- CN213448107U CN213448107U CN202021673245.8U CN202021673245U CN213448107U CN 213448107 U CN213448107 U CN 213448107U CN 202021673245 U CN202021673245 U CN 202021673245U CN 213448107 U CN213448107 U CN 213448107U
- Authority
- CN
- China
- Prior art keywords
- steel bar
- frame
- platform
- wall
- safety protection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses a high pier construction reinforcement safety protection operation frame, which comprises a bottom frame, wherein a first reinforcement installation outer frame platform is fixedly arranged on the inner wall of the bottom frame, stand columns are fixedly arranged at four corners of the top end of the bottom frame, a second reinforcement installation outer frame platform is fixedly arranged at the middle parts of the outer walls of the stand columns, guardrails are fixedly arranged at the top parts of the outer walls of the stand columns, and sleeves are sleeved on the outer walls of the guardrails, the operation frame of the utility model is provided with two layers of platforms and guardrails, an operator can stand on the first reinforcement installation outer frame platform and the second reinforcement installation outer frame platform to carry out operation, and when reinforcement stirrup is bound, the condition that the operator steps on the guardrail of a turnover mould operation platform and the bound stirrup to carry out reinforcement stirrup when the binding height exceeds a certain height in the past can be avoided, and the danger during high altitude operation can be greatly reduced, is beneficial to eliminating potential safety hazard.
Description
Technical Field
The utility model relates to an handling frame, in particular to high mound construction reinforcement safety protection handling frame.
Background
With the vigorous development and construction of traffic civil engineering, high pier construction is more and more, under the condition of ensuring the stability of a girder bridge, the design and application of pier columns are rapidly developed, and steel bars need to be bound and constructed on poured pier columns section by section during binding, so that the construction method belongs to high-altitude operation, and the construction safety and the quality are difficult to control.
When high mound construction reinforcement owner muscle is connected at present, the operation workman ascends a height the operation on mould operation platform turns over, at the in-process that carries out reinforcement stirrup ligature, can appear that the operation workman of individuality steps on the mould operation platform guardrail and carry out reinforcement stirrup on the stirrup that has been binded, has very big potential safety hazard, based on this, provides a high mound construction reinforcement safety protection handling frame.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a high mound construction reinforcement safety protection handling frame to the current high mound construction reinforcement who proposes in solving above-mentioned background lacks the safety protection handling frame, and the operation workman ascends a height the operation on rollover operation platform, can take place to slip or step on the incident such as empty, still can appear the individual operation workman and step on the problem of carrying out reinforcement on rollover operation platform guardrail and the stirrup that has colligated well.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a high mound construction reinforcement safety protection handling frame, includes the bottom frame, the fixed first steel bar installation outrigger platform that is equipped with of inner wall of bottom frame, four edges on bottom frame top all fix and are equipped with the stand, and are a plurality of the fixed second steel bar installation outrigger platform that is equipped with in middle part of stand outer wall is a plurality of the fixed guardrail that is equipped with in top of stand outer wall, it is a plurality of the outer wall of guardrail all overlaps and is equipped with the sleeve pipe.
As an optimal technical scheme of the utility model, the both sides on bottom frame top and both ends are all fixed and are equipped with two support columns, and are a plurality of the top of support column all with the bottom fixed connection of second steel bar installation outrigger platform.
As an optimal technical scheme of the utility model, the fixed staircase that is equipped with in one side on first steel bar installation outrigger platform top, the inner wall fixed connection of the top of staircase one side and second steel bar installation outrigger platform.
As an optimized technical scheme of the utility model, four one side of stand outer wall is equipped with prevents weighing down the net.
As a preferred technical scheme of the utility model, it is a plurality of the middle part of sleeve pipe outer wall is all fixed and is equipped with the spliced pole, and is a plurality of the one end of spliced pole is all fixed and is equipped with the link.
As a preferred technical scheme of the utility model, the couple is hung to the inside of link, the fixed safety rope that is equipped with in middle part of couple outer wall, the fixed safety belt that is equipped with of one end of safety rope.
As an optimized technical scheme of the utility model, one side of safety belt outer wall is fixed and is equipped with a plurality of slash pockets.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model relates to a high mound construction reinforcement safety protection handling frame, this handling frame has set up two-layer platform and guardrail, when the main reinforcement of reinforcing bar is connected, the operation workman can stand and carry out the operation on first reinforcement installation outrigger platform and second reinforcement installation outrigger platform, and when carrying out reinforcement stirrup ligature, can stop in the past when ligature height exceeds a take the altitude individual operation workman steps on the condition of carrying out reinforcement stirrup that mould turnover operation platform guardrail and bind, danger when greatly reducing high altitude construction, be favorable to eliminating the potential safety hazard;
2. the utility model relates to a high mound construction steel bar ligature safety protection handling frame prevents that the net can prevent that operating personnel from falling outside the handling frame, and the operation workman is carrying out steel bar ligature during operation, is on one's body with the safety belt system, wears the safety belt and can effectively prevent to take place to slip or step on the sky and the incident that drops when the operation workman from ascending a height on the operation platform of overturning, and safety protection is effectual, is favorable to ensureing operating personnel's personal safety.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a cross-sectional view of the present invention;
fig. 3 is a schematic structural diagram of the middle sleeve and the safety belt of the present invention.
In the figure: 1. a bottom frame; 2. a column; 3. a support pillar; 4. the first steel bar is provided with an outer frame platform; 5. the second steel bar is provided with an outer frame platform; 6. an escalator; 7. a guardrail; 8. a sleeve; 9. hanging a ring; 10. hooking; 11. a safety cord; 12. a seat belt; 13. inserting a bag; 14. the anti-falling net; 15. connecting columns.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the utility model provides a technical scheme of high mound construction reinforcement safety protection handling frame:
according to the figure 1-3, comprising a bottom frame 1, a first steel bar installation external frame platform 4 is fixedly arranged on the inner wall of the bottom frame 1, upright posts 2 are fixedly arranged at four corners of the top end of the bottom frame 1, a second steel bar installation external frame platform 5 is fixedly arranged at the middle parts of the outer walls of the upright posts 2, an operator performs steel bar binding work on the first steel bar installation external frame platform 4 and the second steel bar installation external frame platform 5, two support posts 3 are fixedly arranged at two sides and two ends of the top end of the bottom frame 1, the top ends of the support posts 3 are fixedly connected with the bottom end of the second steel bar installation external frame platform 5, an escalator 6 is fixedly arranged at one side of the top end of the first steel bar installation external frame platform 4, the top part at one side of the escalator 6 is fixedly connected with the inner wall of the second steel bar installation external frame platform 5, and the second steel bar installation external frame platform 5 can be moved from the first steel bar installation external frame platform 4, set up first steel bar installation outrigger platform 4 and second steel bar installation outrigger platform 5 and guardrail 7, when the main muscle of reinforcing bar is connected, the operation workman can stand and carry out the operation on first steel bar installation outrigger platform 4 and second steel bar installation outrigger platform 5, and when carrying out the reinforcement stirrup ligature, can stop in the past that the ligature highly surpasss when the take individual operation workman steps on the condition of carrying out reinforcement on the mould operation platform guardrail and the stirrup that has binded, danger when greatly reducing high altitude construction, be favorable to eliminating the potential safety hazard, the fixed guardrail 7 that is equipped with in top of the 2 outer walls of a plurality of stands, the outer wall of a plurality of guardrails 7 all overlaps and is equipped with sleeve pipe 8.
According to the drawings 2 and 3, one side of the outer wall of four upright posts 2 is provided with an anti-falling net 14, the anti-falling net 14 can prevent an operator from falling outside an operation frame, the middle parts of the outer walls of a plurality of sleeves 8 are all fixedly provided with connecting posts 15, one ends of a plurality of connecting posts 15 are all fixedly provided with hanging rings 9, hooks 10 are hung inside the hanging rings 9, the middle parts of the outer walls of the hooks 10 are fixedly provided with safety ropes 11, one ends of the safety ropes 11 are fixedly provided with safety belts 12, one side of the outer wall of the safety belts 12 is fixedly provided with a plurality of inserting bags 13, the inserting bags 13 are used for placing tools, when the operator conducts reinforcement binding work, the safety belts 12 are tied on the body, when the operator works on the first reinforcement installation outer frame platform 4, the hooks 10 can be hung on the support columns 3, when the operator works on different positions, the hooks 10 are hung on different support columns 3, when the operator works on the second reinforcement installation outer frame platform 5, along with the removal of operation workman, drive sleeve pipe 8 and remove on guardrail 7, when different positions, hang couple 10 on different link 9, operation workman wears safety belt 12 at the during operation, can effectively prevent to operate the workman and take place to slip or step on empty and the incident that drops when ascending a height the operation on rollover operation platform, and safety protection is effectual, is favorable to ensureing operating personnel's personal safety.
When specifically using, the utility model relates to a high mound construction steel bar ligature safety protection handling frame, at first hoist and mount the handling frame to mould turnover operation platform on, the operation workman wears safety belt 12, in the time of working on first steel bar installation outrigger platform 4, can hang couple 10 on support column 3, then carry out steel bar ligature work, operating personnel moves to when different positions, hang couple 10 on different support columns 3, through staircase 6, operating personnel can come second steel bar installation outrigger platform 5 from first steel bar installation outrigger platform 4, in the time of working on second steel bar installation outrigger platform 5, hang couple 10 on link 9, along with operation workman's removal, it moves on guardrail 7 to drive sleeve pipe 8, in the time of different positions, hang couple 10 on different link 9, the operation workman is at the during operation, wear safety belt 12 can prevent effectively that the operation workman from taking place to slip or stepping on the sky and the safety that drops when ascending a height the operation on mould turnover operation platform The accident, safety protection is effectual, is favorable to ensureing operating personnel's personal safety, and the operation workman carries out the operation on first reinforcing bar installation outrigger platform 4 and second reinforcing bar installation outrigger platform 5 to when carrying out the reinforcement stirrup ligature, can stop in the past that the ligature height surpasss the condition that the individual operation workman stepped on and carries out reinforcement on the mould turnover operation platform guardrail and the stirrup that has ligature well when certain height.
In the description of the present invention, it should be understood that the indicated orientation or positional relationship is based on the orientation or positional relationship shown in the drawings, and is only for convenience of description and simplification of description, and does not indicate or imply that the indicated device or element must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be construed as limiting the present invention.
In the present invention, unless otherwise explicitly specified or limited, for example, it may be fixedly connected, detachably connected, or integrated; can be mechanically or electrically connected; they may be directly connected or indirectly connected through an intermediate medium, and may be connected through the inside of two elements or in an interaction relationship between two elements, unless otherwise specifically defined, and the specific meaning of the above terms in the present invention will be understood by those skilled in the art according to specific situations.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. The utility model provides a high mound construction reinforcement safety protection handling frame, includes bottom frame (1), its characterized in that: the fixed first steel bar installation outrigger platform (4) that is equipped with of inner wall of bottom frame (1), four edges on bottom frame (1) top are all fixed and are equipped with stand (2), and are a plurality of the fixed second steel bar installation outrigger platform (5) that is equipped with in middle part of stand (2) outer wall is a plurality of the fixed guardrail (7) that is equipped with in top of stand (2) outer wall is a plurality of the outer wall of guardrail (7) all is equipped with sleeve pipe (8).
2. The high pier construction steel bar binding safety protection handling frame of claim 1, which is characterized in that: both sides and both ends on bottom frame (1) top are all fixed and are equipped with two support columns (3), and are a plurality of the top of support column (3) all with the bottom fixed connection of second reinforcing bar installation outrigger platform (5).
3. The high pier construction steel bar binding safety protection handling frame of claim 1, which is characterized in that: one side of the top end of the first steel bar installation outrigger platform (4) is fixedly provided with an escalator (6), and the top of one side of the escalator (6) is fixedly connected with the inner wall of the second steel bar installation outrigger platform (5).
4. The high pier construction steel bar binding safety protection handling frame of claim 1, which is characterized in that: and one side of the outer walls of the four upright posts (2) is provided with an anti-falling net (14).
5. The high pier construction steel bar binding safety protection handling frame of claim 1, which is characterized in that: the middle of the outer wall of the sleeve (8) is fixedly provided with a connecting column (15), and one end of the connecting column (15) is fixedly provided with a hanging ring (9).
6. The high pier construction steel bar binding safety protection handling frame of claim 5, which is characterized in that: the hanging ring is characterized in that a hook (10) is hung inside the hanging ring (9), a safety rope (11) is fixedly arranged in the middle of the outer wall of the hook (10), and a safety belt (12) is fixedly arranged at one end of the safety rope (11).
7. The high pier construction steel bar binding safety protection handling frame of claim 6, which is characterized in that: a plurality of insert pockets (13) are fixedly arranged on one side of the outer wall of the safety belt (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021673245.8U CN213448107U (en) | 2020-08-12 | 2020-08-12 | High mound construction reinforcement safety protection handling frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021673245.8U CN213448107U (en) | 2020-08-12 | 2020-08-12 | High mound construction reinforcement safety protection handling frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213448107U true CN213448107U (en) | 2021-06-15 |
Family
ID=76309117
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021673245.8U Active CN213448107U (en) | 2020-08-12 | 2020-08-12 | High mound construction reinforcement safety protection handling frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213448107U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113356078A (en) * | 2021-07-07 | 2021-09-07 | 甘肃路桥建设集团有限公司 | Bridge pier column reinforcement rack |
CN113668393A (en) * | 2021-08-16 | 2021-11-19 | 中交路桥建设有限公司 | Method for quickly installing cable tower steel bar hook bar |
CN113789944A (en) * | 2021-10-22 | 2021-12-14 | 国网山东省电力公司济南市长清区供电公司 | Power supply high-altitude operation safety protection device |
CN114837100A (en) * | 2022-06-17 | 2022-08-02 | 中国一冶集团有限公司 | Template installation mechanism is used in construction of bridge anticollision barrier |
-
2020
- 2020-08-12 CN CN202021673245.8U patent/CN213448107U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113356078A (en) * | 2021-07-07 | 2021-09-07 | 甘肃路桥建设集团有限公司 | Bridge pier column reinforcement rack |
CN113668393A (en) * | 2021-08-16 | 2021-11-19 | 中交路桥建设有限公司 | Method for quickly installing cable tower steel bar hook bar |
CN113789944A (en) * | 2021-10-22 | 2021-12-14 | 国网山东省电力公司济南市长清区供电公司 | Power supply high-altitude operation safety protection device |
CN114837100A (en) * | 2022-06-17 | 2022-08-02 | 中国一冶集团有限公司 | Template installation mechanism is used in construction of bridge anticollision barrier |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213448107U (en) | High mound construction reinforcement safety protection handling frame | |
CN105298100B (en) | A kind of cylinder building cast-in-place flare structure of superelevation is encorbelmented the construction method of operation platform | |
CN205934735U (en) | A operation platform for stretch -draw of cantilever bent cap | |
CN205188839U (en) | Movably -assembled anti -collision bridge wall construction hanging basket | |
CN206219988U (en) | Foldable hanging basket | |
CN109267500A (en) | Bridge maintaining lift truss work platform | |
CN209482687U (en) | A kind of Super High exterior frame column construction operation platform | |
CN212835006U (en) | Mobile trolley for anti-collision guardrail construction | |
CN212766686U (en) | Cantilever type scaffold | |
CN213062871U (en) | Cage for high-altitude scaffold dismantling operation | |
CN213804900U (en) | Pier body construction platform of high pier bridge | |
CN107640612A (en) | Shellfish thunder steel bridge warehouse-out method | |
CN209523123U (en) | A kind of working job platform | |
CN211947968U (en) | Integral assembling type construction platform for high-altitude pier column construction | |
CN102587276B (en) | Multifunctional operating vehicle for concrete anti-collision guardrail of bridge and construction method realized by aid of multifunctional operating vehicle | |
CN219952606U (en) | Safety platform for beam slab prefabricated field | |
CN219059723U (en) | Wet joint connection module | |
CN214658708U (en) | Safe anti-falling device | |
CN214879986U (en) | Construction platform for deep shaft lining and track installation | |
CN220203504U (en) | High-efficient operating tool of demolishing of blast furnace downcomer | |
CN213038825U (en) | Construction work platform in deep shaft | |
CN219157419U (en) | Bridge pier construction encloses cage | |
CN218739929U (en) | Safety protection device for high-altitude operation | |
JP2536395B2 (en) | Construction method of steel pipe / concrete composite structure pier | |
CN217810514U (en) | Pier inner supporting frame capable of being used for binding pier body steel bars and being used for turnover |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |