CN2132727Y - Conveyer for cable - Google Patents
Conveyer for cable Download PDFInfo
- Publication number
- CN2132727Y CN2132727Y CN 92212415 CN92212415U CN2132727Y CN 2132727 Y CN2132727 Y CN 2132727Y CN 92212415 CN92212415 CN 92212415 CN 92212415 U CN92212415 U CN 92212415U CN 2132727 Y CN2132727 Y CN 2132727Y
- Authority
- CN
- China
- Prior art keywords
- cables
- conveyer
- cable
- frame
- double
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Abstract
The utility model discloses a conveyer for cables, which relates to an electric machine used for laying power cables with large diameter, mainly comprising two vertical tracks, two reduction boxes, and a double-head screw rod. The two vertical tracks and the double-head screw rod are driven by two vertical shafts to cause the two tracks to clamp cables to achieve conveyance operation. The conveyer for cables has the advantages of reasonable structure, no damage of cable insulations, labor saving, time saving, and construction cost saving. The acting force is perpendicular to the gravity of cables. Production output of cables can be ensured. The conveyer for cables is suitable for laying various electric power cables with major diameter.
Description
The utility model relates to a kind of motor machine that is used to lay major diameter (φ is more than 50) power cable (or communication cable).
At present, the major diameter power cable in electric power, the telecommunications engineering lays all does it by hand and carry it on one's shoulder, and sometimes increases traction machine cable socket is carried out traction construction.Doing it by hand and carry it on one's shoulder needs up to a hundred people's collaborative commander, easily error; Traction machine becomes the heavy tractive force of ton to make the very long end of cable end, and insulating barrier relatively moves, and can only scrap.And because the cable discontinuity, the middle probability height that damages having increased the work capacity that joint is made in construction, has improved engineering cost, even has made cable will reduce load operation, the expense people, take a lot of work, time-consuming, expensive, economic benefit is unfavorable.
The purpose of this utility model is to overcome the weak point in the above-mentioned technology, and provides a kind of cable end wise that can make evenly stressed, does not damage insulation, only needs people more than ten just can work in coordination with the motor machine of construction.
The utility model is achieved by the following scheme:
Double-motor drives vertical pair of crawler belt operation by dual vertical, and the double end screw mandrel makes two crawler belts from the horizontal direction clamping cables, thereby realizes the purpose of this utility model.
The utlity model has rational in infrastructurely, application force is vertical with cable gravity, does not damage cable insulation, economizes people's saving of work and time, has tangible economic benefit.Be suitable for using on the various major diameter power cable laying works.
Accompanying drawing 1 is the utility model front view
Accompanying drawing 2 is the utility model birds-eye view
See accompanying drawing 1,2, the utility model is made up of double-motor (1), double end screw mandrel (2), frame (3), drop-gear box (4), bottom roll (5), last cylinder (6), crawler belt (7).All be fixed on the frame, double end screw mandrel (2) links to each other with frame (3), and the output shaft of drop-gear box (4) links to each other with the power wheel of two crawler belts (7), and up-down roller (6), (5) are enclosed within respectively on the adjustable support at frame (3) two ends.
When using the utility model, cable socket (8) is passed upper and lower cylinder (6), (5) of frame (3) one ends, throw in the middle of two crawler belts (7), again from upper and lower cylinder (6), (5) process of frame (3) other end.Adjust bottom roll (5) to suitable height, by the double end screw mandrel with two crawler belts (7) from the horizontal direction clamping cables, start double-motor (1) and make two crawler belt (7) runnings, make cable under clamped state, be fed forward operation by the dual vertical on the drop-gear box (4).
Claims (1)
- A kind of telpher, structure is closed: (4) two in (1) two in motor, double end screw mandrel (2), frame (3), drop-gear box, (5) two of bottom rolls, go up (6) two on cylinder, vertical crawler belt (7) two rows, complete machine is fixed on the frame and becomes one,It is characterized in that: double end screw mandrel (2) links to each other with frame (3), and the output shaft of drop-gear box (4) links to each other with the transmission shaft of two crawler belts (7), and the up-down roller that high and low position is adjustable is enclosed within frame (3) two ends respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 92212415 CN2132727Y (en) | 1992-03-19 | 1992-03-19 | Conveyer for cable |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 92212415 CN2132727Y (en) | 1992-03-19 | 1992-03-19 | Conveyer for cable |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2132727Y true CN2132727Y (en) | 1993-05-12 |
Family
ID=33763380
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 92212415 Expired - Lifetime CN2132727Y (en) | 1992-03-19 | 1992-03-19 | Conveyer for cable |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2132727Y (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102502331A (en) * | 2011-10-24 | 2012-06-20 | 无锡市杜昌电力设备制造有限公司 | Cable conveyor |
CN103241586A (en) * | 2013-04-27 | 2013-08-14 | 兖矿东华建设有限公司 | Opened cable conveyor, transformation method and novel cable laying construction method |
CN104538902A (en) * | 2015-01-07 | 2015-04-22 | 陈章赞 | Fully-automatic tractor used for small cables |
CN104753000A (en) * | 2015-04-20 | 2015-07-01 | 冯莉莉 | Manufacturing and applying method of pneumatic and crawler type threading machine |
CN104834064A (en) * | 2015-04-20 | 2015-08-12 | 冯莉莉 | Pneumatic and crawler-type threading machine |
CN108722938A (en) * | 2018-04-24 | 2018-11-02 | 安徽春辉仪表线缆集团有限公司 | A kind of electric wire surface high-efficiency cleaning device |
-
1992
- 1992-03-19 CN CN 92212415 patent/CN2132727Y/en not_active Expired - Lifetime
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102502331A (en) * | 2011-10-24 | 2012-06-20 | 无锡市杜昌电力设备制造有限公司 | Cable conveyor |
CN103241586A (en) * | 2013-04-27 | 2013-08-14 | 兖矿东华建设有限公司 | Opened cable conveyor, transformation method and novel cable laying construction method |
CN103241586B (en) * | 2013-04-27 | 2016-03-02 | 兖矿东华建设有限公司 | Under shed telpher and cable installatition construction method |
CN104538902A (en) * | 2015-01-07 | 2015-04-22 | 陈章赞 | Fully-automatic tractor used for small cables |
CN104753000A (en) * | 2015-04-20 | 2015-07-01 | 冯莉莉 | Manufacturing and applying method of pneumatic and crawler type threading machine |
CN104834064A (en) * | 2015-04-20 | 2015-08-12 | 冯莉莉 | Pneumatic and crawler-type threading machine |
CN108722938A (en) * | 2018-04-24 | 2018-11-02 | 安徽春辉仪表线缆集团有限公司 | A kind of electric wire surface high-efficiency cleaning device |
CN108722938B (en) * | 2018-04-24 | 2021-06-04 | 安徽春辉仪表线缆集团有限公司 | High-efficient cleaning device in wire and cable surface |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105186385B (en) | Intelligent cable lays dolly | |
CN110697494B (en) | Conveyer of high altitude overhead line | |
CN210074624U (en) | Cable laying device that stability is high | |
CN2132727Y (en) | Conveyer for cable | |
CN213387147U (en) | Self-adaptive cable conveying device | |
CN212652597U (en) | Reinforcing bar bending device for construction site | |
CN112103896B (en) | MPP (maximum power point) power tube with protection structure and machining method thereof | |
CN216105604U (en) | Hoisting accessory is used in installation of steel construction factory building | |
CN215009321U (en) | Cable laying device | |
CN214527375U (en) | Clamping device for production and processing of engineering machinery wire harness | |
CN212648948U (en) | Cable laying device for electrical engineering automation equipment | |
CN210914823U (en) | Cable winding and unwinding devices for electric power engineering | |
CN209940313U (en) | Panel transfer equipment for construction | |
CN209081320U (en) | A kind of pre-buried pipeline conveying device of architectural engineering | |
CN210822940U (en) | Tie up ware is used in wire production | |
CN107244558A (en) | A kind of ceramic panel turnover machine of Novel foaming | |
CN206985162U (en) | A kind of Novel foaming ceramics panel turnover machine | |
CN206812463U (en) | A kind of plastics butt-joint bending two-in-one machine | |
CN212648950U (en) | Coal mine machine cable machinery moves device certainly | |
CN206203201U (en) | For the cylinder pair mechanism of pipeline | |
CN219611251U (en) | Self-moving tail random self-moving cable bracket | |
CN220866815U (en) | Cable bundling equipment convenient for integrated blanking | |
CN217606149U (en) | Optical cable traction device for communication engineering | |
CN218472628U (en) | Auxiliary traction moving device for cable laying | |
CN216764102U (en) | Metal flat plate grabbing device convenient to operate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C15 | Extension of patent right duration from 15 to 20 years for appl. with date before 31.12.1992 and still valid on 11.12.2001 (patent law change 1993) | ||
RN01 | Renewal of patent term | ||
C17 | Cessation of patent right | ||
CX01 | Expiry of patent term |