CN213271572U - Pipeline strutting arrangement for building drainage - Google Patents

Pipeline strutting arrangement for building drainage Download PDF

Info

Publication number
CN213271572U
CN213271572U CN202021952617.0U CN202021952617U CN213271572U CN 213271572 U CN213271572 U CN 213271572U CN 202021952617 U CN202021952617 U CN 202021952617U CN 213271572 U CN213271572 U CN 213271572U
Authority
CN
China
Prior art keywords
plate
fixedly connected
buffer
top end
bottom end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021952617.0U
Other languages
Chinese (zh)
Inventor
韩东洋
谭恒清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021952617.0U priority Critical patent/CN213271572U/en
Application granted granted Critical
Publication of CN213271572U publication Critical patent/CN213271572U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model relates to the technical field of pipeline support, in particular to a pipeline support device for building drainage, which comprises a bottom plate and a top plate, wherein the left part and the right part of the top end of the bottom plate are symmetrically and fixedly connected with supporting plates, the left part and the right part of the bottom end of the top plate are respectively and fixedly connected with the top ends of the supporting plates, the bottom four corners of the top plate are respectively and fixedly connected with protective rods, the bottom ends of the protective rods are respectively and fixedly connected with the top end of the bottom plate, a supporting plate is arranged above the top end of the bottom plate, the bottom four corners of the supporting plate are respectively and fixedly connected with fixed columns, the bottom ends of the fixed columns are inserted from the top end of the bottom plate and extend to the bottom part below the bottom plate, the top end of the supporting plate is fixedly connected with a placement device, the placement device comprises an upper clamping plate and a lower clamping plate, the left part and the right part of the upper clamping plate are connected, the safety coefficient is higher.

Description

Pipeline strutting arrangement for building drainage
Technical Field
The utility model relates to a pipeline supports technical field, specifically is a pipeline strutting arrangement for building drainage.
Background
As is well known, a pipeline is a device for transporting gas, liquid or fluid with solid particles, which is formed by connecting pipes, pipe connectors, valves and the like, and the pipeline has a wide application range, and is mainly used in water supply, drainage, heat supply, gas supply, long-distance transportation of oil and gas, agricultural irrigation, hydraulic engineering and various industrial devices, and pipeline supporting devices need to be installed at intervals in the pipeline installation process.
Through retrieval, patent publication No. CN 210716309U's a pipeline strutting arrangement, including fixed bolster and clamping component, this pipeline strutting arrangement includes fixed bolster and clamping component, and the fixed bolster includes support frame and horizontal post, and the horizontal post is rotatably installed on the support frame, and clamping component includes two clamp arms, and the first end of every clamp arm is connected with the support frame.
The protective performance is lower, when natural disasters such as earthquake occur or the ground is impacted, the pipeline is easy to be impacted, displaced or damaged, and the safety coefficient is lower.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a can effectively protect and the shock attenuation, higher pipeline strutting arrangement for the building drainage of factor of safety to the pipeline when natural disasters such as earthquake or ground receive the impact take place.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a pipeline supporting device for building drainage comprises a bottom plate and a top plate, wherein supporting plates are symmetrically and fixedly connected to the left portion and the right portion of the top end of the bottom plate, the left portion and the right portion of the bottom end of the top plate are fixedly connected with the top ends of the supporting plates respectively, protective rods are fixedly connected to the four corner position areas of the bottom end of the top plate, the bottom ends of the protective rods are fixedly connected with the top end of the bottom plate respectively, a supporting plate is arranged above the top end of the bottom plate, fixing columns are fixedly connected to the four corner position areas of the bottom end of the supporting plate, the bottom ends of the fixing columns are inserted into and extend to the lower portion of the bottom plate from the top end of the bottom plate, a placing device is fixedly connected to the top end of the supporting plate and comprises an upper clamping plate and a lower clamping plate, the left portion and the right portion of the upper clamping plate and the left portion and the right portion, the bottom middle part of layer board is provided with buffer, and buffer includes connecting rod and baffle, the top of connecting rod with the bottom middle part fixed connection of layer board, the lower part outside of connecting rod is provided with the sleeve pipe, the sleeve pipe insert from the top middle part of bottom plate and extend to the bottom plate below with the top fixed connection of baffle, the bottom fixedly connected with buffering screw of connecting rod, the bottom of buffering screw certainly the top middle part of baffle passes the top and the bottom of baffle in proper order and extends to the below of baffle, damping spring is installed on buffering screw's circumference outer wall upper portion to the lower part spiral shell of buffering screw is equipped with buffer nut.
Preferably, the bottom middle part fixedly connected with buffer board of roof, the bottom fixedly connected with pillar of buffer board, the bottom fixedly connected with buffer spring of pillar, buffer spring's bottom fixedly connected with U template.
Preferably, the middle part of each protection rod is fixedly connected with a protection pipe, each protection pipe is provided with four pins, and the four pins sequentially penetrate through the protection pipe and the protection rod from the front end of the protection pipe.
Preferably, the bottom end of the U-shaped plate is fixedly connected with a cushion pad.
Preferably, the inner walls of the upper clamping plate and the lower clamping plate are fixedly connected with protective pads.
Preferably, the left part and the right part of the bottom end of the bottom plate are fixedly connected with conical nails.
(III) advantageous effects
Compared with the prior art, the utility model provides a pipeline strutting arrangement for building drainage possesses following beneficial effect:
this pipeline strutting arrangement for building drainage, carry out the centre gripping to the pipeline through punch holder and lower plate, support punch holder and lower plate through layer board and fixed column, the fender rod forms three horn areas with the backup pad, it is more firm to make the device, when taking place the earthquake or collapse, the roof extrudees downwards, fender rod and bracing piece are by extrusion deformation, cushion partly pressure, receive pressure downstream through the connecting rod, drive clamping screw downstream, make damping spring extrusion, thereby reach and can effectively protect and the shock attenuation to the pipeline when natural disasters such as emergence earthquake or ground receive the impact, factor of safety is higher effect.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a portion of the enlarged structure of FIG. 1;
FIG. 3 is a schematic view of a portion of the enlarged structure of FIG. 1 at B according to the present invention;
fig. 4 is a left side view structure diagram of the present invention.
In the figure: 1. a base plate; 2. a top plate; 3. a support plate; 4. a guard bar; 5. a support plate; 6. fixing a column; 7. an upper splint; 8. a lower splint; 9. a clamping screw; 10. clamping the nut; 11. a connecting rod; 12. a partition plate; 13. a sleeve; 14. a buffer screw; 15. a damping spring; 16. a cushion nut; 17. a buffer plate; 18. a pillar; 19. a buffer spring; 20. a U-shaped plate; 21. a protective tube; 22. a pin; 23. a cushion pad; 24. a protective pad; 25. and (5) conical nails.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example (b):
referring to fig. 1-4, a pipeline supporting device for building drainage comprises a bottom plate 1 and a top plate 2, wherein the left part and the right part of the top end of the bottom plate 1 are symmetrically and fixedly connected with supporting plates 3, the left part and the right part of the bottom end of the bottom plate 1 are fixedly connected with conical nails 25, and the conical nails 25 are installed underground to fix the device and improve the stability of the device; the left part and the right part of the bottom end of the top plate 2 are fixedly connected with the top ends of the supporting plates 3 respectively, the four corner position areas of the bottom end of the top plate 2 are fixedly connected with the protective rods 4 respectively, the bottom end of each protective rod 4 is fixedly connected with the top end of the bottom plate 1 respectively, the middle part of each protective rod 4 is fixedly connected with a protective tube 21, four pins 22 are arranged on each protective tube 21, and the four pins 22 sequentially penetrate through the protective tube 21 and the protective rod 4 from the front end of the protective tube 21, so that the device is firmer, and the stability of the device is improved; the middle part of the bottom end of the top plate 2 is fixedly connected with a buffer plate 17, the bottom end of the buffer plate 17 is fixedly connected with a strut 18, the bottom end of the strut 18 is fixedly connected with a buffer spring 19, and the bottom end of the buffer spring 19 is fixedly connected with a U-shaped plate 20 for buffering when collision or collapse occurs, so that the extrusion to a pipeline is reduced; a supporting plate 5 is arranged above the top end of the bottom plate 1, four corner position areas at the bottom end of the supporting plate 5 are fixedly connected with fixing columns 6, the bottom end of each fixing column 6 is inserted into and extends to the lower side of the bottom plate 1 from the top end of the bottom plate 1, a placing device is fixedly connected to the top end of the supporting plate 5 and comprises an upper clamping plate 7 and a lower clamping plate 8, protective pads 24 are fixedly connected to the inner walls of the upper clamping plate 7 and the lower clamping plate 8, the protective pads 24 are made of rubber materials, friction between a pipeline and the upper clamping plate 7 and the lower clamping plate 8 is reduced, and the surface of the pipeline is effectively protected; the bottom end of the U-shaped plate 20 is fixedly connected with a cushion pad 23, the cushion pad 23 is made of rubber, and damage to the U-shaped plate 20 and the upper clamping plate 7 during collision is reduced; the left part and the right part of the upper clamping plate 7 are connected with the left part and the right part of the lower clamping plate 8 through clamping screws 9, clamping nuts 10 are screwed on the left part and the right part of the bottom end of the lower clamping plate 8, a buffer device is arranged in the middle of the bottom end of the supporting plate 5, the buffer device comprises a connecting rod 11 and a partition plate 12, the top end of the connecting rod 11 is fixedly connected with the middle of the bottom end of the supporting plate 5, a sleeve 13 is arranged on the outer side of the lower part of the connecting rod 11, the sleeve 13 is inserted into the middle of the top end of the bottom plate 1 and extends to the lower part of the bottom plate 1 to be fixedly connected with the top end of the partition plate 12, a buffer screw 14 is fixedly connected with the bottom end of the connecting rod 11, the bottom end of the buffer screw 14 sequentially penetrates through the top end and the bottom end of the partition plate 12 from the middle of the top end of the partition plate 12 and extends to the, support punch holder and lower plate through layer board and fixed column, the fender rod forms three angular regions with the backup pad, makes the device more firm, when taking place the earthquake or collapse, the roof extrudees downwards, fender rod and bracing piece are by extrusion deformation, cushion partly pressure, receive pressure downstream through the connecting rod, drive clamping screw downstream, make damping spring extrusion to reach the shock attenuation effect.
To sum up, this pipeline strutting arrangement for building drainage's theory of operation and working process do, when using, at first carry out the centre gripping through punch holder 7 and lower plate 8 to the pipeline, support punch holder 7 and lower plate 8 through layer board 5 and fixed column 6, through roof 2, fender rod 4 and backup pad 3 protect the pipeline, fender rod 4 forms the triangle area with backup pad 3, it is more firm to make the device, when taking place earthquake or ground collapse, roof 2 receives pressure extrusion downwards, U template 20 extrudees punch holder 7, buffer spring 19 compresses, make pressure obtain the buffering, connecting rod 11 receives pressure migration downwards, drive clamping screw 9 and move downwards, buffer spring 15 compresses, make the impact force of external world to the pipeline obtain the buffering.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a pipeline strutting arrangement for building drainage which characterized in that: the anti-theft device comprises a bottom plate (1) and a top plate (2), wherein the left part and the right part of the top end of the bottom plate (1) are symmetrically and fixedly connected with supporting plates (3), the left part and the right part of the bottom end of the top plate (2) are respectively and fixedly connected with the top ends of the supporting plates (3), the four corner position areas of the bottom end of the top plate (2) are respectively and fixedly connected with protective rods (4), the bottom end of each protective rod (4) is respectively and fixedly connected with the top end of the bottom plate (1), a supporting plate (5) is arranged above the top end of the bottom plate (1), the four corner position areas of the bottom end of the supporting plate (5) are respectively and fixedly connected with fixing columns (6), the bottom end of each fixing column (6) is inserted from the top end of the bottom plate (1) and extends to the lower part of the bottom plate (1), the top end of the supporting plate, the left part and the right part of the upper clamping plate (7) are connected with the left part and the right part of the lower clamping plate (8) through clamping screws (9), clamping nuts (10) are screwed on the left part and the right part of the bottom end of the lower clamping plate (8), a buffer device is arranged in the middle of the bottom end of the supporting plate (5), the buffer device comprises a connecting rod (11) and a partition plate (12), the top end of the connecting rod (11) is fixedly connected with the middle of the bottom end of the supporting plate (5), a sleeve (13) is arranged on the outer side of the lower part of the connecting rod (11), the sleeve (13) is inserted from the middle of the top end of the bottom plate (1) and extends to the lower part of the bottom plate (1) and the top end of the partition plate (12), the bottom end of the connecting rod (11) is fixedly connected with a buffer screw (14), the bottom end of the buffer screw (14) sequentially penetrates through the top end and the bottom end of the partition plate (12), and a damping spring (15) is installed on the upper part of the circumferential outer wall of the buffer screw (14), and a buffer nut (16) is screwed on the lower part of the buffer screw (14).
2. The pipe support device for building drainage according to claim 1, wherein: the bottom middle part fixedly connected with buffer board (17) of roof (2), the bottom fixedly connected with pillar (18) of buffer board (17), the bottom fixedly connected with buffer spring (19) of pillar (18), the bottom fixedly connected with U template (20) of buffer spring (19).
3. The pipe support device for building drainage according to claim 2, wherein: the middle part of each protection rod (4) is fixedly connected with a protection pipe (21), four pins (22) are arranged on each protection pipe (21), and the four pins (22) sequentially penetrate through the protection pipe (21) and the protection rod (4) from the front end of the protection pipe (21).
4. The pipe support device for building drainage according to claim 3, wherein: the bottom end of the U-shaped plate (20) is fixedly connected with a cushion pad (23).
5. The pipe support device for building drainage according to claim 4, wherein: and protective pads (24) are fixedly connected to the inner walls of the upper clamping plate (7) and the lower clamping plate (8).
6. The pipe support device for building drainage according to claim 5, wherein: the bottom left part and the right part of the bottom plate (1) are fixedly connected with conical nails (25).
CN202021952617.0U 2020-09-09 2020-09-09 Pipeline strutting arrangement for building drainage Expired - Fee Related CN213271572U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021952617.0U CN213271572U (en) 2020-09-09 2020-09-09 Pipeline strutting arrangement for building drainage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021952617.0U CN213271572U (en) 2020-09-09 2020-09-09 Pipeline strutting arrangement for building drainage

Publications (1)

Publication Number Publication Date
CN213271572U true CN213271572U (en) 2021-05-25

Family

ID=75939415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021952617.0U Expired - Fee Related CN213271572U (en) 2020-09-09 2020-09-09 Pipeline strutting arrangement for building drainage

Country Status (1)

Country Link
CN (1) CN213271572U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114321504A (en) * 2021-12-06 2022-04-12 吉林松江河水力发电有限责任公司 Fixing device for water conservancy and hydropower buried pipe

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114321504A (en) * 2021-12-06 2022-04-12 吉林松江河水力发电有限责任公司 Fixing device for water conservancy and hydropower buried pipe
CN114321504B (en) * 2021-12-06 2024-04-12 吉林松江河水力发电有限责任公司 Fixing device for water conservancy and hydropower buried pipe

Similar Documents

Publication Publication Date Title
CN213271572U (en) Pipeline strutting arrangement for building drainage
CN213452121U (en) Antidetonation support protection device
CN211289181U (en) Electromechanical anti-seismic support and hanger for building
CN214889373U (en) Antidetonation finished product support with high strength stability
CN210050448U (en) Antidetonation support convenient to installation
CN212004572U (en) Hydraulic engineering pipeline connecting device convenient to adjust
CN212689288U (en) Anti-seismic structure with frame structure filled with ductile supporting members
CN212080501U (en) Viscoelastic combined damping bracket for pipeline
CN113090819A (en) Flexible anti-seismic support for vertical pipeline of building
CN211340807U (en) Deep foundation pit supporting device for anti-collapse foundation engineering
CN211548924U (en) Building structure supports steelframe
CN211996965U (en) Novel a support body for transporting dig quick-witted drilling rod soon
CN208136904U (en) A kind of civil engineering combined type support stake
CN211118234U (en) Combined application device of horizontal support and anti-seismic support
CN210196658U (en) Highway bridge pipeline strutting arrangement
CN213871685U (en) Assembled comprehensive anti-seismic support and hanger
CN216201194U (en) Pipeline installation is with antidetonation support
CN108824669B (en) Anti-seismic connecting piece of grid structure
CN213712097U (en) Effectual antidetonation of antidetonation hangs support
CN206903254U (en) Construction fixture type guard rail
CN211259853U (en) Wedge-shaped cushion block for pipeline
CN217328820U (en) Concrete pump pipe damping device
CN211114292U (en) Steel construction curtain anti-seismic structure
CN212002324U (en) Pump pipe limiting and fixing device for anti-shaking pipe explosion of engineering concrete pump pipe
CN213539749U (en) A shock attenuation instrument formula support frame for horizontal pump line of floor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210525

Termination date: 20210909