CN2133624Y - Universal combined ceiling frame connector - Google Patents
Universal combined ceiling frame connector Download PDFInfo
- Publication number
- CN2133624Y CN2133624Y CN 92226073 CN92226073U CN2133624Y CN 2133624 Y CN2133624 Y CN 2133624Y CN 92226073 CN92226073 CN 92226073 CN 92226073 U CN92226073 U CN 92226073U CN 2133624 Y CN2133624 Y CN 2133624Y
- Authority
- CN
- China
- Prior art keywords
- connector
- connecting piece
- skeleton
- shape
- ceiling frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 20
- 229910052742 iron Inorganic materials 0.000 claims abstract description 10
- 230000037431 insertion Effects 0.000 claims 1
- 238000003780 insertion Methods 0.000 claims 1
- 239000011248 coating agent Substances 0.000 abstract 1
- 238000000576 coating method Methods 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 10
- 239000002131 composite material Substances 0.000 description 6
- 239000000463 material Substances 0.000 description 5
- 238000010606 normalization Methods 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
A universal combined type ceiling skeleton connector comprises a first connecting piece and a second connecting piece which are vertically connected in a cross shape, a T shape or an L shape and are supplied to the middle part, the side part or the corner part of the integral combination, wherein the first connecting piece is in a hollow coating shape with a groove-shaped section and is used for being placed into the skeleton and is nailed by iron nails, an upward concave part is arranged at the joint of the two connecting pieces, and the connecting piece penetrates through a preset hole to combine the two connecting pieces, so that the connector and the skeleton can be manufactured and combined in a standardized mode, and the uniform and enough strength of each connecting point is provided.
Description
The utility model relates to a kind of universal composite ceiling skeleton connector, links for skeleton with L type, T type and cross connector, and the convenient construction assembling also improves bond strength, reaches standardization, normalized purpose.
Traditional Ceiling skeleton is the wooden frame overlap joint, mainly all adopts the mode of binding, and hammers into and combination by iron nail on the binding fulcrum of each skeleton junction, and therefore, the number of iron nail and size directly influence the bond strength of fulcrum.Yet because of the constructor is not the designer, in construction, the iron nail number that the constructor hammers into often has difference, also causes respectively to link fulcrum intensity and differ.Because of bond strength difference on each fulcrum, have a strong impact on the engineering quality, when stressed, even can cause ceiling to sink, so that the incident that collapses.
The purpose of this utility model is to propose a kind of universal composite ceiling skeleton connector, normalized structure is provided, according to design requirement, set for the connector number that links usefulness, each skeleton all can cut before construction in normalization, make assembling very convenient, and each to connect the bond strength of fulcrum very close, and this bond strength also the bond strength of the binding fulcrum followed closely with iron nail of tradition improve significantly.
A kind of universal composite ceiling skeleton connector provided by the utility model comprises first connector and the second vertical with it connector, and the cross section of first and second connector all is groove shape, in order to hold the timber skeleton.Junction in first and second connector links it with a colligator.After skeleton is inserted connector, hammer into and combination from side with iron nail again.Based on connector can standardization, normalization produces in a large number, so can calculate the spacing of number and each connector of connector in advance when designing.Identical therewith, also can cook up equidistant skeleton in advance, each material is standardized fully, and provide each close skeleton tie point of intensity, to strengthen overall construction intensity.In addition, the utility model also can be applicable to cross bearing of floor, wood siding wall, tripod, combined bay, circular chair or the like except that can be applicable to ceiling, and its range of application is very extensive.
Another purpose of the present utility model is to provide a kind of universal composite ceiling skeleton connector, wherein first connector of this connector and second connector are L type shape, T type shape and cross shape respectively, to supply the usefulness of corner, side and middle part combination respectively.
Another purpose of the present utility model is to provide a kind of universal composite ceiling skeleton connector, wherein the junction of first connector of this connector and second connector has the gap, allow the relative rotation of making suitable angle between two connectors, the usefulness that adjusts when being beneficial to make up.Therefore, the utlity model has adjustable, can cut in a large number in advance, store, the framework material that size block is formatted.As long as in the material that stores in advance, take required material, can be in order to construction.Therefore, can save material, more can increase work efficiency because of easy construction by a large amount of normalized production.
Below exemplify preferred embodiment now and help and describe it in detail with accompanying drawing.
Fig. 1 is the stereogram after the utility model combination;
Fig. 2 is the stereogram of the utility model first embodiment;
Fig. 3 is the exploded view of the utility model first embodiment;
Fig. 4 is the exploded view of the utility model second embodiment;
Fig. 5 is the exploded view of the utility model the 3rd embodiment.
Please consult Fig. 1 earlier, be depicted as a kind of universal composite ceiling skeleton connector provided by the utility model, can be applicable to infall A, side B and the corner C of skeleton combination, be incorporated on the connector for the timber skeleton, high and the uniform combining structure with acquisition intensity, and reach normalization and simplify the purpose of constructing.
In first embodiment of the present utility model, as shown in Figures 2 and 3, connector 100 comprises first connector 110 and second connector 120, this two connector can be positioned to and be vertical binding each other, wherein first connector 110 and second connector 120 all are the hollow coated, for example its cross section can be groove shape, for inserting skeleton 130.The equal tool of the side hole 111,121 of each connector 110,120 is for hammering into iron nail 140 so that connector 110,120 and skeleton 130 are combined.In the junction of first connector 110 and second connector 120, look up by the bottom of flute profile, be equipped with a recess that makes progress 112,122, pass with attached this two connector 110,120 for a conjunction 150, make it to combine.Conjunction 150 upper ends can be again in conjunction with a branch sleeve 151 members such as grade, be beneficial to upwards be fixed on the corresponding site of building with other link components, this device can be done upper and lower adjustment with the screw rod that the roof is fixed in suspention, to reach whole ceiling plane level unanimity.
Please pay special attention to shown in Figure 2, after two connectors 110,120 combine, be reserved with a gap 160 in the junction of connector 110,120, thus, can do suitable angle for two connectors 110,120 and rotate relatively, with the needs in the coordinative construction, therefore, for the member of error slightly, also still can successfully make up.
Second embodiment of the present utility model points out in Fig. 4, connector 200 is similar to the connector 110 among first embodiment, also comprise first connector 210 and second connector 220, this two connector also can be positioned to vertical each other, so that combine with conjunction 250.Each connector 210,220 all is hollow and coats, and for inserting skeleton 230, passes the lateral orifices 211,221 of connector 210,220 again with iron nail 240, so that in conjunction with skeleton 230 and connector 210,220.
Please consult Fig. 5 again, be depicted as the connector 300 of the 3rd embodiment, this connector 300 comprises first connector 310, second connector 320, skeleton 330, conjunction 350, iron nail 340 members such as grade, and the member of the connector 100,200 of these members and first and second embodiment is roughly the same.Only, first connector 310 of the 3rd embodiment connector 300 is L type shape with second connector 320 and combines, for the corner that is applied to entire combination (as being denoted as the C place among Fig. 1).
Among each embodiment of the present utility model, connector is all narrated with channel section, when this device is applied to metope or because of construction, need attractive in appearance, in the time of can not implementing with bathtub construction, also can be revised as the cross section of L font or other shapes, and the hole of connector side can be number a pair of, or other difference, to adapt to the demand of different construction occasions.
Can obviously find out by above design, but connector of the present utility model and skeleton all standardization, normalization ground are made, and make ups also very conveniently, and the resultant intensity of each junction of while is very even, all very favourable for designer and constructor, and can guarantee the engineering quality.Yet, above embodiment only in order to the explanation the utility model but not in order to the restriction the utility model, the modification of the displacement of the change of number, equivalence element, equivalent shapes such as must be subordinate to category of the present utility model.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 92226073 CN2133624Y (en) | 1992-06-23 | 1992-06-23 | Universal combined ceiling frame connector |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 92226073 CN2133624Y (en) | 1992-06-23 | 1992-06-23 | Universal combined ceiling frame connector |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN2133624Y true CN2133624Y (en) | 1993-05-19 |
Family
ID=33770500
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 92226073 Expired - Fee Related CN2133624Y (en) | 1992-06-23 | 1992-06-23 | Universal combined ceiling frame connector |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN2133624Y (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101397828B (en) * | 2007-09-26 | 2010-06-23 | 达葳工程股份有限公司 | Combined assembly of hanging ceiling framework |
| CN102720291A (en) * | 2012-06-20 | 2012-10-10 | 苏州环亚新型建材有限公司 | Welding-free assembled type framework and bolt latch |
| CN103321336A (en) * | 2013-06-21 | 2013-09-25 | 江苏华顶建设工程股份有限公司 | Long-span suspended ceiling framework |
| CN105544838A (en) * | 2015-12-23 | 2016-05-04 | 杭州飞神工业设计有限公司 | Integrated suspended ceiling structure |
-
1992
- 1992-06-23 CN CN 92226073 patent/CN2133624Y/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101397828B (en) * | 2007-09-26 | 2010-06-23 | 达葳工程股份有限公司 | Combined assembly of hanging ceiling framework |
| CN102720291A (en) * | 2012-06-20 | 2012-10-10 | 苏州环亚新型建材有限公司 | Welding-free assembled type framework and bolt latch |
| CN103321336A (en) * | 2013-06-21 | 2013-09-25 | 江苏华顶建设工程股份有限公司 | Long-span suspended ceiling framework |
| CN105544838A (en) * | 2015-12-23 | 2016-05-04 | 杭州飞神工业设计有限公司 | Integrated suspended ceiling structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6088989A (en) | Framing member | |
| CN113944289A (en) | High-stability wall surface composite ceramic tile module dry hanging structure | |
| CN113622586B (en) | Assembled type drop-level suspended ceiling structure | |
| CN2133624Y (en) | Universal combined ceiling frame connector | |
| CN113293921B (en) | Suspended ceiling double-base-layer structure and installation method | |
| CN113684964A (en) | Assemble shape gypsum board furred ceiling structure of preapring for an unfavorable turn of events of design fast | |
| CN214117330U (en) | Mounting design structure for assembled television background wall | |
| CN113700178A (en) | PVC skeleton partition wall structure of pre-buried design of water and electricity pipeline | |
| CN113152878A (en) | Aluminum frame plastic formwork for building | |
| TWM646403U (en) | Easy to mount and expand wooden construction connection structure | |
| CN211690766U (en) | A connection structure of a steel frame | |
| CN214462104U (en) | Original wood tenon-and-mortise parquet floor and connecting assembly thereof | |
| CN216476073U (en) | Hyperboloid stair decorative board mounting structure | |
| CN214785552U (en) | Integration external wall insulation decorative board mounting structure | |
| CN209837325U (en) | Special-shaped plate cambered surface assembled installation device | |
| CN219138217U (en) | Assembled fitment wallboard structure | |
| CN208203733U (en) | A kind of profile corner connecting assemldy | |
| CN218117040U (en) | Double-veneer mounting structure | |
| CN206385724U (en) | A kind of timber truss | |
| CN216641220U (en) | High-stability wall surface composite ceramic tile module dry hanging structure | |
| CN220908669U (en) | Prefabricated wallboard, prefabricated column and assembled building | |
| CN224173590U (en) | A prefabricated ceiling module | |
| CN222823493U (en) | A special profile for enhancing concealed fixing screws | |
| CN223964102U (en) | Multi-arc type metal wall surface assembly type mounting structure | |
| CN203846608U (en) | Frame connecting structure of sunshine room |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C15 | Extension of patent right duration from 15 to 20 years for appl. with date before 31.12.1992 and still valid on 11.12.2001 (patent law change 1993) | ||
| RN01 | Renewal of patent term | ||
| C19 | Lapse of patent right due to non-payment of the annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |