CN213296223U - Water conservancy construction fastening processing apparatus - Google Patents

Water conservancy construction fastening processing apparatus Download PDF

Info

Publication number
CN213296223U
CN213296223U CN202021697341.6U CN202021697341U CN213296223U CN 213296223 U CN213296223 U CN 213296223U CN 202021697341 U CN202021697341 U CN 202021697341U CN 213296223 U CN213296223 U CN 213296223U
Authority
CN
China
Prior art keywords
splint
clamping
water conservancy
processing apparatus
conservancy construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021697341.6U
Other languages
Chinese (zh)
Inventor
肖玉东
李秉悦
王洪超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Xunan Agricultural Development Investment Co ltd
Original Assignee
Urumchi Xu'an Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Urumchi Xu'an Construction Engineering Co ltd filed Critical Urumchi Xu'an Construction Engineering Co ltd
Priority to CN202021697341.6U priority Critical patent/CN213296223U/en
Application granted granted Critical
Publication of CN213296223U publication Critical patent/CN213296223U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model discloses a water conservancy construction fastening processing apparatus, including splint, bilateral symmetry is provided with the clamping bar around splint, and the middle part of clamping bar is articulated through the outer wall of support with splint, be connected through the both ends of section of thick bamboo pole and ejector pin between the upper end of the clamping bar of both sides around the splint respectively, be articulated between the one end of section of thick bamboo pole and the upper end of clamping bar, and be threaded connection between the other end of section of thick bamboo pole and the one end of ejector pin, the top of splint is worn to locate by the ejector pin, and is connected for rotating between ejector pin and the splint, splint are for falling "U" font structure, and clamping bar, ejector pin and section of thick bamboo pole are provided with two sets ofly about the both ends symmetry of splint, one side that the clamping bar lower extreme is close to splint is provided with the cushion, and one side that. This water conservancy construction fastening processing apparatus adopts structural design such as splint and clamping bar, can strengthen the fastening between the waterproof baffle that has installed and handle, and it is very convenient to operate to can prevent not hard up.

Description

Water conservancy construction fastening processing apparatus
Technical Field
The utility model relates to a hydraulic engineering technical field specifically is a water conservancy construction fastening processing apparatus.
Background
Hydraulic engineering is a general term for various engineering constructions built for controlling, utilizing and protecting water resources and environments on the earth surface and underground. The service objects are divided into flood control engineering, farmland hydraulic engineering, hydroelectric power engineering, channel and harbor engineering, water supply and drainage engineering, environmental hydraulic engineering, coastal reclamation engineering and the like. The hydraulic engineering which can serve multiple targets such as flood control, water supply, irrigation, power generation and the like at the same time is called comprehensive utilization hydraulic engineering. Hydraulic engineering needs to build various types of hydraulic buildings such as dams, dikes, spillways, water gates, water inlets, channels, transition troughs, rafts, fishways and the like so as to achieve the aims.
Waterproof baffle is used in water conservancy construction along with the impact of rivers, and the condition that becomes flexible can take place for the stronger position of part impact, leads to leaking or even collapsing, and current device is not convenient for consolidate the fastening and handles.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a water conservancy construction fastening processing apparatus to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a water conservancy construction fastening processing apparatus, includes splint, bilateral symmetry is provided with the clamping bar around splint, and the outer wall that the middle part of clamping bar passes through support and splint is articulated, be connected through the both ends of barrel bar and ejector pin between the upper end of the clamping bar of both sides around the splint respectively, be articulated between the one end of barrel bar and the upper end of clamping bar, and be threaded connection between the other end of barrel bar and the one end of ejector pin, the top of splint is worn to locate by the ejector pin, and is connected for rotating between ejector pin and the splint.
Preferably, the clamping plate is of an inverted U-shaped structure, and two groups of clamping rods, ejector rods and cylinder rods are symmetrically arranged at two ends of the clamping plate.
Preferably, one side of the lower end of the clamping rod, which is close to the clamping plate, is provided with a cushion block, and one side of the cushion block, which is close to the clamping plate, is of a concave-convex structure.
Preferably, the middle of the ejector rod is provided with a lantern ring, and the outer wall of the lantern ring is of a hexagonal structure.
Preferably, the outer wall of the ejector rod is provided with an annular bulge, the inner wall of the round hole in the top of the clamping plate is provided with an annular groove, and the structure of the annular groove is matched with that of the annular bulge.
Preferably, a connecting rod is connected between the two ends of the clamping plate, and the connecting rod and the clamping plate are welded.
Compared with the prior art, the beneficial effects of the utility model are that: this water conservancy construction fastening processing apparatus adopts structural design such as splint and clamping bar, can strengthen the fastening between the waterproof baffle that has installed and handle, and it is very convenient to operate to can prevent not hard up.
Drawings
FIG. 1 is a side view of the water conservancy construction fastening processing device of the present invention;
FIG. 2 is a front view of the water conservancy construction fastening device of the present invention;
fig. 3 is the utility model relates to a water conservancy construction fastening processing apparatus top view.
In the figure: 1. splint, 2, clamping bar, 3, support, 4, cushion, 5, lantern ring, 6, annular arch, 7, ejector pin, 8, barrel pole, 9, connecting rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a water conservancy construction fastening processing device comprises a clamping plate 1, clamping rods 2 are symmetrically arranged on the front side and the rear side of the clamping plate 1, the middle parts of the clamping rods 2 are hinged with the outer wall of the clamping plate 1 through a support 3, the support 3 is hinged with the clamping rods 2, the support 3 is welded with the clamping plate 1, the clamping plate 1 is of an inverted U-shaped structure, two groups of clamping rods 2, ejector rods 7 and cylinder rods 8 are symmetrically arranged on two ends of the clamping plate 1, the clamping plate 1 is more uniformly and stably stressed on two ends after installation due to the structure, a cushion block 4 is arranged on one side, close to the clamping plate 1, of the lower end of the clamping rod 2, the cushion block 4 is welded with the clamping rods 2, a concave-convex structure is arranged on one side, close to the clamping plate 1, the structure enables the friction force to be larger when the clamping rods 2 are in contact with a waterproof baffle plate, so that the stability after clamping can be improved, a connecting rod 9 is, the structure enables the clamping plate 1 to be firmer and not easy to break, the upper ends of the clamping rods 2 on the front side and the rear side of the clamping plate 1 are respectively connected with the two ends of the ejector rod 7 through the barrel rod 8, one end of the barrel rod 8 is hinged with the upper ends of the clamping rods 2, one end of the clamping rod 2 is inserted into the cavity at one end of the barrel rod 8, the other end of the barrel rod 8 is in threaded connection with one end of the ejector rod 7, the ejector rod 7 penetrates through the top of the clamping plate 1 and is rotatably connected with the clamping plate 1, the structure enables an operator to push and pull the barrel rods 8 at the two ends by rotating the ejector rod 7, so that the upper ends of the 2 clamping rods 2 can be pushed and pulled, the 2 clamping rods 2 are clamped on a waterproof baffle like a pliers, the device can be rapidly installed, the lantern ring 5 is arranged in the middle of the ejector rod 7 and is welded, the outer wall of the lantern ring 5 is of a hexagonal structure, thereby make operator's accessible instrument control ejector pin 7 rotatory, it is more convenient, be provided with annular protrusion 6 on the outer wall of ejector pin 7, seted up the ring channel on the inner wall of splint 1 top round hole, and the structure of this ring channel and the protruding 6 structure phase-match of annular, through the protruding 6 restriction of this ring channel to the annular for ejector pin 7 can be more stable rotatory.
The working principle is as follows: when the water conservancy construction fastening processing device is used, whether parts are damaged or not or the connection is not firm is firstly checked, the device is used after the detection is correct, the device is sleeved at the connecting position between the waterproof baffles from top to bottom, then the ejector rod 7 is rotated, two ends of the ejector rod 7 are respectively in threaded connection with the cylinder rods 8, the cylinder rods 8 are hinged with the clamping rods 2, the cylinder rods 8 can only move linearly under the limitation of the clamping rods 2, so that the upper ends of the 2 clamping rods 2 can be pushed in the direction away from each other by the rotation of the ejector rod 7, the 2 clamping rods 2 rotate like pliers, the lower ends of the 2 clamping rods 2 are close to each other and are tightly clamped on the outer wall of the waterproof baffles, the device and the waterproof baffles are fixedly installed, at the moment, the clamping plate 1 is erected at the position between the waterproof baffles, the fastening processing between the waterproof baffles can be strengthened, and the looseness can be prevented, and the operation is very convenient, which is the working principle of the water conservancy construction fastening processing device.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (6)

1. The utility model provides a water conservancy construction fastening processing apparatus, includes splint (1), its characterized in that: the utility model discloses a clamp plate, including splint (1), both sides symmetry is provided with clamping bar (2) around splint (1), and the middle part of clamping bar (2) is articulated through the outer wall of support (3) with splint (1), be connected through the both ends of section of thick bamboo pole (8) and ejector pin (7) between the upper end of clamping bar (2) of both sides around splint (1) respectively, be articulated between the one end of section of thick bamboo pole (8) and the upper end of clamping bar (2), and be threaded connection between the other end of section of thick bamboo pole (8) and the one end of ejector pin (7), the top of splint (1) is worn to locate by ejector pin (7), and is connected for rotating between ejector pin (7) and splint (1).
2. The water conservancy construction fastening processing apparatus of claim 1, characterized in that: the U-shaped clamping plate (1) is of an inverted U-shaped structure, and two groups of clamping rods (2), ejector rods (7) and cylinder rods (8) are symmetrically arranged at two ends of the clamping plate (1).
3. The water conservancy construction fastening processing apparatus of claim 1, characterized in that: one side of the lower end of the clamping rod (2) close to the clamping plate (1) is provided with a cushion block (4), and one side of the cushion block (4) close to the clamping plate (1) is of a concave-convex structure.
4. The water conservancy construction fastening processing apparatus of claim 1, characterized in that: the middle of the ejector rod (7) is provided with a lantern ring (5), and the outer wall of the lantern ring (5) is of a hexagonal structure.
5. The water conservancy construction fastening processing apparatus of claim 1, characterized in that: the outer wall of the ejector rod (7) is provided with an annular protrusion (6), the inner wall of the round hole in the top of the clamping plate (1) is provided with an annular groove, and the structure of the annular groove is matched with that of the annular protrusion (6).
6. The water conservancy construction fastening processing apparatus of claim 1, characterized in that: connecting rods (9) are connected between the two ends of the clamping plates (1), and the connecting rods (9) and the clamping plates (1) are welded.
CN202021697341.6U 2020-08-14 2020-08-14 Water conservancy construction fastening processing apparatus Active CN213296223U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021697341.6U CN213296223U (en) 2020-08-14 2020-08-14 Water conservancy construction fastening processing apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021697341.6U CN213296223U (en) 2020-08-14 2020-08-14 Water conservancy construction fastening processing apparatus

Publications (1)

Publication Number Publication Date
CN213296223U true CN213296223U (en) 2021-05-28

Family

ID=76025340

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021697341.6U Active CN213296223U (en) 2020-08-14 2020-08-14 Water conservancy construction fastening processing apparatus

Country Status (1)

Country Link
CN (1) CN213296223U (en)

Similar Documents

Publication Publication Date Title
CN213296223U (en) Water conservancy construction fastening processing apparatus
CN211872855U (en) Be applied to cut-off equipment of hydraulic engineering construction
CN211547633U (en) Water retaining device is used in hydraulic and hydroelectric engineering construction
CN209956717U (en) Culvert pipe auxiliary carrying tool for hydraulic engineering
CN211898348U (en) Hydraulic engineering foundation pile
CN215518759U (en) Flood prevention emergency device for hydraulic engineering
CN213328897U (en) Slope protection device for water conservancy construction
CN209958369U (en) Adjustable concrete pouring device is used in water conservancy dyke engineering construction
CN212506155U (en) Shoal of fish guider of water conservancy water and electricity dam
CN216952245U (en) Hydraulic engineering pipeline protection casing
CN212533927U (en) Water conservancy bank protection dismouting wall body convenient to dismantle
CN110865446A (en) Ocean engineering is with submarine optical cable auxiliary fixture
CN211080524U (en) Sewer dredging equipment for water conservancy
CN216768579U (en) Buried pipe fixing device in narrow space for water conservancy and hydropower construction
CN216227222U (en) Novel pipeline cutting fixed equipment that hydraulic engineering used
CN220079897U (en) Dam body protection structure of yellow river hydraulic engineering
CN217129544U (en) Subway pipe piece bolt hole positioner
CN213358514U (en) Reservoir reinforcing and risk removing structure
CN216994779U (en) Device is built fast to kickboard for hydraulic engineering
CN211597729U (en) Template reinforcing apparatus for hydraulic engineering
CN218405329U (en) Hydraulic pressure dam strutting arrangement
CN207031957U (en) A kind of dyke road maintenance structure being easily installed
CN212427147U (en) Flood prevention cofferdam structure for hydraulic engineering
CN212564702U (en) Pipe burying device for hydraulic and hydroelectric engineering
CN213041311U (en) Hydraulic engineering construction water level monitoring devices

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A fastening treatment device for water conservancy construction

Effective date of registration: 20230927

Granted publication date: 20210528

Pledgee: Bank of China Limited Urumqi Yangzijiang Road Sub branch

Pledgor: URUMCHI XU'AN CONSTRUCTION ENGINEERING CO.,LTD.

Registration number: Y2023980059551

PE01 Entry into force of the registration of the contract for pledge of patent right
CP03 Change of name, title or address

Address after: No. 1001, Office Building 1, 10th Floor, Aidi Xinrui Center, No. 889 North Fourth High Speed Rail Road, Urumqi Economic and Technological Development Zone (Toutunhe District), Xinjiang Uygur Autonomous Region, 830000

Patentee after: Xinjiang Xunan Agricultural Development Investment Co.,Ltd.

Country or region after: China

Address before: Room 1018, office building 12, Wanda Plaza, 433 Xuanwuhu Road, Urumqi Economic and Technological Development Zone (Toutunhe District), 830000 Xinjiang Uygur Autonomous Region

Patentee before: URUMCHI XU'AN CONSTRUCTION ENGINEERING CO.,LTD.

Country or region before: China

CP03 Change of name, title or address