CN213236849U - Level tripod for construction engineering project management - Google Patents
Level tripod for construction engineering project management Download PDFInfo
- Publication number
- CN213236849U CN213236849U CN202021876436.4U CN202021876436U CN213236849U CN 213236849 U CN213236849 U CN 213236849U CN 202021876436 U CN202021876436 U CN 202021876436U CN 213236849 U CN213236849 U CN 213236849U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- threaded
- base
- supporting
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 14
- 238000004146 energy storage Methods 0.000 claims description 7
- 230000000694 effects Effects 0.000 abstract description 10
- 241000201308 Boschniakia Species 0.000 description 9
- 239000000463 material Substances 0.000 description 3
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000000149 penetrating effect Effects 0.000 description 2
- 229910000838 Al alloy Inorganic materials 0.000 description 1
- 229920000049 Carbon (fiber) Polymers 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000000956 alloy Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004917 carbon fiber Substances 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Landscapes
- Special Chairs (AREA)
Abstract
The utility model belongs to the technical field of the tripod, especially, be a surveyor's level tripod for construction engineering project management, the on-line screen storage device comprises a base, the fixed surface of base is connected with first fixed station, first fixed station side fixedly connected with first bracing piece, first bracing piece surface swing joint has first sliding sleeve, the fixed surface of first sliding sleeve is connected with first support column, the other end of first support column has the second fixed block through the swing joint of round pin axle, the fixed surface of second fixed block is connected with a supporting bench; the utility model discloses, through setting up first electric putter, when people adjust a supporting bench's height, through the operation of the first electric putter of control panel control, drive first electric putter shrink simultaneously, under the cooperation of head rod and first connecting block, drive first sliding sleeve at the directional activity in first bracing piece surface to drive a supporting bench directional activity that makes progress, thereby people can adjust a supporting bench's height.
Description
Technical Field
The utility model belongs to the technical field of the tripod, concretely relates to surveyor's level tripod for construction engineering project management.
Background
The tripod is a support frame used for stabilizing a camera so as to achieve certain photographic effects, the positioning of the tripod is very important, the tripod can be divided into a plurality of types of wood and high-strength plastic materials, aluminum alloy materials, steel materials, volcanic rocks, carbon fibers and the like according to material classification, a leveling instrument is an instrument for establishing horizontal sight to measure the height difference between two points on the ground, the principle is that the height difference between the two points on the ground is measured according to the leveling principle, main components are expected to be a telescope, a tube level (or a compensator), a vertical shaft, a base and a foot screw, the tripod is divided into a micro-inclination leveling instrument, an automatic leveling instrument, a laser leveling instrument and a digital leveling instrument (also called an electronic leveling instrument) according to the structure, the tripod is divided into a precise leveling instrument and a common leveling instrument according to the precision, when the leveling instrument is used for measurement, the leveling instrument is generally required to be erected on a, the function is comparatively single, and is inconvenient to carry, the people's outdoor operations of being not convenient for, for this reason, we have provided a surveyor's level tripod for construction engineering project management.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a construction engineering is surveyor's level tripod for project management has portable function and convenient characteristics such as adjust.
In order to achieve the above object, the utility model provides a following technical scheme: a leveling instrument tripod for construction engineering project management comprises a base, wherein a first fixed table is fixedly connected to the upper surface of the base, a first supporting rod is fixedly connected to the side surface of the first fixed table, a first sliding sleeve is movably connected to the surface of the first supporting rod, a first supporting column is fixedly connected to the upper surface of the first sliding sleeve, the other end of the first supporting column is movably connected with a second fixed block through a pin shaft, a supporting table is fixedly connected to the upper surface of the second fixed block, and a first connecting block is fixedly connected to the side surface of the first supporting column;
the utility model discloses a support bench, including a base, a first connecting piece, a first connecting pin, a second connecting pin, a supporting bench, a first connecting block, a first electric putter, a second connecting rod, a second connecting pin, a second connecting block, a supporting bench lower surface fixed connection has a second support column, second connecting block fixed connection is in the second support column side, first fixed station is total three, and arranges at the base upper surface.
Preferably, a second fixed station is fixedly connected with the upper surface of the supporting table, a bearing is fixedly connected with the side surface of the second fixed station, a first rotating shaft is arranged in the bearing in a penetrating mode, a first threaded column is fixedly connected with the other end of the first rotating shaft, a second threaded column is fixedly connected with the other end of the first threaded column, a second rotating shaft is fixedly connected with the other end of the second threaded column, a third fixed station is fixedly connected with the upper surface of the supporting table, and the bearing is arranged on the surface of the third fixed station in a penetrating mode.
Preferably, the second rotating shaft penetrates through the bearing, the other end of the second rotating shaft is fixedly connected with a first crank, the other end of the first crank is provided with a first handle, the surface of the first threaded column is in threaded connection with a first threaded pipe, the surface of the first threaded pipe is fixedly connected with a supporting block, the side face of the supporting block is provided with an anti-slip pad, and the surface of the first threaded pipe is fixedly connected with a fourth connecting rod.
Preferably, the second fixed station side fixedly connected with second bracing piece, second bracing piece other end fixed connection is in the third fixed station side, second bracing piece surface swing joint has the second sliding sleeve, fourth connecting rod other end fixed connection is in the second sliding sleeve surface, first screwed pipe is total two, and threaded connection is on first screw thread post and second screw thread post surface respectively.
Preferably, a second threaded pipe penetrates through the surface of the base, a third threaded column penetrates through the second threaded pipe, one end of the third threaded column is fixedly connected with a third connecting rod, a ground thorn is fixedly connected to the side face of the third connecting rod, the other end of the third connecting rod is fixedly connected with a ground cone, and the other end of the third threaded column is fixedly connected with a second crank handle.
Preferably, the other end of the second crank handle is provided with four second handles, the second threaded pipes penetrate through the surface of the base in a rectangular mode, an energy storage bin is arranged in the base, a storage battery is arranged in the energy storage bin, and the surface of the base is provided with a control panel.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model, through setting up the first electric push rod, when people adjust the height of the supporting bench, through the operation of the control panel control first electric push rod, drive the first electric push rod to contract at the same time, under the cooperation of the first connecting rod and the first connecting block, drive the activity of the first supporting pole, drive the first sliding sleeve to directionally move on the surface of the first supporting pole, thereby drive the supporting bench to directionally move upwards, so that people can adjust the height of the supporting bench, through setting up the first handle, when people fix the level gauge on the upper surface of the supporting bench, through controlling the activity of the first handle, drive the rotation of the first threaded column and the second threaded column, drive the two first threaded pipes to move in opposite directions, under the effect of the non-slip mat, so that people can fix the level gauge on the upper surface of the supporting bench, through setting up the second handle, when people fix the device, through controlling the activity of the second handle, thereby driving the third threaded column to rotate, driving the ground cone and the ground thorn to move downwards in a directional way, and people can fix the device under the action of the ground cone and the ground thorn.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic front view of a cross-sectional structure of the present invention;
fig. 2 is a schematic front view of the structure of the present invention;
fig. 3 is a schematic top view of the cross-sectional structure of the present invention;
fig. 4 is a schematic top view of the supporting table of the present invention;
fig. 5 is a schematic perspective view of a control panel according to the present invention;
in the figure: 1. a base; 2. a first fixed table; 3. a first support bar; 4. a first fixed block; 5. a first support column; 6. a second fixed block; 7. a support table; 8. a second stationary stage; 9. a first rotating shaft; 10. A first threaded post; 11. a second threaded post; 12. a second rotating shaft; 13. a third stationary stage; 14. a first crank; 15. a first handle; 16. a first threaded pipe; 17. a support block; 18. a non-slip mat; 19. a first connecting rod; 20. a first electric push rod; 21. a second connecting rod; 22. a second connecting block; 23. a second support column; 24. a second threaded pipe; 25. a third threaded post; 26. a second crank; 27. a second handle; 28. a third connecting rod; 29. a ground cone; 30. puncturing with the ground; 31. a groove; 32. a second electric push rod; 33. a wheel; 34. an energy storage bin; 35. a storage battery; 36. a control panel; 37. a first sliding sleeve; 38. A second support bar; 39. a second sliding sleeve; 40. a fourth connecting rod; 41. a first connection block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-5, the present invention provides the following technical solutions: a leveling instrument tripod for construction engineering project management comprises a base 1, wherein a first fixed table 2 is fixedly connected to the upper surface of the base 1, a first supporting rod 3 is fixedly connected to the side surface of the first fixed table 2, a first sliding sleeve 37 is movably connected to the surface of the first supporting rod 3, a first supporting column 5 is fixedly connected to the upper surface of the first sliding sleeve 37, the other end of the first supporting column 5 is movably connected with a second fixed block 6 through a pin shaft, a supporting table 7 is fixedly connected to the upper surface of the second fixed block 6, and a first connecting block 41 is fixedly connected to the side surface of the first supporting column 5;
first connecting block 41 has first connecting rod 19 through round pin axle swing joint, first connecting rod 19 other end fixedly connected with electric putter 20, first electric putter 20 other end fixedly connected with second connecting rod 21, second connecting rod 21 has second connecting block 22 through round pin axle swing joint, brace table 7 lower fixed surface is connected with second support column 23, second connecting block 22 fixed connection is in second support column 23 side, first fixed station 2 is total three, and arranges at base 1 upper surface.
Specifically, fixed surface is connected with second fixed station 8 on supporting bench 7, 8 side fixedly connected with bearings of second fixed station, wear to be equipped with first pivot 9 in the bearing, 9 other ends fixedly connected with first screw thread post 10 of first pivot, 10 other ends fixedly connected with second screw thread post 11 of first screw thread post, 11 other ends fixedly connected with second pivot 12 of second screw thread post, fixed surface is connected with third fixed station 13 on supporting bench 7, the bearing is worn to be equipped with on 13 surfaces of third fixed station.
Specifically, the second rotating shaft 12 penetrates through the bearing, the other end of the second rotating shaft 12 is fixedly connected with a first crank 14, the other end of the first crank 14 is provided with a first handle 15, the surface of the first threaded column 10 is in threaded connection with a first threaded pipe 16, through the arrangement of the first handle 15, when people fix the level on the upper surface of the supporting table 7, the first threaded column 10 and the second threaded column 11 are driven to rotate simultaneously by controlling the movement of the first handle 15, the two first threaded pipes 16 are driven to move oppositely, under the action of the anti-skid pads 18, people can fix the level on the upper surface of the supporting table 7, the first threaded pipe 16 is fixedly connected with the supporting block 17, the anti-skid pads 18 are arranged on the side surfaces of the supporting block 17, and the fourth connecting rod 40 is fixedly connected with the surfaces of the first threaded pipe 16.
Specifically, the side of the second fixed station 8 is fixedly connected with a second supporting rod 38, the other end of the second supporting rod 38 is fixedly connected to the side of the third fixed station 13, the surface of the second supporting rod 38 is movably connected with a second sliding sleeve 39, the other end of the fourth connecting rod 40 is fixedly connected to the surface of the second sliding sleeve 39, the number of the first threaded pipes 16 is two, and the first threaded pipes are respectively in threaded connection with the surfaces of the first threaded columns 10 and the second threaded columns 11.
Specifically, a second threaded pipe 24 penetrates through the surface of the base 1, a third threaded column 25 penetrates through the second threaded pipe 24, one end of the third threaded column 25 is fixedly connected with a third connecting rod 28, a ground thorn 30 is fixedly connected to the side surface of the third connecting rod 28, through the arrangement of a second handle 27, when people fix the device, the second handle 27 is controlled to move, so that the third threaded column 25 is driven to rotate, the ground cone 29 and the ground thorn 30 are driven to move downwards in a directional mode, under the action of the ground cone 29 and the ground thorn 30, people can fix the device, the other end of the third connecting rod 28 is fixedly connected with the ground cone 29, and the other end of the third threaded column 25 is fixedly connected with a second crank 26.
Specifically, the second crank 26 other end is provided with second handle 27, the total four of second screwed pipe 24, and be the rectangle and wear to establish on base 1 surface, energy storage storehouse 34 has been seted up in the base 1, be provided with battery 35 in the energy storage storehouse 34, base 1 surface is provided with control panel 36, and through setting up first electric putter 20, when people adjust the height of brace table 7, through control panel 36 control first electric putter 20 operation, drive first electric putter 20 shrink simultaneously, under the cooperation of head rod 19 and first connecting block 41, drive the activity of first support column 5, drive the directional activity in first bracing piece 3 surface of first sliding sleeve 37 to drive the directional activity that makes progress of brace table 7, thereby people can adjust the height of brace table 7.
The utility model discloses a theory of operation and use flow: when the utility model is used, firstly the device is moved to a proper position, the second electric push rod 32 is controlled to operate through the control panel 36, the second electric push rod 32 is driven to contract simultaneously, the wheels 33 are driven to move upwards in a directional way, then the third threaded post 25 is driven to rotate by controlling the movement of the second handle 27, the ground cone 29 and the ground thorn 30 are driven to move downwards in a directional way, under the action of the ground cone 29 and the ground thorn 30, people can fix the device, the level is placed on the upper surface of the supporting platform 7, the first threaded post 10 and the second threaded post 11 are driven to rotate simultaneously by controlling the movement of the first handle 15, the two first threaded pipes 16 are driven to move oppositely, under the action of the anti-skid mat 18, people can fix the level on the upper surface of the supporting platform 7, the first electric push rod 20 is controlled to operate through the control panel 36, and the first electric push rod 20 is driven to contract simultaneously, under the cooperation of the first connecting rod 19 and the first connecting block 41, the first supporting column 5 is driven to move, the first sliding sleeve 37 is driven to directionally move on the surface of the first supporting rod 3, so that the supporting platform 7 is driven to directionally move upwards, and people can adjust the level to a proper height.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (6)
1. The utility model provides a construction engineering is surveyor's level tripod for project management, includes base (1), its characterized in that: the upper surface of the base (1) is fixedly connected with a first fixing table (2), the side surface of the first fixing table (2) is fixedly connected with a first supporting rod (3), the surface of the first supporting rod (3) is movably connected with a first sliding sleeve (37), the upper surface of the first sliding sleeve (37) is fixedly connected with a first supporting column (5), the other end of the first supporting column (5) is movably connected with a second fixing block (6) through a pin shaft, the upper surface of the second fixing block (6) is fixedly connected with a supporting table (7), and the side surface of the first supporting column (5) is fixedly connected with a first connecting block (41);
first connecting block (41) have head rod (19) through round pin axle swing joint, head rod (19) other end fixedly connected with electric putter (20), electric putter (20) other end fixedly connected with second connecting rod (21), second connecting rod (21) have second connecting block (22) through round pin axle swing joint, brace table (7) lower fixed surface is connected with second support column (23), second connecting block (22) fixed connection is in second support column (23) side, first fixed station (2) are total three, and arrange at base (1) upper surface.
2. The construction project management level tripod of claim 1, wherein: fixed surface is connected with second fixed station (8) on brace table (7), second fixed station (8) side fixedly connected with bearing, wear to be equipped with first pivot (9) in the bearing, first pivot (9) other end fixedly connected with first screw thread post (10), first screw thread post (10) other end fixedly connected with second screw thread post (11), second screw thread post (11) other end fixedly connected with second pivot (12), fixed surface is connected with third fixed station (13) on brace table (7), the bearing is worn to be equipped with on third fixed station (13) surface.
3. The construction project management level tripod of claim 2, wherein: the second rotating shaft (12) penetrates through the bearing, the other end of the second rotating shaft (12) is fixedly connected with a first crank (14), the other end of the first crank (14) is provided with a first handle (15), the surface of the first threaded column (10) is in threaded connection with a first threaded pipe (16), the surface of the first threaded pipe (16) is fixedly connected with a supporting block (17), the side face of the supporting block (17) is provided with an anti-skid pad (18), and the surface of the first threaded pipe (16) is fixedly connected with a fourth connecting rod (40).
4. A construction project management level tripod according to claim 3, wherein: second fixed station (8) side fixedly connected with second bracing piece (38), second bracing piece (38) other end fixed connection is in third fixed station (13) side, second bracing piece (38) surface swing joint has second sliding sleeve (39), fourth connecting rod (40) other end fixed connection is on second sliding sleeve (39) surface, first screwed pipe (16) are total two, and threaded connection is on first screw thread post (10) and second screw thread post (11) surface respectively.
5. The construction project management level tripod of claim 1, wherein: base (1) surface is worn to be equipped with second screwed pipe (24), wear to be equipped with third threaded post (25) in second screwed pipe (24), third threaded post (25) one end fixedly connected with third connecting rod (28), third connecting rod (28) side fixedly connected with ground thorn (30), third connecting rod (28) other end fixedly connected with ground awl (29), third threaded post (25) other end fixedly connected with second crank (26).
6. The construction project management level tripod of claim 5, wherein: the utility model discloses a portable electronic device, including base (1), second crank (26) other end, second screwed pipe (24), second crank (26) other end is provided with second handle (27), second screwed pipe (24) are total four, and are the rectangle and wear to establish on base (1) surface, energy storage storehouse (34) have been seted up in base (1), be provided with battery (35) in energy storage storehouse (34), base (1) surface is provided with control panel (36).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021876436.4U CN213236849U (en) | 2020-09-01 | 2020-09-01 | Level tripod for construction engineering project management |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021876436.4U CN213236849U (en) | 2020-09-01 | 2020-09-01 | Level tripod for construction engineering project management |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213236849U true CN213236849U (en) | 2021-05-18 |
Family
ID=75903720
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021876436.4U Expired - Fee Related CN213236849U (en) | 2020-09-01 | 2020-09-01 | Level tripod for construction engineering project management |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213236849U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114383567A (en) * | 2022-02-09 | 2022-04-22 | 河南理工大学 | Intelligent righting ruler moving device and method for urban elevation measurement |
-
2020
- 2020-09-01 CN CN202021876436.4U patent/CN213236849U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114383567A (en) * | 2022-02-09 | 2022-04-22 | 河南理工大学 | Intelligent righting ruler moving device and method for urban elevation measurement |
CN114383567B (en) * | 2022-02-09 | 2023-09-19 | 河南理工大学 | Intelligent supporting ruler moving device and method for urban elevation measurement |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214121148U (en) | Tunnel roof elevation measurement sopwith staff in pit | |
CN213236849U (en) | Level tripod for construction engineering project management | |
CN211425458U (en) | High accuracy cadastral survey centering rod | |
CN213809850U (en) | Total powerstation tripod is with stabilizing stabilizer blade | |
CN212300358U (en) | Horizontal fixing device is used in native survey and drawing | |
CN110542007A (en) | Mapping device for irrigation and water conservancy projects | |
CN218409335U (en) | Tripod for mining exploration measurement | |
CN212721429U (en) | Device convenient to engineering measuring instrument centering | |
CN213271790U (en) | Adjustable measuring tool for building construction | |
CN212988373U (en) | Land surveying is with land mark pole instrument of pricking ground | |
CN213236839U (en) | Survey and drawing laying-out device based on BIM | |
CN209764066U (en) | Portable civil engineering construction measuring device | |
CN210050522U (en) | Can place total powerstation on various ground | |
CN211600029U (en) | Handheld distancer support frame is used in national soil space planning | |
CN219720087U (en) | Fine arts platform base convenient to location | |
CN220286920U (en) | Slidable lifting type surveying and mapping support | |
CN220540798U (en) | Tripod supporting device for measurement | |
CN212270698U (en) | Bridge construction support bracket | |
CN215524654U (en) | Building engineering road and bridge construction measuring device | |
CN221665585U (en) | On-site measurement marker post | |
CN217684223U (en) | Instrument support for building engineering quality detection | |
CN215676986U (en) | Stable in structure and scale for architectural survey who conveniently carries | |
CN219712844U (en) | Mapping instrument positioning device | |
CN213576494U (en) | Geological mapping appearance support foot with suitable multiple topography | |
CN213874352U (en) | Land planning positioner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder | ||
CP02 | Change in the address of a patent holder |
Address after: 311100 2-3-502 Windsor garden, Tiandu City, Xingqiao street, Yuhang District, Hangzhou City, Zhejiang Province Patentee after: Wu Song Address before: 311100 2-3-502, Windsor garden, Tiandu City, Xingqiao street, Yuhang District, Ningbo City, Zhejiang Province Patentee before: Wu Song |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210518 |