CN213358862U - Drainage ditch template support piece and drainage ditch formwork system - Google Patents

Drainage ditch template support piece and drainage ditch formwork system Download PDF

Info

Publication number
CN213358862U
CN213358862U CN202021715957.1U CN202021715957U CN213358862U CN 213358862 U CN213358862 U CN 213358862U CN 202021715957 U CN202021715957 U CN 202021715957U CN 213358862 U CN213358862 U CN 213358862U
Authority
CN
China
Prior art keywords
rod
vertical rod
template
clamping
upright
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021715957.1U
Other languages
Chinese (zh)
Inventor
李志坚
吴军
郭磊
李建乔
胡春明
何海
王磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ycih No12 Construction Co ltd
Original Assignee
Ycih No12 Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ycih No12 Construction Co ltd filed Critical Ycih No12 Construction Co ltd
Priority to CN202021715957.1U priority Critical patent/CN213358862U/en
Application granted granted Critical
Publication of CN213358862U publication Critical patent/CN213358862U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a drainage ditch template support piece and a drainage ditch formwork system, belonging to the drainage ditch construction field, comprising a cross rod, a first vertical rod, a second vertical rod and a third vertical rod; the first upright stanchion, the second upright stanchion and the third upright stanchion are sequentially and fixedly arranged at the mounting side of the cross rod at intervals; first clamping rods are further fixed at the mounting side at positions close to the first vertical rods at intervals; a first clamping space is formed between the first clamping rod and the first vertical rod; second clamping rods are further fixed at the mounting side at positions close to the second vertical rods at intervals; a second clamping space is formed between the second clamping rod and the second vertical rod. The mould plate is easy to manufacture in batches, and can be integrally inserted to complete fixation of three mould plate groups in actual use, so that the labor efficiency is greatly improved. And because its size is roughly the same after the escape canal template support piece is made in batches for first template group, second template group and third template group interval are even in the preset length direction of escape canal, make the fashioned escape canal shape rule finally.

Description

Drainage ditch template support piece and drainage ditch formwork system
Technical Field
The utility model relates to a escape canal construction field particularly, relates to a escape canal template support piece and escape canal formwork system.
Background
In the building engineering industry, templates are required to be used during concrete pouring, the templates are mainly divided into wood templates and steel templates, and different types of templates have different application places.
In the construction process of installing and erecting the formworks, in order to ensure that the installed formworks achieve the purposes of firmness, stability and safety, different construction schemes need to install different methods for the formworks, the existing formwork installation mainly adopts the methods of iron nail reinforcement, bolt reinforcement and supporting batten reinforcement, but the installed formworks are difficult to achieve the stable effect, the formworks are easy to deform when concrete is poured, and finally the formed concrete cannot meet the expected design requirements due to the deformed formworks, so that the quality is unqualified, and the reworking waste is caused.
The rectangular cross section of the drainage ditch needs to support and support the template vertically in the process of pouring the vertical surface, so in the process of pouring the drainage ditch, in order to ensure that the drainage ditch has a strict rectangular cross section, higher strict requirements are required for erecting the template.
SUMMERY OF THE UTILITY MODEL
The utility model provides a escape canal template support piece and escape canal formwork system aims at solving among the prior art above-mentioned problem that escape canal template support piece and escape canal formwork system exist.
The utility model discloses a realize like this:
a drainage ditch template support piece comprises a cross rod, a first vertical rod, a second vertical rod and a third vertical rod;
the first upright stanchion, the second upright stanchion and the third upright stanchion are sequentially and fixedly arranged at the mounting side of the cross rod at intervals;
first clamping rods are further fixed on the mounting side at positions close to the first vertical rods at intervals;
a first clamping space is formed between the first clamping rod and the first vertical rod;
second clamping rods are further fixed on the mounting side at positions close to the second vertical rods at intervals;
and a second clamping space is formed between the second clamping rod and the second vertical rod.
The utility model discloses an in one embodiment, the length of first riser is greater than 15cm, the length of second riser is greater than 15cm, the length of third riser is greater than 15 cm.
In an embodiment of the present invention, the device further comprises a connecting rod, one end of the connecting rod is connected to the other end of the first vertical rod away from the cross rod, and the other end of the connecting rod is connected to one end of the second vertical rod away from the cross rod;
the first clamping rod is arranged on one side, far away from the second vertical rod, of the first vertical rod;
the second clamping rod is arranged on one side, far away from the first vertical rod, of the second vertical rod.
In an embodiment of the present invention, the first vertical rod and the first positioning rod are provided with a first positioning plate extending perpendicular to the direction of the horizontal rod.
In an embodiment of the present invention, the second clamping rod and the second vertical rod are provided with a second positioning plate extending perpendicular to the direction of the horizontal rod.
In an embodiment of the present invention, the first positioning plate corresponding to the first positioning rod is connected to the first positioning rod through a pressure spring;
the first vertical rod is connected with the first positioning plate corresponding to the first vertical rod through a pressure spring.
In an embodiment of the present invention, the second positioning plate corresponding to the second positioning rod is connected to the second positioning rod through a compression spring;
the second vertical rod is connected with the second positioning plate corresponding to the second vertical rod through a pressure spring.
In an embodiment of the present invention, the cross bar extends toward one side of the third vertical rod away from the first vertical rod to form an extension section.
A drainage ditch formwork system comprises a first formwork group, a second formwork group, a third formwork group and the drainage ditch formwork support piece;
the third template group, the second template group and the first template group are arranged in parallel;
the drainage ditch template supporting pieces are arranged at intervals along the extension direction of the third template group;
the third upright rod is abutted against one surface of the third template group, and the other surface of the third template group is used for abutting against the wall surface of the drainage ditch;
the second template group is clamped between the second clamping rod and the second vertical rod;
the third template group is clamped between the first clamping rod and the second clamping rod.
The utility model has the advantages that: through the utility model provides a drainage ditch formwork system can provide whole support to the template, and wherein drainage ditch template support piece easily makes in batches, and is fixed when can wholly peg graft and accomplish three template group during in-service use, greatly improves labor efficiency. And because its size is roughly the same after the escape canal template support piece is made in batches for first template group, second template group and third template group interval are even in the preset length direction of escape canal, make the fashioned escape canal shape rule finally.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention, and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
Fig. 1 is a schematic view of a first perspective view of a drain formwork support member without a first positioning plate and a second positioning plate according to an embodiment of the present invention;
FIG. 2 is a schematic view of a first perspective of a drain form support with a first positioning plate and a second positioning plate according to an embodiment of the present invention;
FIG. 3 is a schematic view of a second perspective of the drain formwork support member without the first and second positioning plates according to an embodiment of the present invention;
fig. 4 is a schematic structural view of a first view angle of a drainage ditch formwork support member having a pressure spring disposed on a first positioning plate and a second positioning plate according to an embodiment of the present invention;
fig. 5 is a schematic structural view of a drainage ditch formwork system provided by the embodiment of the present invention.
Icon: 010-a first set of templates; 030-a second set of templates; 050-a third template set; 100-gutter template support; 110-a first upright; 130-a second upright; 150-a third upright; 111-a first detent lever; 131-a second detent lever; 170-connecting rod; 190-cross bar; 113-a first positioning plate; 133-a second positioning plate; 101-pressure spring; 191-an extension.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings of the embodiments of the present invention will be combined to clearly and completely describe the technical solutions of the embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention. Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," and "fixed" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Examples
Referring to fig. 1, the drain formwork system includes a first formwork set 010, a second formwork set 030, a third formwork set 050, and a plurality of drain formwork support members 100.
Third template group 050 is formed by the concatenation of the multiple third templates that the extending direction was arranged along predetermineeing the escape canal, and second template group 030 is formed by the concatenation of the multiple second templates that the extending direction was arranged along predetermineeing the escape canal, and first template group 010 is formed along the concatenation of the multiple first template that the extending direction was arranged along predetermineeing the escape canal.
The third template set 050, the second template set 030 and the first template set 010 are arranged in parallel, wherein the second template set 030 is clamped between the third template set 050 and the first template set 010; a plurality of drain template support members 100 are spaced apart along the direction of extension of the third template set 050 for spacing between the third template set 050 and the second template set 030, and for spacing between the second template set 030 and the first template set 010.
The drain formwork support 100 comprises a cross bar 190, a first upright 110, a second upright 130 and a third upright 150; the first upright stanchion 110, the second upright stanchion 130 and the third upright stanchion 150 are sequentially and fixedly arranged at the mounting side of the cross bar 190 at intervals;
the mounting side is further fixed with first clamping rods 111 at intervals at positions close to the first vertical rod 110, and a first clamping space is formed between the first clamping rods 111 and the first vertical rod 110;
second clamping rods 131 are further fixed at the mounting side at positions close to the second vertical rods 130 at intervals; a second clamping space is formed between the second clamping rod 131 and the second vertical rod 130.
The first clamping space is used for accommodating the top of the first template set 010, that is, the first clamping rod 111 and the first vertical rod 110 fix the position of the first template set 010.
The second positioning space is used for accommodating a top of the second template set 030, that is, the second template set 030 is fixed in position by the second positioning rod 131 and the second vertical rod 130.
In order to enhance the fixing effect and enable the second form set 030 and the first form set 010 to be as upright as possible, the length of the first vertical rod 110 is larger than 15cm, the length of the second vertical rod 130 is larger than 15cm, and the length of the third vertical rod 150 is larger than 15cm, so that the positions of the second form set 030 and the first form set 010 close to the bottom can be as close as possible, and the offset of the second form set 030 and the first form set 010 in the fixing process can be reduced.
In this embodiment, a connecting rod 170 is further included, one end of the connecting rod 170 is connected to the other end of the first vertical rod 110 away from the cross rod 190, and the other end is connected to one end of the second vertical rod 130 away from the cross rod 190; the first clamping rod 111 is arranged on one side of the first vertical rod 110 far away from the second vertical rod 130; the second position-retaining rod 131 is disposed on a side of the second vertical rod 130 away from the first vertical rod 110.
In fact, the first vertical rod 110, the connecting rod 170 and the second vertical rod 130 can be formed by bending a long steel bar, so that the integrity of the first vertical rod 110 and the second vertical rod 130 is stronger, and the end portions of the corresponding first vertical rod 110 and the corresponding second vertical rod 130 are also smoothed by the connection with the connecting rod 170, thereby avoiding stabbing the formwork. In addition, when the space between the third moldboard group 050 and the second moldboard group 030 is poured with concrete, the second upright 130 is further prevented from being biased by the pressure transmitted from the second moldboard group 030 through the connecting rod 170.
Referring to fig. 2 and 3, in the present embodiment, the first vertical rod 110 and the first positioning rod 111 are provided with a first positioning plate 113 extending perpendicular to the direction of the cross rod 190, and correspondingly, the second positioning plate 133 extending perpendicular to the direction of the cross rod 190 is provided on the second positioning rod 131 and the second vertical rod 130.
In other embodiments, the first positioning plate 113 and the second positioning plate 133 may not be provided, and the formwork group may be clamped and fixed only by the rod-shaped structure, and since a plurality of the formwork groups may be provided at intervals along the length direction during the installation, the fixing effect achieved when the installation density of the drainage ditch formwork support members 100 is sufficiently high is not different.
The first positioning plate 113 and the second positioning plate 133 increase the contact area with the formwork, thereby reducing the pressure and improving the supporting capability.
Referring to fig. 4, in order to stably clamp templates with different thicknesses, a first clamping rod 111 is connected with a first positioning plate 113 corresponding to the first clamping rod 111 through a compression spring 101; the first vertical rod 110 is connected with a first positioning plate 113 corresponding to the first vertical rod 110 through a pressure spring 101.
Similarly, the second positioning plate 133 corresponding to the second position-locking rod 131 is connected with the second position-locking rod 131 through a compression spring 101; the second vertical rod 130 is connected with a second positioning plate 133 corresponding to the second vertical rod 130 through a pressure spring 101.
Because the pressure spring 101 can be elastically compressed, the first clamping space and the second clamping space can be elastically adjusted, and the template can be prevented from being damaged by elastically contacting the surface of the template.
The pressure spring 101 is arranged to adapt to construction of a drainage ditch with a complex soil layer structure, the thickness of the formwork group is approximately the same under general conditions, and the formwork group can be fixed through arrangement of the standard first clamping space and the standard second clamping space.
In this embodiment, the cross bar 190 extends to a side of the third upright 150 away from the first upright 110 to form an extension 191. When the third leg 150 is placed against the third template set 050, the extension 191 may lap over the drain roof on the side of the third template to secure the drain template support 100.
Through the utility model provides a drainage ditch formwork system can provide whole support to the template, and wherein drainage ditch template support piece 100 easily makes in batches, and is fixed when can wholly peg graft and accomplish three template group during in-service use, greatly improves labor efficiency. And because the size of the drain template support member 100 is approximately the same after being manufactured in batches, the first template set 010, the second template set 030 and the third template set 050 are uniformly spaced in the preset length direction of the drain, so that the shape of the finally formed drain is regular.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (9)

1. A drainage ditch template support member is characterized by comprising a cross rod, a first vertical rod, a second vertical rod and a third vertical rod;
the first upright stanchion, the second upright stanchion and the third upright stanchion are sequentially and fixedly arranged at the mounting side of the cross rod at intervals;
first clamping rods are further fixed on the mounting side at positions close to the first vertical rods at intervals;
a first clamping space is formed between the first clamping rod and the first vertical rod;
second clamping rods are further fixed on the mounting side at positions close to the second vertical rods at intervals;
and a second clamping space is formed between the second clamping rod and the second vertical rod.
2. The drain template support of claim 1, wherein the length of the first riser is greater than 15cm, the length of the second riser is greater than 15cm, and the length of the third riser is greater than 15 cm.
3. The drain template support of claim 1, further comprising a connecting rod, one end of the connecting rod being connected to the other end of the first upright remote from the cross-bar and the other end being connected to the end of the second upright remote from the cross-bar;
the first clamping rod is arranged on one side, far away from the second vertical rod, of the first vertical rod;
the second clamping rod is arranged on one side, far away from the first vertical rod, of the second vertical rod.
4. The drain template support of claim 1, wherein the first upright and the first detent bar are provided with a first detent plate extending perpendicular to the direction of the cross bar.
5. The drain template support of claim 1, wherein a second retaining plate is provided on the second capture bar and the second upright extending perpendicular to the direction of the cross bar.
6. The drain template support of claim 4, wherein the first capture bar is connected to the first retaining plate corresponding to the first capture bar by a compression spring;
the first vertical rod is connected with the first positioning plate corresponding to the first vertical rod through a pressure spring.
7. The drain template support of claim 5, wherein the second detent lever is connected to the second positioning plate corresponding to the second detent lever by a compression spring;
the second vertical rod is connected with the second positioning plate corresponding to the second vertical rod through a pressure spring.
8. The drain template support of claim 1, wherein the cross-bar extends to a side of the third upright remote from the first upright to form an extension.
9. A drain formwork system comprising a first formwork set, a second formwork set, a third formwork set and a plurality of drain formwork support members according to any one of claims 1 to 8;
the third template group, the second template group and the first template group are arranged in parallel;
the drainage ditch template supporting pieces are arranged at intervals along the extension direction of the third template group;
the third upright rod is abutted against one surface of the third template group, and the other surface of the third template group is used for abutting against the wall surface of the drainage ditch;
the second template group is clamped between the second clamping rod and the second vertical rod;
the third template group is clamped between the first clamping rod and the second clamping rod.
CN202021715957.1U 2020-08-17 2020-08-17 Drainage ditch template support piece and drainage ditch formwork system Expired - Fee Related CN213358862U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021715957.1U CN213358862U (en) 2020-08-17 2020-08-17 Drainage ditch template support piece and drainage ditch formwork system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021715957.1U CN213358862U (en) 2020-08-17 2020-08-17 Drainage ditch template support piece and drainage ditch formwork system

Publications (1)

Publication Number Publication Date
CN213358862U true CN213358862U (en) 2021-06-04

Family

ID=76145012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021715957.1U Expired - Fee Related CN213358862U (en) 2020-08-17 2020-08-17 Drainage ditch template support piece and drainage ditch formwork system

Country Status (1)

Country Link
CN (1) CN213358862U (en)

Similar Documents

Publication Publication Date Title
CN105952154B (en) A kind of concrete-pouring template stent
CN213358862U (en) Drainage ditch template support piece and drainage ditch formwork system
CN211850804U (en) Shear force wall settlement joint steel wood combines template to prop up establishes device
CN215631073U (en) Building ribbed steel bar welding net
JP2005036558A (en) Spacer for double arrangement of reinforcement
CN108222326B (en) Foam concrete light steel keel composite ultrahigh wall and construction method thereof
CN217175727U (en) Internal supporting device for concrete wall buried distribution box
KR20100119688A (en) An assembly for slab-panel
KR101043751B1 (en) insulation deck plate for slab
CN212427569U (en) Multifunctional assembly type wallboard clamping piece and connecting structure of beam, floor and wallboard
CN211948754U (en) Anti-deformation device for water stop belt of rainwater square ditch wall construction joint
CN211037815U (en) Square column mould fossil fragments reinforcing system structure
CN212223933U (en) Assembly type building foundation brick moulding bed capable of being used circularly
CN220058806U (en) Template for pouring construction and pouring construction system
CN215334888U (en) Pump pipe support for high-rise building
CN219298756U (en) Guide wall template fixing device based on canopy face crossbeam
CN215948908U (en) Clamping device for beam formwork structure
CN216196610U (en) Integral fixture for beam side wall
CN211499624U (en) Floor fixing clamp and floor supporting device
CN218643662U (en) ALC wallboard structure
CN215594897U (en) Supporting device for steel bar truss floor bearing plate
CN218374460U (en) Prefabricated plate fetal membrane connection structure
CN212336755U (en) Plate thickness control support
CN215393483U (en) Steel sheet is roof beam installation positioner even
CN219622245U (en) Concrete shaping plate convenient to equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210604

CF01 Termination of patent right due to non-payment of annual fee