CN213371416U - Brewing device - Google Patents

Brewing device Download PDF

Info

Publication number
CN213371416U
CN213371416U CN202021416458.2U CN202021416458U CN213371416U CN 213371416 U CN213371416 U CN 213371416U CN 202021416458 U CN202021416458 U CN 202021416458U CN 213371416 U CN213371416 U CN 213371416U
Authority
CN
China
Prior art keywords
water
brewing device
water outlet
thick film
main control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021416458.2U
Other languages
Chinese (zh)
Inventor
程晓飞
吴田
胡平波
田丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Daozhong Innovation Technology Co ltd
Original Assignee
Shenzhen Daozhong Innovation Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Daozhong Innovation Technology Co ltd filed Critical Shenzhen Daozhong Innovation Technology Co ltd
Priority to CN202021416458.2U priority Critical patent/CN213371416U/en
Application granted granted Critical
Publication of CN213371416U publication Critical patent/CN213371416U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Apparatus For Making Beverages (AREA)

Abstract

The embodiment of the utility model discloses brewing device, including brewing device casing, the main control board, the water tank, first delivery port, the second delivery port, a water pump, a water inlet pipe, the solenoid valve, the instant heating boiler, first outlet pipe, the thick film heater, the second inlet tube, wherein flow to the water of first volume in the instant heating boiler flow to first delivery port after heating fast in order to supply water to coffee extraction device and extract, flow to the water of second volume in the thick film heater in the water tank simultaneously and heat the back and supply water to the second delivery port fast, owing to extract required water and brew required moisture and open the heating, brewing efficiency has been improved.

Description

Brewing device
Technical Field
The utility model relates to a machine's technical field is sold to intelligence, especially relates to a brewing device.
Background
Nowadays, with the development of beverage extraction technology, there are various types of full-automatic or semi-automatic capsule coffee machines which are popularized and applied in places such as malls, milk tea shops, coffee shops, bread baking shops, and the like. However, in the process of brewing by heating cold water into hot water, the brewing device in the existing full-automatic or semi-automatic capsule coffee machine generally has a small amount of heated cold water, and a cup of coffee can be brewed only after a certain amount of cold water is heated for many times, which leads to low brewing efficiency.
SUMMERY OF THE UTILITY MODEL
In order to solve the defects of the prior art, the embodiment of the utility model provides a brewing device, which aims at solving the problem that in the process of brewing by a brewing device of a capsule beverage machine by heating cold water into hot water, the amount of the heated cold water is less, and a cup of coffee can be brewed only after a certain amount of cold water is heated for many times, thus leading to the low brewing efficiency.
The embodiment of the utility model provides a brewing device, wherein, include:
a brewing device housing;
the main control panel is arranged in the brewing device shell;
the water tank is fixedly arranged on the outer wall of the brewing device shell and is electrically connected with the main control board;
the first water outlet and the second water outlet are arranged on the brewing device shell;
the water inlet end of the water pump is connected with the water tank through a first water inlet pipe, and the water pump is also electrically connected with the main control board;
the instant heating boiler is arranged in the brewing device shell and is connected with the water outlet end of the water pump, the instant heating boiler is connected with the first water outlet through a first water outlet pipe, and the instant heating boiler is electrically connected with the main control board;
the electromagnetic valve is arranged on the first water outlet pipe and is electrically connected with the main control board;
the thick film heater is arranged in the brewing device shell and is connected with the water tank through a second water inlet pipe, the thick film heater is connected with the second water outlet, and the thick film heater is electrically connected with the main control board.
The utility model discloses brewing device, the water of first volume in to the instant boiler of flow in the water tank heats the back fast and flows to first delivery port in order to extract in order to supply water to coffee extraction device, flows to the water of second volume in the thick film heater (the second volume is between thirty times several times of first volume) and heats the back fast and flow to the second delivery port and supply water in the water tank simultaneously, owing to will extract required water and brew required moisture and open the heating, has improved and has steeped efficiency.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without any creative effort.
FIG. 1 is a schematic structural diagram of a brewing device provided by an embodiment of the present invention;
FIG. 2 is a schematic view of a brewing device according to an embodiment of the present invention at a first viewing angle after a portion of the brewing device housing is removed;
FIG. 3 is a schematic diagram of a brewing device according to an embodiment of the present invention at a second viewing angle after a portion of the brewing device housing is removed;
fig. 4 is a schematic block diagram of a brewing device provided by an embodiment of the present invention.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. It is to be understood that the embodiments described are only some of the embodiments of the present invention, and not all of them. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
It will be understood that the terms "comprises" and/or "comprising," when used in this specification and the appended claims, specify the presence of stated features, integers, steps, operations, elements, and/or components, but do not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components, and/or groups thereof.
The following description of the embodiments refers to the accompanying drawings for illustrating the specific embodiments in which the invention may be practiced. In the present invention, directional terms such as "up", "down", "front", "back", "left", "right", "inside", "outside", "side", etc. refer to directions of the attached drawings only. Accordingly, the directional terms used are used for describing and understanding the present invention, and are not used for limiting the present invention.
Referring to fig. 1-4, fig. 1 is a schematic structural diagram of a brewing device according to an embodiment of the present invention; FIG. 2 is a schematic view of a brewing device according to an embodiment of the present invention at a first viewing angle after a portion of the brewing device housing is removed; FIG. 3 is a schematic diagram of a brewing device according to an embodiment of the present invention at a second viewing angle after a portion of the brewing device housing is removed; fig. 4 is a schematic block diagram of a brewing device provided by an embodiment of the present invention. As shown in fig. 1-4, the brewing device 90 comprises:
a brewing device housing 900;
a main control panel 910 disposed within the brewing device housing 900;
a water tank 920 fixedly arranged on the outer wall of the brewing device shell 900, wherein the water tank 920 is electrically connected with the main control panel 910;
a first water outlet (not shown) and a second water outlet (not shown) provided on the brewing device housing 900;
a water pump 930 disposed in the brewing device housing, wherein a water inlet end of the water pump 930 is connected to the water tank 910 through a first water inlet pipe (not shown), and the water pump 930 is further electrically connected to the main control panel 910;
an instant heating boiler 950 disposed in the brewing device housing 900, wherein the instant heating boiler 950 is connected to the water outlet end of the water pump 930, the instant heating boiler 950 is connected to the first water outlet through a first water outlet pipe (not shown), and the instant heating boiler 950 is electrically connected to the main control board 910;
the electromagnetic valve 940 is arranged on the first water outlet pipe, and the electromagnetic valve 940 is electrically connected with the main control panel 910;
a thick film heater 960 disposed in the brewing device housing, the thick film heater 960 being connected to the water tank 910 through a second inlet tube (not shown), the thick film heater 960 being connected to the second outlet port, the thick film heater 960 being electrically connected to the main control panel 910.
In this embodiment, the first water outlet of the brewing device 90 and the coffee extracting device supply water to the coffee extracting device, and the lower portion of the second water outlet of the brewing device 90 is aligned with the cup body below to continuously heat the extraction liquid in the cup body, so as to complete the brewing process of the beverage. More specifically, the brewing process is as follows:
1) the electromagnetic valve 940 is controlled to be opened through the main control panel 910, and the water pump 930 and the instant boiler 950 are controlled to be opened at the same time, at this time, water in the water tank 920 is pumped into the instant boiler 950 through the water pump 930 to complete heating (for example, 3 to 5ml of cold water in the instant boiler 950 can be heated to a specified temperature, such as 100 degrees, within 1 second), and then enters the extraction device (for example, a coffee extraction device) connected with the first water outlet through the first water outlet; the electromagnetic valve 940 is arranged on the first water outlet pipe behind the instant boiler 950, so that the electromagnetic valve 940 is positioned between the instant boiler 950 and the extraction device, and thus, after the hot water in the instant boiler 950 enters the extraction device, the extraction device does not influence the instant boiler due to pressure relief;
2) since the total time required for extraction of the extraction device is generally known, after the extraction liquid extracted by the extraction device is received by the cup body, the cup body moves to the position below the second water outlet, at this time, the main control board 910 can control water in the water tank 920 to enter the thick film heater 960 for heating (for example, the thick film heater 960 can heat 0.8-1.2L of cold water to a specified temperature, such as 100 degrees, generally for 1 minute), and then hot water flows out from the second water outlet into the cup body below, thereby completing the brewing process of the beverage.
Because the first volume of cold water required by extraction is heated in the instant boiler 950 for extraction, the second volume of cold water required by brewing (the second volume is several times to thirty times of the first volume) is heated, and the cold water for different purposes and dosage of extraction and brewing is respectively heated by the heating devices with different heating powers, the brewing efficiency is improved.
The instant boiler 950 may be understood as a small water heating apparatus which can heat 3-5ml of cold water to a designated temperature in 1 second, for example. The thick film is heated by mixing the superconductive ceramic material micro powder with organic adhesive solvent to form paste slurry, printing the slurry on the substrate material in the form of circuit wiring or pattern by silk screen printing technique, and sintering by strict heat treatment to obtain the superconductive thick film with thickness of 15-80 μm. The heating power of the thick film heater 960 is larger than that of the instant boiler 950, for example, the thick film heater 9601 min can heat 0.8-1.2L of cold water to a specified temperature,
in one embodiment, as shown in fig. 2-4, the brewing device 90 further comprises:
an air pump 970 disposed in the brewing device housing 900, wherein the air pump 970 is connected to the first water outlet pipe through an air inlet pipe (not shown), and the air pump 970 is electrically connected to the main control board 910.
In this embodiment, since the first water outlet is connected to the extraction device and the first water outlet pipe is connected to the first water outlet, when the hot water heated in the instant boiler 950 enters the extraction device through the first water outlet pipe, the hot water may not completely flow into the extraction device 30 due to insufficient power, and at this time, the air pump 970 may be arranged to blow the hot water in the first water outlet pipe, so that the hot water in the first water outlet pipe has sufficient power to enter the extraction device.
In one embodiment, as shown in fig. 3 and 4, a one-way valve 971 is disposed on the air inlet pipe, and air in the air pump 970 can enter the first water outlet pipe through the one-way valve.
In this embodiment, in order to prevent the air pump 970 from flowing back to the air pump 970 when blowing air into the first water outlet pipe, a check valve 971 may be disposed in the air inlet pipe, so that air in the air pump 970 may enter the first water outlet pipe through the check valve, and meanwhile, water in the first water outlet pipe cannot enter the air pump 970, thereby ensuring the safety of the air pump and prolonging the service life of the air pump.
In one embodiment, as shown in fig. 2 and 4, the brewing device 90 further comprises:
a flow meter 941 disposed on the first water inlet pipe, wherein the flow meter 941 is electrically connected to the main control panel 910.
In this embodiment, a flow meter 941 is disposed on the first water inlet pipe to accurately measure the total volume of cold water that the water tank 920 has entered the instant boiler 950 for heating, so that the amount of hot water entering the extraction device can be accurately controlled.
In an embodiment, a float switch is further disposed in the water tank 920.
In this embodiment, the float switch is a liquid level control device with simple structure and convenient use. Through set up float switch in water tank 920, can judge minimum water level and highest water level in the water tank, in case learn the current water level in the water tank and be less than minimum water level after, be convenient for control carries out the moisturizing to it.
In one embodiment, as shown in fig. 2 and 3, a fixing frame 901 is further disposed in the brewing device housing 900; the fixing frame includes a first side fixing frame 901a and a second side fixing frame 901 b.
In this embodiment, the fixing frame 910 is disposed in the housing 900 of the brewing device to more reasonably arrange the arrangement positions of the functional devices, so as to effectively reduce the overall size of the brewing device.
In an embodiment, as shown in fig. 2 and 3, the water pump 930 and the flow meter 941 are both fixedly disposed on the first side fixing frame 901 a.
In this embodiment, the water pump 930 and the flow meter are both fixedly disposed on the first side fixing frame 901a, and the first side fixing frame 901a is a side closer to the water tank 920, so that water is pumped into the instant heating boiler 950 through the water pump 930 to be heated.
In one embodiment, as shown in fig. 2 and 3, the air pump 970 and the instant heating boiler 950 are both fixedly disposed on the second side fixing frame 901 b.
In this embodiment, the air pump 970 and the instant heating boiler 950 are both fixedly disposed on the second side fixing frame 901b, so as to ensure that the instant heating boiler 950 is separated from the water pump 930, and prevent heat generated by heating the instant heating boiler 950 from causing high temperature influence on the water pump 930.
In one embodiment, as shown in fig. 2 and 3, the brewing device housing 900 is further provided with a thick film device holder 902 therein; the thick film heater 960 is fixedly mounted to the thick film device mount 902.
In this embodiment, the thick film heater 960 is fixedly disposed on the thick film device fixing frame 902, so as to separate the thick film heater 960 from the water pump 930, and prevent heat generated by heating the thick film heater 960 from causing high temperature influence on the water pump 930.
In one embodiment, as shown in fig. 2-4, the thick film heater 960 is connected to the second water outlet via a second water outlet pipe.
In this embodiment, since the thick film heater 960 has its own flow measuring function, it is possible to heat the water in the water tank 920 by providing another water pump in the brewing device housing 900 (the other water pump is also electrically connected to the main control board), and measure the volume of the hot water currently being added by the thick film heater 960 itself. After the thick film heater 960 heats the cold water, the hot water flows from the second water outlet pipe to the second water outlet and finally flows into the cup body, and the extraction liquid is brewed.
The utility model provides a pair of brewing device, flow to the water of first volume in the instant boiler heat the back fast and flow to first delivery port in order to extract in order to supply water to coffee extraction device, flow to the water of second volume in the thick film heater (the second volume is several times of first volume to thirty times between) in the water tank and heat the back fast and flow to the second delivery port and supply water, owing to will extract required water and brew required moisture and open the heating, improved and dash and steep efficiency.
It should be noted that, for simplicity of description, the above-mentioned embodiments of the method are described as a series of combinations of actions, but those skilled in the art should understand that the present invention is not limited by the described order of actions, as some steps may be performed in other orders or simultaneously according to the present invention. Further, those skilled in the art should also appreciate that the embodiments described in the specification are preferred embodiments and that the acts and modules referred to are not necessarily required by the invention.
In the above embodiments, the descriptions of the respective embodiments have respective emphasis, and for parts that are not described in detail in a certain embodiment, reference may be made to related descriptions of other embodiments.
The above description is only for the specific embodiments of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art can easily think of various equivalent modifications or replacements within the technical scope of the present invention, and these modifications or replacements should be covered within the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (10)

1. A brewing device, comprising:
a brewing device housing;
the main control panel is arranged in the brewing device shell;
the water tank is fixedly arranged on the outer wall of the brewing device shell and is electrically connected with the main control board;
the first water outlet and the second water outlet are arranged on the brewing device shell;
the water inlet end of the water pump is connected with the water tank through a first water inlet pipe, and the water pump is also electrically connected with the main control board;
the instant heating boiler is arranged in the brewing device shell and is connected with the water outlet end of the water pump, the instant heating boiler is connected with the first water outlet through a first water outlet pipe, and the instant heating boiler is electrically connected with the main control board;
the electromagnetic valve is arranged on the first water outlet pipe and is electrically connected with the main control board;
the thick film heater is arranged in the brewing device shell and is connected with the water tank through a second water inlet pipe, the thick film heater is connected with the second water outlet, and the thick film heater is electrically connected with the main control board.
2. The brewing device of claim 1, further comprising:
the air pump is arranged in the brewing device shell and is connected with the first water outlet pipe through an air inlet pipe, and the air pump is electrically connected with the main control board.
3. The brewing device of claim 2, wherein the air inlet pipe is provided with a one-way valve, and air in the air pump can enter the first water outlet pipe through the one-way valve.
4. A brewing device as claimed in claim 3, further comprising:
the flowmeter is arranged on the first water inlet pipeline and is electrically connected with the main control board.
5. The brewing device of claim 1, wherein a float switch is further disposed within the water tank.
6. The brewing device of claim 4, wherein a mount is further disposed within the brewing device housing; the fixing frame comprises a first side fixing frame and a second side fixing frame.
7. The brewing device of claim 6, wherein the water pump and the flow meter are both fixedly disposed on the first side mount.
8. The brewing device of claim 6, wherein the air pump and the instant heat boiler are both fixedly disposed on the second side mount.
9. The brewing device of claim 1, wherein a thick film device mount is further disposed within the brewing device housing; the thick film heater is fixedly arranged on the thick film device fixing frame.
10. The brewing apparatus of claim 9, wherein the thick film heater is connected to the second water outlet via a second water outlet tube.
CN202021416458.2U 2020-07-17 2020-07-17 Brewing device Active CN213371416U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021416458.2U CN213371416U (en) 2020-07-17 2020-07-17 Brewing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021416458.2U CN213371416U (en) 2020-07-17 2020-07-17 Brewing device

Publications (1)

Publication Number Publication Date
CN213371416U true CN213371416U (en) 2021-06-08

Family

ID=76201200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021416458.2U Active CN213371416U (en) 2020-07-17 2020-07-17 Brewing device

Country Status (1)

Country Link
CN (1) CN213371416U (en)

Similar Documents

Publication Publication Date Title
CN105266594A (en) Intelligent tea making machine
KR101194980B1 (en) Coffee machine with load cell
CN202341807U (en) Automatic control tea making machine
CN102112026A (en) Beverage forming apparatus with centrifugal pump
CN108567339A (en) Instant heating type drinking machine and its moisture separation device
CN213371416U (en) Brewing device
CN103815789B (en) Capsule beverage brewing apparatus
CN104970699A (en) Water dispenser
CN105333606A (en) Hot water tank
CN115379782A (en) Air preheating for brewing chamber
CN205286050U (en) Intelligence machine of making tea
CN209759050U (en) preparation equipment of zirconium dioxide aerogel
CN107742377A (en) A kind of automatic release device for self-service washing facility
CN106618219A (en) Drink machine capable of preventing liquid from reversely jetting or leaking and brewing method of the drink machine
CN209528892U (en) A kind of portable coffee machines
CN116326991A (en) Brewing head of composite coffee machine
CN211862540U (en) Instant heating type brewing assembly and beverage brewing equipment
CN209605421U (en) A kind of instant heating type pressure extraction tea heating system
CN109984599A (en) A kind of suction hydrogen release hydrogen brewing machine
CN207838786U (en) A kind of environment-friendly cleaning agent preparation facilities
CN211748903U (en) Heating device capable of heating quickly, stably and accurately
CN114513977A (en) Hot water source with horizontal heating coil for beverage machine
CN112237378A (en) Integrated intelligent tea making machine
CN209346691U (en) A kind of drink precooker
CN215983264U (en) Liquid heating machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant