CN213288486U - Cable wiring device for hydraulic engineering construction - Google Patents

Cable wiring device for hydraulic engineering construction Download PDF

Info

Publication number
CN213288486U
CN213288486U CN202021387493.6U CN202021387493U CN213288486U CN 213288486 U CN213288486 U CN 213288486U CN 202021387493 U CN202021387493 U CN 202021387493U CN 213288486 U CN213288486 U CN 213288486U
Authority
CN
China
Prior art keywords
fixedly connected
hydraulic
engineering construction
gear
blade
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021387493.6U
Other languages
Chinese (zh)
Inventor
陶克勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Xunan Agricultural Development Investment Co ltd
Original Assignee
Urumchi Xu'an Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Urumchi Xu'an Construction Engineering Co ltd filed Critical Urumchi Xu'an Construction Engineering Co ltd
Priority to CN202021387493.6U priority Critical patent/CN213288486U/en
Application granted granted Critical
Publication of CN213288486U publication Critical patent/CN213288486U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Shearing Machines (AREA)

Abstract

The utility model discloses a cable routing device of hydraulic engineering construction, concretely relates to hydraulic technical field, comprises a workbench, the top surface fixedly connected with hydraulic pump of workstation, the output fixedly connected with hydraulic stem of hydraulic pump, the top surface fixedly connected with motor case of workstation, one side fixedly connected with motor of motor incasement chamber, the output fixedly connected with drive shaft of motor, the first gear of one end fixedly connected with of drive shaft, the bottom surface fixedly connected with dead lever of motor incasement chamber, the lead screw has been cup jointed in the outer wall rotation of dead lever. The utility model discloses a set up hydraulic pump and hydraulic stem, can be used for promoting the movable block, remove wheel and sliding tray through the setting, can make the movable block remove more conveniently, through setting up movable block, long slab and fixed plate, can make many cables simultaneously by orderly range, fix on the plank, through setting up the wire hole cover, can make cable neatly arranged, it is more convenient to cut.

Description

Cable wiring device for hydraulic engineering construction
Technical Field
The utility model relates to a water conservancy technical field, more specifically say, the utility model relates to a cable routing device of hydraulic engineering construction.
Background
The cable is an electric energy or signal transmission device, usually comprises several or several groups of wires, nowadays the science and technology is developed at a high speed, the network is developed, the use of the cable is also becoming more important, the wiring means the arrangement of wire connection between components, the wire is laid first, the wire is passed through the hole where the pin of electrical connection is located, thus can realize the connection between the components while welding the component.
However, in practical use, there still exist some disadvantages, such as: when the cable is cut, the cable is easy to stack and twine together, is inconvenient to arrange, does not have fixed things, and the cable conductor is very easy to be loose, arranges not striving for gas very much, is unfavorable for the cutting, and when the cutting cable, can only cut one simultaneously, consuming time and power also influences work efficiency.
Therefore, it is desirable to provide a cable routing device for hydraulic engineering construction capable of cutting a plurality of wires simultaneously.
SUMMERY OF THE UTILITY MODEL
In order to overcome the above-mentioned defect of prior art, the embodiment of the utility model provides a cable wiring device of hydraulic engineering construction, through setting up hydraulic pump and hydraulic stem, can be used for promoting the movable block, remove wheel and sliding tray through the setting, it is more convenient to make the movable block remove, through setting up the movable block, long slab and fixed plate, can make many cables by neat's range simultaneously, fix on the plank, through setting up the wire hole cover, can make cable neatly arranged, it is more convenient to cut, with the problem of proposing in solving above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a cable wiring device of hydraulic engineering construction, includes the workstation, the top surface fixedly connected with hydraulic pump of workstation, one side fixedly connected with hydraulic stem of hydraulic pump, the top surface fixedly connected with motor case of workstation, one side fixedly connected with motor of motor incasement chamber, the output fixedly connected with drive shaft of motor, the first gear of one end fixedly connected with of drive shaft, the bottom surface fixedly connected with dead lever of motor incasement chamber, the outer wall of dead lever rotates and has cup jointed the lead screw, the top fixedly connected with second gear of lead screw, the thread bush has been cup jointed to the outer wall screw thread of lead screw, one side of thread bush is rotated and is connected with first blade, one side fixed mounting of motor case has the second blade.
In a preferred embodiment, the first gear and the second gear are meshed with each other, and the first gear and the second gear are matched in specification.
In a preferred embodiment, the first and second blades are both blunt blades.
In a preferred embodiment, a wood board is fixedly connected to the top surface of the workbench, a fixing plate is fixedly connected to one side of the wood board, and a sliding groove is formed in the surface of the wood board.
In a preferred embodiment, the number of the sliding grooves is two, and the sliding grooves are symmetrically distributed.
In a preferred embodiment, one end of the hydraulic rod is fixedly connected with a movable block, and one side of the movable block is provided with a thin rod.
In a preferred embodiment, the outer wall of the slender rod is movably sleeved with a semicircular sleeve, one side of the semicircular sleeve is fixedly connected with a connecting rod, one end of the connecting rod is fixedly connected with a long plate, and the long plate is clamped on the fixing plate.
In a preferred embodiment, a wire hole sleeve is fixedly installed on the top surface of the wood board, a moving wheel is movably sleeved at the bottom of the moving block, a rivet is fixedly connected to one side of the first blade, and the second blade is movably sleeved to one side of the rivet.
The utility model discloses a technological effect and advantage:
1. the utility model discloses a set up hydraulic pump and hydraulic stem, can be used for promoting the movable block, remove wheel and sliding tray through the setting, can make the movable block remove more conveniently, through setting up movable block, long slab and fixed plate, can make many cables simultaneously by orderly range, fix on the plank, through setting up the wire hole cover, can make cable neatly arranged, it is more convenient to cut.
2. The utility model discloses a set up motor, drive shaft and first gear, can drive the second gear rotation, through setting up lead screw and thread bush, can drive first blade and reciprocate, through setting up rivet and second blade, can drive first blade and rotate to help first blade, accomplish the cutting smoothly.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is the schematic diagram of the internal structure of the motor box of the present invention.
Fig. 3 is a side view schematic diagram of a first blade according to the present invention.
Fig. 4 is a schematic side view of the movable block of the present invention.
Fig. 5 is a schematic side view of the long plate of the present invention.
The reference signs are: 1. a work table; 2. a hydraulic pump; 3. a hydraulic lever; 4. a motor case; 5. a motor; 6. a drive shaft; 7. a first gear; 8. fixing the rod; 9. a screw rod; 10. a second gear; 11. a threaded sleeve; 12. a first blade; 13. a second blade; 14. a wood board; 15. a fixing plate; 16. a sliding groove; 17. a movable block; 18. a thin rod; 19. a semicircular sleeve; 20. a connecting rod; 21. a long plate; 22. a wire hole sleeve; 23. a moving wheel; 24. and (4) riveting.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The cable wiring device for hydraulic engineering construction shown in the attached figures 1-5 comprises a workbench 1, a hydraulic pump 2 is fixedly connected to the top surface of the workbench 1, a hydraulic rod 3 is fixedly connected to the output end of the hydraulic pump 2, a motor box 4 is fixedly connected to the top surface of the workbench 1, a motor 5 is fixedly connected to one side of the inner cavity of the motor box 4, a driving shaft 6 is fixedly connected to the output end of the motor 5, a first gear 7 is fixedly connected to one end of the driving shaft 6, a fixing rod 8 is fixedly connected to the bottom surface of the inner cavity of the motor box 4, a lead screw 9 is rotatably sleeved on the outer wall of the fixing rod 8, a second gear 10 is fixedly connected to the top of the lead screw 9, a thread sleeve 11 is sleeved on the outer wall of the lead screw 9, a first blade 12 is rotatably connected to one side of the thread sleeve 11, a second blade 13 is mounted on the, the outer wall of the rivet 24 is movably sleeved with a second blade 13, one side of the second blade 13 is fixedly connected with one side of the motor box 4, the number of the sliding grooves 16 is two and is symmetrically distributed, one end of the hydraulic rod 3 is fixedly connected with a movable block 17, one side of the movable block 17 is provided with a thin rod 18, the outer wall of the thin rod 18 is movably sleeved with a semicircular sleeve 19, one side of the semicircular sleeve 19 is fixedly connected with a connecting rod 20, one end of the connecting rod 20 is fixedly connected with a long plate 21, the long plate 21 is clamped on a fixed plate 15, the top surface of the wood plate 14 is fixedly provided with a wire hole sleeve 22, the bottom of the movable block 17 is movably sleeved with a movable wheel 23, one side of the first blade 12 is fixedly connected with the rivet 24, the second blade 13 is movably sleeved on one side of the rivet 24, the first blade 12 and the second blade 13 are both blunt cutters, the top surface of the workbench 1 is fixedly connected with the wood plate 14, one side, the surface of the wood board 14 is provided with a sliding groove 16.
The implementation mode is specifically as follows: through setting up hydraulic pump 2 and hydraulic stem 3, can be used for promoting movable block 17, remove wheel 23 and sliding tray 16 through setting up, can make movable block 17 remove more conveniently, through setting up movable block 17, long board 21 and fixed plate 15, can make many be fixed on plank 14 by orderly range simultaneously with the cable, through setting up line hole cover 22, can make cable neatly arranged, it is more convenient to cut.
Referring specifically to fig. 2 of the specification, the first gear 7 and the second gear 10 are meshed with each other, and the specifications of the first gear 7 and the second gear 10 are matched.
The implementation mode is specifically as follows: when the first gear 7 moves clockwise, the second gear 10 moves anticlockwise, the second gear 10 can be driven to rotate by arranging the motor 5, the driving shaft 6 and the first gear 7, and the first blade 12 can be driven to move up and down by arranging the screw rod 9 and the threaded sleeve 11.
Wherein the motor 5 is Y80M 1-2.
The utility model discloses the theory of operation:
firstly, an operator places a plurality of cables on the wood board 14, the cables penetrate through the wire hole sleeves 22, the hydraulic pump 2 is started, the hydraulic rod 3 pushes the movable block 17 to move through the hydraulic pump 2, the movable block 17 is sleeved on the sliding groove 16, and the movable wheels 23 run on the wood board 14;
secondly, the long plate 21 is broken off to be buckled on the fixed plate 15 and can move on the fixed plate 15 along with the movable block 17, and when the movable block 17 clamps a plurality of electric wires on one side of the fixed plate 15, the hydraulic pump 2 is closed;
and thirdly, starting the motor 5, driving the driving shaft 6 to rotate by the motor 5, driving the first gear 7 to rotate by the driving shaft 6, so as to drive the second gear 10 to rotate, so that the thread bush 11 can move up and down, the first blade 12 is connected with the second blade 13 through the rivet 24, so that the first blade 12 moves up and down along with the thread bush 11 and rotates, and therefore the cable is cut.
The points to be finally explained are: first, in the description of the present application, it should be noted that, unless otherwise specified and limited, the terms "mounted," "connected," and "connected" should be understood broadly, and may be a mechanical connection or an electrical connection, or a communication between two elements, and may be a direct connection, and "upper," "lower," "left," and "right" are only used to indicate a relative positional relationship, and when the absolute position of the object to be described is changed, the relative positional relationship may be changed;
secondly, the method comprises the following steps: in the drawings of the disclosed embodiments of the present invention, only the structures related to the disclosed embodiments are referred to, and other structures can refer to the common design, and under the condition of no conflict, the same embodiment and different embodiments of the present invention can be combined with each other;
and finally: the above description is only for the preferred embodiment of the present invention and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. The utility model provides a cable wiring device of hydraulic engineering construction, includes workstation (1), the top surface fixedly connected with hydraulic pump (2) of workstation (1), its characterized in that: the output end of the hydraulic pump (2) is fixedly connected with a hydraulic rod (3), the top surface of the workbench (1) is fixedly connected with a motor box (4), one side of the inner cavity of the motor box (4) is fixedly connected with a motor (5), the output end of the motor (5) is fixedly connected with a driving shaft (6), one end of the driving shaft (6) is fixedly connected with a first gear (7), the bottom surface of the inner cavity of the motor box (4) is fixedly connected with a fixed rod (8), the outer wall of the fixed rod (8) is rotatably sleeved with a screw rod (9), the top of the screw rod (9) is fixedly connected with a second gear (10), a thread sleeve (11) is sleeved on the outer side of the screw rod (9) in a threaded manner, a first blade (12) is rotatably connected to one side of the thread sleeve (11), and a second blade (13) is fixedly installed on one side of the motor box (4).
2. The hydraulic engineering construction cable routing device of claim 1, wherein: the first gear (7) and the second gear (10) are meshed with each other, and the specifications of the first gear (7) and the second gear (10) are matched.
3. The hydraulic engineering construction cable routing device of claim 1, wherein: the first blade (12) and the second blade (13) are both blunt cutters.
4. The hydraulic engineering construction cable routing device of claim 1, wherein: the top surface fixedly connected with plank (14) of workstation (1), one side fixedly connected with fixed plate (15) of plank (14), sliding tray (16) have been seted up on the surface of plank (14).
5. The hydraulic engineering construction cable routing device of claim 4, wherein: the number of the sliding grooves (16) is two, and the sliding grooves are symmetrically distributed.
6. The hydraulic engineering construction cable routing device of claim 4, wherein: one end of the hydraulic rod (3) is fixedly connected with a movable block (17), and one side of the movable block (17) is provided with a thin rod (18).
7. The hydraulic engineering construction cable routing device of claim 6, wherein: the outer wall activity of pin (18) has cup jointed semicircle cover (19), one side fixedly connected with connecting rod (20) of semicircle cover (19), the one end fixedly connected with long slab (21) of connecting rod (20), long slab (21) joint is in fixed plate (15).
8. The hydraulic engineering construction cable routing device of claim 6, wherein: the top surface of plank (14) is fixed mounting has wire hole cover (22), the bottom activity of movable block (17) has cup jointed removal wheel (23), and one side fixedly connected with rivet (24) of first blade (12), second blade (13) activity is cup jointed in one side of rivet (24).
CN202021387493.6U 2020-07-15 2020-07-15 Cable wiring device for hydraulic engineering construction Active CN213288486U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021387493.6U CN213288486U (en) 2020-07-15 2020-07-15 Cable wiring device for hydraulic engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021387493.6U CN213288486U (en) 2020-07-15 2020-07-15 Cable wiring device for hydraulic engineering construction

Publications (1)

Publication Number Publication Date
CN213288486U true CN213288486U (en) 2021-05-28

Family

ID=76020227

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021387493.6U Active CN213288486U (en) 2020-07-15 2020-07-15 Cable wiring device for hydraulic engineering construction

Country Status (1)

Country Link
CN (1) CN213288486U (en)

Similar Documents

Publication Publication Date Title
CN211018049U (en) Operation manipulator of distribution network electrified wire breaking and connecting robot
CN110601080A (en) Operation manipulator and operation method for distribution network live wire breaking and connecting robot
CN213846084U (en) Cable stripping tool
CN213288486U (en) Cable wiring device for hydraulic engineering construction
CN211182775U (en) Novel electric cable material girdling scissors
CN203339578U (en) Single/double head machine cable processing machine
CN111864649A (en) Double-end-beating sleeve automatic processing equipment
CN107634481B (en) Rotary wire stripper
CN113794165B (en) Hand-held overhead cable insulating layer stripper
CN215392261U (en) Multicore pencil is with whole line mechanism
CN115149468A (en) Cable wire stripping device for electric power engineering
CN201061073Y (en) Knife model for electric wire stripping
CN209881249U (en) Full-automatic coaxial cable peeler that production efficiency is high
CN109510119B (en) Cable insulation stripping system
CN219371640U (en) Crimping device
CN219054087U (en) Clamp for machining aero-engine blades for preventing parts from falling
CN219874838U (en) Wire stripper
CN217412273U (en) Positioning and cutting device for wire and cable processing
CN212412632U (en) Wire stripping machine for cable end connection
CN212571660U (en) Cable stripping and cutting device
CN213547002U (en) Cable peeling device
CN217010152U (en) Cable insulation layer stripping and cutting tool
CN205342483U (en) Aluminium prduct process structure with swivel work head
CN210161220U (en) Composite insulator disassembling machine
CN212571661U (en) Cable is decided and is shelled and cut all-in-one

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A Cable Wiring Device for Water Conservancy Engineering Construction

Effective date of registration: 20230927

Granted publication date: 20210528

Pledgee: Bank of China Limited Urumqi Yangzijiang Road Sub branch

Pledgor: URUMCHI XU'AN CONSTRUCTION ENGINEERING CO.,LTD.

Registration number: Y2023980059551

PE01 Entry into force of the registration of the contract for pledge of patent right
CP03 Change of name, title or address

Address after: No. 1001, Office Building 1, 10th Floor, Aidi Xinrui Center, No. 889 North Fourth High Speed Rail Road, Urumqi Economic and Technological Development Zone (Toutunhe District), Xinjiang Uygur Autonomous Region, 830000

Patentee after: Xinjiang Xunan Agricultural Development Investment Co.,Ltd.

Country or region after: China

Address before: Room 1018, office building 12, Wanda Plaza, 433 Xuanwuhu Road, Urumqi Economic and Technological Development Zone (Toutunhe District), 830000 Xinjiang Uygur Autonomous Region

Patentee before: URUMCHI XU'AN CONSTRUCTION ENGINEERING CO.,LTD.

Country or region before: China

CP03 Change of name, title or address