CN213241823U - Bulletin board for building engineering management - Google Patents

Bulletin board for building engineering management Download PDF

Info

Publication number
CN213241823U
CN213241823U CN202021604899.5U CN202021604899U CN213241823U CN 213241823 U CN213241823 U CN 213241823U CN 202021604899 U CN202021604899 U CN 202021604899U CN 213241823 U CN213241823 U CN 213241823U
Authority
CN
China
Prior art keywords
bulletin board
clamping
board body
sliding
side wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021604899.5U
Other languages
Chinese (zh)
Inventor
刘丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
He Penghui
Original Assignee
Guangzhou Lianhui Technology Service Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Lianhui Technology Service Co ltd filed Critical Guangzhou Lianhui Technology Service Co ltd
Priority to CN202021604899.5U priority Critical patent/CN213241823U/en
Application granted granted Critical
Publication of CN213241823U publication Critical patent/CN213241823U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cleaning In General (AREA)

Abstract

The utility model discloses a bulletin board for building engineering management, including the bulletin board body, two spouts, two have been seted up on the bulletin board body the mounting groove has all been seted up to the inside wall of spout, two equal sliding connection has the slider in the mounting groove, two the draw-in groove has all been seted up on the slider, two the first spring of fixedly connected with between the bottom of slider and the interior bottom of relative spout, two be equipped with clean mechanism, two between the slider all be equipped with chucking mechanism, two in the mounting groove chucking mechanism all extends to in the relative draw-in groove and offsets tightly rather than the inside wall, the top of bulletin board body is equipped with two pulling mechanisms, two pulling mechanism all extends to in the relative mounting groove and with the lateral wall fixed connection of chucking mechanism. The utility model has the advantages of reasonable design, it can be fast to the surface of bulletin board clean, has saved artifical manual clear operation, and is clean convenient.

Description

Bulletin board for building engineering management
Technical Field
The utility model relates to a building engineering equipment technical field especially relates to a bulletin board for building engineering management.
Background
The building engineering is an engineering entity which is used for planning, surveying, designing, constructing, completing and other technical works and completed for newly building, reconstructing or extending building structures and auxiliary structure facilities, and is an installation engineering of lines, pipelines and equipment matched with the engineering entity, and bulletin boards are often used for bulletin notification in the construction engineering in the construction management process.
In the prior art, because the dust on building site is great, building engineering management bulletin board is after long-time use, and its surface adheres to a large amount of dust, influences its bulletin show function, needs clean it, and current cleaning methods are manual clean, but bulletin board height is higher, and surface area is great again, and the manual clean of sanitizer is comparatively inconvenient, and clear work load is great, for this reason we have designed a building engineering management bulletin board and have solved above problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving current bulletin board height among the prior art higher, surface area is great again, and the manual cleanness of sanitizer is comparatively inconvenient, the great problem of clear work load, and the bulletin board for building engineering management that proposes, it can be fast to the surface of bulletin board clean, has saved artifical manual clear operation, and is clean convenient.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a bulletin board for building engineering management comprises a bulletin board body, wherein two sliding grooves are formed in the bulletin board body, mounting grooves are formed in the inner side walls of the two sliding grooves, sliding blocks are connected in the two mounting grooves in a sliding mode, clamping grooves are formed in the two sliding blocks, a first spring is fixedly connected between the bottoms of the two sliding blocks and the inner bottom of the corresponding sliding groove, a cleaning mechanism is arranged between the two sliding blocks, clamping mechanisms are arranged in the two mounting grooves, the two clamping mechanisms extend into the corresponding clamping grooves and are abutted against the inner side walls of the clamping grooves, the top of the bulletin board body is provided with two pulling mechanisms, the two pulling mechanisms extend into the opposite mounting grooves and are fixedly connected with the side walls of the clamping mechanisms, the top of bulletin board body is equipped with blocking mechanism, blocking mechanism extends to in the clean mechanism and offsets with its inside wall.
Preferably, the cleaning mechanism comprises a water storage basin fixedly connected between the two sliding blocks, a cleaning brush is fixedly mounted at the bottom of the water storage basin, the cleaning brush abuts against the front side wall of the bulletin board body, a plurality of water outlet holes are formed in the inner side wall of the water storage basin in a penetrating mode, and two jacking mechanisms are arranged at the inner bottom of the water storage basin.
Preferably, chucking mechanism includes the fixture block of sliding connection in the mounting groove, the fixture block extends to in the draw-in groove and rather than the inside wall counterbalance tightly, a plurality of second springs of fixedly connected with between the lateral wall of fixture block and the inside wall of mounting groove.
Preferably, the pulling mechanism includes the mounting panel of fixed mounting on bulletin board body top, sliding connection has the slide on the mounting panel, fixedly connected with stay cord on the slide, the stay cord extend to the mounting groove in and with the lateral wall fixed connection of fixture block.
Preferably, the blocking mechanism comprises a baffle fixedly mounted on the top of the bulletin board body, and the baffle extends into the water storage basin and is abutted against the inner side wall of the water storage basin.
Preferably, the jacking mechanism comprises a limiting frame fixedly installed at the bottom in the water storage basin, a floating ball is connected in the limiting frame in a sliding mode, and a top rod is fixedly connected to the top of the floating ball.
Compared with the prior art, the utility model, its beneficial effect does:
1. through the inlet tube, the retaining basin, the cleaning brush, jack-up mechanism, pulling mechanism and chucking mechanism's setting, with water through the inlet tube pour into in the retaining basin, the water level in the retaining basin rises gradually, it constantly rises to drive the floater, when water in the retaining basin will be filled with, ejector pin on the floater promotes the slide upwards, the slide drives in the fixture block slides in the mounting groove through the stay cord, the fixture block breaks away from stopping the slider, the retaining basin slides downwards under the effect of gravity, and it cleans the surface of bulletin board body to drive the cleaning brush, manual clear operation has been saved, it is clean rapidly.
2. Run through to set up a plurality of apopores and use the baffle to block through the inside wall at the retaining basin for when carrying out the water injection to the retaining basin, can make the full water of fast filling in the retaining basin, the retaining basin is when the lapse, apopore on the retaining basin breaks away from blockking of baffle, and the water in the retaining basin flows the surface of bulletin board body through the apopore, moistens the surface of bulletin board body, improves clean effect.
To sum up, the utility model has the advantages of reasonable design, it can be fast to the surface of bulletin board clean, has saved artifical manual clear operation, and is clean convenient.
Drawings
Fig. 1 is a schematic structural view of a bulletin board for construction engineering management according to the present invention;
FIG. 2 is an enlarged view of the structure at A in FIG. 1;
FIG. 3 is an enlarged view of the structure at B in FIG. 1;
fig. 4 is an enlarged view of the structure at C in fig. 1.
In the figure: 1 bulletin board body, 2 spouts, 3 inlet tubes, 4 retaining basins, 5 cleaning brushes, 6 apopores, 7 baffles, 8 sliders, 9 clamping grooves, 10 mounting grooves, 11 clamping blocks, 12 second springs, 13 pull ropes, 14 mounting plates, 15 sliding plates, 16 limiting frames, 17 floating balls, 18 ejector rods and 19 first springs.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, a bulletin board for building engineering management, comprising a bulletin board body 1, wherein two sliding grooves 2 are arranged on the bulletin board body 1, mounting grooves 10 are arranged on the inner side walls of the two sliding grooves 2, sliding blocks 8 are connected in the two mounting grooves 10 in a sliding manner, clamping grooves 9 are arranged on the two sliding blocks 8, a first spring 19 is fixedly connected between the bottoms of the two sliding blocks 8 and the inner bottom of the corresponding sliding groove 2, a cleaning mechanism is arranged between the two sliding blocks 8, the cleaning mechanism comprises a water storage basin 4 fixedly connected between the two sliding blocks 8, a cleaning brush 5 is fixedly arranged at the bottom of the water storage basin 4, the cleaning brush 5 is abutted against the front side wall of the bulletin board body 1, a plurality of water outlet holes 6 are arranged on the inner side wall of the water storage basin 4 in a penetrating manner, two jacking mechanisms are arranged at the inner bottom of the water storage basin 4, a floating ball 17 is connected in the limiting frame 16 in a sliding manner, and the top of the floating ball 17 is fixedly connected with a mandril 18;
the clamping mechanisms are arranged in the two mounting grooves 10, the two clamping mechanisms extend into the opposite clamping grooves 9 and are abutted against the inner side walls of the clamping grooves, each clamping mechanism comprises a clamping block 11 which is connected into the corresponding mounting groove 10 in a sliding mode, the clamping blocks 11 extend into the clamping grooves 9 and are abutted against the inner side walls of the clamping grooves, and a plurality of second springs 12 are fixedly connected between the side walls of the clamping blocks 11 and the inner side walls of the mounting grooves 10;
the top of the bulletin board body 1 is provided with two pulling mechanisms, the two pulling mechanisms extend into the opposite mounting grooves 10 and are fixedly connected with the side walls of the clamping mechanisms, each pulling mechanism comprises a mounting plate 14 fixedly mounted on the top of the bulletin board body 1, a sliding plate 15 is slidably connected onto the mounting plate 14, a pull rope 13 is fixedly connected onto the sliding plate 15, the pull rope 13 extends into the mounting groove 10 and is fixedly connected with the side wall of the clamping block 11, water is injected into the water storage basin 4 through the water inlet pipe 3 through the arrangement of the water inlet pipe 3, the water level in the water storage basin 4 gradually rises to drive the floating ball 17 to continuously rise, when the water in the water storage basin 4 is to be filled, the push rod 18 on the floating ball 17 pushes the sliding plate 15 to slide upwards, the sliding plate 15 drives the clamping block 11 to slide into the mounting groove 10 through the pull rope 13, and the clamping block 11 is separated from blocking the sliding block, the water storage basin 4 slides downwards under the action of gravity and drives the cleaning brush 5 to clean the surface of the bulletin board body 1, so that the manual cleaning operation is omitted, and the bulletin board is quick to clean;
the top of bulletin board body 1 is equipped with stop gear, stop gear extends to in the clean mechanism and offsets rather than the inside wall, stop gear includes baffle 7 of fixed mounting on bulletin board body 1 top, baffle 7 extends to in retaining basin 4 and offsets rather than the inside wall, run through at the inside wall of retaining basin 4 and set up a plurality of apopores 6 and use baffle 7 to block, make when carrying out the water injection to retaining basin 4, can make and to fill water fast in retaining basin 4, retaining basin 4 is when the lapse, apopore 6 on retaining basin 4 breaks away from stopping of baffle 7, the water in retaining basin 4 flows the surface of bulletin board body 1 through apopore 6, carry out moist to the surface of bulletin board body 1, improve clean effect.
The utility model discloses its functional principle is explained to following mode of operation of accessible:
when the surface of the bulletin board body 1 needs to be cleaned, firstly, an operator injects water into the water storage basin 4 through the water inlet pipe 3, the water level in the water storage basin 4 gradually rises to drive the floating ball 17 to continuously rise, when the water in the water storage basin 4 is to be filled, the ejector rod 18 on the floating ball 17 pushes the sliding plate 15 to slide upwards, the sliding plate 15 drives the clamping block 11 to slide into the mounting groove 10 through the pull rope 13, the clamping block 11 is separated from blocking the sliding block 8, the water storage basin 4 slides downwards under the action of gravity, when the water storage basin 4 slides downwards, the water outlet 6 on the water storage basin 4 is separated from blocking of the baffle 7, the water in the water storage basin 4 flows to the surface of the bulletin board body 1 through the water outlet 6 to moisten the surface of the bulletin board body 1, and the cleaning brush 5 on the bottom of the water storage basin 4 cleans the surface of the bulletin board body 1, when the, after the cleaning, the water in the water storage basin 4 gradually flows out, the water storage basin 4 is reset under the action of the elastic force of the first spring 19, the clamping block 11 slides into the clamping groove 9 under the action of the elastic force of the second spring 12 and is tightly propped against the inner side wall of the clamping block, and the cleaning operation of the bulletin board body 1 is completed.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The bulletin board for the building engineering management comprises a bulletin board body (1) and is characterized in that two sliding grooves (2) are formed in the bulletin board body (1), mounting grooves (10) are formed in the inner side walls of the two sliding grooves (2), sliding blocks (8) are connected in the two mounting grooves (10) in a sliding mode, clamping grooves (9) are formed in the two sliding blocks (8), a first spring (19) is fixedly connected between the bottoms of the two sliding blocks (8) and the inner bottom of the opposite sliding groove (2), a cleaning mechanism is arranged between the two sliding blocks (8), clamping mechanisms are arranged in the two mounting grooves (10), the two clamping mechanisms extend into the opposite clamping grooves (9) and are abutted against the inner side walls of the clamping mechanisms, two pulling mechanisms are arranged at the top of the bulletin board body (1), the two pulling mechanisms extend into the opposite mounting grooves (10) and are fixedly connected with the side walls of the clamping mechanisms, the top of the bulletin board body (1) is provided with a blocking mechanism, and the blocking mechanism extends into the cleaning mechanism and is abutted against the inner side wall of the cleaning mechanism.
2. The bulletin board for building engineering management according to claim 1, wherein the cleaning mechanism comprises a water storage basin (4) fixedly connected between two sliding blocks (8), a cleaning brush (5) is fixedly mounted at the bottom of the water storage basin (4), the cleaning brush (5) abuts against the front side wall of the bulletin board body (1), a plurality of water outlet holes (6) are formed in the inner side wall of the water storage basin (4) in a penetrating manner, and two jacking mechanisms are arranged at the inner bottom of the water storage basin (4).
3. The bulletin board for building engineering management according to claim 1, wherein the clamping mechanism comprises a clamping block (11) slidably connected in the mounting groove (10), the clamping block (11) extends into the clamping groove (9) and abuts against the inner side wall of the clamping groove, and a plurality of second springs (12) are fixedly connected between the side wall of the clamping block (11) and the inner side wall of the mounting groove (10).
4. A bulletin board for building engineering management according to claim 3, wherein the pulling mechanism comprises a mounting plate (14) fixedly mounted on the top of the bulletin board body (1), a sliding plate (15) is slidably connected to the mounting plate (14), a pulling rope (13) is fixedly connected to the sliding plate (15), and the pulling rope (13) extends into the mounting groove (10) and is fixedly connected to the side wall of the fixture block (11).
5. A bulletin board for building engineering management as claimed in claim 2, wherein the blocking mechanism comprises a baffle (7) fixedly mounted on top of the bulletin board body (1), the baffle (7) extending into the basin (4) and abutting against the inner side wall thereof.
6. The bulletin board for building engineering management according to claim 2, wherein the jacking mechanism comprises a limiting frame (16) fixedly mounted on the inner bottom of the water storage basin (4), a floating ball (17) is slidably connected in the limiting frame (16), and a top rod (18) is fixedly connected to the top of the floating ball (17).
CN202021604899.5U 2020-08-05 2020-08-05 Bulletin board for building engineering management Active CN213241823U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021604899.5U CN213241823U (en) 2020-08-05 2020-08-05 Bulletin board for building engineering management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021604899.5U CN213241823U (en) 2020-08-05 2020-08-05 Bulletin board for building engineering management

Publications (1)

Publication Number Publication Date
CN213241823U true CN213241823U (en) 2021-05-18

Family

ID=75892821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021604899.5U Active CN213241823U (en) 2020-08-05 2020-08-05 Bulletin board for building engineering management

Country Status (1)

Country Link
CN (1) CN213241823U (en)

Similar Documents

Publication Publication Date Title
CN106733844B (en) Herringbone bear iron chips cleaning device
CN213241823U (en) Bulletin board for building engineering management
CN111395982B (en) Anti-floating anchor rod drilling construction mud collection device
CN113349033B (en) Afforestation water saving fixtures
CN213495520U (en) Be used for laboratory waste material clearing device
CN211755191U (en) Test bench for high school chemistry
CN216194764U (en) Superfluid concrete pile bottom grouting device
CN213623875U (en) Glass etching device
CN220656507U (en) Inclined tube sedimentation tank
CN210504040U (en) Stainless steel water tank with cleaning mechanism
CN213174050U (en) Basement drainage-preventing structure
CN116169946B (en) But self-cleaning's photovoltaic equipment
CN108978778A (en) A kind of energy conservation and environmental protection wash basin
CN216339951U (en) Drainage plate for water prevention and drainage integrated device
CN212646039U (en) Cross-regional water transfer simulation test device
CN215442276U (en) Sewage pipeline slip casting structure
CN217439052U (en) Novel water control equipment
CN212944374U (en) Building tool cleaning equipment
CN218521869U (en) Desilting equipment based on deep foundation ditch of river surge in narrow area of city
CN216640514U (en) Pump station that hydraulic engineering used blocks dirty device
CN113149249B (en) Sponge urban sewage treatment system
CN219091272U (en) Convenient cleaning device for mud sand in water collection pit
CN216580510U (en) Water outlet mechanism of ash water tank of train hand washing pool
CN211037236U (en) Quick drainage launching structure
CN219218922U (en) River course trash device for environmental engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: He Penghui

Inventor after: Liu Dan

Inventor before: Liu Dan

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230920

Address after: 512000 Zhongjin Lingnan Engineering Technology Management Center, Shaoye Nine Kilometers, Zhenjiang District, Shaoguan City, Guangdong Province

Patentee after: He Penghui

Address before: 511400 Room 814, Xiangjiang Financial and Business Center, 41 Jinlong Road, Nansha District, Guangzhou City, Guangdong Province

Patentee before: GUANGZHOU LIANHUI TECHNOLOGY SERVICE CO.,LTD.