- CN213271474U CN213271474U CN202021323511.4U CN202021323511U CN213271474U CN 213271474 U CN213271474 U CN 213271474U CN 202021323511 U CN202021323511 U CN 202021323511U CN 213271474 U CN213271474 U CN 213271474U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- mounting
- adapter sleeve
- mount pad
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000004321 preservation Methods 0.000 title claims abstract description 10
- 238000007789 sealing Methods 0.000 claims abstract description 4
- 238000009413 insulation Methods 0.000 claims description 22
- 230000001681 protective effect Effects 0.000 claims description 19
- 239000010410 layer Substances 0.000 claims description 9
- 239000011241 protective layer Substances 0.000 claims description 4
- 238000009434 installation Methods 0.000 description 7
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009439 industrial construction Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000003345 natural gas Substances 0.000 description 1
- 239000000047 product Substances 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Thermal Insulation (AREA)
Abstract
The utility model discloses a connect inseparable pipe engineering with connecting heat preservation lag, including the adapter sleeve, the one end fixed mounting of adapter sleeve has the mount pad, movable mounting has fixing bolt on the mount pad, the other end movable mounting of adapter sleeve has the sealing washer, fixed mounting has fixed fixture block in the adapter sleeve, connecting slot has been seted up in the adapter sleeve, it has the mounting hole to reserve in the adapter sleeve, it has the connecting hole to reserve on the mount pad, the outside reservation of mount pad has fixed screw, fixing bolt's one end movable mounting has the pinch-off blades, the one end movable mounting of pinch-off blades has the protection cushion, fixed mounting has the protection spring between protection cushion and the pinch-off blades. This connect inseparable pipe engineering with connecting heat preservation lag, whole device simple structure conveniently carries out the work of using, can be better protect the work, has enlarged the application scope of product simultaneously, reduces the cost input of work.
Description
Technical Field
The utility model relates to a pipeline engineering technical field specifically is a connect inseparable pipeline engineering with connecting heat preservation lag.
Background
The pipeline engineering in the broad sense also includes equipment and equipment supply, and the engineering for constructing pipelines for conveying oil products, natural gas and solid slurry includes pipeline line engineering, station library engineering and pipeline auxiliary engineering, the pipeline line engineering is a comprehensive engineering using various modern scientific techniques, including a large number of general buildings and installation engineering, also including some engineering buildings with professionality, professional equipment and construction technology, and the pipeline consumes tens of thousands of tons of steel or more than millions of tons, and the investment sometimes needs tens of dollars, and the engineering scale is very large, and is regarded as a large-scale and comprehensive industrial construction project by all countries in the world.
However, when the pipeline connection work is carried out in the existing market, the fixed connecting sleeves need to be installed, but the connecting sleeves in the existing market are generally simple in structural design, when the connecting sleeves are used, the leakage situation can occur due to the fact that the connection is not tight enough, resources can be wasted, the environment can be polluted, the cost expenditure in the working process is increased, the working speed can be slowed down, the heat preservation work can not be carried out, and the application range is limited.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a connect inseparable pipe engineering with connecting heat preservation lag, generally be simple structural design to the adapter sleeve that proposes on the market among the solution above-mentioned background, when using, probably because connect inseparable enough and the condition that appears leaking, not only can the resource be wasted, still can cause the pollution of environment, the cost expenditure when having increased work, also can cause the condition that operating speed slows down, and also can't carry out heat retaining work, application scope's problem has been restricted.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a connect inseparable pipe engineering with connecting heat preservation lag, includes the adapter sleeve, the one end fixed mounting of adapter sleeve has the mount pad, movable mounting has fixing bolt on the mount pad, the other end movable mounting of adapter sleeve has the sealing washer, fixed mounting has fixed fixture block in the adapter sleeve, connecting slot has been seted up in the adapter sleeve, it has the mounting hole to reserve in the adapter sleeve, it has the connecting hole to reserve on the mount pad, the outside reservation of mount pad has fixed screw, fixing bolt's one end movable mounting has the clamp plate, the one end movable mounting of clamp plate has the protection cushion, fixed mounting has protection spring between protection cushion and the clamp plate.
Preferably, the connecting sleeve is designed to be a cylindrical structure, the inner side of the connecting sleeve is fixedly provided with a heat insulation cavity, the inner side of the heat insulation cavity is fixedly provided with a heat insulation layer, and the heat insulation layer is fixedly arranged on the inner side of the heat insulation cavity.
Preferably, the mounting seat is designed to be a cylindrical structure, the size of the mounting seat is smaller than that of the connecting sleeve, four fixing screw holes and fixing bolts are symmetrically arranged on the mounting seat, and the fixing bolts are arranged in a cross-shaped structure.
Preferably, the fixed clamping blocks are designed to be of an I-shaped structure, and two groups of fixed clamping blocks and two groups of connecting clamping grooves are symmetrically arranged on the connecting sleeve.
Preferably, the clamping plate is designed to be of a circular arc-shaped structure, four clamping plates are symmetrically arranged in the mounting seat, and the size of each clamping plate is matched with that of the corresponding connecting hole.
Preferably, the protection cushion is of a circular arc structure design, and seven protection springs which are arranged at equal intervals are symmetrically arranged on the protection cushion.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the connecting heat-insulating protective sleeve for the pipeline engineering with tight connection is additionally provided with an internal connecting plate, the interior of the connecting heat-insulating protective sleeve can be fixed again, the protective work can be further carried out, the use work can be better carried out, and the protective effect of the whole device is improved;
2. the connecting heat-insulating protective sleeve for the pipeline engineering with tight connection is additionally provided with an internal heat-insulating filling layer, so that heat-insulating work can be better performed when the connecting heat-insulating protective sleeve is used, the situation that the interior of the connecting heat-insulating protective sleeve bursts due to over-low temperature is prevented, and the service life of equipment is prolonged;
3. this connect inseparable pipe engineering with connecting heat preservation lag, whole device simple structure conveniently carries out the work of using, can be better protect the work, has enlarged the application scope of product simultaneously, reduces the cost input of work.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the split structure of the present invention;
FIG. 3 is a schematic view of the connection structure of the present invention;
fig. 4 is a schematic view of the internal structure of the present invention.
In the figure: 1. connecting sleeves; 2. a mounting seat; 3. fixing the bolt; 4. a seal ring; 5. fixing the fixture block; 6. a connecting clamping groove; 7. mounting holes; 8. connecting holes; 9. fixing screw holes; 10. a clamping plate; 11. a protective cushion; 12. a guard spring; 13. a thermally insulating cavity; 14. a heat-insulating layer; 15. and (4) a protective layer.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a connecting heat-insulating protective sleeve for tightly connected pipeline engineering comprises a fixed bottom plate 1, wherein one end of a connecting sleeve 1 is fixedly provided with a mounting seat 2, a fixing bolt 3 is movably mounted on the mounting seat 2, the other end of the connecting sleeve 1 is movably mounted with a sealing ring 4, a fixing clamping block 5 is fixedly mounted in the connecting sleeve 1, a connecting clamping groove 6 is formed in the connecting sleeve 1, a mounting hole 7 is reserved in the connecting sleeve 1, a connecting hole 8 is reserved in the mounting seat 2, a fixing screw hole 9 is reserved on the outer side of the mounting seat 2, one end of the fixing bolt 3 is movably mounted with a clamping plate 10, one end of the clamping plate 10 is movably mounted with a protective cushion 11, and a protective spring 12 is fixedly mounted between the protective cushion 11 and;
furthermore, the connecting sleeve 1 is designed to be a cylindrical structure, the inner side of the connecting sleeve 1 is fixedly provided with a heat insulation cavity 13, the inner side of the heat insulation cavity 13 is fixedly provided with a heat insulation layer 14, and a protective layer 15 is fixedly arranged in the heat insulation layer 14, so that the heat insulation work can be better carried out;
furthermore, the installation base 2 is designed to be a cylindrical structure, the size of the installation base 2 is smaller than that of the connection sleeve 1, four fixing screw holes 9 and fixing bolts 3 are symmetrically arranged on the installation base 2, and the fixing bolts 3 are arranged in a cross-shaped structure, so that the fixing work can be better carried out;
furthermore, the fixed fixture blocks 5 are designed to be in an I-shaped structure, and two groups of the fixed fixture blocks 5 and the connecting clamp grooves 6 are symmetrically arranged on the connecting sleeve 1, so that the connection work can be better carried out;
furthermore, the clamping plate 10 is designed to be of an arc-shaped structure, four clamping plates 10 are symmetrically arranged in the mounting seat 2, and the size of the clamping plate 10 is matched with that of the connecting hole 8, so that the stability after mounting can be improved;
furthermore, the protection cushion 11 is designed to be in a circular arc structure, and seven protection springs 12 which are arranged at equal intervals are symmetrically arranged on the protection cushion 11, so that protection can be better performed.
The working principle is as follows: firstly, selecting a proper position to install the whole device, fixing a pipeline to be installed through a connecting structure on the pipeline, after the installation is finished, connecting the pipeline through the mutual connection of a fixed clamping block 5 and a connecting clamping groove 6 on a connecting sleeve 1, adjusting the external part of the connecting sleeve 1 after the installation is finished, then driving a clamping plate 10 to move by rotating a fixed bolt 3 in a fixed screw hole 9, carrying out the work of secondary clamping on the pipeline, simultaneously matching a protective cushion 11 on the clamping plate 10 with a protective spring 12 to be more accordant with the pipeline, after the installation is finished, using the device, when the device is used, reducing the influence of external temperature on the inside by a heat insulation cavity 13 in the connecting sleeve 1, simultaneously better carrying out heat insulation work by a heat insulation layer 14 and a protective layer 15, and having simple structure, the work of conveniently using, the work of protecting that can be better has enlarged the application scope of product simultaneously, reduces the cost input of work.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a connect inseparable pipe engineering with connecting heat preservation lag, includes the adapter sleeve, its characterized in that: the one end fixed mounting of adapter sleeve has the mount pad, movable mounting has fixing bolt on the mount pad, the other end movable mounting of adapter sleeve has the sealing washer, fixed mounting has fixed fixture block in the adapter sleeve, connecting slot has been seted up in the adapter sleeve, it has the mounting hole to reserve in the adapter sleeve, it has the connecting hole to reserve on the mount pad, the outside of mount pad is reserved has fixed screw, fixing bolt's one end movable mounting has the pinch-off blades, the one end movable mounting of pinch-off blades has the protection cushion, fixed mounting has protection spring between protection cushion and the pinch-off blades.
2. The connecting thermal insulation protective sleeve for the pipeline engineering with tight connection according to claim 1, wherein: the connecting sleeve is designed to be a cylindrical structure, a heat insulation cavity is fixedly mounted on the inner side of the connecting sleeve, a heat insulation layer is fixedly mounted on the inner side of the heat insulation cavity, and a protective layer is fixedly mounted in the heat insulation layer.
3. The connecting thermal insulation protective sleeve for the pipeline engineering with tight connection according to claim 1, wherein: the mounting seat is designed to be of a cylindrical structure, the size of the mounting seat is smaller than that of the connecting sleeve, four fixing screw holes and fixing bolts are symmetrically arranged on the mounting seat, and the fixing bolts are arranged in a cross-shaped structure.
4. The connecting thermal insulation protective sleeve for the pipeline engineering with tight connection according to claim 1, wherein: the fixed fixture blocks are designed to be of an I-shaped structure, and two groups of fixed fixture blocks and two groups of connecting clamp grooves are symmetrically arranged on the connecting sleeve.
5. The connecting thermal insulation protective sleeve for the pipeline engineering with tight connection according to claim 1, wherein: the clamping plate is of an arc-shaped structural design, four clamping plates are symmetrically arranged in the mounting seat, and the size of each clamping plate is matched with that of the corresponding connecting hole.
6. The connecting thermal insulation protective sleeve for the pipeline engineering with tight connection according to claim 1, wherein: the protection cushion is of an arc-shaped structural design, and seven protection springs which are arranged at equal intervals are symmetrically arranged on the protection cushion.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021323511.4U CN213271474U (en) | 2020-07-08 | 2020-07-08 | Connect inseparable pipe engineering with connecting heat preservation lag |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021323511.4U CN213271474U (en) | 2020-07-08 | 2020-07-08 | Connect inseparable pipe engineering with connecting heat preservation lag |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213271474U true CN213271474U (en) | 2021-05-25 |
Family
ID=75958472
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021323511.4U Expired - Fee Related CN213271474U (en) | 2020-07-08 | 2020-07-08 | Connect inseparable pipe engineering with connecting heat preservation lag |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213271474U (en) |
-
2020
- 2020-07-08 CN CN202021323511.4U patent/CN213271474U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213271474U (en) | Connect inseparable pipe engineering with connecting heat preservation lag | |
CN202914933U (en) | Double sealing flange | |
CN202883302U (en) | Padding component of piston type compressor | |
CN214373312U (en) | Water cooling structure for vertical rotor tester | |
CN210566850U (en) | Sealing flange connecting piece of natural gas transportation pipeline | |
CN204533956U (en) | A kind of pipeline leakage plugging device | |
CN203147156U (en) | Fast leakage stopping fixture for pipeline perforation | |
CN217143291U (en) | Lathe rotary joint | |
CN213811917U (en) | Elastic sealing sleeve for double-tube-plate silicon carbide heat exchanger | |
CN218378324U (en) | Heating power pipeline water leakage point plugging structure | |
CN218348181U (en) | Detachable protective structure for natural gas pipeline | |
CN220488450U (en) | Sealing device of hydraulic control butterfly valve of quenching machine | |
CN213811918U (en) | Sealing sleeve for double-tube-plate silicon carbide heat exchanger | |
CN215890167U (en) | Engine exhaust pipe with heat shield and engine | |
CN216344665U (en) | Pressurized plugging clamp for leakage working condition of submarine pipeline | |
CN220354843U (en) | Central heating overhead heat preservation pipe | |
CN202133326U (en) | Stepped positioning structure for four corners of heat transfer plate | |
CN217683758U (en) | Protective plastic-sheathed steel heat-insulation pipe for constructional engineering | |
CN217714014U (en) | Electromechanical water supply and drainage pipe anti-seepage device | |
CN217401754U (en) | High-temperature-resistant wear-resistant hard alloy ball valve | |
CN215927964U (en) | Hydraulic valve block convenient for drilling for wind power system | |
CN212131549U (en) | Sealing device | |
CN216976252U (en) | Natural gas power generation flue gas heat recycling device | |
CN219975722U (en) | Sleeve leakage-proof unit and heat supply network heating device | |
CN214947079U (en) | Cold supply pipeline connecting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210525 |