CN213267459U - Road pouring device for road construction - Google Patents
Road pouring device for road construction Download PDFInfo
- Publication number
- CN213267459U CN213267459U CN202120329159.3U CN202120329159U CN213267459U CN 213267459 U CN213267459 U CN 213267459U CN 202120329159 U CN202120329159 U CN 202120329159U CN 213267459 U CN213267459 U CN 213267459U
- Authority
- CN
- China
- Prior art keywords
- mounting
- road
- fissures
- cementation
- mounting plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Road Repair (AREA)
Abstract
The utility model discloses a road cementation of fissures device is used in road construction relates to road construction technical field. This road cementation of fissures device for road construction, including mounting plate, mounting plate's top is provided with cementation of fissures mechanism and canceling release mechanical system, and mounting plate's bottom movable mounting has four groups of walking wheels. This road cementation of fissures device is used in road construction, carry out the embedment to the ground crack and handle, do not need the manual work to bow or squat and operate on the ground, only need operating personnel downwards step on the foot pedal can, device simple structure, the operating personnel operation of being convenient for, can effectually avoid operating personnel to stand for a long time or squat on the ground, cause the painful condition of operating personnel backache, the leg to it, and then the effectual probability that reduces operating personnel and suffer from waist disease, greatly increased the practicality and the plasticity of device, and the device cost is lower, therefore facilitate promotion and use.
Description
Technical Field
The utility model relates to a road construction technical field specifically is a road cementation of fissures device is used in road construction.
Background
In the road construction process, crack pouring is carried out on cracks by using a crack pouring device; the utility model discloses a be CN212199998U in the utility model discloses a name for cementation of fissures device of road construction usefulness, it includes the shallow, the top of shallow bottom plate is fixed with the mount, the bottom of mount is fixed with the fan, the bottom of shallow bottom plate is fixed with lift wheel and scraper blade, and the lift wheel is located the outside of scraper blade, the top of the shallow bottom plate that is located the scraper blade top is fixed with the fan, the top of mount is fixed with the workbin, one side of workbin is hung and is equipped with the spray gun, the top of spray gun nozzle end is fixed with the gas injection pole. Wherein, the spray gun is mainly aimed at the cracks on the ground, and then the material pump is controlled to carry out encapsulation treatment on the cracks on the ground; although the crack pouring treatment can be carried out, the method needs the operator to bend down or crouch on the ground, the waist of the operator is painful due to long-time operation, waist diseases can be caused to the operator due to long-time operation, the labor intensity of the operator is increased, and the crack pouring treatment is inconvenient to use and popularize.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a road cementation of fissures device is used in road construction to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a road cementation of fissures device is used in road construction, includes mounting plate, mounting plate's top is provided with cementation of fissures mechanism and canceling release mechanical system, and mounting plate's bottom movable mounting has four groups of walking wheels, and four groups of walking wheels are the rectangle and distribute and all be provided with the braking piece on four groups of walking wheels.
Preferably, the crack pouring mechanism comprises mounting vertical plates, sliding chutes, sliding blocks, foot pedals, arc-shaped long rods, a crack pouring box, pistons, a storage box, a conveying pipe and a discharging pipe, wherein two groups of mounting vertical plates are fixedly mounted at the top of a mounting base plate, the two groups of mounting vertical plates are arranged in the front and at the back, the sliding chutes are formed in the adjacent side walls of the two groups of mounting vertical plates, the sliding blocks are slidably mounted in the sliding chutes, the foot pedals are fixedly mounted on the adjacent side walls of the two groups of sliding blocks, the arc-shaped long rods are fixedly mounted at the top of the foot pedals, the top of the mounting base plate is fixedly provided with the crack pouring box, an opening is formed in the top of the crack pouring box, one end of each arc-shaped long rod penetrates through the opening in the crack pouring box to extend into the crack pouring box and is fixedly provided with the pistons, the storage box, the other end of the conveying pipe is fixedly connected with the outer wall of one side of the crack pouring box and communicated with the inside of the crack pouring box, a one-way valve is arranged on the conveying pipe, a discharging pipe is fixedly arranged at the bottom of the mounting base plate, one end of the discharging pipe extends to the upper side of the mounting base plate and is communicated with the inside of the crack pouring box, and the discharging pipe is provided with the one-way valve.
Preferably, canceling release mechanical system includes fixed plate, first spring and lift post, and mounting plate's top fixed mounting has the fixed plate, and the bottom fixed mounting of bow-shaped stock has the lift post, and the movable groove has been seted up to the inside of fixed plate, and the inside fixed mounting in movable groove has first spring, and the one end of lift post extends to the inside in movable groove and the top fixed connection of first spring.
Preferably, the top fixed mounting of storage case has the inlet pipe, and the one end of inlet pipe communicates with each other with the inside of storage case, and the screw thread lid is installed to the other end screw thread of inlet pipe, is convenient for carry out the material loading to the device and handles.
Preferably, the top fixed mounting of mounting plate has two sets of handles and is the front and back setting, and one of them group handle is located the front side of bow-shaped stock, and another group handle is located the rear side of bow-shaped stock, is convenient for carry out the application of force to the device and removes.
Preferably, a second spring is fixedly installed at the top of the installation bottom plate, and one end of the second spring is fixedly connected with the bottom of the pedal.
Compared with the prior art, the beneficial effects of the utility model are that:
this road cementation of fissures device is used in road construction, through the installation riser, the spout, the slider, the foot pedal, bow-shaped stock, the cementation of fissures case, a piston, the storage case, the conveying pipeline, the discharging pipe, the fixed plate, the cooperation of first spring and lift post is used, carry out the embedment processing to the ground crack, do not need the manual work to bow or squat and operate on the ground, only need operating personnel to step on the foot pedal downwards can, device simple structure, the operating personnel of being convenient for operate, can effectually avoid operating personnel to stand for a long time or squat on the ground, cause the operating personnel backache to it, the painful condition of leg, and then the effectual probability that reduces operating personnel and suffer from waist disease, greatly increased the practicality and the plasticity of device, and the device cost is lower, therefore facilitate promotion and use.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a front view of the present invention;
FIG. 3 is a schematic diagram of the structure of the mounting riser of the present invention viewed from the right;
fig. 4 is an enlarged schematic view of part a of the present invention.
In the figure: the device comprises a mounting base plate 1, a crack pouring mechanism 2, a mounting vertical plate 201, a sliding chute 202, a sliding block 203, a pedal 204, an arch-shaped long rod 205, a crack pouring box 206, a piston 207, a material storage box 208, a material conveying pipe 209, a material discharging pipe 210, a resetting mechanism 3, a fixing plate 301, a first spring 302, a lifting column 303, a handle 4, a material feeding pipe 5, a second spring 6 and a travelling wheel 7.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a road cementation of fissures device is used in road construction, includes mounting plate 1, and mounting plate 1's top is provided with cementation of fissures mechanism 2 and canceling release mechanical system 3, and mounting plate 1's bottom movable mounting has four groups of walking wheels 7, and four groups of walking wheels 7 are the rectangle and distribute and all are provided with the braking piece on four groups of walking wheels 7.
The crack pouring mechanism 2 comprises mounting vertical plates 201, sliding grooves 202, sliding blocks 203, foot treading plates 204, arch-shaped long rods 205, crack pouring boxes 206, pistons 207, material storage boxes 208, material conveying pipes 209 and a discharging pipe 210, wherein two groups of mounting vertical plates 201 are fixedly mounted at the top of a mounting base plate 1, the two groups of mounting vertical plates 201 are arranged in the front and at the back, the sliding grooves 202 are respectively formed in the adjacent side walls of the two groups of mounting vertical plates 201, the sliding blocks 203 are slidably mounted in the sliding grooves 202, the foot treading plates 204 are fixedly mounted on the adjacent side walls of the two groups of sliding blocks 203, the arch-shaped long rods 205 are fixedly mounted at the tops of the foot treading plates 204, the crack pouring boxes 206 are fixed at the tops of the mounting base plate 1, openings are formed in the tops of the crack pouring boxes 206, one ends of the arch-shaped long rods 205 penetrate through the openings in the crack pouring boxes 206 and extend to the insides of, one end of a material conveying pipe 209 is communicated with the inside of a material storage tank 208, the other end of the material conveying pipe 209 is fixedly connected with the outer wall of one side of a crack pouring tank 206 and is communicated with the inside of the crack pouring tank 206, a one-way valve is arranged on the material conveying pipe 209, a material discharging pipe 210 is fixedly arranged at the bottom of an installation base plate 1, one end of the material discharging pipe 210 extends to the upper side of the installation base plate 1 and is communicated with the inside of the crack pouring tank 206, the one-way valve is arranged on the material discharging pipe 210, a reset mechanism 3 comprises a fixing plate 301, a first spring 302 and a lifting column 303, a fixing plate 301 is fixedly arranged at the top of the installation base plate 1, a lifting column 303 is fixedly arranged at the bottom of an arched long rod 205, a movable groove is formed in the fixing plate 301, a first spring 302 is fixedly arranged in the movable groove, one end of the lifting column 303 extends to the inside of the movable groove and is fixedly connected with the, the device is moved to a ground crack by only needing an operator to step the pedal 204 downwards, so that the discharge pipe 210 is aligned with the ground crack, then the operator steps the pedal 204 downwards to longitudinally move the pedal 204, so that the slide block 203 and the arched long rod 205 are driven to longitudinally move under the action of the chute 202, and then the piston 207 is driven to longitudinally move, so that slurry in the storage box 208 is sucked into the crack pouring box 206 through the feed pipe 209 and then is discharged through the discharge pipe 210, so that the crack pouring treatment is carried out on the ground crack, the device has a simple structure, is convenient for the operator to operate, can effectively avoid the situations that the operator stands or squats on the ground for a long time and causes the waist pain and the leg pain of the operator, further effectively reduces the probability that the operator suffers from waist diseases, greatly increases the practicability and plasticity of the device, has low cost, and is convenient to popularize and use, the top fixed mounting of storage case 208 has inlet pipe 5, the one end of inlet pipe 5 communicates with each other with the inside of storage case 208, the screw cap is installed to the other end screw thread of inlet pipe 5, be convenient for carry out the material loading to the device and handle, the top fixed mounting of mounting plate 1 has two sets of handles 4 and sets up around being, one of them set of handle 4 is located the front side of bow-shaped stock 205, another set of handle 4 is located the rear side of bow-shaped stock 205, be convenient for carry out the application of force to the device and remove, the top fixed mounting of mounting plate 1 has second spring 6, the one end of second spring 6 and the bottom fixed connection of foot pedal 204.
The working principle is as follows: handle 4 is pushed through the manual work, then on moving the device to ground crack, make discharging pipe 210 aim at ground crack, then operating personnel tramples pedal 204 downwards, make pedal 204 longitudinal movement, drive slider 203 and bow-shaped stock 205 longitudinal movement under the effect of spout 202, then drive piston 207 longitudinal movement, thereby with the thick liquids in the storage tank 208 absorb into cementation of fissures case 206 through conveying pipeline 209, then discharge through discharging pipe 210, thereby carry out cementation of fissures to ground crack and handle.
Claims (6)
1. The utility model provides a road cementation of fissures device for road construction, includes mounting plate (1), its characterized in that: the joint grouting mechanism (2) and the reset mechanism (3) are arranged above the mounting base plate (1), four groups of walking wheels (7) are movably mounted at the bottom of the mounting base plate (1), the four groups of walking wheels (7) are distributed in a rectangular shape, and braking pieces are arranged on the four groups of walking wheels (7).
2. The road joint sealing device for road construction according to claim 1, characterized in that: pouring mechanism (2) is including installation riser (201), spout (202), slider (203), foot pedal (204), bow-shaped stock (205), cementation of fissures case (206), piston (207), storage case (208), conveying pipeline (209) and discharging pipe (210), the top fixed mounting of mounting plate (1) has two sets of installation riser (201), set up around two sets of installation riser (201) are, spout (202) have all been seted up to the adjacent lateral wall of two sets of installation riser (201), the inside slidable mounting of spout (202) has slider (203), the adjacent lateral wall fixed mounting of two sets of sliders (203) has foot pedal (204), the top fixed mounting of foot pedal (204) has bow-shaped stock (205), the top of mounting plate (1) is fixed and is having cementation of fissures case (206), the opening has been seted up at the top of cementation of fissures case (206), the opening that the one end of bow-shaped (205) passed on pouring of fissures case (206) extends to the inside of cementation of fissures case (206 ) The utility model discloses a crack pouring box, including mounting plate (1), the top fixed mounting of mounting plate (1) has storage tank (208), one side outer wall fixed mounting of storage tank (208) has conveying pipeline (209), the one end of conveying pipeline (209) communicates with each other with the inside of storage tank (208), the other end of conveying pipeline (209) and one side outer wall fixed connection of crack pouring box (206) and communicate with each other with the inside of crack pouring box (206), be provided with the check valve on conveying pipeline (209), the bottom fixed mounting of mounting plate (1) has discharging pipe (210), the one end of discharging pipe (210) extends to the top of mounting plate (1) and communicates with each other with the inside of crack pouring box (206), be provided with the check valve on discharging pipe (210).
3. The road joint sealing device for road construction according to claim 1, characterized in that: reset mechanism (3) include fixed plate (301), first spring (302) and lift post (303), and the top fixed mounting of mounting plate (1) has fixed plate (301), and the bottom fixed mounting of bow-shaped stock (205) has lift post (303), and movable groove has been seted up to the inside of fixed plate (301), and the inside fixed mounting in movable groove has first spring (302), and the one end of lift post (303) extends to the inside in movable groove and the top fixed connection of first spring (302).
4. The road joint sealing device for road construction according to claim 2, characterized in that: the top fixed mounting of storage case (208) has inlet pipe (5), and the one end of inlet pipe (5) communicates with each other with the inside of storage case (208), and the other end screw thread of inlet pipe (5) installs the screw cap.
5. The road joint sealing device for road construction according to claim 1, characterized in that: the top of mounting plate (1) is fixed mounting has two sets of handles (4) and is the setting from beginning to end, and one of them group handle (4) are located the front side of bow-shaped stock (205), and another group handle (4) are located the rear side of bow-shaped stock (205).
6. The road joint sealing device for road construction according to claim 5, wherein: the top of the mounting base plate (1) is fixedly provided with a second spring (6), and one end of the second spring (6) is fixedly connected with the bottom of the pedal (204).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120329159.3U CN213267459U (en) | 2021-02-04 | 2021-02-04 | Road pouring device for road construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120329159.3U CN213267459U (en) | 2021-02-04 | 2021-02-04 | Road pouring device for road construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213267459U true CN213267459U (en) | 2021-05-25 |
Family
ID=75954908
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120329159.3U Active CN213267459U (en) | 2021-02-04 | 2021-02-04 | Road pouring device for road construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213267459U (en) |
-
2021
- 2021-02-04 CN CN202120329159.3U patent/CN213267459U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205628076U (en) | Construction waste processing device with feed arrangement | |
CN109986678A (en) | A kind of cement base imitation stone type curb and preparation method thereof, molding equipment | |
CN110000968A (en) | A kind of building waste efficiency crushing processing unit | |
CN105781106B (en) | Build prosthetic device in a kind of building template surface | |
CN213267459U (en) | Road pouring device for road construction | |
CN108049359A (en) | A kind of snow shoveling machine convenient for processing snow drift | |
CN214299159U (en) | Electric power overhaul frame | |
CN206705220U (en) | A kind of steel pipe blanking device | |
CN205588397U (en) | Rubber material collection device | |
CN217782793U (en) | Wearable fluid self-balancing scaffold | |
CN206108118U (en) | Pre -compression garbage compression equipment | |
CN208879627U (en) | A kind of compaction apparatus of moulding machine | |
CN107030133A (en) | Push structure for billet extrusion process | |
CN208513504U (en) | A kind of punched mold convenient for cleaning | |
CN109162461B (en) | Lower chord plate pouring equipment for arch plate concrete pouring construction | |
CN209395846U (en) | Handling device for building site | |
CN207659063U (en) | A kind of barreled honey tilting device | |
CN207185775U (en) | A kind of biscuit fueling injection equipment | |
CN110042043A (en) | A kind of microbial fermentation partial pressure type Zymolysis Equipment | |
CN217936507U (en) | A fertilizer injection unit for farming | |
CN206200408U (en) | A kind of running wheel pusher | |
CN205804245U (en) | A kind of civil engineering smoothing machine | |
CN221479556U (en) | Sewage treatment agent solution sprinkler for sewage treatment | |
CN208106453U (en) | Tunnel Engineering pulp shooting machine automatic charging device | |
CN109304886A (en) | A kind of multipole limit squeezing process and device therefor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |