CN213448969U - Steel construction assembled wallboard - Google Patents
Steel construction assembled wallboard Download PDFInfo
- Publication number
- CN213448969U CN213448969U CN202021686953.5U CN202021686953U CN213448969U CN 213448969 U CN213448969 U CN 213448969U CN 202021686953 U CN202021686953 U CN 202021686953U CN 213448969 U CN213448969 U CN 213448969U
- Authority
- CN
- China
- Prior art keywords
- wallboard
- lateral wall
- seted
- fixed block
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a steel construction assembled wallboard, including first wallboard and second wallboard, the equal fixed mounting of the relative lateral wall of first wallboard and second wallboard has the pre-fixing piece, and the fixed block draw-in groove has all been seted up to the relative lateral wall of first wallboard and second wallboard, and the open slot has all been seted up to the left side wall of first wallboard and the right side wall of second wallboard, and the relative lateral wall longitudinal symmetry of first wallboard and second wallboard is provided with coupling mechanism, is equipped with the fixed establishment of fixing mutually with coupling mechanism in the open slot. The positions of the first wallboard and the second wallboard are fixed through the matching of the connecting mechanism and the fixing mechanism between the first wallboard and the second wallboard respectively, the assembly between the first wallboard and the second wallboard can be more convenient through the connecting mechanism and the fixing mechanism which are arranged, and the fixing effect of the first wallboard and the second wallboard can be enhanced.
Description
Technical Field
The utility model relates to an assembly type structure technical field specifically is a steel construction assembled wallboard.
Background
The fabricated building is a building which is formed by transferring a large amount of field operation work in the traditional construction mode to a factory, processing and manufacturing building components and accessories (such as floor slabs, wall slabs, stairs, balconies and the like) in the factory, transporting the components and accessories to a building construction site, and assembling and installing the components and the accessories on the site in a reliable connection mode. The existing assembling type wallboard is assembled after being processed, the assembling process is complex, the fixing structure is simple, and the fixing effect between the two assembling type wallboards is poor. To this end, we propose a steel structure fabricated panel.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a steel construction assembled wallboard to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a steel construction assembled wallboard, includes first wallboard and second wallboard, the equal fixed mounting of the relative lateral wall of first wallboard and second wallboard has the pre-fixing piece, the fixed block draw-in groove has all been seted up to the relative lateral wall of first wallboard and second wallboard, the open slot has all been seted up to the left side wall of first wallboard and the right side wall of second wallboard, the relative lateral wall longitudinal symmetry of first wallboard and second wallboard is provided with coupling mechanism, the assembly has fixed mechanism mutually with coupling mechanism in the open slot.
Preferably, coupling mechanism is including seting up the mounting groove at first wallboard and second wallboard lateral wall, sliding connection has the connecting plate in the mounting groove, the connecting plate is pegged graft to the spread groove in, the lateral wall at first wallboard and second wallboard is seted up to the spread groove.
Preferably, the front side wall of first wallboard and second wallboard has all seted up the rectangular channel, the front side wall fixed mounting of connecting plate has the handle pole that runs through the rectangular channel.
Preferably, fixed establishment is including the dwang that runs through the open slot, the installation piece has been cup jointed to the lateral wall of dwang, the one end fixed mounting of dwang has fixing bolt, the fixing bolt spiro union is to in the screw, the lateral wall at the connecting plate is seted up to the screw, the other end fixed mounting of dwang has the handle piece, the lateral wall fixed mounting of installation piece has the limiting plate, the limiting plate is pegged graft to the spacing inslot.
Preferably, the installation cavity has been seted up in the installation piece, be equipped with supplementary fixed block in the installation cavity, fixed being equipped with the spring between supplementary fixed block and the installation cavity, fixed mounting has the guide bar that runs through supplementary fixed block in the installation cavity.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model provides a steel construction assembled wallboard, be provided with fixed block and fixed block draw-in groove in advance between first wallboard and second wallboard, through the cooperation of fixed block and fixed block draw-in groove in advance, can fix in advance first wallboard and second wallboard, then respectively through coupling mechanism and the cooperation of fixed establishment between first wallboard and the second wallboard, fix the position of first wallboard and second wallboard, coupling mechanism and the fixed establishment through setting up not only can make the assembly between first wallboard and the second wallboard more convenient, and can strengthen the fixed effect to first wallboard and second wallboard.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a front view of the present invention.
Fig. 3 is a detailed view of fig. 2 at a.
In the figure: 1. first wallboard, 2, second wallboard, 3, the fixed block in advance, 4, the fixed block draw-in groove, 5, the open slot, 6, coupling mechanism, 61, the mounting groove, 62, the connecting plate, 63, the spread groove, 7, fixed establishment, 71, the dwang, 72, the installation piece, 73, fixing bolt, 74, the screw, 75, the handle piece, 76, the limiting plate, 77, the spacing groove, 8, the rectangular channel, 9, the handle bar, 10, the installation cavity, 11, supplementary fixed block, 12, the spring, 13, the guide bar.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, fig. 2 and fig. 3, the present invention provides a technical solution: the utility model provides a steel construction assembled wallboard, includes first wallboard 1 and second wallboard 2, and the equal fixed mounting of the relative lateral wall of first wallboard 1 and second wallboard 2 has fixed block 3 in advance, and fixed block draw-in groove 4 has all been seted up to the relative lateral wall of first wallboard 1 and second wallboard 2, and first wallboard 1 and second wallboard 2 are fixed in advance through 3 grafting to fixed block draw-in groove 4 of fixed block in advance.
The left side wall of the first wall plate 1 and the right side wall of the second wall plate 2 are both provided with an open slot 5, the opposite side walls of the first wall plate 1 and the second wall plate 2 are provided with connecting mechanisms 6 in an up-down symmetry manner, each connecting mechanism 6 comprises a mounting groove 61 arranged on the side wall of the first wall plate 1 and the side wall of the second wall plate 2, a connecting plate 62 is connected in the mounting groove 61 in a sliding manner, the connecting plate 62 is inserted into a connecting groove 63, the connecting groove 63 is arranged on the side wall of the first wall plate 1 and the side wall of the second wall plate 2, a fixing mechanism 7 fixed with the connecting mechanism 6 is, connect fixedly to first wallboard 1 and second wallboard 2 after pegging graft to spread groove 63 through connecting plate 52, rectangular channel 8 has all been seted up to the preceding lateral wall of first wallboard 1 and second wallboard 2, and the preceding lateral wall fixed mounting of connecting plate 62 has the handle bar 9 that runs through rectangular channel 8, conveniently removes connecting plate 62 through handle bar 9.
Set up installation cavity 10 in the installation piece 72, be equipped with supplementary fixed block 11 in the installation cavity 10, fixed being equipped with spring 12 between supplementary fixed block 11 and the installation cavity 10, fixed mounting has the guide bar 13 that runs through supplementary fixed block 11 in the installation cavity 10, supplementary fixed block 11 is the rubber material, has stronger frictional force, and spring 12 makes supplementary fixed block 11 and the lateral wall of connecting plate 62 keep closely laminating to strengthen the fixed effect to connecting plate 62.
The working principle is as follows: in the in-process of assembling, first wallboard 1 and second wallboard 2 are pegged graft through fixed block 3 in advance and are fixed in advance to fixed block draw-in groove 4, then respectively in sliding connection board 62 to the spread groove 63 that corresponds, at 5 internal rotation dwang 71 of open slot, make fixing bolt 73 spiro union to screw 74 in, fix the position of connecting plate 62, thereby make first wallboard 1 and second wallboard 2 carry out the fixed of position, then supplementary fixed block 11 of rethread keeps closely laminating with the lateral wall of connecting plate 62, thereby strengthen the fixed effect to connecting plate 62, through the utility model discloses make the assembly to the assembled wallboard simpler, convenient.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.
Claims (5)
1. The utility model provides a steel construction assembled wallboard, includes first wallboard (1) and second wallboard (2), its characterized in that: the utility model discloses a wallboard, including first wallboard (1), second wallboard (2), fixed block (3) are in advance installed to the equal fixed mounting of relative lateral wall of first wallboard (1) and second wallboard (2), fixed block draw-in groove (4) have all been seted up to the relative lateral wall of first wallboard (1) and second wallboard (2), open slot (5) have all been seted up to the left side wall of first wallboard (1) and the right side wall of second wallboard (2), the relative lateral wall of first wallboard (1) and second wallboard (2) is symmetry about the upper and lower side is provided with coupling mechanism (6), be equipped with in open slot (5) with coupling mechanism (6) fixed establishment (7) mutually.
2. The steel structure assembled wallboard of claim 1, wherein: coupling mechanism (6) are including offering mounting groove (61) at first wallboard (1) and second wallboard (2) lateral wall, sliding connection has connecting plate (62) in mounting groove (61), connecting plate (62) are pegged graft to in spread groove (63), the lateral wall at first wallboard (1) and second wallboard (2) is offered in spread groove (63).
3. The steel structure assembled wallboard of claim 2, wherein: rectangular channel (8) have all been seted up to the preceding lateral wall of first wallboard (1) and second wallboard (2), the preceding lateral wall fixed mounting of connecting plate (62) has handle pole (9) that run through rectangular channel (8).
4. The steel structure assembled wallboard of claim 1, wherein: fixed establishment (7) are including dwang (71) that runs through open slot (5), the lateral wall of dwang (71) has cup jointed installation piece (72), the one end fixed mounting of dwang (71) has fixing bolt (73), fixing bolt (73) spiro union is to in screw (74), the lateral wall at connecting plate (62) is seted up in screw (74), the other end fixed mounting of dwang (71) has handle piece (75), the lateral wall fixed mounting of installation piece (72) has limiting plate (76), limiting plate (76) are pegged graft to spacing groove (77) in.
5. The steel structure assembled wallboard of claim 4, wherein: install chamber (10) have been seted up in installation piece (72), be equipped with supplementary fixed block (11) in installation chamber (10), fixed assembly has spring (12) between supplementary fixed block (11) and installation chamber (10), fixed mounting has guide bar (13) that run through supplementary fixed block (11) in installation chamber (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021686953.5U CN213448969U (en) | 2020-08-14 | 2020-08-14 | Steel construction assembled wallboard |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021686953.5U CN213448969U (en) | 2020-08-14 | 2020-08-14 | Steel construction assembled wallboard |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213448969U true CN213448969U (en) | 2021-06-15 |
Family
ID=76310062
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021686953.5U Active CN213448969U (en) | 2020-08-14 | 2020-08-14 | Steel construction assembled wallboard |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213448969U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115217242A (en) * | 2022-08-16 | 2022-10-21 | 广亚铝业有限公司 | Assembly type built-in system and installation method thereof |
-
2020
- 2020-08-14 CN CN202021686953.5U patent/CN213448969U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115217242A (en) * | 2022-08-16 | 2022-10-21 | 广亚铝业有限公司 | Assembly type built-in system and installation method thereof |
CN115217242B (en) * | 2022-08-16 | 2024-04-02 | 广亚铝业有限公司 | Assembled built-in system and installation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213448969U (en) | Steel construction assembled wallboard | |
CN112922159A (en) | Assembly type building system | |
CN216948923U (en) | Assembled steel construction wallboard | |
CN216713565U (en) | Green new forms of energy building wallboard for assembly building | |
CN110094000B (en) | Cold-formed thin-wall light steel composite wall sheet with clamping key type connection structure | |
CN110847534A (en) | Stone toilet wall assembly and mounting method thereof | |
CN114319639A (en) | Low-carbon energy-saving building waterproof wall | |
CN211200822U (en) | Partition plate's installation clamping device | |
CN109440935B (en) | Wall board | |
CN215889028U (en) | Assembled wall system with moulding | |
KR20090002630U (en) | A connecting bracket for prefabricated wall panel | |
CN205063103U (en) | Partition wall | |
CN212613497U (en) | Wallboard connection structure that assembled was decorated | |
CN210659032U (en) | Light energy-saving wallboard with mounting structure | |
CN211899100U (en) | Partition plate and roof beam connecting piece mounting structure | |
CN112982743A (en) | Gypsum wallboard, assembly type gypsum internal partition wall and mounting method of assembly type gypsum internal partition wall | |
CN220014096U (en) | Assembled building wall for green building | |
CN220203172U (en) | Connecting piece for prefabricated building plates | |
CN218580924U (en) | Installation component for assembly type building | |
CN213869029U (en) | Reinforcing member for assembled hollow light outer wall window opening | |
CN216949227U (en) | Assembled building heat preservation decorates integration wallboard structure | |
CN215759754U (en) | Energy-saving assembled building wall | |
CN214169653U (en) | Waterproof thermal insulation wall suitable for archaize building | |
CN220848146U (en) | Assembled building structure | |
CN219364996U (en) | Assembled insulation board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210805 Address after: 423000 5th floor, office building, No. 55, Yanquan Road, Beihu District, Chenzhou City, Hunan Province Patentee after: Hunan Dongtai Construction Group Co.,Ltd. Address before: 2 / F, Hunan Zhongfu aviation group building, No.1 Quyuan North Road, Yueyang Economic and Technological Development Zone, Yueyang City, Hunan Province, 414000 Patentee before: Hunan Zhongfu Hangxiao Construction Technology Co.,Ltd. |
|
TR01 | Transfer of patent right |