, the connecting block 2 and the connecting rod 3 are connected through, thus, the replacement and installation of the whole scraper knife are convenient, the replacement efficiency is improved, the hollow extension bar 5 is placed in the connecting rod 3, the weight of the whole device is reduced by the hollow connecting rod 3 and the extension bar 5, the carrying and the operation of an operator are convenient, the other end of the connecting rod 3 is in threaded connection with the plug 6, the extension bar 5 can be placed in the inner cavity of the connecting rod 3 only when the outer diameter of the extension bar 5 is smaller than the inner diameter of the connecting rod 3, the plug 6 adopts a structure with a large left end and a small right end, the large end is connected with the connecting rod 3, the plug 6 is used for preventing the extension bar 5 in the connecting rod 3 from falling, the plug 6 is provided with external threads, when the extension bar 5 needs to be extended, the extension bar 5 is directly in threaded connection with the small end of the plug 6, the extension bar 5 can enable the operator to carry out the scraping operation on a high wall surface without adding an external padding device, the diameter of pull ring 7 is less than the less end diameter of end cap 6, the installation extension bar 5 of being convenient for like this, pull ring 7 this device of being convenient for can hang on the wall or other positions when not being used, reduce occuping of space, connecting rod 3 surfaces are equipped with a plurality of crisscross antiskid ribbed tile 20 each other and form diamond-shaped block 19, diamond-shaped block 19 has better skid resistance, when the operator uses for a long time, the palm is easily perspired, can effectively prevent skidding like this, the travelling comfort of reinforcing use.
Specifically, first nuts 10 are fixed on two sides of the shovel 1 and the connecting block 2, the two first nuts 10 on the same side are located on the same straight line, the two first nuts 10 on the same side are in threaded connection with a limiting bolt 12, and one end of the limiting bolt 12 is in threaded connection with a second nut 13. The screw-thread fit of the first nut 10 and the limit bolt 12 limits the lateral displacement of the shovel head 1 and the connecting block 2, so that the shovel head 1 is not easy to be separated from the connecting block 2.
Specifically, the surface of the extension bar 5 is sleeved with an anti-slip rubber sleeve 11. The multifunctional electric bicycle can be used by an operator more comfortably and conveniently, achieves the purpose of convenient use, and embodies the rationality of design.
Specifically, the welding has tup 14 and broken head 15 on connecting block 2, and tup 14 and broken head 15 are located connecting block 2 both sides respectively and are relative setting, and tup 14 and broken head 15 are close to the setting of screw thread head 4, and broken head 15 welds in connecting block 2 top, and 14 welding of tup is in connecting block 2 below. The hammer 14 and the crushing head 15 can facilitate users to loosen the rough surface layer of the wall surface and knock on the harder rough surface, and the multifunctional performance of the equipment is embodied.
Specifically, a miniature blower 16 and a battery box 18 are arranged on the position, close to the connecting block 2, of the connecting rod 3, an air outlet of the miniature blower 16 faces the direction of the shovel head 1, the miniature blower 16 is connected with a battery in the battery box 18 through a wire, and a switch button 17 for controlling the miniature blower 16 to start and stop is arranged between the miniature blower 16 and the battery box 18. By pressing the switch button 17, the micro-blower 16 can blow the shoveled dust to the direction far away from the operator when the operator shovels the wall surface, so as to prevent the dust from falling onto eyes and body.
The utility model discloses an application principle: when the device is used, when a scraper knife is used for scraping a wall surface, the scraper head 1 is most easily damaged, after the scraper knife is damaged, the scraper head 1 with the same dovetail groove 8 is replaced, the dovetail block 9 is clamped into the dovetail groove 8 along the length direction of the dovetail block 9, so that the scraper head 1 is flush with the two sides of the connecting block 2, the limiting bolt 12 and the second nut 13 are sequentially connected, the scraper head 1 and the connecting block 2 are firmly fixed, the replacement of the scraper head 1 is completed, convenience and rapidness are realized, the whole scraper knife does not need to be replaced at the same time, and resources and manufacturing cost are saved; simultaneously in the use, if need to shovel the higher position flat, only need take off end cap 6, take out extension bar 5, then be connected to connecting rod 3 lower extreme with end cap 6 again, after that with extension bar 5 direct and the less end threaded connection of end cap 6, just so can carry out the operation to higher wall, in the operation is shoveled to the wall, can also press shift knob 17, start miniature hair-dryer 16, blow the dust of shoveling down to the direction of keeping away from the operation, prevent effectively that the dust from dropping in operator's the eyes, the utility model relates to a multi-functional equipment of shoveling has better practicality.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention in any way, and the technical essence of the present invention is that within the spirit and principle of the present invention, any simple modification, equivalent replacement, and improvement made to the above embodiments are all within the protection scope of the technical solution of the present invention.

Claims (6)

1. The utility model provides a wall shovels equipment for architectural decoration, a serial communication port, including spiller and connecting rod (3), the spiller includes shovel head (1) and connecting block (2), the connection terminal surface of shovel head (1) and connecting block (2) is equipped with dovetail (8) and forked tail piece (9) respectively, the terminal surface that forked tail piece (9) were kept away from in connecting block (2) is equipped with screw thread head (4), connecting rod (3) all are equipped with the internal thread for cavity setting and both ends, screw thread head (4) and connecting block (2) threaded connection are passed through to connecting rod (3) one end, the one end of other end threaded connection end cap (6), the other end of end cap (6) is equipped with pull ring (7), connecting rod (3) surface is equipped with a plurality of crisscross antiskid ribbed tile (20) and forms diamond piece (19).
2. The wall surface leveling device for building decoration according to claim 1, wherein first nuts (10) are fixed on two sides of the shovel head (1) and the connecting block (2), the two first nuts (10) on the same side are located on a straight line, a limiting bolt (12) is in threaded connection with the two first nuts (10) on the same side, and one end of the limiting bolt (12) is in threaded connection with a second nut (13).
3. The wall surface leveling device for building decoration according to claim 1, wherein a hollow extension bar (5) is placed in the connecting rod (3), the plugs (6) are arranged in a left-large and right-small mode, external threads are arranged on the plugs (6), and one end of the extension bar (5) can be in threaded connection with the smaller end of each plug (6).
4. A wall surface leveling device for building finishing as claimed in claim 3 wherein said extension bar (5) is covered with an anti-slip rubber sleeve (11) on the surface.
5. A wall-spading apparatus for building decoration according to claim 1, wherein the connecting block (2) is welded with a hammer head (14) and a crushing head (15), the hammer head (14) and the crushing head (15) are respectively located at two sides of the connecting block (2) and are oppositely arranged, and the hammer head (14) and the crushing head (15) are arranged near the screw head (4).
6. The wall surface leveling device for building decoration according to claim 1, wherein a micro blower (16) and a battery box (18) are arranged on the connecting rod (3) at a position close to the connecting block (2), the micro blower (16) is connected with a battery in the battery box (18) through a wire, and a switch button (17) for controlling the micro blower (16) to be turned on and off is arranged between the micro blower (16) and the battery box (18).
CN202022212924.1U 2020-10-07 2020-10-07 A wall levelling equipment for building decoration Expired - Fee Related CN213449588U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022212924.1U CN213449588U (en) 2020-10-07 2020-10-07 A wall levelling equipment for building decoration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022212924.1U CN213449588U (en) 2020-10-07 2020-10-07 A wall levelling equipment for building decoration

Publications (1)

Publication Number Publication Date
CN213449588U true CN213449588U (en) 2021-06-15

Family

ID=76286617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022212924.1U Expired - Fee Related CN213449588U (en) 2020-10-07 2020-10-07 A wall levelling equipment for building decoration

Country Status (1)

Country Link
CN (1) CN213449588U (en)

Similar Documents

Publication Publication Date Title
US10562455B2 (en) Footrest for assisting in touching car roof
CN213449588U (en) A wall levelling equipment for building decoration
WO2009142364A1 (en) Electric plug that is easy to be separated from the consent
US20180201235A1 (en) Combination tool for use with ice or snow
CN211388514U (en) Electromechanical device installation engineering is with multi-functional insulating spanner
CN209771247U (en) Portable badminton racket
CN207771875U (en) A kind of multi-functional axe
CN211559062U (en) Luggage handle
CN217560615U (en) Steel bar diameter detection device for building engineering detection
CN212201375U (en) Building wall building tool
CN218455675U (en) Wall body hollowing detection rod with adjustable
CN212148211U (en) Wax statue making tool
CN214114876U (en) Hand-held type spiral cover machine grip mechanism
CN216970517U (en) High leakproofness metal packaging barrel
CN216876270U (en) Multifunctional cleaning shovel for decoration
CN217776651U (en) Remote control support for angle grinder
CN211841276U (en) A grind flat brush for fitment construction
CN212105166U (en) Portable concrete vibrting spear of intelligence
CN215706590U (en) Anti-skidding flat car handlebar
CN211890705U (en) Tool handle for hand tool and hand tool
CN210228035U (en) Building site rubbish cleans instrument
CN211022037U (en) High-strength anti-falling porcelain cup
CN218508950U (en) Decorate leveling instrument for construction
CN208619836U (en) A kind of American angle valve handle
CN210407978U (en) Long service life's porcelain cup

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210615