CN213389879U - Assembled pedestrian passageway guardrail for top of steel box arch rib - Google Patents

Assembled pedestrian passageway guardrail for top of steel box arch rib Download PDF

Info

Publication number
CN213389879U
CN213389879U CN202021289836.5U CN202021289836U CN213389879U CN 213389879 U CN213389879 U CN 213389879U CN 202021289836 U CN202021289836 U CN 202021289836U CN 213389879 U CN213389879 U CN 213389879U
Authority
CN
China
Prior art keywords
arch rib
baffle
guardrail
arch
top surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021289836.5U
Other languages
Chinese (zh)
Inventor
王安文
薛飞
吴瑞
黄振威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Steel Structure Branch Of Cccc Road And Bridge Construction Co ltd
Road and Bridge International Co Ltd
CCCC Ruitong Construction Engineering Co Ltd
Original Assignee
Steel Structure Branch Of Cccc Road And Bridge Construction Co ltd
Road and Bridge International Co Ltd
CCCC Ruitong Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Steel Structure Branch Of Cccc Road And Bridge Construction Co ltd, Road and Bridge International Co Ltd, CCCC Ruitong Construction Engineering Co Ltd filed Critical Steel Structure Branch Of Cccc Road And Bridge Construction Co ltd
Priority to CN202021289836.5U priority Critical patent/CN213389879U/en
Application granted granted Critical
Publication of CN213389879U publication Critical patent/CN213389879U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to an assembled pedestrian passageway guardrail for steel box arch rib top, which comprises a plurality of guardrail vertical rods arranged along two sides of an arch rib, wherein the guardrail vertical rods at each side are connected through a cross rod, a baffle is respectively arranged along two sides of the arch rib, the lower half part of the baffle is tightly attached to the side wall of the arch rib, the upper half part of the baffle is higher than the top surface of the arch rib, a clamping plate which is vertically arranged and is vertical to the baffle is welded at intervals at the part of the baffle higher than the top surface of the arch rib, and the bottom edge of the clamping plate is supported on the top surface of the arch rib; the lower ends of the guardrail vertical rods are supported on the top surfaces of the arch ribs and are connected with the baffle plates through bolts; a pair of pull rods is arranged between the two baffles at certain intervals, and the pair of pull rods is tightly attached to the top surfaces of the arch ribs. The utility model has no welding construction in the installation process, and can not damage the arch rib; the opposite pull rod can be used as an anti-skid device when constructors walk on the top of the arch rib, and construction safety is improved.

Description

Assembled pedestrian passageway guardrail for top of steel box arch rib
Technical Field
The utility model relates to a steel case arched bridge construction technical field, concretely relates to set up at assembled pedestrian passageway guardrail of steel case vault costal part.
Background
In the construction process of the steel box arch bridge, when the welding and coating operation of the arch rib is carried out, the top surface of the arch rib is usually used as a pedestrian passage for the construction personnel to pass. In order to ensure the construction safety, guardrails are required to be arranged on two sides of the arch rib. The existing guardrail mounting mode is that the lower ends of guardrail vertical rods are directly welded on the two sides of the top of an arch rib, and the vertical rods are connected through a cross rod to form a guardrail. The existing guardrail installation mode needs welding construction, has large damage to the arch rib structure, needs cutting during dismantling, and also needs repairing treatment on the surface of the arch rib after dismantling to influence the construction progress; and constructors walk on the arch rib and are influenced by the radian of the arch rib, the feet of the constructors slip easily, and the safety risk of the constructors is increased.
Disclosure of Invention
The utility model aims at the above-mentioned problem, a assembled pedestrian passageway guardrail for steel box arch rib top is provided, and the guardrail installation need not weld, avoids causing the damage to the arch rib to improve the security of guardrail.
The technical scheme of the utility model as follows:
the utility model provides an assembled pedestrian passageway guardrail for steel case arch rib top, includes the many guardrail pole settings that set up along the arch rib both sides, connects its characterized in that through the horizontal pole between the guardrail pole setting of every side: the two sides of the arch rib are respectively provided with a baffle plate, the lower half part of each baffle plate is tightly attached to the side wall of the arch rib, the upper half part of each baffle plate is higher than the top surface of the arch rib, clamping plates which are vertically arranged and are vertical to the baffles are welded at certain intervals at the parts of the baffle plates higher than the top surface of the arch rib, one side edge of each clamping plate is welded with the side wall of each baffle plate, and the bottom edge of each clamping plate is supported on the; the lower end of the guardrail upright stanchion is supported on the top surface of the arch rib and is connected with the baffle plate through a bolt; a pair of pull rods is arranged between the two baffle plates at intervals, the pair of pull rods is tightly attached to the top surfaces of the arch ribs, and two ends of each pull rod respectively penetrate through the two side plates and are in threaded connection with a fixing nut.
The utility model adopts the assembly type mounting structure, no welding construction is adopted in the mounting process, and the arch rib is not damaged; the counter-pull rod can be used as an anti-skid device when constructors walk on the top of the arch rib, so that the construction safety is improved; the guardrail can be repeatedly used after being dismantled, and the construction cost can be reduced.
Drawings
Fig. 1 is a schematic cross-sectional structure of the present invention;
fig. 2 is a schematic side view of the present invention;
fig. 3 is a schematic top view of the present invention.
Detailed Description
As shown in fig. 1, 2 and 3, the utility model comprises a plurality of guardrail vertical rods 2 arranged along two sides of an arch rib 1, and the guardrail vertical rods 2 at each side are connected by a cross rod 3; the two sides of the arch rib 1 are respectively provided with a baffle 4, the lower half part of the baffle 4 is tightly attached to the side wall of the arch rib 1, the upper half part of the baffle is higher than the top surface of the arch rib, a clamping plate 5 which is vertically arranged and is vertical to the baffle is welded at certain intervals at the part of the baffle 4 higher than the top surface of the arch rib, one side edge of the clamping plate 5 is welded with the side wall of the baffle 4, and the bottom edge of the clamping plate 5 is supported on the top surface of the arch rib 1; the lower end of the guardrail upright stanchion 2 is supported on the top surface of the arch rib 1 and is connected with the baffle 4 through a bolt 6; a pair of pull rods 7 is arranged between the two baffle plates 4 at intervals, the pull rods 7 are tightly attached to the top surfaces of the arch ribs 1, and two ends of each pull rod 7 penetrate through the two side plates 4 respectively and are in threaded connection with fixing nuts 8.
When the utility model is implemented, the upright stanchion of the guardrail can adopt angle steel, and the lower end of one edge of the angle steel is provided with a screw hole for connecting with the baffle plate through a bolt; the baffle plate is made of a strip-shaped steel plate with a certain width, and screw holes are preset according to the design interval of the guardrail upright rods; the upper half part of the baffle plate is used for being connected with the upright stanchion of the guardrail and can also have the function of a skirting board to prevent sundries at the top of the arch rib from falling off; the clamping plate mainly has a stabilizing effect on the baffle and can adopt a triangular steel plate to save materials; the distance between the opposite pull rods can be reasonably set according to the walking stride of the workers, so that the opposite pull rods not only tension the baffles on the two sides of the arch rib, but also can be used as an anti-skid device for the workers to walk on the arch crown.

Claims (1)

1. The utility model provides an assembled pedestrian passageway guardrail for steel case arch rib top, includes the many guardrail pole settings that set up along the arch rib both sides, connects its characterized in that through the horizontal pole between the guardrail pole setting of every side: the two sides of the arch rib are respectively provided with a baffle plate, the lower half part of each baffle plate is tightly attached to the side wall of the arch rib, the upper half part of each baffle plate is higher than the top surface of the arch rib, clamping plates which are vertically arranged and are vertical to the baffles are welded at certain intervals at the parts of the baffle plates higher than the top surface of the arch rib, one side edge of each clamping plate is welded with the side wall of each baffle plate, and the bottom edge of each clamping plate is supported on the; the lower end of the guardrail upright stanchion is supported on the top surface of the arch rib and is connected with the baffle plate through a bolt; a pair of pull rods is arranged between the two baffle plates at intervals, the pair of pull rods is tightly attached to the top surfaces of the arch ribs, and two ends of each pull rod respectively penetrate through the two side plates and are in threaded connection with a fixing nut.
CN202021289836.5U 2020-07-02 2020-07-02 Assembled pedestrian passageway guardrail for top of steel box arch rib Active CN213389879U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021289836.5U CN213389879U (en) 2020-07-02 2020-07-02 Assembled pedestrian passageway guardrail for top of steel box arch rib

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021289836.5U CN213389879U (en) 2020-07-02 2020-07-02 Assembled pedestrian passageway guardrail for top of steel box arch rib

Publications (1)

Publication Number Publication Date
CN213389879U true CN213389879U (en) 2021-06-08

Family

ID=76199378

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021289836.5U Active CN213389879U (en) 2020-07-02 2020-07-02 Assembled pedestrian passageway guardrail for top of steel box arch rib

Country Status (1)

Country Link
CN (1) CN213389879U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113309004A (en) * 2021-06-22 2021-08-27 中铁大桥局第七工程有限公司 Assembled high-altitude walkway for arched bridge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113309004A (en) * 2021-06-22 2021-08-27 中铁大桥局第七工程有限公司 Assembled high-altitude walkway for arched bridge

Similar Documents

Publication Publication Date Title
CN213389879U (en) Assembled pedestrian passageway guardrail for top of steel box arch rib
CN211229608U (en) Safety rope stand column for steel structure construction
CN201786036U (en) Temporary protective barrier for building construction
CN105822076A (en) Construction edge safety protection warning fence
CN211172010U (en) Deep foundation pit supporting device
CN204590556U (en) With the steel pipe lifting scaffold of steel sash net safeguard structure
CN207829505U (en) A kind of pin-connected panel floor edge protective fence
CN211594844U (en) Detachable tower crane attaches wall operation platform
CN211201112U (en) Sectional steel tower mounted assembly type construction platform
CN110937525A (en) Detachable tower crane attaches wall operation platform
CN211923448U (en) Construction equipment of steel construction
CN211081084U (en) Tool type pole holding safety protection device
CN203514764U (en) Overhanging scaffold tool type bolt anchoring device
CN110847529A (en) Simple to operate's pin-connected panel railing
KR102408722B1 (en) Removable height extension smart safety railing
CN214362865U (en) Municipal bridge guardrail convenient to adjust
CN218405215U (en) Temporary guardrail for super-large-diameter shield tunnel construction channel
CN218324028U (en) Be used for pipeline welding protection portal assembled to hang corridor protector on road
CN210975562U (en) Cage is hung in bent cap stretch-draw construction
CN216999351U (en) Novel square pier column tie beam assembly type bracket device
CN211691800U (en) Safety protective guard for construction
CN216689037U (en) Protective hanging bracket for bridge
CN219654471U (en) Temporary guardrail upright post of assembled bridge
CN215164762U (en) Protective equipment for cradle operation platform
CN220789729U (en) Simple mud splash preventing device suitable for triaxial stirring pile machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant