CN213267975U - Foundation pile for road and bridge construction - Google Patents

Foundation pile for road and bridge construction Download PDF

Info

Publication number
CN213267975U
CN213267975U CN202022105974.XU CN202022105974U CN213267975U CN 213267975 U CN213267975 U CN 213267975U CN 202022105974 U CN202022105974 U CN 202022105974U CN 213267975 U CN213267975 U CN 213267975U
Authority
CN
China
Prior art keywords
fixed
fixing
foundation pile
road
bridge construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022105974.XU
Other languages
Chinese (zh)
Inventor
祁彩霞
刘平
安卫兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guyuan Kaida Highway Engineering Co ltd
Original Assignee
Guyuan Kaida Highway Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guyuan Kaida Highway Engineering Co ltd filed Critical Guyuan Kaida Highway Engineering Co ltd
Priority to CN202022105974.XU priority Critical patent/CN213267975U/en
Application granted granted Critical
Publication of CN213267975U publication Critical patent/CN213267975U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a foundation pile for road and bridge construction, which comprises a foundation pile, wherein two groups of clamping blocks are arranged on the foundation pile, fastening holes are formed at two ends of each clamping block, a fixed shaft is arranged on each clamping block, a first fixed rod is sleeved on each fixed shaft, a second fixed rod is arranged on each fixed rod, a fixed sleeve is arranged between each first fixed rod and each second fixed rod, a fixed spring is sleeved on each first fixed rod and each second fixed rod, and a fixed base is arranged below each second fixed rod; the grip block bottom is equipped with the fixed block, and the fixed block has the gasket, and the gasket has vibration damping mount, is equipped with damping spring on the vibration damping mount, damping spring top and gasket contact. The utility model discloses when using, it is fixed with two sets of grip blocks through the fastening hole, fix unable adjustment base subaerial, the fixed spring card of setting is established in fixed cover, and is fixed with the foundation pile, and it is more firm to let the foundation pile fixed, and is stable, and it is more convenient to dismantle, and the damping spring of setting lets this foundation pile for road and bridge construction have better shock resistance, has prolonged its life.

Description

Foundation pile for road and bridge construction
Technical Field
The utility model relates to a road and bridge construction technical field specifically is a foundation pile is used in road and bridge construction.
Background
The existing road and bridge foundation piles are usually poured into a column shape by cement paste, the bottom structure is unstable, and meanwhile, the outside of the foundation pile needs to be subjected to long-term rain wash and wind erosion, so that potential safety hazards exist in the foundation pile, and therefore reinforcing devices are installed on most of the foundation piles.
Traditional reinforcement mode adopts to pour again outside impaired foundation pile and protects a cement section of thick bamboo, but the time of construction is longer, and is fixed insecure, and dismantles inconveniently, influences work efficiency, does not have better shock resistance.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art, the utility model provides a foundation pile is used in road and bridge construction to the time of traditional reinforcement mode construction among the solution prior art is longer, and is fixed insecure, and dismantles inconveniently, influences work efficiency, does not have better shock resistance's technical problem.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes:
a foundation pile for road and bridge construction comprises a foundation pile, wherein two groups of clamping blocks are arranged on the foundation pile, fastening holes are formed in two ends of each clamping block, a fixing shaft is arranged on each clamping block and sleeved with a first fixing rod, a second fixing rod is arranged below each fixing rod, a fixing sleeve is arranged between each first fixing rod and the corresponding second fixing rod, fixing springs are sleeved on the first fixing rod and the second fixing rod, and a fixing base is arranged below each second fixing rod; the bottom of grip block is provided with the fixed block, be provided with the gasket under the fixed block, be provided with vibration damping mount under the gasket, the last spring fixed position that is provided with of vibration damping mount, be provided with damping spring in the spring fixed position, the damping spring top contacts with the gasket.
As the utility model discloses a preferred technical scheme, bolt and nut have been seted up to the both ends of two sets of grip blocks.
As the utility model discloses a preferred technical scheme, be provided with four group's spud piles under unable adjustment base, set up respectively under unable adjustment base's four feet.
As the utility model discloses an optimized technical scheme, set up two sets of fixed orificess on the fixed block.
As an optimal technical scheme of the utility model, the bottom surface of gasket is provided with the spring fixed position, the spring fixed position with damping spring all is provided with four groups.
As the utility model discloses an optimized technical scheme, the fixed through hole that the multiunit is equidistant to be distributed has been seted up on vibration damping mount's the bottom.
The utility model provides a foundation pile is used in road and bridge construction possesses following beneficial effect:
the utility model discloses when using, it is fixed with two sets of grip blocks through the fastening hole, fix unable adjustment base subaerial, dead lever one all is provided with fixing spring with dead lever two, and the fixing spring card is established in fixed cover, and is fixed with the foundation pile, and the fixing spring of setting makes the foundation pile fixed more firm, and is stable, and it is more convenient to dismantle, and the damping spring of setting lets this foundation pile for road and bridge construction have better shock resistance, has prolonged its life.
Drawings
FIG. 1 is a schematic perspective view of a foundation pile for road and bridge construction according to the present invention;
FIG. 2 is an exploded view of the foundation pile for road and bridge construction;
fig. 3 is the utility model relates to a road and bridge construction is with foundation pile's front view.
In the figure: 1. foundation piles; 2. a clamping block; 3. a fastening hole; 4. a bolt; 5. a nut; 6. a fixed shaft; 7. fixing a rod I; 8. a second fixing rod; 9. fixing the spring; 10. fixing a sleeve; 11. a fixed base; 12. a fixed block; 13. a fixing hole; 14. a gasket; 15. a damping spring; 16. fixing the spring; 17. a damping mount; 18. a fixing through hole; 19. and (6) fixing the pile.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 3, the present invention provides a technical solution:
a foundation pile for road and bridge construction comprises a foundation pile 1, wherein two groups of clamping blocks 2 are arranged on the foundation pile 1, fastening holes 3 are formed in two ends of each clamping block 2, a fixing shaft 6 is arranged on each clamping block 2, a first fixing rod 7 is sleeved on each fixing shaft 6, a second fixing rod 8 is arranged below each fixing rod 7, a fixing sleeve 10 is arranged between each first fixing rod 7 and each second fixing rod 8, a fixing spring 9 is sleeved on each first fixing rod 7 and each second fixing rod 8, and a fixing base 11 is arranged below each second fixing rod 8; the bottom of grip block 2 is provided with fixed block 12, be provided with gasket 14 under the fixed block 12, be provided with vibration damping mount 17 under the gasket 14, be provided with spring fixed position 16 on the vibration damping mount 17, be provided with damping spring 15 in the spring fixed position 16, damping spring 15 top and the contact of gasket 14.
According to the foundation pile for road and bridge construction, two groups of clamping blocks 2 are arranged on a foundation pile 1, fastening holes 3 are formed in two ends of each clamping block 2, a fixing shaft 6 is arranged on each clamping block 2, a first fixing rod 7 is sleeved on each fixing shaft 6, a second fixing rod 8 is arranged below each fixing rod 7, a fixing sleeve 10 is arranged between each fixing rod 7 and each second fixing rod 8, fixing springs 9 are sleeved on the first fixing rods 7 and the second fixing rods 8, and a fixing base 11 is arranged below each fixing rod 8; when the fixing device is used, the two groups of clamping blocks 2 are fixed through the fastening holes 3, the fixing base 11 is fixed on the ground, the fixing springs 9 are arranged on the fixing rod I7 and the fixing rod II 8, the fixing springs 9 are clamped in the fixing sleeve 10 to fix the foundation pile 1, and the foundation pile is fixed more firmly and stably through the arranged fixing springs 9 and is more convenient to disassemble; the bottom of grip block 2 is provided with fixed block 12, be provided with gasket 14 under the fixed block 12, be provided with vibration damping mount 17 under the gasket 14, be provided with spring fixation position 16 on the vibration damping mount 17, be provided with damping spring 15 in the spring fixation position 16, damping spring 15 top and the contact of gasket 14 are connected gasket 14 and grip block 2, and damping spring 15 of setting lets this foundation pile for road and bridge construction have better shock resistance, has prolonged its life.
Specifically, bolt 4 and nut 5 have been seted up to the both ends of two sets of grip blocks 2, and two sets of grip blocks 2 pass through bolt 4 and nut 5 are fixed, let this road and bridge construction fixed more firm with the foundation pile.
Specifically, four groups of fixing piles 19 are arranged below the fixing base 11 and respectively arranged below four feet of the fixing base 11, and the four groups of fixing piles 19 enable the fixing base 11 to be fixed with the ground more firmly and stably.
Specifically, two sets of fixing holes 13 are formed in the fixing block 12, the clamping block 2 is fixed to the gasket 14 through the bolts 4 and the nuts 5, and the two sets of fixing holes 13 are formed to enable the clamping block to be fixed more firmly.
Specifically, the bottom surface of gasket 14 is provided with spring fixed position 16, spring fixed position 16 with damping spring 15 all is provided with four groups, and four groups of spring fixed positions 16 and damping spring 15 that set up let this foundation pile for road and bridge construction have better shock resistance, have prolonged its life.
Specifically, the damping base 17 is provided with a plurality of groups of fixing through holes 18 distributed at equal intervals, and the damping base 17 is fixed on the ground through the fixing through holes 18, so that the foundation pile for road and bridge construction is more practical.
In summary, in the foundation pile for road and bridge construction, two groups of clamping blocks 2 are arranged on a foundation pile 1, fastening holes 3 are formed in two ends of each clamping block 2, a fixing shaft 6 is arranged on each clamping block 2, a first fixing rod 7 is sleeved on each fixing shaft 6, a second fixing rod 8 is arranged below each fixing rod 7, a fixing sleeve 10 is arranged between each first fixing rod 7 and each second fixing rod 8, fixing springs 9 are sleeved on the first fixing rods 7 and the second fixing rods 8, and a fixing base 11 is arranged below each second fixing rod 8; when the fixing device is used, the two groups of clamping blocks 2 are fixed through the fastening holes 3, the fixing base 11 is fixed on the ground, the fixing springs 9 are arranged on the fixing rod I7 and the fixing rod II 8, the fixing springs 9 are clamped in the fixing sleeve 10 to fix the foundation pile 1, and the foundation pile is fixed more firmly and stably through the arranged fixing springs 9 and is more convenient to disassemble; the bottom of the clamping block 2 is provided with a fixed block 12, a gasket 14 is arranged below the fixed block 12, a damping base 17 is arranged below the gasket 14, a spring fixing position 16 is arranged on the damping base 17, a damping spring 15 is arranged in the spring fixing position 16, the top of the damping spring 15 is in contact with the gasket 14, the gasket 14 is connected with the clamping block 2, and the damping spring 15 is arranged to enable the foundation pile for road and bridge construction to have better shock resistance and prolong the service life of the foundation pile; bolts 4 and nuts 5 are arranged at two ends of the two groups of clamping blocks 2, and the two groups of clamping blocks 2 are fixed with the nuts 5 through the bolts 4, so that the foundation pile for road and bridge construction is more firmly fixed; the bottom surface of the gasket 14 is provided with the spring fixing positions 16, the spring fixing positions 16 and the damping springs 15 are respectively provided with four groups, and the four groups of spring fixing positions 16 and the damping springs 15 are arranged, so that the foundation pile for road and bridge construction has better shock resistance, and the service life of the foundation pile is prolonged; the damping base 17 is provided with a plurality of groups of fixing through holes 18 distributed at equal intervals, and the damping base 17 is fixed on the ground through the fixing through holes 18, so that the foundation pile for road and bridge construction is more practical.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a foundation pile is used in road and bridge construction which characterized in that: the pile foundation comprises a foundation pile (1), wherein two groups of clamping blocks (2) are arranged on the foundation pile (1), fastening holes (3) are formed in two ends of each clamping block (2), a fixing shaft (6) is arranged on each clamping block (2), a first fixing rod (7) is sleeved on each fixing shaft (6), a second fixing rod (8) is arranged below each fixing rod (7), a fixing sleeve (10) is arranged between each first fixing rod (7) and each second fixing rod (8), fixing springs (9) are sleeved on each first fixing rod (7) and each second fixing rod (8), and a fixing base (11) is arranged below each second fixing rod (8); the bottom of grip block (2) is provided with fixed block (12), be provided with gasket (14) under fixed block (12), be provided with vibration damping mount (17) under gasket (14), be provided with spring fixed position (16) on vibration damping mount (17), be provided with damping spring (15) in spring fixed position (16), damping spring (15) top and gasket (14) contact.
2. The foundation pile for road and bridge construction according to claim 1, wherein: and bolts (4) and nuts (5) are arranged at two ends of the two groups of clamping blocks (2).
3. The foundation pile for road and bridge construction according to claim 1, wherein: four groups of fixing piles (19) are arranged below the fixing base (11) and are respectively arranged below four feet of the fixing base (11).
4. The foundation pile for road and bridge construction according to claim 1, wherein: two groups of fixing holes (13) are formed in the fixing block (12).
5. The foundation pile for road and bridge construction according to claim 1, wherein: the bottom surface of gasket (14) is provided with spring fixed position (16), spring fixed position (16) with damping spring (15) all are provided with four groups.
6. The foundation pile for road and bridge construction according to claim 1, wherein: and a plurality of groups of fixing through holes (18) which are distributed at equal intervals are formed in the bottom of the damping base (17).
CN202022105974.XU 2020-09-23 2020-09-23 Foundation pile for road and bridge construction Active CN213267975U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022105974.XU CN213267975U (en) 2020-09-23 2020-09-23 Foundation pile for road and bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022105974.XU CN213267975U (en) 2020-09-23 2020-09-23 Foundation pile for road and bridge construction

Publications (1)

Publication Number Publication Date
CN213267975U true CN213267975U (en) 2021-05-25

Family

ID=75944070

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022105974.XU Active CN213267975U (en) 2020-09-23 2020-09-23 Foundation pile for road and bridge construction

Country Status (1)

Country Link
CN (1) CN213267975U (en)

Similar Documents

Publication Publication Date Title
CN111877142A (en) Assembled bridge pier column structure
CN213267975U (en) Foundation pile for road and bridge construction
CN213682542U (en) Building structure design wall column base quick connecting device
CN210562211U (en) Building foundation ditch bracing supporting construction
CN218521831U (en) Building foundation pile with strong impact resistance
CN209457481U (en) A kind of cross-arm for novel concrete electric pole
CN111622349A (en) Assembled brace rod connection form suitable for cable support prestressed steel column
CN220598490U (en) Assembled antidetonation cushion cap structure
CN112593527A (en) Hydraulic engineering cantilever ecological hydraulic retaining wall structure
CN220318395U (en) Steel construction bridge reinforcing apparatus
CN218969744U (en) Road and bridge pier column structure
CN213539359U (en) Steel structure shockproof base for building
CN212613076U (en) Building steel structure with anti-seismic performance
CN211286901U (en) Angle steel tower column foot reinforcement reinforcing apparatus
CN211286758U (en) Steel construction of house foundation post convenient to installation
CN213269067U (en) Support device for steel structure beam
CN210947803U (en) Pre-buried steel sheet positioner on isolation bearing
CN212896959U (en) Prefabricated shear force wall of assembled with shock-resistant structure
CN218970727U (en) Reinforcing and connecting device for building structure
CN215562377U (en) Ecological slope protection bearing structure for hydraulic engineering
CN212052821U (en) A two-layer equation cofferdam for hydraulic engineering construction
CN221168944U (en) Cement pole securing device
CN214695130U (en) Road and bridge support capable of improving stability
CN218116426U (en) Embedded structure of high pile foundation
CN216109364U (en) Building construction foundation reinforcing bar reinforcing apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant