CN213356661U - Balance hanging beam of crane - Google Patents

Balance hanging beam of crane Download PDF

Info

Publication number
CN213356661U
CN213356661U CN202022159674.XU CN202022159674U CN213356661U CN 213356661 U CN213356661 U CN 213356661U CN 202022159674 U CN202022159674 U CN 202022159674U CN 213356661 U CN213356661 U CN 213356661U
Authority
CN
China
Prior art keywords
lifting
hanging beam
connecting block
fixedly connected
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022159674.XU
Other languages
Chinese (zh)
Inventor
平易
曹峥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Rongwei Hoisting Equipment Co ltd
Original Assignee
Wuxi Rongwei Hoisting Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Rongwei Hoisting Equipment Co ltd filed Critical Wuxi Rongwei Hoisting Equipment Co ltd
Priority to CN202022159674.XU priority Critical patent/CN213356661U/en
Application granted granted Critical
Publication of CN213356661U publication Critical patent/CN213356661U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a balanced hanging beam of hoist, including main lifting rope and hanging beam, the vice lifting rope of fixedly connected with in pairs is controlled to the lower extreme of main lifting rope, the first connecting block of the equal fixedly connected with in end of vice lifting rope, the equal level of downside of first connecting block be provided with second connecting block and first connecting block with be connected with between the second connecting block and connect the rope, connect about the rope exist in pairs, second connecting block intermediate position downside all is provided with the lifting hook. The utility model discloses when controlling mated lifting hook need be according to the distance between the horizontal width regulation of the thing that lifts by crane, make the compliance separation that makes the lifting hook of the left and right sides rely on vice lifting rope or draw close to make the card post gomphosis on the second connecting block of lifting hook top in the gomphosis draw-in groove that the hanging beam corresponds the position, keep good the distance between the left and right sides lifting hook, the balance when lifting by crane has then been guaranteed to main lifting rope through balanced lifting rope connection to the hanging beam simultaneously.

Description

Balance hanging beam of crane
Technical Field
The utility model relates to a hoist hanging beam technical field specifically is a balanced hanging beam of hoist.
Background
The lifting beam (including load beam and connecting rigging) is a special beam hanger for lifting the lifted object, the lifting beam is a beam hanger and is a mechanism for realizing the lifting of the lifted object, the general lifting beam is divided into two types, one type is fixed by a lifting hook and is called fixed lifting beam, and the other type is adjustable by the lifting hook and is called adjustable lifting beam;
the common crane hanging beam has the following disadvantages: even if the lifting hook on general hanging beam is adjustable, but the relative hanging beam of lifting hook itself has the mobility, and the lifting hook needs relative hanging beam freely movable for the convenience is detained on the quilt, but lifting hook itself is direct sliding connection again on the hanging beam, also has the mobility to a certain extent when will resulting in the lifting hook to hoist like this, reduces the equilibrium of lifting by crane in-process.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a balanced hanging beam of hoist to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a balance hanging beam of a crane comprises a main hanging rope and a hanging beam, wherein the lower end of the main hanging rope is fixedly connected with auxiliary hanging ropes in pairs at the left and right sides, the tail ends of the auxiliary hanging ropes are fixedly connected with first connecting blocks, the lower sides of the first connecting blocks are horizontally provided with second connecting blocks, the connecting ropes are connected between the first connecting blocks and the second connecting blocks, the connecting ropes exist in pairs at the left and right sides, the lower side of the middle position of each second connecting block is provided with a hanging hook, the hanging beams exist in pairs at the front and back sides and are in a horizontal position, the balance hanging ropes are fixedly connected between the left and right ends of the hanging beams and the main hanging ropes, the left and right ends of the hanging beams are fixedly connected with butt-joint blocks at the ends of the hanging beams at the front and back sides and are attached together, meanwhile, the distance between the hanging beams at the front and back sides is smaller than the width of the second connecting blocks, and the first connecting blocks are respectively positioned, the equal horizontal fixedly connected with card post in the second connecting block up end left and right sides, the gomphosis draw-in groove has been seted up to the horizontal equidistance of lower terminal surface of hanging beam, the laminating from beginning to end the cover has U type card frame between the butt joint piece, vertical fixedly connected with in pairs inserts the post around the curb plate on the U type card frame, it is in to set up the jack on the butt joint piece and insert the vertical interlude of post in the jack.
Preferably, the upper side of the lifting hook is fixedly connected with a rotary column, the rotary column is movably inserted on the second connecting block, and the upper end and the lower end of the rotary column are fixedly connected with limit stops respectively arranged at the upper side and the lower side of the second connecting block.
Preferably, the side wall of the inserted column is fixedly sleeved with a rubber anti-slip sleeve.
Preferably, the clamping column and the second connecting block are integrally cast.
Preferably, the hanging beam and the hanging hook are both made of hard steel materials.
Preferably, the side walls of the clamping column and the embedding clamping groove are provided with anti-skid grains.
Compared with the prior art, the beneficial effects of the utility model are that:
1. when the left and right paired lifting hooks of the utility model need to adjust the distance between the horizontal widths of the lifted objects, the lifting hooks on the left and right sides are separated or drawn close by virtue of the flexibility of the auxiliary lifting rope, and the clamping columns on the second connecting blocks above the lifting hooks are embedded in the embedded clamping grooves at the corresponding positions of the lifting beam, so that the distance between the lifting hooks on the left and right sides is kept, and meanwhile, the lifting beam is connected with the main lifting rope through the balance lifting rope, so that the balance during lifting is ensured;
2. the utility model discloses when needs make lifting hook and second connecting block break away from out from the hanging beam downside, then make U type card frame area insert the post and take out from the jack on the butt joint piece, then make around mated hanging beam separate can.
Drawings
FIG. 1 is a schematic view of the overall structure of a balance hanging beam of a crane of the present invention;
FIG. 2 is a left side view structural diagram of the butt joint block and the U-shaped clamp frame in the balance hanging beam of the crane of the present invention;
fig. 3 is a schematic view of a bottom end surface of a hanging beam in a crane balance hanging beam of the present invention;
fig. 4 is the utility model relates to a overlook the structure chart that card post and second connecting block in the balanced hanging beam of hoist are connected.
In the figure: 1. a main lifting rope; 2. an auxiliary lifting rope; 3. a first connection block; 4. connecting ropes; 5. a second connecting block; 6. a hook; 7. turning the column; 8. a limit stop block; 9. clamping the column; 10. embedding the clamping groove; 11. a hanging beam; 12. a U-shaped clamping frame; 13. inserting a column; 14. a rubber anti-slip sleeve; 15. a jack; 16. a butt joint block; 17. and balancing the lifting rope.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a balance hanging beam of a crane comprises a main hanging rope 1 and a hanging beam 11, wherein the lower end of the main hanging rope 1 is fixedly connected with auxiliary hanging ropes 2 in pairs from left to right, the tail ends of the auxiliary hanging ropes 2 are fixedly connected with first connecting blocks 3, the lower sides of the first connecting blocks 3 are horizontally provided with second connecting blocks 5, connecting ropes 4 are connected between the first connecting blocks 3 and the second connecting blocks 5, the connecting ropes 4 are in pairs from left to right, the lower sides of the middle positions of the second connecting blocks 5 are provided with lifting hooks 6, and the lifting hooks 6 are used for being buckled on an object to be lifted and then lifted; the front and the back of the hanging beam 11 exist in pairs and are in horizontal positions, the left and the right ends of the hanging beam 11 are fixedly connected with a balance hanging rope 17 between the main hanging rope 1, the left and the right ends of the hanging beam 11 are fixedly connected with butt-joint blocks 16, the butt-joint blocks 16 at the end heads of the front and the back hanging beams 11 are jointed together, meanwhile, the distance between the front and the back hanging beams 11 is smaller than the width of the second connecting block 5, the second connecting block 5 and the first connecting block 3 are respectively positioned at the lower side and the upper side of the hanging beam 11, the left and the right sides of the upper end surface of the second connecting block 5 are horizontally and fixedly connected with clamping columns 9, the clamping columns 9 are positioned in the front and back moving positions, the lower end surface of the hanging beam 11 is transversely provided with embedded clamping grooves 10 at equal intervals, the size of the embedded clamping grooves 10 is matched with the size of the clamping columns 9, when the left and the right paired hanging hooks 6 need to, the clamping column 9 on the second connecting block 5 above the lifting hook 6 is embedded in the embedding clamping groove 10 at the corresponding position, the distance between the lifting hooks 6 at the left side and the right side is kept, and meanwhile, the lifting beam 11 is connected with the main lifting rope 1 through the balance lifting rope 17, so that the balance during lifting is ensured; the cover has U type card frame 12 between the butt joint piece 16 of laminating around, vertical fixedly connected with inserts post 13 in pairs around the curb plate on U type card frame 12, seted up jack 15 on the butt joint piece 16 and inserted the vertical interlude of post 13 in jack 15, U type card frame 12 makes around mated hanging beam 11 fixed connection together with the combination of inserting post 13, when needs make lifting hook 6 and second connecting block 5 break away from hanging beam 11 downside, then make U type card frame 12 take and insert post 13 and take out from jack 15 on butt joint piece 16, mated hanging beam 11 separates around realizing.
The upside fixedly connected with rotary column 7 and the activity of rotary column 7 of lifting hook 6 alternate on second connecting block 5, and the equal fixedly connected with limit stop 8 of lower extreme and limit stop 8 are in the upper and lower side of second connecting block 5 respectively on the rotary column 7, and limit stop 8 makes rotary column 7 can't break away from second connecting block 5 to rotary column 7 makes things convenient for 6 rotation regulation angle directions of lifting hook to locate, conveniently uses.
The side wall of the inserted column 13 is fixedly sleeved with a rubber anti-slip sleeve 14, and when the inserted column 13 is inserted into the insertion hole 15, the rubber anti-slip sleeve 14 facilitates the inserted column 13 to be stably clamped in the insertion hole 15.
The clamping column 9 and the second connecting block 5 are integrally cast, and stability between the clamping column and the second connecting block is guaranteed.
The hanging beam 11 and the hanging hook 6 are both made of hard steel materials, so that bending is avoided.
The side walls of the clamping column 9 and the embedded clamping groove 10 are provided with anti-skid grains, so that the clamping column 9 can be stably embedded in the embedded clamping groove 10.
The working principle is as follows: the utility model discloses a control during mated lifting hook 6 needs the distance between the horizontal width regulation according to the thing of lifting by crane, make the lifting hook 6 that makes the left and right sides rely on the compliance separation of vice lifting rope 2 or draw close, and make the gomphosis of card post 9 on the second connecting block 5 of lifting hook 6 top in the gomphosis draw-in groove 10 of hanging beam 11 corresponding position, keep good the distance between the left and right sides lifting hook 6, hanging beam 11 is connecting main lifting rope 1 through balanced lifting rope 17 and then has guaranteed the equilibrium when lifting by crane simultaneously, when needs make lifting hook 6 and second connecting block 5 break away from out from hanging beam 11 downside, then make U type card frame 12 take insert post 13 and take out from jack 15 on butt joint piece 16 in, then make around mated hanging beam 11 separate can.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a balanced hanging beam of hoist, includes main lifting rope (1) and hanging beam (11), its characterized in that: the left end and the right end of the main lifting rope (1) are fixedly connected with auxiliary lifting ropes (2) in pairs, the tail ends of the auxiliary lifting ropes (2) are fixedly connected with first connecting blocks (3), the lower sides of the first connecting blocks (3) are horizontally provided with second connecting blocks (5), connecting ropes (4) are connected between the first connecting blocks (3) and the second connecting blocks (5), the connecting ropes (4) exist in pairs on the left side and the right side, the lower sides of the middle positions of the second connecting blocks (5) are provided with lifting hooks (6), the front end and the rear end of the lifting beam (11) exist in pairs and are positioned at the horizontal position, balance lifting ropes (17) are fixedly connected between the left end and the right end of the lifting beam (11) and the main lifting rope (1), butt-connecting blocks (16) and front end and rear end portions of the lifting beam (11) are fixedly connected with the left end and the right end of the lifting beam (11) in a fit manner, side around simultaneously interval between hanging beam (11) is less than the width of second connecting block (5), and second connecting block (5) with first connecting block (3) are in respectively the downside and the upside of hanging beam (11), the equal horizontal fixedly connected with card post (9) of second connecting block (5) up end left and right sides, gomphosis draw-in groove (10) have been seted up to the horizontal equidistance of lower terminal surface of hanging beam (11), the laminating around the cover has U type card frame (12) between butt joint piece (16), vertical fixedly connected with inserted column (13) in pairs around U type card frame (12) side panel, seted up jack (15) and inserted column (13) on butt joint piece (16) are vertical to alternate in jack (15).
2. The crane equalizing hanging beam of claim 1, wherein: the upper side of the lifting hook (6) is fixedly connected with a rotary column (7) and the rotary column (7) is movably inserted on the second connecting block (5), and the upper end and the lower end of the rotary column (7) are fixedly connected with limit stops (8) and the limit stops (8) are respectively arranged on the upper side and the lower side of the second connecting block (5).
3. The crane equalizing hanging beam of claim 1, wherein: and a rubber anti-slip sleeve (14) is fixedly sleeved on the side wall of the inserted column (13).
4. The crane equalizing hanging beam of claim 1, wherein: the clamping column (9) and the second connecting block (5) are integrally cast.
5. The crane equalizing hanging beam of claim 1, wherein: the hanging beam (11) and the lifting hook (6) are both made of hard steel materials.
6. The crane equalizing hanging beam of claim 1, wherein: the side walls of the clamping column (9) and the embedding clamping groove (10) are provided with anti-skid grains.
CN202022159674.XU 2020-09-28 2020-09-28 Balance hanging beam of crane Expired - Fee Related CN213356661U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022159674.XU CN213356661U (en) 2020-09-28 2020-09-28 Balance hanging beam of crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022159674.XU CN213356661U (en) 2020-09-28 2020-09-28 Balance hanging beam of crane

Publications (1)

Publication Number Publication Date
CN213356661U true CN213356661U (en) 2021-06-04

Family

ID=76156106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022159674.XU Expired - Fee Related CN213356661U (en) 2020-09-28 2020-09-28 Balance hanging beam of crane

Country Status (1)

Country Link
CN (1) CN213356661U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117550487A (en) * 2024-01-12 2024-02-13 江苏澳构矿业科技股份有限公司 Mining crane balance detection equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117550487A (en) * 2024-01-12 2024-02-13 江苏澳构矿业科技股份有限公司 Mining crane balance detection equipment
CN117550487B (en) * 2024-01-12 2024-03-19 江苏澳构矿业科技股份有限公司 Mining crane balance detection equipment

Similar Documents

Publication Publication Date Title
CN213356661U (en) Balance hanging beam of crane
CN205653032U (en) Deformed steel flats vertical hoisting device
CN212387617U (en) Tower crane base convenient for bidirectional combination reinforcement
CN207375708U (en) A kind of hanging basket balance-conditioning system
CN211448484U (en) Height-adjustable movable ladder for building construction
CN214935432U (en) Anti-shaking mechanism suitable for shore bridge crane hoisting equipment
CN211945861U (en) Counterweight block and counterweight device
CN210152204U (en) Building scaffold adjusts backup pad
CN215439318U (en) Steel coil overturning pliers
CN211393562U (en) Lifting device for lifting steel coil
CN211691463U (en) Jacking for building
CN210340156U (en) Concrete precast culvert is with hoist device
CN210654452U (en) Assembled prefabricated component piling bin
US3788494A (en) Apparatus to facilitate the extraction of a room form
CN216835175U (en) Auxiliary frame for transporting raw glass sheets with super-large plates
CN217106066U (en) Bearing stores pylon for civil engineering construction with adjustable
CN210622089U (en) Solid ceramsite brick
CN111039139B (en) Simple 450-ton hanging row
CN108609483A (en) A kind of H-shaped steel hanger
CN214976670U (en) Square tube forming device convenient for replacing upper roller
CN214996324U (en) Steel reinforcement cage bearing structure
CN211572508U (en) Lower hanging mechanism and hoisting device for scaffold
CN207277216U (en) A kind of hyperbola pier shaft splices auxiliary tool
CN214611323U (en) Transfer trolley for paint bucket
CN213505581U (en) Stable form feed bin lifting mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210604