CN213302851U - Water-through and ventilation tool for testing of motor controller rack - Google Patents
Water-through and ventilation tool for testing of motor controller rack Download PDFInfo
- Publication number
- CN213302851U CN213302851U CN202021966952.6U CN202021966952U CN213302851U CN 213302851 U CN213302851 U CN 213302851U CN 202021966952 U CN202021966952 U CN 202021966952U CN 213302851 U CN213302851 U CN 213302851U
- Authority
- CN
- China
- Prior art keywords
- water
- way valve
- pipe
- quick
- switch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Testing Of Engines (AREA)
Abstract
The utility model discloses a machine controller rack test leads to water frock of ventilating, including machine controller and install inlet tap and the faucet on machine controller, it is equipped with inlet tap quick-operation joint and faucet quick-operation joint to block respectively on inlet tap and faucet, install first three-way valve and second three-way valve on inlet tap quick-operation joint and the faucet quick-operation joint, inlet tap quick-operation joint is connected to one mouth of first three-way valve, first water pipe and first trachea are connected respectively to two other mouths, connect first logical water switch on the first water pipe, connect first ventilation switch on the first trachea, outlet tap quick-operation joint is connected to one mouth of second three-way valve, connect second water pipe and second trachea in addition two, be connected with second logical water switch on the second water pipe, connect second tracheal switch on the second trachea. The utility model provides the high installation and dismantlement convenience improve production efficiency, and compatible strong, the coolant liquid flow also can not the seepage when big, can directly blow off after the test and remain the coolant liquid in the water course.
Description
The technical field is as follows:
the utility model relates to a machine controller rack test leads to water frock of ventilating, it belongs to new energy automobile machine controller test technical field.
Background art:
the loading test of the motor controller rack is an important link in the production process, and aims to test the loading capacity of the controller. When the controller is loaded to the peak current (taking SMC350 as an example, the peak current 530A) during the test, the power device IGBT generates a large amount of heat and needs cooling liquid supplied from the outside for heat dissipation. The working principle is that cooling liquid flows into a water channel through a water pipe arranged on a water nozzle of the controller and then flows out from an outlet water nozzle through an outlet water pipe to take away heat. The main problems and disadvantages are: 1. the water pipe and the water nozzle are not well matched and are inconvenient to install; 2. the water pipe and the water nozzle need to be fastened through the hose clamp, so that the operation is inconvenient; 3. when the flow of the cooling liquid is large, the joint of the water pipe is easy to leak; 4. residual cooling liquid still exists in the water channel after the test is finished; 5. the water pipe is mounted and dismounted inefficiently.
Therefore, there is a need to improve the prior art to overcome the deficiencies of the prior art.
The utility model has the following contents:
the utility model relates to a solve the problem that above-mentioned prior art exists and provide a machine controller rack test leads to water frock of ventilating, improve the installation and dismantle the convenience, improve production efficiency, it is compatible strong, the coolant liquid flow also can not the seepage when big, can directly blow off after the test and remain the coolant liquid in the water course.
The utility model discloses the technical scheme who adopts has: the utility model provides a machine controller rack test leads to water frock of ventilating, includes machine controller and installs inlet nozzle and faucet on machine controller the inlet nozzle and faucet go up the card respectively and are equipped with inlet nozzle quick-operation joint and faucet quick-operation joint, install first three-way valve and second three-way valve on inlet nozzle quick-operation joint and the faucet quick-operation joint respectively, inlet nozzle quick-operation joint is connected to a mouth of first three-way valve, and first water pipe and first trachea are connected respectively to two other mouths, be connected with first logical water switch on the first water pipe, be connected with first ventilation switch on the first trachea, outlet nozzle quick-operation joint is connected to a mouth of second three-way valve, and second water pipe and second trachea are connected respectively to two other mouths, be connected with second logical water switch on the second water pipe, be connected with second trachea switch on the second trachea.
Furthermore, the first water pipe is a water inlet, the first air pipe is an air inlet, the second water pipe is a water outlet, and the second air pipe is an air outlet.
Furthermore, the first water pipe is connected to the left side of the first three-way valve, the first air pipe is connected to the right side of the first three-way valve, the second water pipe is connected to the left side of the second three-way valve, and the second air pipe is connected to the right side of the second three-way valve.
The utility model discloses following beneficial effect has: the utility model discloses the test of machine controller rack leads to water frock installation of ventilating fast, convenient, connects the fastening, and the coolant liquid flow can not the seepage greatly yet, can bear 10Mpa pressure the most, can effectively clear up after the test accomplishes and remain the coolant liquid in the water course.
Description of the drawings:
fig. 1 is the utility model discloses the schematic diagram of the test of machine controller rack leads to water frock of ventilating.
The specific implementation mode is as follows:
the present invention will be further described with reference to the accompanying drawings.
The utility model discloses machine controller rack test leads to water frock of ventilating includes machine controller 1 and installs inlet nozzle 2 and faucet 3 on machine controller 1, it has inlet nozzle quick-operation joint 4 and faucet quick-operation joint 5 to block respectively on inlet nozzle 2 and faucet 3, install first three-way valve 6 and second three-way valve 7 on inlet nozzle quick-operation joint 4 and the faucet quick-operation joint 5 respectively, inlet nozzle quick-operation joint 4 is connected to a mouthful of first three-way valve 6, first water pipe 8 and first air pipe 9 are connected respectively to two other mouths, be connected with first logical water switch 10 on the first water pipe 8, be connected with first ventilation switch 11 on the first trachea. One port of the second three-way valve 7 is connected with the water outlet nozzle quick connector 5, the other two ports are respectively connected with a second water pipe 12 and a second air pipe 13, the second water pipe 12 is connected with a second water through switch 14, and the second air pipe 13 is connected with a second air pipe switch 15.
The utility model discloses well first water pipe 8 is the water inlet, and first trachea 9 is the air inlet, and second water pipe 12 is the delivery port, and second trachea 13 is the gas outlet.
The utility model discloses it is fixed to screw up through the thread between inlet tap quick-operation joint 4 and first three-way valve 6, outlet tap quick-operation joint 5 and the second three-way valve 7 in the frock of ventilating to lead to water in the test of machine controller rack. The first water pipe 8 is connected to the left side of the first three-way valve 6, the first air pipe 9 is connected to the right side of the first three-way valve 6, the second water pipe 12 is connected to the left side of the second three-way valve 7, and the second air pipe 13 is connected to the right side of the second three-way valve 7. The water path and the air path on the first three-way valve 6 and the second three-way valve 7 are respectively provided with a switch, which can be controlled independently.
During testing, the ventilation switch at the air inlet is closed, the water switch at the water inlet and the water outlet is opened, and the cooling liquid flows into the water channel through the water inlet nozzle quick connector 4 arranged on the water inlet nozzle 2 of the motor controller 1 and then flows out from the water outlet nozzle 3 through the water outlet nozzle quick connector 5 and the water outlet. And after the test is finished, opening the ventilation switch at the air inlet, closing the water switch at the water inlet, and blowing out the residual cooling liquid from the water outlet by using gas pressure.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, several modifications can be made without departing from the principle of the present invention, and these modifications should also be regarded as the protection scope of the present invention.
Claims (3)
1. The utility model provides a machine controller rack test leads to water frock of ventilating which characterized in that: comprises a motor controller (1), a water inlet nozzle (2) and a water outlet nozzle (3) which are arranged on the motor controller (1), wherein a water inlet nozzle quick joint (4) and a water outlet nozzle quick joint (5) are respectively clamped on the water inlet nozzle (2) and the water outlet nozzle (3), a first three-way valve (6) and a second three-way valve (7) are respectively arranged on the water inlet nozzle quick joint (4) and the water outlet nozzle quick joint (5), one port of the first three-way valve (6) is connected with the water inlet nozzle quick joint (4), the other two ports are respectively connected with a first water pipe (8) and a first air pipe (9), the first water pipe (8) is connected with a first water through switch (10), the first air pipe is connected with a first air through switch (11), one port of the second three-way valve (7) is connected with the water outlet nozzle quick joint (5), and the other two ports are respectively connected with a second water pipe (12) and a second air pipe (13), the second water pipe (12) is connected with a second water through switch (14), and the second air pipe (13) is connected with a second air pipe switch (15).
2. The water and air supply tool for testing the motor controller rack as claimed in claim 1, wherein: the first water pipe (8) is a water inlet, the first air pipe (9) is an air inlet, the second water pipe (12) is a water outlet, and the second air pipe (13) is an air outlet.
3. The water and air supply tool for testing the motor controller rack as claimed in claim 1, wherein: the first water pipe (8) is connected to the left side of the first three-way valve (6), the first air pipe (9) is connected to the right side of the first three-way valve (6), the second water pipe (12) is connected to the left side of the second three-way valve (7), and the second air pipe (13) is connected to the right side of the second three-way valve (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021966952.6U CN213302851U (en) | 2020-09-10 | 2020-09-10 | Water-through and ventilation tool for testing of motor controller rack |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021966952.6U CN213302851U (en) | 2020-09-10 | 2020-09-10 | Water-through and ventilation tool for testing of motor controller rack |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213302851U true CN213302851U (en) | 2021-05-28 |
Family
ID=76030179
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021966952.6U Active CN213302851U (en) | 2020-09-10 | 2020-09-10 | Water-through and ventilation tool for testing of motor controller rack |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213302851U (en) |
-
2020
- 2020-09-10 CN CN202021966952.6U patent/CN213302851U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102042073A (en) | Engine cooling water system device with automatic exhaust function | |
CN111816894A (en) | Fuel cell heat management device and control method thereof | |
CN204481672U (en) | Current transformer water cooling plant and control system | |
CN213302851U (en) | Water-through and ventilation tool for testing of motor controller rack | |
CN107489886A (en) | A kind of metallurgical industry oxygen control system | |
CN209415046U (en) | A kind of automatic acid feeding appts | |
CN201875888U (en) | DC heat conducting type hot water machine set | |
CN208743881U (en) | Copper pipe is brazed oxygen-proof protecting device | |
CN212082073U (en) | Cooling tower for chemical production | |
CN210241924U (en) | Large central air conditioner exhaust device | |
CN219865407U (en) | Heat energy recycling system of air compressor | |
CN204778831U (en) | Argon gas desicator | |
CN208420285U (en) | A kind of air charging system of automobile tail light airtight detecting apparatus | |
CN214199628U (en) | Cooling water pipeline structure of tunnel oven | |
CN214973889U (en) | Non-pressure water return device for cooling water return based on reaction tower | |
CN204071749U (en) | Zero pressure energy-saving drinking machine | |
CN218750192U (en) | Guide plate, thermal management system and vehicle | |
CN2539930Y (en) | Automatic air intake-discharge device suitable for water storage sealed electric water heater | |
CN212313326U (en) | Pure [ electric ] motor coach battery heat dissipation liquid cooling pipe-line system | |
CN220900340U (en) | Automatic air supplementing device for continuous reaction | |
CN221279235U (en) | Automatic adjusting device of nitrogen main pipeline | |
CN216344094U (en) | Three-way ball valve capable of adjusting flow | |
CN213420135U (en) | Inlet and outlet pipe nozzle of vehicle-mounted air conditioner | |
CN220953634U (en) | Improved water-saving equipment for vacuum pump | |
CN219324907U (en) | A circulation water route for welding equipment disconnect-type water-cooling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |