CN213448815U CN202021890888.8U CN202021890888U CN213448815U CN 213448815 U CN213448815 U CN 213448815U CN 202021890888 U CN202021890888 U CN 202021890888U CN 213448815 U CN213448815 U CN 213448815U
Authority
CN
China
Prior art keywords
gate
pump
integrated
river channel
flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021890888.8U
Other languages
Chinese (zh)
Inventor
张磊
罗研
王维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Kaiquan Motor Pump Co ltd
Original Assignee
Hefei Kaiquan Motor Pump Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Kaiquan Motor Pump Co ltd filed Critical Hefei Kaiquan Motor Pump Co ltd
Priority to CN202021890888.8U priority Critical patent/CN213448815U/en
Application granted granted Critical
Publication of CN213448815U publication Critical patent/CN213448815U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a municipal administration water supply and drainage field, concretely relates to integration pump floodgate of two-way water delivery, including the work gate of arranging in the river course and the support longmen that spanes the river course, the support longmen including fixing respectively at the base of river course both sides and the supporting platform who connects two bases, work gate hoist and mount in the installation gate slot of supporting platform below for the hoist headstock gear that the control work gate was opened or was closed is fixed on supporting platform, the work gate on be provided with the full tubular pump of two-way drainage, the equal connection control cabinet of hoist headstock gear and the full tubular pump of two-way drainage, this switch board is fixed on supporting platform, the full tubular pump both sides of two-way drainage all be provided with the flotation tank flap valve that covers the pump outlet of a river.

Description

Integrated pump gate for bidirectional water delivery
Technical Field
The utility model relates to a municipal administration plumbing field, concretely relates to integration pump floodgate of two-way water delivery.
Background
The integrated pump gate is a system which integrates a pump station and a sluice into a whole device, forms the sluice with a submersible pump, and is an integrated system which integrates a plurality of accessory facilities such as an opening and closing system, a trash blocking system, liquid level monitoring, water quality monitoring, intelligent control and the like. If the two-way water delivery function of the integrated pump is to be realized, the gate reversing equipment is additionally arranged, namely, when reverse water delivery is required, the working gate and the submersible pump are opened together, then the reversing equipment reverses the working gate and the submersible pump to reverse directions, and then the working gate and the submersible pump are closed simultaneously, and the water pump is started to realize the reverse water delivery function, so that the operation is very complicated, and the labor and the time are wasted. And the ordinary integrated pump floodgate need establish solitary pump room, that is to say that the integrated pump floodgate includes lock chamber and pump room, and area is big, and the construction is convenient inadequately, overhauls inconveniently, and construction cost is high.
Disclosure of Invention
The utility model aims at providing a can positive drainage reverse diversion, area is little construction convenience's two-way water delivery's integration pump floodgate.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the integrated pump gate for bidirectional water delivery comprises a working gate arranged in a river channel and a supporting gantry stretching across the river channel, wherein the supporting gantry comprises bases fixed on two sides of the river channel respectively and a supporting platform connected with the two bases, the working gate is hung in a mounting gate slot below the supporting platform, a hoisting hoist for controlling the opening or closing of the working gate is fixed on the supporting platform, a bidirectional drainage full-through-flow pump is arranged on the working gate, the hoisting hoist and the bidirectional drainage full-through-flow pump are both connected with a control cabinet, the control cabinet is fixed on the supporting platform, and buoyancy tank flap valves for covering water outlets of the pump are arranged on two sides of the bidirectional drainage full-through-flow pump.
Due to the adoption of the technical scheme, the bidirectional drainage full-tubular pump has a bidirectional water delivery function, the functions of water diversion and drainage can be realized only by positive and negative rotation of the motor, a reversing device is not required to be additionally arranged, and the integrated pump brake integrates the lock chamber and the pump room into a whole, so that the gate is used as a structural foundation, the occupied area is effectively reduced, the construction period is shortened, the construction cost is reduced, and considerable expense is saved for users.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
fig. 2 is a left side view of fig. 1.
Detailed Description
An integrated pump gate for bidirectional water delivery comprises a working gate 100 arranged in a river channel 200 and a supporting gate 300 stretching across the river channel 200, wherein the supporting gate 300 comprises bases 310 fixed on two sides of the river channel 200 and a supporting platform 320 connected with the two bases 310, the working gate 100 is hung in a mounting gate slot below the supporting platform 320, a hoisting hoist 400 for controlling the opening or closing of the working gate 100 is fixed on the supporting platform 320, a bidirectional drainage full-through-flow pump 110 is arranged on the working gate 100, the hoisting hoist 400 and the bidirectional drainage full-through-flow pump 110 are both connected with a control cabinet 500, the control cabinet 500 is fixed on the supporting platform 320, and buoyancy tank flap valves 120 for covering water outlets of the pump are arranged on two sides of the bidirectional drainage full-through-flow pump 110. The bidirectional drainage full-through-flow pump 110 is directly installed on the working gate 100, flap valves 120 are arranged on two sides of the bidirectional drainage full-through-flow pump to limit water backflow, the hoisting hoist 400 can be in a hoisting type, a screw rod type or a hydraulic oil cylinder type, and the working gate 100 is in a vertical lifting type. The utility model discloses especially, be adapted to some municipal works that need drainage and the two-way water delivery function of diversion, only need the motor just reverse can realize the function of diversion and drainage, need not set up the switching-over device in addition. And an independent pump room is not required to be built, the whole mechanism is compact and perfect, the occupied land is small, the land resources are saved, and the land acquisition and removal cost of the project is reduced. And also does not affect the flood discharge of the riverway and the control of the water ecological environment. The mill is prefabricated, the equipment cooperation is accurate, and the installation is maintained simply.
The two-way drainage full-through-flow pump 110 is provided with a trash rack 130 at the side, and the trash rack 130 is arranged in the river channel 200. The sewage grid 130 can prevent weed and dirt in the flowing water from entering the bidirectional drainage tubular pump 110, prevent the impurities from damaging the bidirectional drainage tubular pump 110 and prolong the service life of the bidirectional drainage tubular pump.
An overhaul stop log gate 140 is arranged beside the bidirectional drainage full-through-flow pump 110, the overhaul stop log gate 140 is arranged in the river channel 200, and the overhaul stop log gate 140 is used for controlling the on-off of water flow in the river channel 200. The maintenance stop log gate 140 is formed by a plurality of individual gate plates which are transversely placed into a gate slot one by one and are stacked into a plane water retaining structure. The structure is simple, the dead weight is light, the lifting force is small, the carrying is convenient, and the device is suitable for temporary water blocking or gate maintenance.
The liquid level meter 150 is arranged beside the bidirectional drainage full-through-flow pump 110, the liquid level meter 150 is arranged in the river channel 200, and the liquid level meter 150 transmits collected liquid level signals to the control cabinet 500.
Two sides of the bidirectional drainage full-through-flow pump 110 are provided with liquid level meters 150.
The trash rack 130 is located in front of the bi-directional drainage total cross-flow pump 110 along the forward direction of the water flow of the river channel 200.
The access stop 140 is located in front of the bi-directional discharge full cross-flow pump 110 in the forward direction of the flow of the river 200. The access stop 140 is located in front of the trash rack 130 in the forward direction of the flow of the river 200.
The supporting platform 320 is provided with a shed roof 330 covering the supporting platform 320. The shed roof 330 can protect the hoisting hoist 400 and the control cabinet 500 from being exposed to the sun and being corroded by rainwater, and the service life of the hoisting hoist is prolonged.
The liquid level meter 150 transmits the collected liquid level signal to a remote cloud platform. The switch of the working gate 100 and the switch of the bidirectional drainage full-tubular pump 110 are all controlled by liquid level signals triggered by liquid levels, so that unmanned control and automatic control can be realized, and a remote cloud platform can be connected to realize real-time monitoring and message pushing of data.
The utility model provides a 110 pump impeller of two-way drainage full tubular pump and motor rotor integral type design, special design makes the more ordinary dive axial-flow pump of whole pump axial length shorter, and whole pump floodgate system operation is more stable.

Claims (10)

1. The utility model provides an integration pump floodgate of two-way water delivery which characterized in that: comprises a working gate (100) arranged in a river channel (200) and a supporting gantry (300) crossing the river channel (200), the supporting gantry (300) comprises bases (310) respectively fixed on two sides of the river channel (200) and a supporting platform (320) connected with the two bases (310), the working gate (100) is hung in a mounting gate slot below the supporting platform (320), a hoist (400) for controlling the opening or closing of the work gate (100) is fixed to the support platform (320), the working gate (100) is provided with a bidirectional drainage full-through-flow pump (110), the hoisting hoist (400) and the bidirectional drainage full-through-flow pump (110) are both connected with a control cabinet (500), the control cabinet (500) is fixed on a supporting platform (320), and two sides of the bidirectional drainage full-through-flow pump (110) are respectively provided with a buoyancy tank flap valve (120) covering a water outlet of the pump.
2. The integrated bi-directional water transfer pump gate of claim 1, further comprising: a trash rack (130) is arranged beside the bidirectional drainage full-through-flow pump (110), and the trash rack (130) is arranged in the river channel (200).
3. The integrated bi-directional water transfer pump gate of claim 2, further comprising: an overhauling stop log (140) is arranged beside the bidirectional drainage full-through-flow pump (110), the overhauling stop log (140) is arranged in the river channel (200), and the overhauling stop log (140) is used for controlling the on-off of water flow in the river channel (200).
4. The integrated bi-directional water transfer pump gate of claim 3, further comprising: a liquid level meter (150) is arranged beside the bidirectional drainage full-through-flow pump (110), the liquid level meter (150) is arranged in the river channel (200), and the liquid level meter (150) transmits collected liquid level signals to the control cabinet (500).
5. The bi-directional water transfer integrated pump gate of claim 4, wherein: and liquid level meters (150) are arranged on both sides of the bidirectional drainage full-through-flow pump (110).
6. The integrated bi-directional water transfer pump gate of claim 5, wherein: the trash rack (130) is positioned in front of the bidirectional drainage total-through-flow pump (110) along the positive direction of the water flow of the river channel (200).
7. The integrated bi-directional water transfer pump gate of claim 6, further comprising: the maintenance stop log (140) is positioned in front of the bidirectional drainage full cross-flow pump (110) along the positive direction of the water flow of the river channel (200).
8. The integrated bi-directional water transfer pump gate of claim 7, further comprising: the access stop (140) is located in front of the trash rack (130) along the forward direction of the water flow in the channel (200).
9. The integrated bi-directional water transfer pump gate of claim 8, wherein: and a shed roof (330) covering the supporting platform (320) is arranged on the supporting platform (320).
10. The integrated bi-directional water transfer pump gate of claim 9, further comprising: the liquid level meter (150) transmits the collected liquid level signal to a remote cloud platform.
CN202021890888.8U 2020-09-02 2020-09-02 Integrated pump gate for bidirectional water delivery Active CN213448815U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021890888.8U CN213448815U (en) 2020-09-02 2020-09-02 Integrated pump gate for bidirectional water delivery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021890888.8U CN213448815U (en) 2020-09-02 2020-09-02 Integrated pump gate for bidirectional water delivery

Publications (1)

Publication Number Publication Date
CN213448815U true CN213448815U (en) 2021-06-15

Family

ID=76319972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021890888.8U Active CN213448815U (en) 2020-09-02 2020-09-02 Integrated pump gate for bidirectional water delivery

Country Status (1)

Country Link
CN (1) CN213448815U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113897915A (en) * 2021-10-09 2022-01-07 安徽农业大学 Bidirectional symmetrical integrated pump gate

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113897915A (en) * 2021-10-09 2022-01-07 安徽农业大学 Bidirectional symmetrical integrated pump gate

Similar Documents

Publication Publication Date Title
CN111021502A (en) Wisdom vatch basin
CN105780906B (en) A kind of dirty exhaust system of fragment abandoned stream section
CN211596997U (en) Intelligent intercepting well
CN213448815U (en) Integrated pump gate for bidirectional water delivery
CN210767116U (en) Integrated intelligent intercepting well
CN216475468U (en) Cut dirty main pipe and prevent flowing backward reposition of redundant personnel well
CN210658625U (en) Integrated intelligent intercepting well
CN211690645U (en) Wisdom vatch basin
CN218322600U (en) Buried pump gate station
CN209874005U (en) Clear water and sewage flow dividing device for reducing rural non-point source pollution
CN210857472U (en) Bury formula dispersion regulation storage battery system
CN110468796B (en) Multifunctional sluice capable of realizing bidirectional pumping through sluice translation switching
CN211200659U (en) Water conservancy automatic control's vatch basin
CN210917247U (en) Multifunctional sluice capable of realizing bidirectional pumping through gate translation switching
CN113529912A (en) Hydraulic self-control rainwater flow dividing device
CN207063094U (en) A kind of solar energy hydraulic self-control cuts dirty reverse-filling equipment
CN216586904U (en) Integrated intelligent intercepting well
CN111926904A (en) Automatic open and close and cut dirty overflow gate system
CN111719663A (en) Intercepting device for rainwater and sewage separation
CN215712210U (en) Water conservation integration equipment is synthesized to public building cooling tower
CN210395618U (en) Integrated intercepting and lifting well
CN114182803B (en) Intelligent split-flow well for preventing dirty-intercepting dry pipe from flowing backwards and using method
CN217949273U (en) Structure for reducing rain peak and initial rainwater runoff pollution of offline storage tank
CN212835779U (en) Cut-off system applied to drainage pipeline
CN113187164B (en) Water conservation integration equipment is synthesized to public building cooling tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant