CN213336236U - Big data acquisition device of power plant - Google Patents
Big data acquisition device of power plant Download PDFInfo
- Publication number
- CN213336236U CN213336236U CN202022525612.6U CN202022525612U CN213336236U CN 213336236 U CN213336236 U CN 213336236U CN 202022525612 U CN202022525612 U CN 202022525612U CN 213336236 U CN213336236 U CN 213336236U
- Authority
- CN
- China
- Prior art keywords
- data
- collection device
- data collection
- detection sensors
- power plant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000013480 data collection Methods 0.000 claims abstract description 22
- 238000001514 detection method Methods 0.000 claims abstract description 20
- 238000012544 monitoring process Methods 0.000 claims abstract description 9
- 230000005611 electricity Effects 0.000 claims abstract description 8
- 230000007613 environmental effect Effects 0.000 claims abstract description 4
- 238000004519 manufacturing process Methods 0.000 claims abstract description 4
- 238000004140 cleaning Methods 0.000 description 3
- 238000007781 pre-processing Methods 0.000 description 3
- 238000013144 data compression Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
Images
Landscapes
- Testing Or Calibration Of Command Recording Devices (AREA)
Abstract
The utility model provides a big data acquisition device of power plant, include: a plurality of equipment detection sensors that are used for gathering production facility data, a plurality of environment detection sensors that are used for environmental monitoring, a plurality of video monitor that are used for safety monitoring and a plurality of positioning sensor that are used for personnel's location to detect, a plurality of equipment detection sensors are connected with first data collection device electricity, environment detection sensor is connected with second data collection device electricity, first data collection device, second data collection device, positioning sensor all are connected with the host computer, video monitor passes through the video wall control system and is connected with the video wall. The utility model discloses can collect device, second data through first data and collect the device and carry out the preliminary treatment of data to the data pressure of host computer has been alleviateed, make entire system operation stable performance more, reliable.
Description
Technical Field
The utility model relates to a power plant technical field, in particular to big data acquisition device of power plant.
Background
In the prior art, the data volume of the equipment detection sensor and the environment detection sensor is large during large data acquisition of a power plant, and the data volume is directly transmitted to the upper computer, so that the performance requirement on the upper computer is high, and the operational reliability and stability of the upper computer are also greatly influenced by data pressure.
SUMMERY OF THE UTILITY MODEL
The utility model provides a big data acquisition device of power plant to solve at least one above-mentioned technical problem.
For solving the above problem, as an aspect of the utility model, a big data acquisition device of power plant is provided, include: a plurality of equipment detection sensors that are used for gathering production facility data, a plurality of environment detection sensors that are used for environmental monitoring, a plurality of video monitor that are used for safety monitoring and a plurality of positioning sensor that are used for personnel's location to detect, a plurality of equipment detection sensors are connected with first data collection device electricity, environment detection sensor is connected with second data collection device electricity, first data collection device, second data collection device, positioning sensor all are connected with the host computer, video monitor passes through the video wall control system and is connected with the video wall.
Since the technical scheme is used, the utility model discloses can collect the device through first data and carry out the preliminary treatment of data, second data collection device to the data pressure of host computer has been alleviateed, make entire system operation stable performance more, reliable.
Drawings
Fig. 1 schematically shows a schematic structural diagram of the present invention.
Detailed Description
The embodiments of the invention will be described in detail below with reference to the drawings, but the invention can be implemented in many different ways as defined and covered by the claims.
As an aspect of the utility model, a big data acquisition device of power plant is provided, include: a plurality of equipment detection sensors that are used for gathering production facility data, a plurality of environment detection sensors that are used for environmental monitoring, a plurality of video monitor that are used for safety monitoring and a plurality of positioning sensor that are used for personnel's location to detect, a plurality of equipment detection sensors are connected with first data collection device electricity, environment detection sensor is connected with second data collection device electricity, first data collection device, second data collection device, positioning sensor all are connected with the host computer, video monitor passes through the video wall control system and is connected with the video wall.
In the technical scheme, data collected by various equipment detection sensors are firstly collected to a first data collection device for preprocessing, data collected by an environment detection sensor are firstly collected to a second data collection device for preprocessing (for example, data cleaning and the like), then the data are sent to an upper computer by the first data collection device and the second data collection device, meanwhile, monitoring videos collected by a video monitor are collected to a television wall for displaying, so that a worker can conveniently monitor, and a positioning sensor can identify RFID tags carried by the patrol worker in ways such as RFID tags and the like so as to know the position of the patrol worker at any time. In particular, the preprocessing refers to data cleaning and/or data compression, and the like, and invalid or repeated data can be removed through the data cleaning, so that the invalid number is reduced; by data compression, the transmission speed and efficiency of data can be improved.
Since the technical scheme is used, the utility model discloses can collect the device through first data and carry out the preliminary treatment of data, second data collection device to the data pressure of host computer has been alleviateed, make entire system operation stable performance more, reliable.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (1)
1. The utility model provides a big data acquisition device of power plant which characterized in that includes: a plurality of equipment detection sensors that are used for gathering production facility data, a plurality of environment detection sensors that are used for environmental monitoring, a plurality of video monitor that are used for safety monitoring and a plurality of positioning sensor that are used for personnel's location to detect, a plurality of equipment detection sensors are connected with first data collection device electricity, environment detection sensor is connected with second data collection device electricity, first data collection device, second data collection device, positioning sensor all are connected with the host computer, video monitor passes through the video wall control system and is connected with the video wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022525612.6U CN213336236U (en) | 2020-11-03 | 2020-11-03 | Big data acquisition device of power plant |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022525612.6U CN213336236U (en) | 2020-11-03 | 2020-11-03 | Big data acquisition device of power plant |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213336236U true CN213336236U (en) | 2021-06-01 |
Family
ID=76076628
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022525612.6U Expired - Fee Related CN213336236U (en) | 2020-11-03 | 2020-11-03 | Big data acquisition device of power plant |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213336236U (en) |
-
2020
- 2020-11-03 CN CN202022525612.6U patent/CN213336236U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204347600U (en) | A kind of production line Intelligent management control system | |
CN109396954B (en) | Embedded axis system abnormality intelligent measurement and information push-delivery apparatus | |
CN203133577U (en) | Remote inspection tour monitoring and alarm device for medical equipment | |
CN203643834U (en) | Fault diagnosis system of mining main ventilator | |
CN204536215U (en) | A kind of fault detection system for wind-power blade | |
CN115616341B (en) | Operation and maintenance monitoring system for remotely and automatically searching power cable line based on Internet of things | |
CN110738289A (en) | Multi-dimensional linkage comprehensive studying and judging device for electric power operation standardization and using method thereof | |
CN107175691A (en) | A kind of online fault detect of robot and maintaining method | |
CN103234520A (en) | Controller area network (CAN) bus-based settlement deformation monitoring system | |
CN205846861U (en) | A kind of 500 kv substation communication equipment intelligence regular visit systems | |
CN213336236U (en) | Big data acquisition device of power plant | |
CN106767683A (en) | Measurement apparatus and method of a kind of unmanned plane of electronic information field to ground level | |
CN204204181U (en) | A kind of remote data acquisition system for the monitoring of Wind turbines driftage sliding bearing | |
CN115765184A (en) | Electric power overhauls supervisory systems for data processing | |
CN103279098A (en) | Electrical equipment monitoring device based on image identification | |
CN111124823A (en) | Fault early warning system and method for three-dimensional visualization equipment | |
CN207540585U (en) | A kind of charming appearance and behaviour dynamic effect remote supervision system of Transmission Tower-line | |
CN206367982U (en) | A kind of visual crane, which is hung, takes alignment system | |
CN104765311A (en) | Pumping well monitoring and early warning device | |
CN107473125A (en) | Monitoring assembly and system for FS final spice pushing tow girder | |
CN211060960U (en) | Electric power operation site monitoring device | |
CN210862771U (en) | Intelligent inspection management system for operating personnel of large power plant | |
CN209230776U (en) | A kind of rotating machinery monitoring protection and vibration analysis combination instrument | |
CN204733278U (en) | A kind of machinery instrument monitoring device | |
CN1294412C (en) | Round inspection monitoring system and method for cathode protection signal of long conveying pipeline |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210601 |