CN213420132U - Pipeline for desulfurization station - Google Patents

Pipeline for desulfurization station Download PDF

Info

Publication number
CN213420132U
CN213420132U CN202022232243.1U CN202022232243U CN213420132U CN 213420132 U CN213420132 U CN 213420132U CN 202022232243 U CN202022232243 U CN 202022232243U CN 213420132 U CN213420132 U CN 213420132U
Authority
CN
China
Prior art keywords
pipe
wall
threaded rod
pipeline
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022232243.1U
Other languages
Chinese (zh)
Inventor
路杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022232243.1U priority Critical patent/CN213420132U/en
Application granted granted Critical
Publication of CN213420132U publication Critical patent/CN213420132U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses a pipeline is used at desulfurization station relates to pipeline technical field, including a pipe, one side of a pipe is provided with No. two pipes, and a pipe and No. two union coupling departments all are provided with the ring flange, the inside of ring flange is provided with a plurality of screws, the welding of one side of No. two pipes has the go-between, and the outer wall of go-between is provided with four annulars, the inner wall of a pipe is provided with four card strips, the outer wall connection of No. two pipes has the casing ware, and the bottom of casing ware is connected with two and supports a section of thick bamboo, two be connected with the threaded rod between the support a section of thick bamboo, and the outer wall welding of threaded rod has the rotation bolt, the bottom of supporting a section of thick bamboo. The utility model discloses a thereby set up fixed function that ring flange, screw, go-between, annular, card strip etc. realized a pipe and No. two pipes, make a pipe and No. two pipes can fix two ring flanges through bolt and nut more convenient after fixed when connecting from this.

Description

Pipeline for desulfurization station
Technical Field
The utility model relates to the technical field of pipelines, specifically a pipeline for desulfurization station.
Background
The pipeline is applied to various fields of water supply, pollution discharge, chemical industry and the like, and is important equipment for conveying fluid.
However, some pipelines need to be supported because of surrounding environment and position factors in some places, most pipelines do not have related supporting facilities, certain progress is delayed in pipeline construction, most pipelines are mostly formed by flange plates and bolt connection, the pipelines are not easy to fix when being connected, certain difficulty is caused when the bolt connection is used, and the pipelines are very inconvenient.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a: in order to solve the problem that the pipeline is inconvenient to fix when not provided with a supporting facility and connected with the pipeline, the pipeline for the desulfurization station is provided.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a pipeline for desulfurization station, includes a pipe, one side of a pipe is provided with No. two pipes, and a pipe and No. two union coupling departments all are provided with the ring flange, the inside of ring flange is provided with a plurality of screws, one side welding of No. two pipes has the go-between, and the outer wall of go-between is provided with four annulars, the inner wall of a pipe is provided with four card strips, the outer wall connection of No. two pipes has a sleeve pipe ware, and the bottom of sleeve pipe ware is connected with two support sections, two be connected with the threaded rod between the support section, and the outer wall welding of threaded rod has the rotation bolt, the bottom of support section is connected with the supporting seat, the top of sleeve pipe ware is connected with two ring covers.
Preferably, the outer wall of the connecting ring matches the inner wall of the first tube.
Preferably, the outer wall of the clamping strip is matched with the inner wall of the ring groove.
Preferably, the bottom end of the inner wall of the casing device is arc-shaped, and the two ring sleeves are rotatably connected with the casing device through rotating shafts.
Preferably, the inner wall of the supporting cylinder is provided with threads matched with the threaded rod, and the rotating bolt welded on the outer wall of the threaded rod is of an octagonal structure.
Preferably, four screw holes are formed in the supporting seat.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model realizes the fixing function of the first pipe and the second pipe by arranging the flange plates, the screw holes, the connecting rings, the ring grooves, the clamping strips and the like, so that the first pipe and the second pipe can be more conveniently fixed by the bolts and the nuts after being fixed when being connected;
2. the utility model discloses a set up the supporting role who supports a section of thick bamboo, threaded rod, rotation bolt, supporting seat, sleeve pipe ware etc. and realize the pipeline to make the pipeline can effectively support setting up the in-process, avoid the pipeline to cause fracture or damage because of the unevenness.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a first tube structure of the present invention;
FIG. 3 is a schematic view of the connection of the first pipe of the present invention;
fig. 4 is a schematic structural view of the casing sleeving device of the present invention.
In the figure: 1. a first pipe; 2. a second pipe; 3. a flange plate; 4. a screw hole; 5. a connecting ring; 6. a ring groove; 7. clamping the strip; 8. a casing device; 9. a support cylinder; 10. a threaded rod; 11. rotating the bolt; 12. a supporting seat; 13. a loop is provided.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance. In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "connected" and "disposed" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art. The following describes an embodiment of the present invention according to its overall structure.
Referring to fig. 1-4, a pipeline for a desulfurization station comprises a first pipe 1, a second pipe 2 is arranged on one side of the first pipe 1, a flange 3 is arranged at the joint of the first pipe 1 and the second pipe 2, a plurality of screw holes 4 are formed in the flange 3, a connecting ring 5 is welded on one side of the second pipe 2, four annular grooves 6 are formed in the outer wall of the connecting ring 5, four clamping strips 7 are arranged on the inner wall of the first pipe 1, a sleeve device 8 is connected to the outer wall of the second pipe 2, two supporting cylinders 9 are connected to the bottom end of the sleeve device 8, a threaded rod 10 is connected between the two supporting cylinders 9, a rotating bolt 11 is welded on the outer wall of the threaded rod 10, a supporting seat 12 is connected to the bottom end of the supporting cylinder 9, and two ring sleeves 13 are connected to the top end of the.
Please refer to fig. 3, the outer wall of the connection ring 5 is matched with the inner wall of the first tube 1, so that the connection ring 5 can be connected with the inner wall of the first tube 1 more tightly, and the problems of water leakage and the like after connection are avoided, thereby improving the connection tightness.
Please refer to fig. 3, the outer wall of the clip strip 7 is engaged with the inner wall of the ring groove 6, so that the clip strip 7 and the ring groove 6 can be more stable when connected, and the difficulty in fixing the two flanges 3 when connected due to position deviation is avoided, thereby improving the fixity of the first pipe 1 and the second pipe 2.
Please refer to fig. 4, the bottom end of the inner wall of the casing device 8 is arc-shaped, and the two ring sleeves 13 are rotatably connected with the casing device 8 through the rotating shaft, so that the pipeline can be stably seated in the casing device 8 to avoid shaking, and the pipeline is effectively fixed by the ring sleeves 13 to avoid falling, thereby improving the stability of pipeline connection.
Please refer to fig. 1, the inner walls of the two supporting cylinders 9 are provided with threads matched with the threaded rod 10, and the rotating bolt 11 welded to the outer wall of the threaded rod 10 is of an octagonal structure, so that the threaded rod 10 can effectively drive the two supporting cylinders 9 to lift when rotating, thereby improving the adjustment of the pipeline height and the practicability of the supporting cylinders.
Please refer to fig. 1, four screw holes 4 are formed inside the supporting seat 12, so that the supporting seat 12 can be effectively fixed to the ground, and the supporting seat 12 is prevented from being inclined or damaged by the displacement of the supporting seat, thereby improving the stability and practicability of the connection between the pipeline and the ground.
The working principle is as follows: when a first pipe 1 and a second pipe 2 are connected, firstly, an annular groove 6 of the second pipe 2 is aligned to a clamping strip 7 on the inner wall of the first pipe 1, then the second pipe 2 is pushed to enable the annular groove 6 to be sleeved on the outer wall of the clamping strip 7, and a connecting ring 5 is clamped into the inner wall of the first pipe 1, so that the primary connection of the first pipe 1 and the second pipe 2 is completed, and the first pipe 1 and the second pipe 2 are prevented from shaking and shifting after being connected, then matched bolts pass through screw holes 4, two flange plates 3 on the outer walls of the first pipe 1 and the second pipe 2 are fixed through nuts, then when the pipeline needs to be supported, the pipeline is lifted upwards, a pipe sleeving device 8 is placed below the outer wall of the pipeline, then a rotating bolt 11 is rotated through a tool, the rotating bolt 11 drives a threaded rod 10 to rotate, the rotating of the threaded rod 10 drives supporting cylinders 9 at two ends to lift, and when the supporting cylinders lift to the height enough to support the pipeline, rotate two ring sleeves 13 to the pipeline both sides through changeing to connect the top of two ring sleeves through bolt and nut, realize fixing to avoid taking place to rock and the displacement from this to the pipeline, it can to be fixed in ground with supporting seat 12 at last rethread bolt or screw.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a pipeline for desulfurization station, includes a pipe (1), its characterized in that: a second pipe (2) is arranged on one side of the first pipe (1), flanges (3) are arranged at the joints of the first pipe (1) and the second pipe (2), a plurality of screw holes (4) are arranged inside the flange plate (3), a connecting ring (5) is welded on one side of the second pipe (2), and the outer wall of the connecting ring (5) is provided with four ring grooves (6), the inner wall of the first pipe (1) is provided with four clamping strips (7), the outer wall of the second pipe (2) is connected with a casing device (8), the bottom end of the casing device (8) is connected with two supporting cylinders (9), a threaded rod (10) is connected between the two supporting cylinders (9), and the outer wall welding of threaded rod (10) has and rotates and tie (11), the bottom of a support section of thick bamboo (9) is connected with supporting seat (12), the top of casing ware (8) is connected with two ring covers (13).
2. A duct for a desulfurization station according to claim 1, characterized in that: the outer wall of the connecting ring (5) is matched with the inner wall of the first pipe (1).
3. A duct for a desulfurization station according to claim 1, characterized in that: the outer wall of the clamping strip (7) is matched with the inner wall of the annular groove (6).
4. A duct for a desulfurization station according to claim 1, characterized in that: the bottom end of the inner wall of the casing device (8) is arc-shaped, and the two ring sleeves (13) are rotatably connected with the casing device (8) through rotating shafts.
5. A duct for a desulfurization station according to claim 1, characterized in that: the inner wall of the two supporting cylinders (9) is provided with threads matched with the threaded rod (10), and the rotating bolt (11) welded on the outer wall of the threaded rod (10) is of an octagonal structure.
6. A duct for a desulfurization station according to claim 1, characterized in that: four screw holes (4) are formed in the supporting seat (12).
CN202022232243.1U 2020-10-10 2020-10-10 Pipeline for desulfurization station Expired - Fee Related CN213420132U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022232243.1U CN213420132U (en) 2020-10-10 2020-10-10 Pipeline for desulfurization station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022232243.1U CN213420132U (en) 2020-10-10 2020-10-10 Pipeline for desulfurization station

Publications (1)

Publication Number Publication Date
CN213420132U true CN213420132U (en) 2021-06-11

Family

ID=76265971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022232243.1U Expired - Fee Related CN213420132U (en) 2020-10-10 2020-10-10 Pipeline for desulfurization station

Country Status (1)

Country Link
CN (1) CN213420132U (en)

Similar Documents

Publication Publication Date Title
US2684222A (en) Adjustable pipe support
CN112519247A (en) PE pipe connection sealing method
CN213420132U (en) Pipeline for desulfurization station
CN218543389U (en) Installation device is assisted to infrastructure for building engineering
CN212804544U (en) Auxiliary device for pipeline connection
CN211939703U (en) Stagnant water formula can be adjusted in bank sleeve pipe welding fixing tool
CN211499201U (en) Assembled steel structure node
CN210687250U (en) Natural gas line junction supports protection device
CN211821155U (en) Butt-joint structure for petrochemical pipeline installation
CN217272417U (en) Steel pipe connector with good supporting effect
CN213318667U (en) Quick installation of major diameter steel pipe is to mouthpart
CN218745844U (en) Pipeline is laid and is used device of keeping to mouthpart
CN208967997U (en) A kind of air conditioning wind pipe connection structure
CN217292098U (en) Alignment device for pipeline installation
CN206144778U (en) Flange structure
CN216617530U (en) Conveying pipeline for admixture for subway pipe piece concrete
CN218326680U (en) Concrete pipeline mouth of pipe interfacing apparatus
CN220168824U (en) Antistatic polytetrafluoroethylene lining anti-corrosion pipeline
CN211821154U (en) Petroleum pipeline coupling
CN220957371U (en) Gas pipeline sealing device
CN212868974U (en) CIPP pipeline repairing device
CN219809516U (en) Pipeline bracket with supporting structure
CN218208132U (en) Novel water pipe support convenient to installation
CN211220430U (en) Natural gas pipeline mounting structure
CN214037119U (en) Cement pipeline installation all-in-one

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210611