CN213361309U - Indoor warm pipeline fixing device that leads to - Google Patents

Indoor warm pipeline fixing device that leads to Download PDF

Info

Publication number
CN213361309U
CN213361309U CN202021496801.9U CN202021496801U CN213361309U CN 213361309 U CN213361309 U CN 213361309U CN 202021496801 U CN202021496801 U CN 202021496801U CN 213361309 U CN213361309 U CN 213361309U
Authority
CN
China
Prior art keywords
fixed
sets
riser
fixing device
pipeline fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021496801.9U
Other languages
Chinese (zh)
Inventor
肖宏灿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yangzhou Air Conditioning Engineering Co ltd
Original Assignee
Jiangsu Yangzhou Air Conditioning Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yangzhou Air Conditioning Engineering Co ltd filed Critical Jiangsu Yangzhou Air Conditioning Engineering Co ltd
Priority to CN202021496801.9U priority Critical patent/CN213361309U/en
Application granted granted Critical
Publication of CN213361309U publication Critical patent/CN213361309U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an indoor warm pipeline fixing device that leads to, including the wall body roof, the bottom of wall body roof is provided with the fixed diaphragm of second, the fastening screw has all been seted up to the wall body roof bottom left and right sides, the inside left and right sides of the fixed diaphragm of second all is provided with the fastening bolt with fastening screw threaded connection, the fixed welding of intermediate position department of the fixed diaphragm bottom of second has the connecting rod, the outside bottom cover of connecting rod is equipped with the connecting pipe, the fixed welding in bottom of connecting pipe has first fixed diaphragm, the fixed welding in top that the connecting pipe left and right sides and be located first fixed diaphragm has the second fixed riser. The indoor heating and ventilation pipeline fixing device rotates the hoisting vertical plates on two sides and drives the hoisting inclined plates to move and separate from the hoisting holes, and then the first fixing transverse plate moves up and down to drive the connecting pipe to move up and down to a proper position and then the hoisting vertical plates rotate again to enable the hoisting inclined plates to be clamped with the hoisting holes in the corresponding positions again, so that the height of the indoor heating and ventilation pipeline fixing device can be adjusted conveniently.

Description

Indoor warm pipeline fixing device that leads to
Technical Field
The utility model relates to a warm logical pipeline technical field specifically is an indoor warm logical pipeline fixing device.
Background
The application of warm logical pipeline is in fields such as air conditioner ventilation pipe and send the ventilation pipe of airing exhaust, and warm logical pipeline need install fixedly with the help of fixing device when indoor installation, and traditional indoor warm logical pipeline fixing device can satisfy people's user demand basically, but still has certain problem, and concrete problem is as follows:
1. most indoor heating and ventilation pipeline fixing devices in the current market are simple in structure, and the installation height is fixed and cannot be adjusted;
2. most indoor heating and ventilation pipeline fixing devices in the current market are not convenient for fixing heating and ventilation pipelines with different pipe diameters.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an indoor warm logical pipeline fixing device to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a fixing device for an indoor heating pipeline comprises a wall body top plate, wherein a second fixing transverse plate is arranged at the bottom of the wall body top plate, fastening screw holes are formed in the left side and the right side of the bottom of the wall body top plate, fastening bolts in threaded connection with the fastening screw holes are arranged on the left side and the right side of the inside of the second fixing transverse plate, a connecting rod is fixedly welded at the middle position of the bottom of the second fixing transverse plate, a connecting pipe is sleeved at the bottom of the outer part of the connecting rod, a first fixing transverse plate is fixedly welded at the bottom of the connecting pipe, second fixing vertical plates are fixedly welded at the left side and the right side of the connecting pipe and positioned at the top of the first fixing transverse plate, first elastic cushions are fixedly adhered to the side walls of the two groups of second fixing vertical plates, sliding mechanisms are arranged at the outer sides of the two groups of first elastic cushions and positioned, two sets of the lateral wall fixed mounting that the third fixed riser is close to one side each other has the second cushion, and is two sets of the top fixed mounting that the third fixed riser outside just is located first fixed diaphragm has first fixed riser.
Preferably, in the indoor heating and ventilation pipeline fixing device, the sliding mechanism comprises sliding blocks and sliding grooves, the sliding grooves are formed in the left side and the right side of the top of the first fixing transverse plate respectively, and the sliding blocks fixed to the bottom of the third fixing vertical plate are arranged in the inner cavities of the sliding grooves.
Based on the technical characteristics, the heating and ventilation pipelines with different sizes can be clamped and fixed conveniently.
Preferably, among the above-mentioned indoor warm logical pipeline fixing device, two sets of the intercommunicating pore that runs through first fixed riser is all seted up to the inside intermediate position department of first fixed riser, and is two sets of the intercommunicating pore inner chamber is provided with runs through the intercommunicating pore and with the fixed pull rod of the fixed riser of third, and is two sets of the equidistant fixed mounting in bottom that first fixed riser is close to one side lateral wall each other has the telescopic machanism fixed mutually with the fixed riser of third.
Based on the technical characteristics, the heating and ventilation pipelines with different sizes can be clamped and fixed conveniently.
Preferably, among the above-mentioned indoor heating and ventilation pipeline fixing device, telescopic machanism includes the second spring, stretches out and draws back violently the pipe and flexible horizontal pole, and is two sets of respectively fixed mounting is close to the bottom of one side lateral wall each other at two sets of first fixed risers to flexible violently the pipe one side fixed mounting that the inner chamber was kept away from each other has the second spring, and is two sets of the second spring is close to one side fixed mounting each other and runs through flexible violently the pipe and with the fixed vertical pole fixed together of third flexible horizontal pole.
Based on the technical characteristics, the heating and ventilation pipelines with different sizes can be clamped and fixed conveniently.
Preferably, among the above-mentioned indoor warm logical pipeline fixing device, two sets of the top fixed mounting that first fixed riser is close to one side lateral wall each other has a tension bracket, and is two sets of the fixed cover in top that the tension bracket is close to one side lateral wall each other has first spring, and is two sets of the outside cover that first spring bottom just is located the tension bracket is equipped with the sleeve pipe.
Based on the technical characteristics, the heating and ventilation pipelines with different sizes can be clamped and fixed conveniently.
Preferably, among the above-mentioned indoor warm logical pipeline fixing device, two sets of the sleeve pipe is close to the intermediate position department of one side lateral wall each other and articulates through the articulated shaft has a tension bar, and is two sets of the tension bar is close to one side each other and is articulated mutually with the fixed riser lateral wall upper end of third through the articulated shaft.
Based on the technical characteristics, the heating and ventilation pipelines with different sizes can be clamped and fixed conveniently.
Preferably, among the above-mentioned indoor warm logical pipeline fixing device, the hoist and mount hole that runs through the connecting pipe lateral wall is seted up in the equal slope of connecting pipe left and right sides wall, the connecting pipe left and right sides just is located the fixed diaphragm bottom position of second and has a hoist and mount riser, and is two sets of the hoist and mount riser is close to one side bottom fixed welding each other and has the hoist and mount swash plate with hoist and mount hole block.
Based on the technical characteristics, the height of the indoor heating and ventilation pipeline fixing device is convenient to adjust.
Compared with the prior art, the beneficial effects of the utility model are that:
firstly, through the design of the technical scheme, the hoisting vertical plates on two sides are rotated through the hinge shaft and drive the hoisting inclined plates to move and separate from the hoisting holes, then the first fixing transverse plate is moved up and down to drive the connecting pipe to move up and down to a proper position, and then the hoisting vertical plates are rotated again to enable the hoisting inclined plates to be clamped with the hoisting holes in the corresponding positions again, so that the height of the indoor heating and ventilation pipeline fixing device is convenient to adjust;
the second, through the design of this technical scheme, the pull rod of pulling both sides earlier moves to the outside under the effect of intercommunicating pore, then will warm logical pipeline and place between first cushion and second cushion, thereby it drives the tension bar rotation and promotes the fixed riser of third to move and then the fixed warm logical pipeline of centre gripping to drive under the elastic action of telescopic machanism under the elastic action of articulated shaft to promote the sleeve pipe downstream under the elastic action of first spring to move to the fixed riser one side of second.
Drawings
FIG. 1 is a schematic view of the structure of the utility model in use;
FIG. 2 is an enlarged view of the portion A of FIG. 1 according to the present invention;
FIG. 3 is an enlarged schematic view of a portion B of FIG. 1 according to the present invention;
fig. 4 is an enlarged schematic view of the part C in fig. 1 according to the present invention.
In the figure: 1. a pull rod; 2. a communicating hole; 3. a first fixed vertical plate; 4. a coasting mechanism; 401. a slider; 402. a chute; 5. a second fixed vertical plate; 6. a first elastic pad; 7. a second elastic pad; 8. a third fixed vertical plate; 9. a first fixed transverse plate; 10. fastening a bolt; 11. a second fixed transverse plate; 12. a wall top plate; 13. fastening screw holes; 14. hoisting a vertical plate; 15. a first spring; 16. a sleeve; 17. a tension bar; 18. a tension bracket; 19. a telescoping mechanism; 1901. a second spring; 1902. a telescopic horizontal pipe; 1903. a telescopic cross bar; 20. hoisting holes; 21. a connecting rod; 22. hoisting the inclined plate; 23. and (4) connecting the pipes.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides an embodiment: a fixing device for an indoor heating pipeline comprises a wall top plate 12, wherein a second fixing transverse plate 11 is arranged at the bottom of the wall top plate 12, fastening screw holes 13 are respectively formed in the left side and the right side of the bottom of the wall top plate 12, fastening bolts 10 in threaded connection with the fastening screw holes 13 are respectively arranged on the left side and the right side of the inside of the second fixing transverse plate 11, a connecting rod 21 is fixedly welded at the middle position of the bottom of the second fixing transverse plate 11, a connecting pipe 23 is sleeved at the bottom outside the connecting rod 21, a first fixing transverse plate 9 is fixedly welded at the bottom of the connecting pipe 23, second fixing vertical plates 5 are fixedly welded at the left side and the right side of the connecting pipe 23 and positioned at the top of the first fixing transverse plate 9, first elastic cushions 6 are fixedly adhered to the side walls of two groups of the second fixing vertical plates 5, sliding mechanisms 4 are arranged on the outer sides of the two groups of the first elastic cushions, two sets of third fixed risers 8 are close to the lateral wall fixed mounting on one side each other and have second cushion 7, and the top fixed mounting that is located first fixed diaphragm 9 in the two sets of third fixed risers 8 outsides has first fixed riser 3.
Please refer to fig. 1 in the drawings of the specification: the sliding mechanism 4 comprises sliding blocks 401 and sliding grooves 402, two groups of sliding grooves 402 are respectively arranged on the left side and the right side of the top of the first fixed transverse plate 9, and sliding blocks 401 fixed with the bottom of the third fixed vertical plate 8 are arranged in inner cavities of the two groups of sliding grooves 402.
Please refer to fig. 1 in the drawings of the specification: the intercommunicating pores 2 that run through first fixed riser 3 are all seted up to 3 inside intermediate positions departments of two sets of first fixed risers, and 2 inner chambers of two sets of intercommunicating pores are provided with and run through intercommunicating pores 2 and with the fixed pull rod 1 of 8 looks of third fixed risers, and the equidistant fixed mounting in bottom that two sets of first fixed risers 3 are close to one side lateral wall each other has the telescopic machanism 19 of fixing mutually with the fixed riser 8 of third.
Please refer to fig. 3 in the drawings of the specification: telescopic machanism 19 includes second spring 1901, flexible violently pipe 1902 and flexible horizontal pole 1903, and two sets of flexible violently pipes 1902 respectively fixed mounting be close to the bottom of one side lateral wall each other at two sets of first fixed risers 3, and one side fixed mounting that two sets of flexible violently pipe 1902 inner chambers kept away from each other has second spring 1901, and two sets of second springs 1901 are close to one side fixed mounting each other and run through flexible violently pipe 1902 and with the fixed flexible horizontal pole 1903 of third fixed riser 8 looks fixed.
Please refer to fig. 2 in the drawings of the specification: two sets of first fixed risers 3 are close to the top fixed mounting of one side lateral wall each other and have tension bracket 18, and two sets of tension bracket 18 are close to the fixed first spring 15 that has cup jointed in top of one side lateral wall each other, and two sets of first springs 15 bottoms just are located the outside cover of tension bracket 18 and are equipped with sleeve pipe 16.
Please refer to fig. 2 in the drawings of the specification: two sets of sleeve pipes 16 are close to the intermediate position department of one side lateral wall each other and are articulated through the articulated shaft to have tension bar 17, and two sets of tension bar 17 are close to one side each other and are articulated mutually through articulated shaft and 8 lateral walls upper ends of third fixed riser.
Please refer to fig. 4 in the drawings of the specification: the hoisting hole 20 that runs through the connecting pipe 23 lateral wall is seted up all to the slope of connecting pipe 23 left and right sides wall, and the connecting pipe 23 left and right sides just is located the fixed diaphragm 11 bottom position of second and has hoist riser 14 through articulated shaft, and two sets of hoist risers 14 are close to one side bottom fixed welding each other and have the hoist swash plate 22 with hoisting hole 20 looks block.
The working principle is as follows: when the indoor heating and ventilation pipeline fixing device is used, the second fixing transverse plate 11 is fixedly installed on the top plate 12 of the wall body through thread fixing between the fastening bolt 10 and the fastening screw hole 13, the pull rods 1 on two sides are pulled to move outwards under the action of the communication hole 2, then the heating and ventilation pipeline is placed between the first elastic cushion 6 and the second elastic cushion 7, the telescopic cross rod 1903 is driven to move in the inner cavity of the telescopic cross pipe 1902 under the elastic action of the second spring 1901, the sleeve 16 is driven to move downwards under the elastic action of the first spring 15 so as to drive the tension rod 17 to rotate under the action of the articulated shaft and push the third fixing vertical plate 8 to move in the inner cavity of the sliding groove 402 through the sliding block 401 so as to move to one side of the second fixing vertical plate 5 under the coordination of the telescopic cross rod 1903, and then the heating and ventilation pipeline is clamped and fixed under the coordination of the first elastic cushion 6 and the second elastic cushion 7, when this indoor warm logical pipeline fixing device's height needs to be adjusted, hold first fixed diaphragm 9 earlier and upwards remove slightly, thereby the hoist and mount riser 14 that rotates both sides rotates through the articulated shaft and drives hoist and mount swash plate 22 and remove and the hole for hoist 20 between the separation, thereby it drives connecting pipe 23 and reciprocates thereby makes its relative connecting rod 21 reciprocate to rotate hoist and mount riser 14 again behind the suitable position after reciprocating first fixed diaphragm 9 makes hoist and mount swash plate 22 and the hole for hoist 20 of corresponding position between block again be convenient for adjust this indoor warm logical pipeline fixing device's height, do above the utility model discloses a whole theory of operation.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (7)

1. The utility model provides an indoor warm logical pipeline fixing device, includes wall body roof (12), its characterized in that: the bottom of wall body roof (12) is provided with the fixed diaphragm of second (11), fastening screw (13) have all been seted up to the wall body roof (12) bottom left and right sides, the inside left and right sides of the fixed diaphragm of second (11) all is provided with fastening bolt (10) with fastening screw (13) threaded connection, the intermediate position department fixed welding of the fixed diaphragm of second (11) bottom has connecting rod (21), the outside bottom cover of connecting rod (21) is equipped with connecting pipe (23), the fixed welding in bottom of connecting pipe (23) has first fixed diaphragm (9), the fixed welding in top that the connecting pipe (23) left and right sides just is located first fixed diaphragm (9) has second fixed riser (5), and is two sets of the lateral wall that one side was kept away from each other to second fixed riser (5) is fixed to be pasted and is had first cushion (6), and is two sets of the top that first cushion (6) outside just is located first fixed diaphragm (9) is provided with slide mechanism (13), (4) And the top of the sliding mechanism (4) is fixedly provided with a third fixed vertical plate (8), the third fixed vertical plate (8) is fixedly provided with a second elastic cushion (7) and a first fixed vertical plate (3) at the outer side of the third fixed vertical plate (8) and at the top of a first fixed transverse plate (9).
2. An indoor heating pipeline fixing device as claimed in claim 1, wherein: the sliding mechanism (4) comprises sliding blocks (401) and sliding grooves (402), the two groups of sliding grooves (402) are respectively arranged on the left side and the right side of the top of the first fixed transverse plate (9), and the sliding blocks (401) fixed with the bottom of the third fixed vertical plate (8) are arranged in the inner cavities of the two groups of sliding grooves (402).
3. An indoor heating pipeline fixing device as claimed in claim 1, wherein: two sets of intercommunicating pore (2) that run through first fixed riser (3) are all seted up to inside intermediate position department of first fixed riser (3), and are two sets of intercommunicating pore (2) inner chamber is provided with runs through intercommunicating pore (2) and with third fixed riser (8) fixed pull rod (1) mutually, two sets of equidistant fixed mounting in bottom that one side lateral wall is close to each other in first fixed riser (3) has telescopic machanism (19) fixed mutually with third fixed riser (8).
4. An indoor heating pipeline fixing device as claimed in claim 3, wherein: telescopic machanism (19) are including second spring (1901), flexible violently pipe (1902) and flexible horizontal pole (1903), and are two sets of flexible violently pipe (1902) respectively fixed mounting be close to the bottom of one side lateral wall each other in two sets of first fixed risers (3), and are two sets of flexible violently pipe (1902) one side fixed mounting that the inner chamber kept away from each other has second spring (1901), and is two sets of second spring (1901) are close to one side fixed mounting each other and run through flexible violently pipe (1902) and with the fixed flexible horizontal pole (1903) of third fixed riser (8) looks fixed.
5. An indoor heating pipeline fixing device as claimed in claim 1, wherein: two sets of top fixed mounting that first fixed riser (3) are close to one side lateral wall each other has tension bracket (18), and is two sets of tension bracket (18) are close to one side lateral wall each other's top fixed the cup jointing first spring (15), and are two sets of the outside cover that first spring (15) bottom and be located tension bracket (18) is equipped with sleeve pipe (16).
6. An indoor heating pipeline fixing device as claimed in claim 5, wherein: two sets of sleeve pipe (16) are close to the intermediate position department of one side lateral wall each other and have tension bar (17) through the articulated shaft is articulated, and is two sets of tension bar (17) are close to one side each other and pass through articulated shaft and third fixed riser (8) lateral wall upper end articulated mutually.
7. An indoor heating pipeline fixing device as claimed in claim 1, wherein: the hoist and mount hole (20) that run through connecting pipe (23) lateral wall are seted up in the equal slope of connecting pipe (23) left and right sides wall, connecting pipe (23) left and right sides just is located second fixed diaphragm (11) bottom position and articulates through the articulated shaft has hoist and mount riser (14), and is two sets of hoist and mount riser (14) are close to one side bottom fixed welding each other and have hoist and mount swash plate (22) with hoist and mount hole (20) looks block.
CN202021496801.9U 2020-07-24 2020-07-24 Indoor warm pipeline fixing device that leads to Active CN213361309U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021496801.9U CN213361309U (en) 2020-07-24 2020-07-24 Indoor warm pipeline fixing device that leads to

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021496801.9U CN213361309U (en) 2020-07-24 2020-07-24 Indoor warm pipeline fixing device that leads to

Publications (1)

Publication Number Publication Date
CN213361309U true CN213361309U (en) 2021-06-04

Family

ID=76141483

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021496801.9U Active CN213361309U (en) 2020-07-24 2020-07-24 Indoor warm pipeline fixing device that leads to

Country Status (1)

Country Link
CN (1) CN213361309U (en)

Similar Documents

Publication Publication Date Title
CN211203521U (en) Adjustable mounting bracket structure of water pump
CN213361309U (en) Indoor warm pipeline fixing device that leads to
CN213039953U (en) Anti-seismic support and hanger structure for building electromechanical engineering
CN113531436A (en) Novel search lamp base of outer hanging
CN210684987U (en) Portable folding shower room
CN204434199U (en) The removable lifting machine of a kind of portable inversion hydraulic pressure
CN211177330U (en) Hanging and fixing device for air pipe installation
CN208424666U (en) A kind of sound equipment hanger bracket
CN201558078U (en) Suspension bracket
CN213460945U (en) Safe cable channel gallows that takes precautions against earthquakes
CN211761941U (en) PVC tubular product processing fixing device
CN202447236U (en) Suction type bracket for shower head
CN206545771U (en) A kind of rod-type electric hanger
CN208556909U (en) A kind of steel tube surface grinding device
CN212644746U (en) Heat accumulating type air source heat pump heating device for high-rise building
CN207373878U (en) A kind of pressed film equipment of profiled sheeting
CN210164697U (en) Pressure pump with noise reduction function
CN213931423U (en) Mounting rack convenient for mounting central air conditioner
CN216713776U (en) Construction hanging basket for building external wall
CN215808932U (en) Air conditioner external unit mounting frame with adjusting structure
CN218570683U (en) Network technology service equipment convenient to installation
CN216896137U (en) Water pipe antidetonation gallows of adaptable different diameter pipelines
CN220470841U (en) Multi-row connection type pipe clamp
CN103017113B (en) Electric adjusting device of vertical hanger rod
CN219756605U (en) Air pipe hanging structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant