CN213390093U - Connecting device between steel pipe piles - Google Patents

Connecting device between steel pipe piles Download PDF

Info

Publication number
CN213390093U
CN213390093U CN202022300824.4U CN202022300824U CN213390093U CN 213390093 U CN213390093 U CN 213390093U CN 202022300824 U CN202022300824 U CN 202022300824U CN 213390093 U CN213390093 U CN 213390093U
Authority
CN
China
Prior art keywords
frame
parallel
pile
hoop
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022300824.4U
Other languages
Chinese (zh)
Inventor
陈苏贵
陈猛巍
刘向东
王煜博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 11 Co Ltd
PowerChina 11th Bureau Engineering Co Ltd
Original Assignee
Sinohydro Bureau 11 Co Ltd
PowerChina 11th Bureau Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 11 Co Ltd, PowerChina 11th Bureau Engineering Co Ltd filed Critical Sinohydro Bureau 11 Co Ltd
Priority to CN202022300824.4U priority Critical patent/CN213390093U/en
Application granted granted Critical
Publication of CN213390093U publication Critical patent/CN213390093U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a connecting device between steel pipe piles, which comprises a pile body and a parallel frame, wherein the quantity of the pile body and the parallel frame is two groups, two groups of pile bodies are vertically extended and are parallel to each other, the parallel frame is transversely arranged at the inner sides of the two groups of pile bodies, and two ends of the two groups of parallel frames are respectively provided with a fixing frame for connecting the pile bodies; two sets of the parallel frame middle part opposite side vertical connection has the vaulting pole, both ends are provided with location head and support respectively about the vaulting pole, just the location head with the support respectively with upper and lower two sets of parallel frame welded fastening. Has the advantages that: the utility model discloses a set up horizontal length adjustable parallel connection frame, through the interval of adjusting this parallel connection frame both ends mount to connect both sides steel-pipe pile through the mount, so that be applicable to different intervals adjacent steel-pipe pile and connect fixedly, simplify the connection flow, the simple operation, and follow-up demolish more convenient, the practicality is strong.

Description

Connecting device between steel pipe piles
Technical Field
The utility model relates to a steel-pipe pile structure field, concretely relates to connecting device between steel-pipe pile.
Background
In the building construction process, the steel pipe piles are mutually lapped to form an arc shape or a circular shape, so that the effects of surrounding water, surrounding soil, surrounding sand and the like can be achieved. In the construction process of the steel pipe pile, after the longitudinal beam is welded with the pile top, a connection system (the connection system consists of a parallel connection and an inclined strut) among the piles can be welded. And processing the single-layer connection system between every two steel pipe piles into groups in the back field. The steel pipe pile connection device is a necessary structure for connecting adjacent steel pipe piles.
The applicant finds that at least the following technical problems exist in the prior art: connecting device is fixed structure between the steel pipe stake that uses at present, need correspond the connecting device of length according to the distance preparation between adjacent steel pipe stake, and it is higher to measuring the requirement, and the installation is comparatively loaded down with trivial details, need will tie with steel pipe stake outer wall welded fastening, follow-up the difficulty of demolising, the practicality is poor.
Disclosure of Invention
The utility model aims at providing a connecting device between steel pipe pile just lies in solving above-mentioned problem, sets up horizontal length adjustable parallel connection frame, through the interval of adjusting this parallel connection frame both ends mount to connect both sides steel-pipe pile through the mount, so that be applicable to different intervals adjacent steel-pipe pile and connect fixedly, simplify the connection flow, the simple operation, and follow-up demolish more convenient, the practicality is strong, see the explanation below in detail.
In order to achieve the above purpose, the utility model provides a following technical scheme:
the utility model provides a connecting device between steel pipe piles, which comprises a pile body and a parallel frame, wherein the quantity of the pile body and the parallel frame is two groups, two groups of pile bodies are vertically extended and are parallel to each other, the parallel frame is transversely arranged at the inner sides of the two groups of pile bodies, and two ends of the two groups of parallel frames are respectively provided with a fixing frame for connecting the pile bodies;
two sets of the parallel frame middle part opposite side vertical connection has the vaulting pole, both ends are provided with location head and support respectively about the vaulting pole, just the location head with the support respectively with upper and lower two sets of parallel frame welded fastening.
Adopt above-mentioned connecting device between steel pipe pile, in the use, when needing to connect adjacent pile body, will the activity hoop in the parallel frame both ends mount outside with the separation of installation hoop will installation hoop corresponds to contradict in two sets of pile body opposite sides, stretches into through spanner instrument in the holding hole of parallel frame, in order to rotate the nut drives the transfer line rotates, through transfer line tip double-screw bolt with the screw-thread fit effect of installation piece to support through the double-screw bolt the installation piece is in the guide effect of guide way slides to the outside down, support through the installation piece installation hoop support tightly in the pile body outside, later keep away from installation hoop one side in the pile body outside through activity hoop chucking to be fixed in between two sets of pile bodies with parallel frame through two sets of mounts, in order to realize the connection process between the steel pipe pile.
Preferably, the fixing frame comprises a mounting hoop arranged at the end part of the parallel connection frame, and a movable hoop is arranged on one side, far away from the parallel connection frame, of the mounting hoop.
Preferably, the installation hoop and the movable hoop are both in a semicircular annular structure, the installation hoop and the movable hoop are symmetrically arranged on two sides outside the pile body, and the front side and the rear side of the installation hoop and the front side and the rear side of the movable hoop are connected through bolts.
Preferably, the parallel frame is a transversely extending steel frame structure, a longitudinally through accommodating hole is formed in the center of the parallel frame, a transmission rod is transversely arranged in the parallel frame and in clearance fit with the parallel frame, the middle of the transmission rod penetrates through the accommodating hole, and a nut is welded and fixed on the outer side of the transmission rod in the accommodating hole.
Preferably, guide grooves are formed in two ends of the parallel frame, the outer side of the transmission rod extends into the guide grooves, studs are transversely fixed at the end portions of the transmission rod in the guide grooves, threads on the outer sides of the studs at two ends of the transmission rod are opposite in rotating direction, mounting blocks are transversely arranged in the guide grooves in a sliding mode, the studs are in threaded fit with the mounting blocks, and the outer sides of the mounting blocks are welded and fixed with the mounting hoops.
Preferably, two groups of inclined struts are symmetrically arranged on two sides of the outer side of the strut, one end of the bottom of each inclined strut extends outwards to the end of the corresponding flat connecting frame, reinforcing seats are arranged at the joints of the bottom ends of the inclined struts and the corresponding flat connecting frames, and the inclined struts and the corresponding flat connecting frames are fixedly welded with the reinforcing seats.
Has the advantages that: the utility model discloses a set up horizontal length adjustable parallel connection frame, through the interval of adjusting this parallel connection frame both ends mount to connect both sides steel-pipe pile through the mount, so that be applicable to different intervals adjacent steel-pipe pile and connect fixedly, simplify the connection flow, the simple operation, and follow-up demolish more convenient, the practicality is strong.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a front view structural diagram of the present invention;
FIG. 2 is an internal structural view of the present invention;
fig. 3 is an internal structure view of the parallel rack of the present invention.
The reference numerals are explained below:
1. a pile body; 2. a parallel connection frame; 201. a housing hole; 202. a transmission rod; 202a, a nut; 202b, a stud; 203. a guide groove; 204. mounting blocks; 3. a fixed mount; 301. installing a hoop; 302. a movable hoop; 4. a stay bar; 401. positioning the head; 402. a support; 5. bracing; 501. and (7) reinforcing the base.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention clearer, the technical solutions of the present invention will be described in detail below. It is to be understood that the embodiments described are only some embodiments of the invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-3, the utility model provides a connecting device between steel pipe pile, including pile 1 and parallel frame 2, pile 1 is two sets of with parallel frame 2 quantity, and two sets of pile 1 all vertical extension and be parallel to each other, and parallel frame 2 transversely sets up in two sets of piles 1 inboardly, and two sets of parallel frame 2 both ends all are provided with the mount 3 of connecting pile 1.
Two sets of parallel frame 2 middle part opposite sides vertical connection have a vaulting pole 4, the both ends are provided with location head 401 and support 402 respectively about vaulting pole 4, and location head 401 and support 402 respectively with two sets of parallel frame 2 welded fastening from top to bottom, the outer bilateral symmetry of vaulting pole 4 is provided with two sets of bracing 5, 5 bottom one end of bracing is outside to be extended to the parallel frame 2 tip, 5 bottoms of bracing are provided with the parallel frame 2 department of meeting and are reinforced seat 501, bracing 5 and parallel frame 2 all with reinforced seat 501 welded fastening.
As an optional embodiment, the fixed frame 3 includes a mounting hoop 301 disposed at an end of the parallel frame 2, a movable hoop 302 is disposed on a side of the mounting hoop 301 away from the parallel frame 2, the mounting hoop 301 and the movable hoop 302 are both semi-circular structures, the mounting hoop 301 and the movable hoop 302 are symmetrically disposed at two sides outside the pile body 1, and the front and rear sides of the mounting hoop 301 and the movable hoop 302 are both connected by bolts, the parallel frame 2 is a steel frame structure extending transversely, a longitudinally through accommodating hole 201 is disposed at a center of the parallel frame 2, a transmission rod 202 is disposed transversely inside the parallel frame 2, the transmission rod 202 is in clearance fit with the parallel frame 2, a nut 202a is welded and fixed at an outer side of the transmission rod 202 inside the accommodating hole 201, guide grooves 203 are disposed at two ends of the parallel frame 2, an outer side of the transmission rod 202 extends into the guide grooves 203, and a stud 202b is transversely fixed at an end of the transmission rod 202 inside the guide grooves 203, the screw threads on the outer sides of studs 202b at two ends of the transmission rod 202 are opposite in rotating direction, the mounting blocks 204 are arranged in the guide grooves 203 in a transverse sliding mode, the studs 202b are in threaded fit with the mounting blocks 204, the outer sides of the mounting blocks 204 are fixedly welded with the mounting hoops 301, and the two sets of studs 202b with opposite rotating directions of the screw threads are arranged to ensure that the transmission rod 202 drives the two sets of studs 202b to rotate and drive the two sets of mounting blocks 204 to move in opposite directions, so that the two sets of fixing frames 3 at two ends of the same parallel connection frame 2 are driven to expand or contract in distance through the two sets of mounting blocks 204, and the positions of the fixing frames 3 are.
By adopting the structure, when adjacent pile bodies 1 need to be connected in the using process, the movable hoops 302 on the outer sides of the fixed frames 3 at the two ends of the parallel frame 2 are separated from the mounting hoops 301, the mounting hoops 301 correspondingly abut against the opposite sides of the two groups of pile bodies 1, the wrench tool stretches into the accommodating hole 201 of the parallel frame 2 to rotate the nut 202a to drive the transmission rod 202 to rotate, the stud 202b at the end part of the transmission rod 202 is matched with the thread of the mounting block 204, so that the stud 202b supports the mounting block 204 to slide outwards under the guiding action of the guide groove 203, the mounting hoops 301 are supported by the mounting block 204 to abut against the outer side of the pile bodies 1, and then the movable hoops 302 are clamped on the outer side of the pile bodies 1 far away from the mounting hoops 301, so that the parallel frame 2 is fixed between the two groups of pile bodies 1 through the two groups of fixed frames 3, and the connecting process;
set up horizontal length adjustable parallel connection frame 2, through the interval of adjusting this parallel connection frame 2 both ends mount 3 to connect the steel-pipe pile in both sides through mount 3, so that be applicable to the adjacent steel-pipe pile of different intervals and connect fixedly, simplify the connection flow, the simple operation, and follow-up demolish more conveniently, the practicality is strong.
The above description is only for the specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art can easily think of the changes or substitutions within the technical scope of the present invention, and all should be covered within the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (6)

1. The utility model provides a connecting device between steel pipe pile which characterized in that: the pile comprises pile bodies (1) and parallel frames (2), wherein the quantity of the pile bodies (1) and the quantity of the parallel frames (2) are two, the two pile bodies (1) vertically extend and are parallel to each other, the parallel frames (2) are transversely arranged at the inner sides of the two pile bodies (1), and fixing frames (3) connected with the pile bodies (1) are arranged at the two ends of the two parallel frames (2);
two sets of parallelly connected frame (2) middle part opposite side vertical connection has vaulting pole (4), both ends are provided with locating head (401) and support (402) respectively about vaulting pole (4), just locating head (401) with support (402) respectively with upper and lower two sets of parallelly connected frame (2) welded fastening.
2. The device for connecting steel pipe piles according to claim 1, wherein: the fixing frame (3) comprises an installation hoop (301) arranged at the end part of the parallel connection frame (2), and the installation hoop (301) is far away from one side of the parallel connection frame (2) and is provided with a movable hoop (302).
3. The device for connecting steel pipe piles according to claim 2, wherein: the installation hoop (301) with activity hoop (302) is half-circle ring structure, installation hoop (301) with activity hoop (302) symmetry set up in the outer both sides of pile body (1), just installation hoop (301) with activity hoop (302) front and back side all is through bolted connection.
4. The device for connecting steel pipe piles according to claim 3, wherein: the horizontally-connected frame (2) is of a transversely-extending steel frame structure, a longitudinally-through accommodating hole (201) is formed in the center of the horizontally-connected frame (2), a transmission rod (202) is transversely arranged in the horizontally-connected frame (2), the transmission rod (202) is in clearance fit with the horizontally-connected frame (2), the middle of the transmission rod (202) penetrates through the accommodating hole (201), and a nut (202 a) is fixedly welded on the outer side of the transmission rod (202) in the accommodating hole (201).
5. The device for connecting steel pipe piles according to claim 4, wherein: the parallel frame (2) both ends all are provided with guide way (203), the transfer line (202) outside stretches into in guide way (203), just in guide way (203) transfer line (202) tip transversely is fixed with double-screw bolt (202 b), the screw thread in the outside of double-screw bolt (202 b) in transfer line (202) both ends revolves to opposite, transversely slide in guide way (203) is provided with installation piece (204), double-screw bolt (202 b) with installation piece (204) screw-thread fit, the installation piece (204) outside with installation hoop (301) welded fastening.
6. The device for connecting steel pipe piles according to claim 1, wherein: bracing piece (4) outer bilateral symmetry is provided with two sets of bracing (5), bracing (5) bottom one end outside extends to tie frame (2) tip, bracing (5) bottom with tie frame (2) department of meeting is provided with reinforcement seat (501), bracing (5) with tie frame (2) all with reinforcement seat (501) welded fastening.
CN202022300824.4U 2020-10-16 2020-10-16 Connecting device between steel pipe piles Active CN213390093U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022300824.4U CN213390093U (en) 2020-10-16 2020-10-16 Connecting device between steel pipe piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022300824.4U CN213390093U (en) 2020-10-16 2020-10-16 Connecting device between steel pipe piles

Publications (1)

Publication Number Publication Date
CN213390093U true CN213390093U (en) 2021-06-08

Family

ID=76187861

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022300824.4U Active CN213390093U (en) 2020-10-16 2020-10-16 Connecting device between steel pipe piles

Country Status (1)

Country Link
CN (1) CN213390093U (en)

Similar Documents

Publication Publication Date Title
CN104259717A (en) Adjustable splicing mould bed
CN106494588A (en) A kind of adjustable line style docking block suitable under various working
CN208992089U (en) A kind of steel pipe welding pipeline clamping device
CN102535704B (en) Three-dimensional adjusting type hanging device for unit curtain
CN213390093U (en) Connecting device between steel pipe piles
CN211661444U (en) Steel pipe butt joint auxiliary device
MX2022006368A (en) Self-supporting frame for photovoltaic panels.
CN110440966B (en) Prestressed steel structure detection system
CN212428855U (en) Continuous concrete pouring device
CN107502940A (en) A kind of new automobile accessory surface electrophoretic paint handles hanging apparatus
CN210587934U (en) Special pipeline welding support
CN203698608U (en) Marine steel structure support mechanism
CN211219393U (en) Clamp for welding reinforcing steel bar column
CN211396851U (en) Cement bin support frame mounting structure
CN103852226A (en) Steel-pipe pressure test clamping device
CN216008386U (en) Track type drill guide rail stabilizing device
CN217928184U (en) Anti-seismic support for hoisting fan
CN219654715U (en) Roadway steel pipe concrete combined support bracket
CN217634275U (en) Pipeline hanger used on I-shaped steel beam
CN214656319U (en) Device capable of fixing pre-buried sleeves of anchor bolts of different types of supports
CN204075581U (en) A kind of technique shell case weld jig
CN203686381U (en) Adjustable interlayer cable installation support for inner portion of top pipe
CN217518184U (en) Overweight super-span steel pipe formwork system
CN210236933U (en) High pier stud tower crane attaches wall device
CN217513201U (en) Automobile parts welds dress anchor clamps

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant