CN213330279U CN202021845943.1U CN202021845943U CN213330279U CN 213330279 U CN213330279 U CN 213330279U CN 202021845943 U CN202021845943 U CN 202021845943U CN 213330279 U CN213330279 U CN 213330279U
Authority
CN
China
Prior art keywords
groove
iron tower
electric power
grooves
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021845943.1U
Other languages
Chinese (zh)
Inventor
王宗家
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Maotong Power Equipment Co ltd
Original Assignee
Qingdao Maotong Power Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Maotong Power Equipment Co ltd filed Critical Qingdao Maotong Power Equipment Co ltd
Priority to CN202021845943.1U priority Critical patent/CN213330279U/en
Application granted granted Critical
Publication of CN213330279U publication Critical patent/CN213330279U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses an electric power iron tower installation base, including seting up the standing groove on the pedestal, install the bottom plate in the standing groove, and bottom plate lower extreme fixed mounting has two branches, be equipped with two on the lateral wall of standing groove and correspond branch matched with flexible groove, and all install supporting spring between two flexible grooves and two branches, all be equipped with a plurality of spread grooves on the lateral wall about the standing groove, and equal fixed mounting has the pressure spring in every spread groove, and every a plurality of positions are corresponding all the curb plate is installed in the cooperation between the pressure spring, and equal fixed mounting has the gag lever post on two curb plates. Has the advantages that: the utility model discloses fixed mode between pedestal and the electric power iron tower is comparatively simple and convenient, and the pedestal can realize the separation with ground, is convenient for remove this electric power iron tower when needs, and the back is demolishd to the electric power iron tower in addition, and the pedestal is recoverable to carry out reuse, has avoided the problem of wasting of resources.

Description

Electric power iron tower installation base
Technical Field
The utility model relates to a power equipment technical field especially relates to an electric power iron tower installation base.
Background
The tower-shaped building for power transmission features that its tower shapes are space truss structures and its rod is composed of single equilateral or combined angle steel.
When the electric power iron tower is installed, the base is generally used for completing connection between the electric power iron tower and the ground, the existing base is mostly a cement pier formed by pouring, after the electric power iron tower is installed, the position of the electric power iron tower is not easy to move, and after the electric power iron tower is dismantled, the cement pier formed by pouring can be remained on the ground and is not easy to process the electric power iron tower.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problems existing in the prior art and providing an electric power iron tower mounting base.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an electric power iron tower installation base, is including seting up the standing groove on the pedestal, install the bottom plate in the standing groove, and bottom plate lower extreme fixed mounting has two branches, be equipped with two on the lateral wall of standing groove and correspond branch matched with flexible groove, and all install supporting spring between two flexible grooves and two branches, all be equipped with a plurality of spread grooves on the lateral wall about the standing groove, and equal fixed mounting has the pressure spring in every spread groove, and every a plurality of positions are corresponding all the cooperation is installed the curb plate between the pressure spring, and equal fixed mounting has the gag lever post on two curb plates, be equipped with two on the lateral wall of standing groove and correspond gag lever post matched with spacing groove, two all install separating mechanism between gag lever post and the bottom plate.
In the above installation base for the electric iron tower, the separation mechanism comprises a positioning component, a moving groove is arranged on the side wall of the limiting groove, the positioning component is connected in the moving groove in a sliding manner, a tension spring is arranged between the positioning component and the moving groove, a plurality of positioning grooves are arranged on the side wall of the limiting rod and are matched with the positioning component at the same time, a sliding groove is arranged on the side wall of the placing groove, a sliding rod matched with the sliding groove is fixedly arranged at the bottom of the bottom plate, a rack is arranged on the side wall of the sliding rod, an installation groove is arranged between the moving groove and the sliding groove, one end of the installation groove close to the sliding groove is connected with a connecting gear through rotation of the rotating rod, the connecting gear is meshed with the rack, a control gear is connected in the installation groove through rotation of a lead screw and is meshed with the, and a connecting rope is fixedly connected between the winding wheel and the positioning component.
In the electric power iron tower mounting base, the side plates are fixedly provided with the fixing rods, the side walls of the placing grooves are provided with transverse grooves, and the fixing rods are connected in the transverse grooves in a sliding mode.
In the above electric iron tower mounting base, the diameter of the control gear is larger than that of the connecting gear.
In the above installation base for the electric power iron tower, the base body, the bottom plate and the side plates are all made of stainless steel materials.
Compared with the prior art, the utility model discloses the advantage lies in:
1: after putting into the standing groove with electric power iron tower bottom in, utilize its gravity to make the bottom plate move down, through the cooperation of two separating mechanism and two sets of pressure springs, can make two curb plates carry out the centre gripping fixed to electric power iron tower both sides this moment to realize its being connected with this base, fixed mode is comparatively simple and convenient.
2: because the base body is made of stainless steel materials instead of concrete casting, when the electric iron tower needs to be moved, the whole base body can be separated from the ground, and then the electric iron tower can be moved, and after the electric iron tower is dismantled, the base body can be recycled.
To sum up, the utility model discloses fixed mode between pedestal and the electric power iron tower is comparatively simple and convenient, and the pedestal can realize the separation with ground, is convenient for remove this electric power iron tower when needs, and the back is demolishd to the electric power iron tower in addition, and the pedestal is recoverable to carry out reuse, has avoided the extravagant problem of resource.
Drawings
Fig. 1 is a schematic structural view of an electric iron tower mounting base provided by the present invention;
FIG. 2 is an enlarged view of the structure of part A in FIG. 1;
fig. 3 is an enlarged schematic view of the structure of part B in fig. 1.
In the figure: the device comprises a base body 1, a placing groove 2, a bottom plate 3, a supporting rod 4, a telescopic groove 5, a supporting spring 6, a sliding groove 7, a sliding rod 8, a rack 9, a mounting groove 10, a connecting gear 11, a control gear 12, a winding wheel 13, a connecting rope 14, a connecting groove 15, a pressure spring 16, a side plate 17, a limiting groove 18, a limiting rod 19, a positioning groove 20, a positioning assembly 21, a moving groove 22 and a tension spring 23.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-3, an electric iron tower mounting base comprises a placing groove 2 arranged on a base body 1, a bottom plate 3 is arranged in the placing groove 2, two supporting rods 4 are fixedly arranged at the lower end of the bottom plate 3, two telescopic grooves 5 matched with the corresponding supporting rods 4 are arranged on the side wall of the placing groove 2, and supporting springs 6 are arranged between the two telescopic grooves 5 and the two supporting rods 4;
the above is noteworthy:
1. the supporting springs 6 can provide supporting force for the bottom plate 3, and when the electric iron tower is not installed on the seat body 1, the position of the bottom plate 3 in the placing groove 2 can be kept unchanged.
2. All be equipped with a plurality of spread grooves 15 on the lateral wall about standing groove 2, and equal fixed mounting has pressure spring 16 in every spread groove 15, all cooperates between the pressure spring 16 that every a plurality of positions are corresponding and installs curb plate 17, through the elasticity of two sets of pressure springs 16, can exert the power that is close to each other to two curb plates 17 to can make the two carry out the centre gripping to the electric power iron tower both sides that are located in standing groove 2, keep its stability on pedestal 1.
3. Fixed mounting has the dead lever on the curb plate 17, is equipped with the horizontal groove on the lateral wall of standing groove 2, and dead lever sliding connection is in the horizontal groove, and the horizontal groove is not marked in the picture with the dead lever, and the two cooperation can be injectd the relative standing groove 2's of curb plate 17 angle and moving direction.
4. The seat body 1, the bottom plate 3 and the side plates 17 are all made of stainless steel materials, and the strength and the service life of the installation base can be ensured by using the stainless steel materials.
Limiting rods 19 are fixedly arranged on the two side plates 17, two limiting grooves 18 matched with the corresponding limiting rods 19 are arranged on the side walls of the placing groove 2, and separating mechanisms are arranged between the two limiting rods 19 and the bottom plate 3;
the above is noteworthy:
1. separating mechanism includes locating component 21, be equipped with shifting chute 22 on the lateral wall of spacing groove 18, locating component 21 sliding connection is in shifting chute 22, and install extension spring 23 between locating component 21 and the shifting chute 22, be equipped with a plurality of constant head tanks 20 on the lateral wall of gag lever post 19, and a plurality of constant head tanks 20 cooperate with locating component 21 simultaneously, when locating component 21 is located a plurality of constant head tanks 20, can prescribe a limit to the position of the relative spacing groove 18 of gag lever post 19, thereby fix the position of curb plate 17 in standing groove 2, avoid it to cause the hindrance in placing of this installation base to the electric power iron tower.
2. Be equipped with spout 7 on the lateral wall of standing groove 2, the bottom fixed mounting of bottom plate 3 has slide bar 8 with spout 7 matched with, and be equipped with rack 9 on slide bar 8's the lateral wall, be equipped with mounting groove 10 between shifting chute 22 and the spout 7, and the mounting groove 10 is close to the one end of spout 7 and is connected with connecting gear 11 through the bull stick rotation, connecting gear 11 meshes with rack 9 mutually, when electric power iron tower is placed in standing groove 2, its gravity can make bottom plate 3 overcome supporting spring 6's elasticity and move down, thereby make two slide bars 8 move down in two spouts 7 simultaneously, this moment through rack 9 and connecting gear 11's meshing effect, can make connecting gear 11 carry out corresponding rotation.
3. The installation groove 10 is connected with a control gear 12 through a screw rod in a rotating way, the control gear 12 is meshed with a connecting gear 11, a winding wheel 13 is sleeved on the screw rod, a connecting rope 14 is fixedly connected between the winding wheel 13 and a positioning component 21, when the two connecting gears 11 rotate, the corresponding two control gears 12 are driven to rotate, so that the two winding wheels 13 rotate to wind the two connecting ropes 14, at the moment, the two positioning components 21 overcome the elasticity of two tension springs 23 under the tensile force action of the corresponding connecting ropes 14 and are separated from a plurality of corresponding positioning grooves 20, at the moment, two side plates 17 are not limited, the electric iron tower is clamped and fixed under the elastic force action of two groups of compression springs 16, if the fixing effect between the electric iron tower and the seat body 1 needs to be improved, concrete can be poured into the installation groove 2 again, and the space of the installation groove 2 is relatively small, only partial concrete is required to be poured, so that the raw material loss is saved.
4. The control gear 12 has a diameter greater than that of the connecting gear 11, and the positioning assembly 21 can move at a speed much lower than that of the bottom plate 3, so as to ensure that the side plates 17 do not move when the electric iron tower is not completely inserted into the placing groove 2.
Further, unless otherwise specifically stated or limited, the above-described fixed connection is to be understood in a broad sense, and may be, for example, welded, glued, or integrally formed as is conventional in the art.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. An electric power iron tower installation base comprises a placement groove (2) arranged on a base body (1), and is characterized in that a bottom plate (3) is arranged in the placement groove (2), two support rods (4) are fixedly arranged at the lower end of the bottom plate (3), two telescopic grooves (5) matched with the corresponding support rods (4) are formed in the side wall of the placement groove (2), a supporting spring (6) is arranged between each two telescopic grooves (5) and each two support rods (4), a plurality of connecting grooves (15) are formed in the left side wall and the right side wall of the placement groove (2), a pressure spring (16) is fixedly arranged in each connecting groove (15), side plates (17) are arranged between the pressure springs (16) corresponding to each plurality of positions in a matched manner, limiting rods (19) are fixedly arranged on the two side plates (17), two limiting grooves (18) matched with the corresponding limiting rods (19) are formed in the side wall of the placement groove (2), and separating mechanisms are arranged between the two limiting rods (19) and the bottom plate (3).
2. The electric iron tower mounting base as claimed in claim 1, wherein the separating mechanism comprises a positioning assembly (21), a moving groove (22) is formed in a side wall of the limiting groove (18), the positioning assembly (21) is slidably connected in the moving groove (22), a tension spring (23) is installed between the positioning assembly (21) and the moving groove (22), a plurality of positioning grooves (20) are formed in a side wall of the limiting rod (19), the positioning grooves (20) are matched with the positioning assembly (21), a sliding groove (7) is formed in a side wall of the placing groove (2), a sliding rod (8) matched with the sliding groove (7) is fixedly installed at the bottom of the bottom plate (3), a rack (9) is formed in a side wall of the sliding rod (8), a mounting groove (10) is formed between the moving groove (22) and the sliding groove (7), and a connecting gear (11) is rotatably connected to one end, close to the sliding groove (7), of the mounting groove (10) through a rotating rod, connecting gear (11) and rack (9) mesh mutually, rotate through the lead screw in mounting groove (10) and be connected with control gear (12), and control gear (12) and connecting gear (11) mesh mutually, the cover is equipped with wind-up wheel (13) on the lead screw, and fixedly connected with between wind-up wheel (13) and locating component (21) is connected rope (14).
3. The electric iron tower mounting base as claimed in claim 1, wherein the side plates (17) are fixedly provided with fixing rods, the side walls of the placing groove (2) are provided with transverse grooves, and the fixing rods are slidably connected in the transverse grooves.
4. An electric power tower mounting base according to claim 2, characterised in that the diameter of the control gear (12) is larger than the diameter of the connecting gear (11).
5. The electric iron tower mounting base as claimed in claim 1, wherein the base body (1), the bottom plate (3) and the side plates (17) are made of stainless steel material.
CN202021845943.1U 2020-08-30 2020-08-30 Electric power iron tower installation base Active CN213330279U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021845943.1U CN213330279U (en) 2020-08-30 2020-08-30 Electric power iron tower installation base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021845943.1U CN213330279U (en) 2020-08-30 2020-08-30 Electric power iron tower installation base

Publications (1)

Publication Number Publication Date
CN213330279U true CN213330279U (en) 2021-06-01

Family

ID=76101127

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021845943.1U Active CN213330279U (en) 2020-08-30 2020-08-30 Electric power iron tower installation base

Country Status (1)

Country Link
CN (1) CN213330279U (en)

Similar Documents

Publication Publication Date Title
CN214091279U (en) Electric pole correction device for electric power engineering
CN213330279U (en) Electric power iron tower installation base
CN209675831U (en) A kind of electric power installation Poling Construction device
CN211369577U (en) Supporting beam jacking device for building
CN218205925U (en) Aluminum template supporting structure
CN217054292U (en) Supporting frame for preventing falling object for building safety
CN214639856U (en) Green is reinforcing bar bending apparatus for construction
CN210563535U (en) Reinforcing structure for rain shed
CN212311213U (en) Wind and rain protective cover for vertically-installed tower barrel
CN203603459U (en) Stabilizing device for creeping formwork system
CN211071583U (en) Table type bending machine
CN210214543U (en) Hoisting frame for mounting power equipment
CN208792789U (en) A kind of bracket for steel reinforcement cage binding
CN203781118U (en) Cement storage tank
CN213937367U (en) Construction site removes with laying built on stilts support
CN202152554U (en) Novel and integral supporting structure for communication tower
CN215291754U (en) Auxiliary holding pole with top pulley
CN213953184U (en) Electric power iron tower convenient to handling
CN202000726U (en) Novel heightening frame
CN210224910U (en) Lightning protection device support frame for housing construction engineering
CN216233753U (en) Carbon fiber plate placing frame
CN215212301U (en) Reinforced aluminum template
CN217924741U (en) Scaffold for building engineering
CN215122862U (en) Agricultural irrigation buried pipe low tube auxiliary device
CN203774679U (en) Tensile device for temporary power line stringing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant