CN213356718U - Cement pipeline inner wall processing lifting device - Google Patents

Cement pipeline inner wall processing lifting device Download PDF

Info

Publication number
CN213356718U
CN213356718U CN202021480701.7U CN202021480701U CN213356718U CN 213356718 U CN213356718 U CN 213356718U CN 202021480701 U CN202021480701 U CN 202021480701U CN 213356718 U CN213356718 U CN 213356718U
Authority
CN
China
Prior art keywords
hoist
mould
pipeline inner
electric hoist
hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021480701.7U
Other languages
Chinese (zh)
Inventor
唐祥明
沈来松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dazhu Dinghong Building Materials Co ltd
Original Assignee
Dazhu Dinghong Building Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dazhu Dinghong Building Materials Co ltd filed Critical Dazhu Dinghong Building Materials Co ltd
Priority to CN202021480701.7U priority Critical patent/CN213356718U/en
Application granted granted Critical
Publication of CN213356718U publication Critical patent/CN213356718U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a cement pipeline inner wall processing lifting device, including the overhang roll machine body, its characterized in that still includes hoist device, hoist device includes hanger rail, along the electric hoist of hanger rail removal and the two supports that are used for supporting the hanger rail, the hanger rail is located the mould when mould is installed on the overhang roll machine body directly over the mould axis, be provided with chain and the lifting hook that is used for hoisting the mould on the electric hoist. Adopt the electric hoist to hoist and mount the transportation, reduce operating personnel's handling, reduce operating personnel's intensity of labour, can easily remove the mould when hoist and mount, make things convenient for the installation of mould.

Description

Cement pipeline inner wall processing lifting device
Technical Field
The utility model relates to a cement pipeline processing technology equipment especially relates to a cement pipeline inner wall processing lifting device.
Background
In the process of processing a cement pipeline, a conventional overhang roll machine generally uses a trolley to convey a mould to the overhang roll machine for installation. The mold is generally cast by steel, the length of the mold is long, one worker cannot move the mold basically, and the common moving method is that the two workers combine to move the mold to a small trolley, and then the small trolley is pushed by the one worker to move the mold to a suspension roller machine for installation. When the position of the trolley is not well adjusted during installation, the position of the trolley needs to be adjusted for many times to align the die with the installation position of the overhang roll machine, so that time is wasted, and the production efficiency is reduced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a cement pipeline inner wall processing lifting device has the die setting of being convenient for, reduces workman intensity of labour's advantage.
In order to realize the purpose, the utility model discloses a technical scheme is: the utility model provides a cement pipeline inner wall processing lifting device, includes the overhang roll machine body, its characterized in that still includes hoist device, hoist device includes hanger rail, along the electric hoist that the hanger rail removed and two supports that are used for supporting the hanger rail, the hanger rail is located mould when die holding is on the overhang roll machine body directly over the mould axis, be provided with chain and the lifting hook that is used for hoisting the mould on the electric hoist.
Preferably, still including being used for carrying the electric wire of electric energy to the electric hoist on the electric hoist, two it is provided with the installation rope to connect between the support, be provided with a plurality of rings that remove along the installation rope on the installation rope, it is a plurality of all be provided with the clip that is used for the centre gripping electric wire on the ring.
Preferably, the length of the electric wire between two adjacent hanging rings is 0.6-1 m.
Preferably, the two surfaces of the clamp used for clamping the electric wire are both arc-shaped.
Preferably, the installation rope is located the side of electric hoist, and is 0.1 ~ 0.2m with the distance between the electric hoist, the lateral wall of electric hoist is provided with the push pedal, be provided with the recess that is used for only supplying the installation rope to pass on the push pedal.
Preferably, the recess is open towards the ground.
Preferably, the two supports respectively comprise a quadrangular prism-shaped frame arranged on the ground and a quadrangular pyramid-shaped frame arranged at the top of the quadrangular prism-shaped frame and used for being connected with the hanging rail, a plurality of reinforcing rods are connected between two adjacent rods on the quadrangular prism-shaped frame, and the distance between the adjacent reinforcing rods on the same vertical surface is 0.4-0.6 m.
Compared with the prior art, the utility model has the advantages of:
the structure is simple, and the carrying mode of the die is simple and convenient;
only one person can operate, so that the labor consumption is reduced;
thirdly, the structure is reasonable, the interference of the electric wire to the electric hoist is effectively avoided, and the overall safety of the device is high;
and fourthly, the alignment is convenient when the worker installs the die, and the operator can quickly finish the alignment.
Drawings
FIG. 1 is a schematic structural diagram of the whole of the present embodiment;
fig. 2 is a schematic structural diagram of the push plate, the lifting ring and the clamp in the embodiment.
In the figure: 1. a suspension roll machine body; 2. hoisting a rail; 3. an electric hoist; 31. a chain; 32. a hook; 33. an electric wire; 4. a support; 41. a quadrangular-prism-shaped frame; 42. a rectangular pyramid type frame; 43. a reinforcing bar; 5. installing a rope; 6. a hoisting ring; 61. a clip; 7. pushing the plate; 71. a groove; 8. and (5) molding.
Detailed Description
The present invention will be further explained below.
Example (b):
as shown in fig. 1, a cement pipeline inner wall processing and hoisting device comprises a suspension roller machine body 1 and a hoisting device.
The hoisting device comprises a hoisting rail 2, an electric hoist 3 moving along the hoisting rail 2 and two brackets 4 for supporting the hoisting rail 2 (only one bracket 4 is shown in the figure, and the other bracket 4 is consistent with the bracket 4 shown in the figure, so the illustration is omitted), and the lower surface of the electric hoist 3 is also provided with a chain 31 and a hook 32 for hoisting the mold 8 in a connecting manner.
In this embodiment, the total height of the support 4 is 3m, the two supports 4 include the quadrangular frame 41 for setting on the ground and the quadrangular frame 42 for connecting with the hanger rail 2 at the top of the quadrangular frame 41, the hanger rail 2 is welded at the top of the quadrangular frame 42, and the hanger rail 2 is located right above the central axis of the mold 8 when the mold 8 is installed on the suspension roller body 1, so that when the electric hoist 3 is used for hoisting the mold 8, the mold 8 can be easily aligned to the installation position of the mold 8 on the suspension roller body 1, and an operator only needs to move the mold 8 by a small margin to align.
As shown in fig. 1 and 2, the electric hoist 3 needs the electric wire 33 to transmit electric energy in daily use, however, the electric hoist 3 needs to move around when working, and at this time, the length of the electric wire 33 is at least the same as the stroke of the electric hoist 3 in order for the electric wire 33 to meet the stroke of the electric hoist 3, so that the electric wire 33 may be dragged on the ground or contact with the roller suspension body 1 when the electric hoist 3 does not move to the maximum stroke. When the overhang roll machine body 1 works, the mold 8 rotates, the danger that the electric wire 33 is pulled by the mold 8 when the electric wire 33 is hooked on the mold 8 is very large, and the electric wire 33 is separated from the electric hoist 3 if the electric wire is light, so that the electric hoist 3 is damaged. The electric hoist 3 is pulled down to drop and smash on the ground or the suspension roller machine body 1, huge potential safety hazards are caused to surrounding workers, and great economic loss is caused. Therefore, the installation rope 5 is further connected between the two brackets 4, in this embodiment, the installation rope 5 is a thin steel wire rope, and two ends of the thin steel wire rope are respectively tied on the two brackets 4. In order to avoid the interference of the installation rope 5 on the movement of the electric hoist 3, the installation rope 5 is located on the side edge of the electric hoist 3 and is 0.2m away from the electric hoist 3. The installation rope 5 is provided with a plurality of hanging rings 6 moving along the installation rope 5, and the plurality of hanging rings 6 are provided with clamps 61 used for clamping the electric wires 33. In order to enable the clamp 61 to clamp the electric wire 33 stably and enable the electric wire 33 not to be damaged easily, two surfaces, used for clamping the electric wire 33, of the clamp 61 are arranged in an arc shape, the contact area is increased to increase friction force, meanwhile, the pressure of the clamp 61 acting on the electric wire 33 is reduced, the electric wire 33 is prevented from being damaged due to long-term clamping, and the service life of the electric wire 33 is effectively prolonged.
As shown in figures 1 and 2, the length of the electric wire 33 between two adjacent hanging rings 6 is 0.6-1 m, and when the two adjacent hanging rings 6 are contacted, the distance between the lowest point of the electric wire 33 and the hanging rings 6 is 0.3-0.5 m, so that the electric wire 33 can be ensured not to be contacted with the suspension roller body 1. The electric hoist 3 can pull the electric wire 33 when moving, so that the lifting ring 6 moves along the mounting rope 5 to ensure that the electric hoist 3 can reach the preset maximum stroke. In order to make the electric hoist 3 when moving to initial position, the initial position also can be got back to rings 6, be provided with push pedal 7 at the lateral wall of electric hoist 3, be provided with on push pedal 7 and be used for only supplying the recess 71 that installation rope 5 passed, electric hoist 3 is at the removal in-process, and push pedal 7 promotes rings 6 and moves along installation rope 5 for rings 6 can get back to initial position. In order to avoid unnecessary friction between the side wall of the groove 71 and the installation rope 5, thereby causing abrasion of the installation rope 5 and reducing the service life of the installation rope 5, the opening of the groove 71 faces downwards, when the electric hoist 3 moves to the middle position of the installation rope 5, the middle position of the installation rope 5 can sag, the opening of the groove 71 faces downwards, the friction between the opening of the groove 71 and the middle position of the installation rope 5 can be effectively avoided, and the loss of the installation rope 5 is reduced.
As shown in fig. 1, in order to stabilize the structure of the quadrangular frame 41 in the rack 4, a plurality of reinforcing rods 43 are connected between two adjacent rods on the quadrangular frame 41 to reinforce the overall structure of the quadrangular frame 41. Meanwhile, in order to carry out simple maintenance and inspection on the hanging ring 6, the clamp 61 and the electric hoist 3 under the condition that no stairs are used, the distance between the adjacent reinforcing rods 43 on the same vertical surface is 0.4-0.6 m, so that the operator can climb on the quadrangular prism type frame 41.
The use process comprises the following steps:
operating personnel controls electric hoist 3 for lifting hook 32 reaches the point of depositing of mould 8, hangs lifting hook 32 hook on mould 8 afterwards, starts electric hoist 3 and wholly promotes mould 8, and transports mould 8 to the mounted position of mould 8 on the overhang roll machine body 1, and operating personnel stir mould 8 by a small margin afterwards and can make mould 8 aim at the mounted position, and operating personnel can install this moment.
The whole installation process can be completed by one worker, and the labor force is reduced. Meanwhile, workers in the whole process only need to align the die 8 to the mounting position for mounting, the die 8 does not need to be moved, and the labor intensity of operators is reduced. The whole process of carrying the mold 8 is less time-consuming relative to the process of carrying the mold 8 by a trolley, so that the whole process is less time-consuming, and the production efficiency is improved.
The principle and the implementation of the present invention are explained herein by using specific examples, and the above description of the embodiments is only used to help understand the method and the core idea of the present invention; while the invention has been described in terms of specific embodiments and applications, it will be apparent to those skilled in the art that numerous variations and modifications can be made without departing from the spirit and scope of the invention as defined in the appended claims.

Claims (7)

1. The utility model provides a cement pipeline inner wall processing lifting device, includes the overhang roll machine body, its characterized in that still includes hoist device, hoist device includes hanger rail (2), along electric hoist (3) that hanger rail (2) removed and two supports (4) that are used for supporting hanger rail (2), directly over mould (8) axis when hanger rail (2) are located mould (8) and install on overhang roll machine body (1), be provided with chain (31) and lifting hook (32) that are used for hoisting mould (8) on electric hoist (3).
2. The cement pipeline inner wall processing and hoisting equipment as claimed in claim 1, wherein the electric hoist (3) further comprises an electric wire (33) for transmitting electric energy to the electric hoist (3), a mounting rope (5) is connected between the two brackets (4), the mounting rope (5) is provided with a plurality of hoisting rings (6) moving along the mounting rope (5), and the hoisting rings (6) are provided with clamps (61) for clamping the electric wire (33).
3. The cement pipeline inner wall processing and hoisting equipment as claimed in claim 2, wherein the length of the electric wire (33) between two adjacent hoisting rings (6) is 0.6-1 m.
4. The cement pipeline inner wall processing and hoisting equipment as claimed in claim 2, wherein the two surfaces of the clamp (61) for clamping the electric wire (33) are both arc-shaped.
5. The cement pipeline inner wall processing and hoisting equipment as claimed in claim 2, wherein the mounting rope (5) is located at the side of the electric hoist (3) and the distance between the mounting rope and the electric hoist (3) is 0.1-0.2 m, a push plate (7) is arranged on the side wall of the electric hoist (3), and a groove (71) for only the mounting rope (5) to pass through is arranged on the push plate (7).
6. The cement pipeline inner wall processing hoisting device as claimed in claim 5, wherein the opening of the groove (71) is arranged towards the ground.
7. The cement pipeline inner wall processing and hoisting equipment as claimed in claim 1, wherein each of the two brackets (4) comprises a quadrangular prism-shaped frame (41) arranged on the ground and a quadrangular pyramid-shaped frame (42) arranged at the top of the quadrangular prism-shaped frame (41) and connected with the hanger rail (2), a plurality of reinforcing rods (43) are connected between two adjacent rods on the quadrangular prism-shaped frame (41), and the distance between the adjacent reinforcing rods (43) on the same vertical surface is 0.4-0.6 m.
CN202021480701.7U 2020-07-23 2020-07-23 Cement pipeline inner wall processing lifting device Active CN213356718U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021480701.7U CN213356718U (en) 2020-07-23 2020-07-23 Cement pipeline inner wall processing lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021480701.7U CN213356718U (en) 2020-07-23 2020-07-23 Cement pipeline inner wall processing lifting device

Publications (1)

Publication Number Publication Date
CN213356718U true CN213356718U (en) 2021-06-04

Family

ID=76141139

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021480701.7U Active CN213356718U (en) 2020-07-23 2020-07-23 Cement pipeline inner wall processing lifting device

Country Status (1)

Country Link
CN (1) CN213356718U (en)

Similar Documents

Publication Publication Date Title
CN201460182U (en) Construction trolley on trolley line of bridge crane
CN201342454Y (en) Quick changer of die
CN213356718U (en) Cement pipeline inner wall processing lifting device
CN201762035U (en) Simple crane movable arm
CN210884899U (en) Hoist steel reinforcement cage hoist
CN107612234B (en) Core drawing and penetrating method for ultimate short shaft shoulder pole beam motor
CN217323013U (en) Special lifting appliance for indoor integral installation of large equipment
CN102229408A (en) Bridge crane for mine
CN215711042U (en) Overhead hoist suitable for tubular product
CN205772813U (en) For 40 tons of door machines built-in decelerator remove and install one suspender
CN205662284U (en) Two poles become platform ground jack
CN213265358U (en) Hoisting tool for hoisting large cylinder
CN211004197U (en) Lifting appliance for lifting flat strip steel coils
CN220449505U (en) Crane sling special for lifting cement lining cast pipe
CN219546454U (en) Hoisting device for H steel production
CN214456164U (en) Hanging bar frame for steel plate loading and unloading vehicle
CN215828145U (en) I-steel dress equipment of hanging
CN220976436U (en) Single track hangs track installation elevating gear
CN221253577U (en) Steel plate hoisting sling
CN218879245U (en) Double-beam crane for hoisting tubular parts
CN209322326U (en) Ground power supply system guide groove Special-purpose hanger entrucking
CN217894839U (en) Metallurgical magnetic disc hangs and changes device
CN217578093U (en) Machining lifting device
CN212474862U (en) Huge stone manpower handling device
CN220866937U (en) Simple and easy swift conveyer of crown block track change

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant