CN213234312U - Assembled concrete building rapid grouting construction device - Google Patents

Assembled concrete building rapid grouting construction device Download PDF

Info

Publication number
CN213234312U
CN213234312U CN202021763728.7U CN202021763728U CN213234312U CN 213234312 U CN213234312 U CN 213234312U CN 202021763728 U CN202021763728 U CN 202021763728U CN 213234312 U CN213234312 U CN 213234312U
Authority
CN
China
Prior art keywords
block
fixed
grouting
square
output
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021763728.7U
Other languages
Chinese (zh)
Inventor
龚安灿
王东云
王贤权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021763728.7U priority Critical patent/CN213234312U/en
Application granted granted Critical
Publication of CN213234312U publication Critical patent/CN213234312U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an assembled concrete building rapid grouting construction device relates to grouting construction device technical field. The utility model discloses a cementer main part, the bottom mounting of cementer main part has the bottom plate, and the grout output tube is installed to the output of cementer main part, and the output position department threaded connection who is close to the grout output tube has rotatory piece, and rotatory piece is close to grout output tube output position department and rotates and be connected with first fixed block. The utility model discloses a rotatory piece, first fixed block, first square, mutually supporting of second square and second fixed block, can carry out grouting output tube and grouted object better fixed, thereby avoid the influence to grouting efficiency, further avoided the influence to the construction process, through the motor, the stroke pole, mutually supporting of first rectangular plate and round bar, can be in grouting work progress, avoid removing because of the device that the shake of device produced often, and then avoided the influence to the construction safety nature.

Description

Assembled concrete building rapid grouting construction device
Technical Field
The utility model belongs to the technical field of the construction equipment that is in milk, especially, relate to an assembled concrete building rapid grouting construction equipment.
Background
The assembled integral concrete structure is a whole structure formed by connecting precast concrete members or components through reinforcing steel bars, connecting pieces or applying prestress and pouring concrete in situ, a grouting construction device is a professional construction machine tool for chemical grouting plugging and structure reinforcement of cracks, expansion joints, construction joints and structural joints of various buildings and underground concrete engineering, the existing grouting construction device easily causes that a grouting output pipe and a grouted object cannot be well fixed, the grouting efficiency is influenced, the construction progress is influenced, in the grouting construction process, the device is easy to shake, the device is moved, and the construction safety is influenced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an assembled concrete building changes construction equipment that is in milk fast to current problem has been solved: the existing grouting construction device easily causes that a grouting output pipe and a grouted object cannot be well fixed, and the grouting efficiency is influenced, so that the construction process is influenced.
In order to solve the technical problem, the utility model discloses a realize through following technical scheme:
the utility model relates to an assembled concrete building rapid grouting construction device, including the cementer main part, the bottom mounting of cementer main part has the bottom plate, the grout output tube is installed to the output of cementer main part, is close to the output position department threaded connection of grout output tube has rotatory piece, rotatory piece is close to grout output tube output end position department and rotates and be connected with first fixed block, the week side of first fixed block rotates and is connected with three first square, the one end of first square all rotates and is connected with the second square, is close to the output position department of grout output tube is fixed with the second fixed block, just the second fixed block is located between the output of first fixed block and grout output tube, the week side of second fixed block rotates with the middle part of three second square and is connected.
Further, the bottom plate bottom mounting has a plurality of universal wheels, the one end at bottom plate top is fixed with the handle, the motor is all installed at the bottom plate both ends, worm wheel lead screw lift is all installed to the output of motor, worm wheel lead screw lift includes the stroke pole, just stroke pole and the equal sliding connection of bottom plate, the bottom of stroke pole all is fixed with first rectangular plate, the both ends of first rectangular plate all are fixed with the round bar, just the round bar all with bottom plate sliding connection.
Further, the external screw thread has been seted up to the week side of grout output tube and the position department that is close to the second fixed block, the internal thread has been seted up to the inside of rotatory piece, rotatory piece carries out threaded connection through external screw thread and internal thread with the grout output tube.
Further, the internally mounted of first fixed block has the bearing, just the one end of rotatory piece is located the inside of bearing, rotatory piece rotates through the bearing with first fixed block and is connected.
Further, the pin is all installed to one side that first fixed block is close to first square, first fixed block all rotates through the pin with first square to be connected, the position department that first square is close to the second square also all installs the pin, first square also all rotates through the pin with the second square to be connected, the position department that the second square is close to the second fixed block also all installs the pin, the second square also all rotates through the pin with the second fixed block to be connected.
Furthermore, the bottom end of the stroke rod is fixed with a fixed base, and the fixed base and the first rectangular plate are fixed through bolts.
Furthermore, the bottom end of the first rectangular plate is fixed with a second rectangular plate, the bottom end of the second rectangular plate is provided with a square groove, and the second rectangular plate is made of rubber.
The utility model discloses following beneficial effect has:
1. the utility model discloses a mutually supporting of rotatory piece, first fixed block, first square, second square and second fixed block can carry out grouting output tube and grouted object better fixed to avoid the influence to grouting efficiency, further avoided the influence to the construction process.
2. The utility model discloses a mutually supporting of motor, stroke pole, first rectangular plate and round bar can avoid removing because of the device that the shake of device produced often in the grout work progress, and then has avoided the influence to the construction security.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the main structure of the grouting device of the present invention;
fig. 3 is a schematic structural view of the fixing device of the present invention;
fig. 4 is a partial exploded view of the fixing device of the present invention;
fig. 5 is a schematic structural view of the braking device of the present invention;
fig. 6 is a schematic structural view of the bottom of the second rectangular plate according to the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1. a grouting device main body; 2. a base plate; 3. rotating the block; 4. an external thread; 5. an internal thread; 6. a first fixed block; 7. a bearing; 8. a first block; 9. a pin; 10. a second block; 11. a second fixed block; 12. a motor; 13. a trip lever; 14. a fixed base; 15. a first rectangular plate; 16. a second rectangular plate; 17. a round bar; 18. a universal wheel; 19. a handle; 20. and (5) grouting an output pipe.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-4, the utility model relates to an assembled concrete construction device for rapid grouting, which comprises a grouting device main body 1, a bottom plate 2 fixed at the bottom end of the grouting device main body 1, a grouting output pipe 20 installed at the output end of the grouting device main body 1, a rotating block 3 in threaded connection at the position close to the output end of the grouting output pipe 20, a first fixed block 6 rotatably connected at the position close to the output end of the grouting output pipe 20 of the rotating block 3, three first blocks 8 rotatably connected at the peripheral side of the first fixed block 6, a second block 10 rotatably connected at one end of the first block 8, a second fixed block 11 fixed at the position close to the output end of the grouting output pipe 20, and the second fixed block 11 is positioned between the first fixed block 6 and the output end of the grouting output pipe 20, and the peripheral side surface of the second fixed block 11 is rotatably connected with the middle parts of the three second blocks 10.
Referring to fig. 1 and 5, a plurality of universal wheels 18 are fixed at the bottom end of a bottom plate 2, a handle 19 is fixed at one end of the top of the bottom plate 2, motors 12 are respectively installed at two ends of the bottom plate 2, worm gear lead screw elevators are respectively installed at output ends of the motors 12, each worm gear lead screw elevator comprises a stroke rod 13, the stroke rods 13 are respectively connected with the bottom plate 2 in a sliding manner, first rectangular plates 15 are respectively fixed at the bottom ends of the stroke rods 13, round rods 17 are respectively fixed at two ends of each first rectangular plate 15, and the round rods 17 are respectively connected with the bottom plate 2 in a sliding manner;
the worm gear lead screw lifter is also called a QWL lifter, is widely applied to industries such as machinery, metallurgy, building, hydraulic equipment and the like, has a plurality of functions of lifting, descending, propelling by means of auxiliary parts, overturning, adjusting various height positions and the like, and is not described in detail in the embodiment.
Please refer to fig. 4, the outer thread 4 is disposed on the circumferential side of the grouting output pipe 20 and near the second fixing block 11, the inner thread 5 is disposed inside the rotary block 3, the rotary block 3 and the grouting output pipe 20 are in threaded connection with the inner thread 5 through the outer thread 4, which is convenient for fixing the rotary block 3 and the grouting output pipe 20, the bearing 7 is disposed inside the first fixing block 6, one end of the rotary block 3 is located inside the bearing 7, the rotary block 3 and the first fixing block 6 are rotatably connected through the bearing 7, which is convenient for rotating the rotary block 3 and the first fixing block 6.
Referring to fig. 4-5, a pin 9 is installed on one side of the first fixing block 6 close to the first block 8, the first fixing block 6 and the first block 8 are rotatably connected through the pin 9, the pin 9 is also installed on the first block 8 close to the second block 10, the first block 8 and the second block 10 are also rotatably connected through the pin 9, the pin 9 is also installed on the second block 10 close to the second fixing block 11, and the second block 10 and the second fixing block 11 are also rotatably connected through the pin 9, so that the first block 8 and the second block 10 can rotate.
Referring to fig. 1 and 5, the bottom end of the stroke rod 13 is fixed with a fixed base 14, and the fixed base 14 and the first rectangular plate 15 are fixed by bolts, so that the stroke rod 13 and the first rectangular plate 15 are fixed conveniently.
Referring to fig. 5-6, the bottom ends of the first rectangular plates 15 are fixed with second rectangular plates 16, the bottom ends of the second rectangular plates 16 are provided with square grooves, and the second rectangular plates 16 are made of rubber to increase the friction force with the ground.
One specific application of this embodiment is: when the grouting output pipe device is used, the electric equipment is electrically connected with an external power supply, the grouting output pipe 20 extends into the object to be grouted, the rotating block 3 is rotated to move on the outer surface of the grouting output pipe 20, the rotating block 3 is rotatably connected with the first fixing block 6, so that the first fixing block 6 moves on the outer surface of the grouting output pipe 20, when the first fixing block 6 moves towards the output end of the grouting output pipe 20, the first block 8 is driven to move, and then the second block 10 moves, so that one end of the second block 10 moves towards the output end of the grouting output pipe 20, when the first fixing block 6 moves towards the output end far away from the grouting output pipe 20, one end of the second block 10 moves towards the output end far away from the grouting output pipe 20, so that the second block 10 is clamped with the object to be grouted, so that the grouting output pipe 20 is well fixed with the object to be grouted, thereby avoid the influence to grouting efficiency, further avoided the influence to the construction process, through starter motor 12 to drive worm screw rod elevator's motion, when stroke pole 13 moves down, make first rectangular plate 15 move down, make first rectangular plate 15 support tightly with ground, can make in grouting the work progress, avoid the device removal because of the shake of device produces often, and then avoided the influence to construction safety nature.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical applications, to thereby enable others skilled in the art to best understand the invention for and utilize the invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims (7)

1. The utility model provides an assembled concrete building rapid grouting construction device, includes cementer main part (1), its characterized in that: a bottom plate (2) is fixed at the bottom end of the grouting device main body (1), a grouting output pipe (20) is installed at the output end of the grouting device main body (1), a rotating block (3) is in threaded connection at the position close to the output end of the grouting output pipe (20), the position of the rotating block (3) close to the output end of the grouting output pipe (20) is rotationally connected with a first fixed block (6), the peripheral side surface of the first fixed block (6) is rotationally connected with three first square blocks (8), one end of the first square block (8) is rotatably connected with a second square block (10), a second fixed block (11) is fixed at the position close to the output end of the grouting output pipe (20), and the second fixed block (11) is positioned between the first fixed block (6) and the output end of the grouting output pipe (20), the peripheral side surface of the second fixed block (11) is rotationally connected with the middle parts of the three second square blocks (10).
2. The assembly type concrete building rapid grouting construction device according to claim 1, wherein a plurality of universal wheels (18) are fixed at the bottom end of the bottom plate (2), a handle (19) is fixed at one end of the top of the bottom plate (2), motors (12) are installed at two ends of the bottom plate (2), worm gear lead screw elevators are installed at output ends of the motors (12), each worm gear lead screw elevator comprises a stroke rod (13), the stroke rods (13) are in sliding connection with the bottom plate (2), first rectangular plates (15) are fixed at the bottom ends of the stroke rods (13), round rods (17) are fixed at two ends of the first rectangular plates (15), and the round rods (17) are in sliding connection with the bottom plate (2).
3. The rapid grouting construction device for the fabricated concrete building according to claim 1, wherein an external thread (4) is formed on the peripheral side surface of the grouting output pipe (20) and a position close to the second fixed block (11), an internal thread (5) is formed inside the rotating block (3), and the rotating block (3) and the grouting output pipe (20) are in threaded connection with the internal thread (5) through the external thread (4).
4. The rapid grouting construction device for the fabricated concrete building according to claim 1, wherein a bearing (7) is installed inside the first fixed block (6), one end of the rotating block (3) is located inside the bearing (7), and the rotating block (3) is rotatably connected with the first fixed block (6) through the bearing (7).
5. The rapid grouting construction device for the fabricated concrete building according to claim 1, wherein a pin (9) is installed on one side, close to the first square block (8), of the first fixing block (6), the first fixing block (6) is rotationally connected with the first square block (8) through the pin (9), a pin (9) is installed on a position, close to the second square block (10), of the first square block (8), the first square block (8) is rotationally connected with the second square block (10) through the pin (9), a pin (9) is installed on a position, close to the second fixing block (11), of the second square block (10), and the second square block (10) is rotationally connected with the second fixing block (11) through the pin (9).
6. The rapid grouting construction device for the fabricated concrete building according to claim 2, wherein a fixed base (14) is fixed at the bottom end of each stroke rod (13), and the fixed base (14) and the first rectangular plate (15) are fixed through bolts.
7. The rapid grouting construction device for the fabricated concrete building according to claim 2, wherein second rectangular plates (16) are fixed at the bottom ends of the first rectangular plates (15), square grooves are formed in the bottom ends of the second rectangular plates (16), and the second rectangular plates (16) are made of rubber.
CN202021763728.7U 2020-08-21 2020-08-21 Assembled concrete building rapid grouting construction device Active CN213234312U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021763728.7U CN213234312U (en) 2020-08-21 2020-08-21 Assembled concrete building rapid grouting construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021763728.7U CN213234312U (en) 2020-08-21 2020-08-21 Assembled concrete building rapid grouting construction device

Publications (1)

Publication Number Publication Date
CN213234312U true CN213234312U (en) 2021-05-18

Family

ID=75901051

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021763728.7U Active CN213234312U (en) 2020-08-21 2020-08-21 Assembled concrete building rapid grouting construction device

Country Status (1)

Country Link
CN (1) CN213234312U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114000714A (en) * 2021-12-16 2022-02-01 茅顾新 Assembly type building interior wall positioning device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114000714A (en) * 2021-12-16 2022-02-01 茅顾新 Assembly type building interior wall positioning device

Similar Documents

Publication Publication Date Title
CN107740572A (en) Double shear wall form device and template peace tear method open in small space
CN213234312U (en) Assembled concrete building rapid grouting construction device
CN207727776U (en) The connection structure of concrete floor
CN212101729U (en) Open caisson foundation for building engineering
CN212387586U (en) Building engineering lifting device
CN213085265U (en) Hoisting accessory for assembly type structure
CN107980286A (en) A kind of small-sized automatic pit-picker
CN210396131U (en) Novel electromechanical entrance to a cave sleeve pipe is consolidated device
CN204418681U (en) The overall advance and retreat mold mechanism of a kind of band inner corner trim wall form
CN214517271U (en) Reinforcing bar bending device for house construction
CN211472612U (en) Rotary core-pulling device for rectifying inclination of building structure
CN212405499U (en) Civil chain building structure
CN220565732U (en) Construction robot for building reinforcing steel bars
CN214364921U (en) Support is used in civil engineering construction
CN214461613U (en) Building node of prefabricated floor and support piece
CN215331278U (en) Construction control device for controlling ground flatness of concrete raw slurry
CN213330163U (en) Strutting arrangement for template engineering
CN210595017U (en) Hoisting equipment for cement pipe pile
CN214293678U (en) Concrete drawing die lifting device
CN220596352U (en) Building block stacking device
CN221031637U (en) Cast-in-place concrete structure crack surface treatment device
CN216000442U (en) Auxiliary supporting structure for mounting steel structure column
CN215516375U (en) Manhole hoisting device for foundation reinforcement cage
CN218597157U (en) Bridge pile foundation protects a section of thick bamboo and pulls out device
CN220198009U (en) Prefabricated part vibrating auxiliary device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant