CN213352850U - Steel construction and move, quiet equipment do not have sizing block installation seat thick liquid mound preparation mould - Google Patents

Steel construction and move, quiet equipment do not have sizing block installation seat thick liquid mound preparation mould Download PDF

Info

Publication number
CN213352850U
CN213352850U CN202021170331.7U CN202021170331U CN213352850U CN 213352850 U CN213352850 U CN 213352850U CN 202021170331 U CN202021170331 U CN 202021170331U CN 213352850 U CN213352850 U CN 213352850U
Authority
CN
China
Prior art keywords
mould
handle
sizing block
base plate
prismoid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021170331.7U
Other languages
Chinese (zh)
Inventor
仇士惠
肖然
胡绍辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Fourth Construction Co Ltd
Original Assignee
Sinopec Fourth Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinopec Fourth Construction Co Ltd filed Critical Sinopec Fourth Construction Co Ltd
Priority to CN202021170331.7U priority Critical patent/CN213352850U/en
Application granted granted Critical
Publication of CN213352850U publication Critical patent/CN213352850U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a steel structure and movable and static equipment non-sizing block mounting seat pulp pier manufacturing mould, which comprises a prismoid mould body formed by welding four isosceles trapezoid steel plates, wherein the upper opening of the prismoid mould body is fixedly connected with a vertical edge, and a handle is hinged on the vertical edge; the two ends of the handle are connected with the vertical edges through bolts. When the grouting material is used, the grouting material is poured into the mold, the embedded base plate is installed, the hand hammer is used for knocking the embedded base plate to apply force to enable the embedded base plate to be compacted with the grouting material, the operation is convenient, the controllability is good, the shape and the elevation of the grouting pier can be well controlled, the working efficiency is high, the construction period can be shortened, the labor intensity can be reduced, the personnel allocation is reduced, and the labor cost is saved; the mould has the advantages of less required machines and materials and low construction material cost; moreover, the utility model also has the advantages of simple structure, convenient manufacture, low cost, safe use, wide application range, etc.

Description

Steel construction and move, quiet equipment do not have sizing block installation seat thick liquid mound preparation mould
Technical Field
The utility model relates to a mould, especially a steel construction and move, quiet equipment do not have parallels installation seat thick liquid mound preparation mould.
Background
With the continuous development of the petrochemical industry in China, in recent years, petrochemical devices of petroleum, medium petrochemical and medium marine oil are continuously built, expanded, reconstructed and built, the number of related steel structures and moving and static equipment is continuously increased, and the installation quality requirement is more and more strict, so that the installation technology without the sizing block is also widely introduced into the petrochemical construction, wherein the manufacturing precision of the seat pulp pier directly influences the installation precision of the structure and the equipment, and even influences the production operation of the whole device; the manufacturing speed of the seat slurry pier directly influences the construction period.
Traditional steel construction and move, quiet equipment fixing adopts the parallels, and concrete step is as follows: 1) before the steel structure and the moving and static equipment are installed, the foundation is processed to be roughened so as to form a pitted surface; 2) selecting the position where the sizing block needs to be arranged, and leveling the base pitted surface to form a relatively flat plane; 3) setting the specification of the sizing blocks, calculating the number of the sizing blocks and entrusting the sizing blocks to be processed; 4) Placing sizing blocks at the flat plane after treatment, wherein the size of the sizing blocks is required to be not more than 5, 2 oblique sizing blocks are required to be arranged, and the other sizing blocks are flat sizing blocks; 5) mounting a steel structure or moving and static equipment, and using a sledge hammer to knock the inclined sizing block to adjust the elevation or levelness of the inclined sizing block; 6) Cutting the excessive part of the sizing block, and fixing the sizing block by spot welding; 7) and finally, formwork supporting and grouting.
The disadvantages of the method are: 1) a large amount of sizing blocks are needed for installation, the flat sizing blocks need to be subjected to blanking and cutting by manpower, and the inclined sizing blocks need to be entrusted to a workshop for processing, so that the processing time is long, the cost is high, and the construction period is likely to be delayed; 2) the large number of sizing blocks requires transportation, which wastes manpower and vehicle shifts; 3) the position of the base for placing the sizing block needs to be flat, a large amount of manpower and machines need to be consumed, the precision requirement is high, and the condition that the grouting quality of the base is influenced due to the gap between the sizing block and the base is avoided; 4) a large amount of manpower is needed for placing when the sizing block is arranged, and the labor hour is wasted; 5) after a steel structure is installed or movable and static equipment is installed, due to the fact that the weight is too large, a sizing block can fly out to hurt people, and the safety factor is low; 6) the installation elevation and levelness of a steel structure or movable and static equipment are adjusted through the sizing blocks, the adjustment value is limited, the quantity and the manufacturing thickness of the sizing blocks cannot be well controlled, the adjustment accuracy cannot be well controlled by knocking the inclined sizing blocks through a sledge hammer, and the adjustment is unsafe; 7) the part of the sizing block beyond the cutting and spot welding are required to be fixed, so that not only are manpower, machinery and materials wasted, but also the electric operation danger caused by fire is high; if the spot welding fixed part of the sizing block is placed for a long time, the spot welding fixed part is easy to fall off, and rework is easy to cause.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a solve the technical problem that exists among the well-known technology and provide a steel construction and move, quiet equipment does not have parallels installation seat thick liquid mound preparation mould, adopt this mould to make seat thick liquid mound, not only convenient and fast can reduce consumeing of manpower, machinery and material, and easy to operate, construction cost is low.
The utility model discloses a solve the technical scheme that technical problem that exists among the well-known technique took and be: the utility model provides a steel construction and move, quiet equipment does not have parallels installation seat thick liquid mound preparation mould, includes the prismoid form mould body that adopts four isosceles trapezoid steel sheet welding to form the last mouthful rigid coupling of prismoid form mould body has vertical border is last to articulate there is the handle.
On the basis of the above scheme, the utility model discloses following improvement has still been made:
the two ends of the handle are connected with the vertical edges through bolts.
The utility model has the advantages and positive effects that: when the grouting material is used, the grouting material is poured into the mold, the embedded base plate is installed, the hand hammer is used for knocking the embedded base plate to apply force to enable the embedded base plate to be compacted with the grouting material, the operation is convenient, the controllability is good, the shape and the elevation of the grouting pier can be well controlled, the working efficiency is high, the construction period can be shortened, the labor intensity can be reduced, the personnel allocation is reduced, and the labor cost is saved; the mould has the advantages of less required machines and materials and low construction material cost; moreover, the utility model also has the advantages of simple structure, convenient manufacture, low cost, safe use, wide application range, etc.
Drawings
Fig. 1 is a plan view of the present invention;
FIG. 2 is a cross-sectional view A-A of FIG. 1;
FIG. 3 is a cross-sectional view B-B of FIG. 1;
fig. 4 is a plan view of the present invention.
In the figure: 1. a mold body; 2. a vertical edge; 3. a handle; 4. a bolt; 5. and (6) pre-burying a base plate.
Detailed Description
For further understanding of the contents, features and effects of the present invention, the following embodiments are exemplified in conjunction with the accompanying drawings as follows:
referring to fig. 1 to 4, a mold for manufacturing a mortar pier of a steel structure and a movable and static equipment non-sizing block mounting seat comprises a prismoid mold body 1 formed by welding four isosceles trapezoid steel plates, wherein a vertical edge 2 is fixedly connected to the upper opening of the prismoid mold body 1, a handle 3 is hinged to the vertical edge 2, the handle 3 can move left and right, the handle 3 is laid flat when the mold is used, and the handle 3 is lifted to be in a vertical state when the mold is disassembled.
In this embodiment, the two ends of the handle 3 are connected with the vertical edge 2 through bolts 4, so that the installation and the disassembly are convenient.
The utility model discloses a use method:
1) before the steel structure and the moving and static equipment are installed, the foundation is processed and roughened to form a rough surface.
2) All the positions where the sizing blocks need to be arranged are selected to place the die.
3) The grout was adjusted with water and poured into the mold.
4) Placing the blanked embedded base plate 5, and compacting by a hand hammer, wherein the embedded base plate 5 can be made of galvanized steel plates.
5) After the grouting material is solidified, the mold is removed, and the grouting material can be removed by lifting, so that the grouting material is very convenient and fast.
6) And laying gunny bags on the prepared mortar bed pier and curing for 3 days by water.
7) And (5) placing a steel structure or movable and static equipment on the prepared seat slurry pier to finish the installation.
Although the preferred embodiments of the present invention have been described with reference to the accompanying drawings, the present invention is not limited to the above-mentioned embodiments, which are only illustrative and not restrictive, and those skilled in the art can make many forms without departing from the spirit and scope of the present invention, which is within the scope of the present invention.

Claims (2)

1. The utility model provides a steel construction and move, quiet equipment does not have parallels installation seat thick liquid mound preparation mould, its characterized in that, includes the prismoid mould body that adopts four isosceles trapezoid steel sheet welding to form the last mouthful rigid coupling of prismoid mould body has vertical border is last to articulate there is the handle.
2. The mold for manufacturing the steel structure and the movable and static equipment non-sizing block mounting seat pulp pier as claimed in claim 1, wherein two ends of the handle are connected with the vertical edge through bolts.
CN202021170331.7U 2020-06-22 2020-06-22 Steel construction and move, quiet equipment do not have sizing block installation seat thick liquid mound preparation mould Active CN213352850U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021170331.7U CN213352850U (en) 2020-06-22 2020-06-22 Steel construction and move, quiet equipment do not have sizing block installation seat thick liquid mound preparation mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021170331.7U CN213352850U (en) 2020-06-22 2020-06-22 Steel construction and move, quiet equipment do not have sizing block installation seat thick liquid mound preparation mould

Publications (1)

Publication Number Publication Date
CN213352850U true CN213352850U (en) 2021-06-04

Family

ID=76138283

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021170331.7U Active CN213352850U (en) 2020-06-22 2020-06-22 Steel construction and move, quiet equipment do not have sizing block installation seat thick liquid mound preparation mould

Country Status (1)

Country Link
CN (1) CN213352850U (en)

Similar Documents

Publication Publication Date Title
CN101787710B (en) Integrally-assembled buttressed retaining wall and construction method thereof
CN204000523U (en) The prefabricated road surface of a kind of Novel reinforced concrete
CN213352850U (en) Steel construction and move, quiet equipment do not have sizing block installation seat thick liquid mound preparation mould
CN109881699B (en) Method for molding and installing concrete tire of assembled tongue-and-groove Miller type universal raft foundation
CN110206020B (en) Prefabricated snowflake type concrete steel sheet pile and construction method thereof
CN109732773B (en) Mounting node and mounting method of support hinged concrete prefabricated part
CN109385977B (en) Anti-cracking concrete panel and construction method thereof
CN113585317B (en) Construction method for mucky soil support beam cushion layer
CN202029233U (en) Adjustable solid cubic pile mold
CN215518717U (en) Shell-structure filler and manufacturing tool thereof
CN202108037U (en) Weight-variable ram for rammer
CN210032660U (en) Device for controlling flatness of concrete top plate surface
CN109235439B (en) Hydropower engineering volute casing large-volume concrete pressure-maintaining pouring method wrapped below waist line
CN206359879U (en) A kind of blinding layer of light section steel structure bridge
CN206873960U (en) The adjustable mobile rapid construction mortar of one kind builds device by laying bricks or stones
CN201827604U (en) Base for high-precision universal mechanical equipment
CN110512642A (en) Soft clay area drainage pipeline concrete pack punching block board construction method
CN114956732B (en) Solidified soil brick moulding bed and construction method thereof
CN212045250U (en) Novel interlocking piece prefabricating mold
CN218522130U (en) Finished product flue installation unloading structure
CN204604575U (en) The automatic production line of the shaping prestressed concrete base plate of mechanical presses
CN108037008B (en) Novel device for limiting and adjusting shear test piece of rock joint surface filler
CN215629709U (en) Cantilever rigid frame type underwater template
CN218861246U (en) Sitting slurry assembly type panel structure and pavement structure
CN220202700U (en) Integrated device for uniform settlement of foundation edge facing platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant