CN213418164U - Green building curtain wall of quick installation - Google Patents
Green building curtain wall of quick installation Download PDFInfo
- Publication number
- CN213418164U CN213418164U CN202021152953.7U CN202021152953U CN213418164U CN 213418164 U CN213418164 U CN 213418164U CN 202021152953 U CN202021152953 U CN 202021152953U CN 213418164 U CN213418164 U CN 213418164U
- Authority
- CN
- China
- Prior art keywords
- connecting plate
- curtain wall
- base
- curtain
- folding edge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model discloses a green building curtain of quick installation, including wall body and curtain body, the resin layer has been pour including the toughened glass layer and the centre of the left and right sides to the curtain body, the internal installation of wall is fixed with the steel sheet base, and the welding has first connecting plate in the middle of the steel sheet base, the built-in cavity of first connecting plate, be equipped with the bayonet lock in the first connecting plate, the utility model discloses a built-in cavity of first connecting plate, including 6 restriction pieces through the inside can be with the tight lock of second chain link board firmly, first hem, second hem, third hem and inlay can perfectly agree with, through the connection between restriction piece and the restriction groove, structural strength is high, has increased the security of whole curtain, and the reliability, the resin layer that adopts in the middle of the curtain makes the whole weight of curtain slim and graceful, and the light transmissivity is good, wholly pleasing to the eye. The utility model discloses very big simplification the installation step, simple to operate, easy operation makes things convenient for constructor to get to the hand fast, has reduced training cost and construction cost.
Description
Technical Field
The utility model relates to a building curtain field specifically is a green building curtain of quick installation.
Background
The building curtain wall is a culture from the western world, but is also greatly used in the current Chinese building construction, but the methods used in the prior art for installing the building curtain wall are complicated, so that the installation is difficult, and the structural strength of the building curtain wall cannot be ensured.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a green building curtain of quick installation to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a fast-mounting green building curtain wall comprises a wall body and a curtain wall body, wherein the curtain wall body comprises a left toughened glass layer, a right toughened glass layer and a resin layer poured in the middle, a steel plate base is fixedly arranged in the wall body, a first connecting plate is welded in the middle of the steel plate base, a cavity is arranged in the first connecting plate, a bayonet lock is arranged in the first connecting plate and comprises a groove, a spring and a limiting block, the spring is fixedly arranged at the bottom of the groove, the limiting block is fixedly connected at the top of the spring, the top of the curtain wall body is provided with a first base through a screw, the left side of the first base is fixedly connected with a second connecting plate, the upper part and the lower part of the second connecting plate are provided with limiting grooves, the embedded curtain wall comprises a curtain wall body and is characterized in that an inlay is fixedly mounted at the top end of the right side of the first base, a second base is screwed at the bottom of the curtain wall body, a first folded edge is fixedly mounted at the bottom of the second base, the first folded edge is fixedly connected with a second folded edge, and the second folded edge is fixedly connected with a third folded edge.
Preferably, 6 bayonet locks are arranged in the first connecting plate, 3 bayonet locks are arranged at the upper part and the lower part respectively, and the bayonet locks are symmetrically distributed.
Preferably, the limiting grooves are respectively arranged at the upper part and the lower part of the second connecting plate in 3 numbers and are symmetrically distributed.
Preferably, the first base and the second base are connected with the curtain wall body through two screws.
Preferably, the inlay is provided with a limiting groove above and a bayonet lock below.
Preferably, the second base, the first folding edge, the second folding edge and the third folding edge are perpendicular to each other, a clamping pin is arranged below the first folding edge, and a limiting groove is arranged above the third folding edge.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a built-in cavity of first connecting plate is longer, including 6 restriction pieces through the inside can be with the tight lock of second chain link board firmly, increased the security of whole curtain, reliability. The first folding edge, the second folding edge, the third folding edge and the inlay can be perfectly fit, the structural strength is high through the connection between the limiting block and the limiting groove, the safety and the reliability of the whole curtain wall are improved, and the resin layer adopted in the middle of the curtain wall enables the whole weight of the curtain wall to be light, the light transmission performance to be good and the whole body to be attractive;
2. the utility model discloses very big simplification the installation step, simple to operate, easy operation makes things convenient for constructor to get to the hand fast, has reduced training cost and construction cost.
Drawings
FIG. 1 is a front view of the green building curtain wall of the present invention;
FIG. 2 is an enlarged view of the first connecting plate structure of the present invention;
FIG. 3 is an enlarged view of the bottom structure of the curtain wall of the present invention;
fig. 4 is the utility model discloses green building curtain wall installation completion state elevation.
In the figure: the wall body 1, the steel plate base 2, the first connecting plate 3, the spring 4, the limiting block 5, the cavity 6, the second connecting plate 7, the first base 8, the screw 9, the inlay 10, the toughened glass layer 11, the resin layer 12, the first folded edge 13, the second folded edge 14, the third folded edge 15, the limiting groove 16, the groove 17 and the second base 18.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 4, the present invention provides a technical solution: a fast-mounting green building curtain wall comprises a wall body 1 and a curtain wall body, wherein the curtain wall body comprises a left toughened glass layer 11 and a right toughened glass layer 11, a resin layer 12 is poured in the middle of the left toughened glass layer and the right toughened glass layer 11, the toughened glass layer 11 can be firmer, the resin layer 12 can absorb heat and insulate sound, a steel plate base 2 is fixedly mounted in the wall body 1, a first connecting plate 3 is welded in the middle of the steel plate base 2, a cavity 6 is arranged in the first connecting plate 3, a bayonet lock is arranged in the first connecting plate 3 and comprises a groove 17, a spring 4 and a limiting block 5, the spring 4 is fixedly mounted at the bottom of the groove 17, the limiting block 5 is fixedly connected to the top of the spring 4, the second connecting plate 7 can be very easily connected with the first connecting plate 3 through the bayonet lock, the connection is tighter, the first base 8 is mounted at the, second connecting plate 7 is equipped with restriction groove 16 from top to bottom, and restriction groove 16 and bayonet lock cooperate the use, 8 right side top fixed mounting on first base have inlay 10, curtain body bottom spiro union has second base 18, and 18 bottom fixed mounting on the second base first hem 13, first hem 13 fixed connection second hem 14, 14 fixed connection third hem 15 on the second hem.
Furthermore, 6 grooves 17 are arranged in the first connecting plate 3, and the upper part and the lower part of the first connecting plate are respectively provided with 3 grooves which are symmetrically distributed.
Furthermore, the limiting grooves 16 are respectively arranged at the upper part and the lower part of the second connecting plate 7 and are symmetrically distributed.
Further, the first base 8 and the second base 17 are both connected with the curtain wall body through two screws 9.
Further, a limiting groove 16 is arranged above the inlay 10, and a bayonet is arranged below the inlay.
Further, the second base 17, the first folding edge 13, the second folding edge 14 and the third folding edge 15 are perpendicular to each other, a bayonet lock is arranged below the first folding edge 13, and a limiting groove 16 is arranged above the third folding edge 15.
The working principle is as follows:
during construction, firstly, when the wall body 1 is built, the connecting body of the steel plate base 2 welded with the first connecting plate 3 is built into a wall, the combination of the first base 8, the second connecting plate 7 and the inlay 10 is connected with the top end of the left side of the curtain wall body through the screw 9, and the combination of the second base 18, the second connecting plate 7, the first folded edge 13, the second folded edge 14 and the third folded edge 15 is connected with the bottom end of the left side of the curtain wall body through the screw 9.
Through the zonulae occludens of first connecting plate 3 and second connecting plate 7, the interlock of bayonet lock and restriction groove 16, fix the installation of curtain body in the outside of wall body 1, the inlay 10 interlock at first hem 13, second hem 14, the third hem 15 and the curtain body top of curtain body bottom for firmly fastening between curtain and the curtain.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a green building curtain of quick installation, includes wall body (1) and curtain body, resin layer (12), its characterized in that have been pour including toughened glass layer (11) and the centre about the curtain body: the wall body (1) is internally and fixedly provided with a steel plate base (2), a first connecting plate (3) is welded in the middle of the steel plate base (2), a cavity (6) is arranged in the first connecting plate (3), a clamping pin is arranged in the first connecting plate (3) and comprises a groove (17), a spring (4) and a limiting block (5), the bottom of the groove (17) is fixedly provided with the spring (4), the top of the spring (4) is fixedly connected with the limiting block (5), the top of the curtain wall body is provided with a first base (8) through a screw (9), the left side of the first base (8) is fixedly connected with a second connecting plate (7), the upper part and the lower part of the second connecting plate (7) are provided with limiting grooves (16), the top end of the right side of the first base (8) is fixedly provided with an inlay (10), the bottom of the curtain wall body is in threaded connection with a, the first folding edge (13) is fixedly connected with a second folding edge (14), and the second folding edge (14) is fixedly connected with a third folding edge (15).
2. A quickly-installed green building curtain wall as claimed in claim 1, wherein: 6 bayonet locks are arranged in the first connecting plate (3), and the upper bayonet lock and the lower bayonet lock are respectively 3 and are symmetrically distributed.
3. A quickly-installed green building curtain wall as claimed in claim 1, wherein: the limiting grooves (16) are respectively 3 on the upper side and the lower side of the second connecting plate (7) and are symmetrically distributed.
4. A quickly-installed green building curtain wall as claimed in claim 1, wherein: the first base (8) and the second base (18) are connected with the curtain wall body through two screws (9).
5. A quickly-installed green building curtain wall as claimed in claim 1, wherein: a limiting groove (16) is formed above the inlay (10), and a clamping pin is arranged below the inlay.
6. A quickly-installed green building curtain wall as claimed in claim 1, wherein: the second base (18), the first folding edge (13), the second folding edge (14) and the third folding edge (15) are perpendicular to each other, a clamping pin is arranged below the first folding edge (13), and a limiting groove (16) is arranged above the third folding edge (15).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021152953.7U CN213418164U (en) | 2020-06-20 | 2020-06-20 | Green building curtain wall of quick installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021152953.7U CN213418164U (en) | 2020-06-20 | 2020-06-20 | Green building curtain wall of quick installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213418164U true CN213418164U (en) | 2021-06-11 |
Family
ID=76224226
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021152953.7U Active CN213418164U (en) | 2020-06-20 | 2020-06-20 | Green building curtain wall of quick installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213418164U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113818610A (en) * | 2021-10-26 | 2021-12-21 | 深圳市博大建设集团有限公司 | Super high-rise full-special-shaped unit type curtain wall design structure and construction method |
-
2020
- 2020-06-20 CN CN202021152953.7U patent/CN213418164U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113818610A (en) * | 2021-10-26 | 2021-12-21 | 深圳市博大建设集团有限公司 | Super high-rise full-special-shaped unit type curtain wall design structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213418164U (en) | Green building curtain wall of quick installation | |
CN104457115B (en) | refrigerator door and refrigerator | |
CN205529739U (en) | Ceramic tile or meadow brick with tenon fourth of twelve earthly branches structure | |
CN213477154U (en) | Assembled building that possesses shock-absorbing function | |
CN218206424U (en) | Door frame aluminum profile connector with firm structure | |
CN214169740U (en) | Building antidetonation exterior wall cladding | |
CN213115492U (en) | Corner stand column | |
CN217054832U (en) | Door frame structure of homochromy lines | |
CN213572364U (en) | Outdoor assembly type building with good protection effect | |
CN205611112U (en) | A piece together cabinet spare outward for rack | |
CN216381060U (en) | Commercial aluminum alloy structure door and window of high strength | |
CN214034520U (en) | Protective connecting and fixing piece for stone joint treatment | |
CN217260439U (en) | Bottom fork guard plate for two sides of electric vehicle | |
CN213711512U (en) | Right-angle connector | |
CN214120780U (en) | Convenient reinforced structure of two stove roller installations | |
CN213016086U (en) | Club's connecting piece in window | |
CN211422330U (en) | Standard aluminum frame door | |
CN220301629U (en) | Three-dimensional enhancement mode plane skylight | |
CN208813452U (en) | A kind of ship steel door being easily installed | |
CN213654638U (en) | Mullion connecting structure of Chinese air door window | |
CN217205113U (en) | High outer moulding mounting structure of stability | |
CN214402361U (en) | Decorative glass outer baffle | |
CN217833451U (en) | Supplementary equipment hasp limit clamp | |
CN213928023U (en) | Bridge cut-off aluminum alloy door and window reinforced structure | |
CN210767464U (en) | Ceiling keel stabilizing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |