CN213233406U - Positioning pile for building construction - Google Patents
Positioning pile for building construction Download PDFInfo
- Publication number
- CN213233406U CN213233406U CN202021183369.8U CN202021183369U CN213233406U CN 213233406 U CN213233406 U CN 213233406U CN 202021183369 U CN202021183369 U CN 202021183369U CN 213233406 U CN213233406 U CN 213233406U
- Authority
- CN
- China
- Prior art keywords
- fixed
- connecting rod
- spud
- stopper
- positioning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a positioning pile for building construction, which comprises a positioning pile and an adjusting structure, wherein one end of the positioning pile is provided with the adjusting structure, and one end of the positioning pile is fixedly connected with a fixed column through a bolt; the utility model discloses a be equipped with the pilot pin, fixed column and fixed cover, when needs adjustment axis, through rotating fixed cover, can rotate the position of pilot pin, utilize the fixed column to fix a point, then utilize the pilot pin to look for the point that needs the location, when needs look for the setpoint on horizontal, the slider through removing pilot pin one end is in the position of the spout of difference, can make the slider promote the connecting rod to slide to fixed intraduct, and then make the spring compressed, make the holistic length of pilot pin shortened, under the condition that need not demolish original pilot pin, can adjust the axis, the manpower has not only been practiced thrift, material resources, bring the convenience for constructor, the progress of construction has been improved.
Description
Technical Field
The utility model relates to a spud technical field specifically is a spud for construction.
Background
In the building construction process, the scope of involving is wider, in the basic processing procedure, generally need level the place, carry out subsequent construction after water and electricity are passed through, the construction place after leveling needs measure the unwrapping wire to it, the basic scope of circle construction, wherein, involve the location of pile foundation, the method of location pile foundation at present is, after adopting the stake to drive into level and smooth place, draw the coil after its upper end is nailed and decide the operation scope, however, present spud pile exists some deficiencies, for example:
after the guide pile is driven into the soil body in the prior art, the position is fixed, when the axis needs to be adjusted, the original pile needs to be dismantled, and then the pile is driven again, so that manpower and material resources are wasted, and troubles are brought to constructors.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a spud for construction to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a spud for construction, includes spud, adjustment structure, spud one end is provided with the adjustment structure, bolt fixedly connected with fixed column is passed through to spud one end, cushion cap, limiting plate and fixed cover have been cup jointed on the fixed column, the cushion cap with the fixed column passes through bolt fixed connection, the limiting plate with the fixed column passes through bolt fixed connection, fixed cover with the fixed column rotates to be connected, bolt fixedly connected with installation piece is passed through to fixed cover one side, bolt fixedly connected with pilot pin is passed through to installation piece one side, the cushion cap upper surface is provided with the spout, the pilot pin with spout sliding connection.
Preferably, the pilot pin still includes fixed pipe, connecting rod, the welding of fixed pipe one end has first stopper, connecting rod one end is passed first stopper with fixed pipe, just the connecting rod with first stopper with the equal sliding connection of fixed pipe, spring and second stopper have been cup jointed at the peripheral middle part of connecting rod, the spring with connecting rod sliding connection, the second stopper with the connecting rod passes through bolt fixed connection, the one end of spring with the welding of first stopper, the other end of spring with the welding of second stopper.
Preferably, one end of the connecting rod is fixedly connected with a sliding block, and the sliding block is matched with the sliding groove.
Preferably, one end of the positioning pile is fixedly connected with a conical head, and the conical head is in a regular triangular pyramid structure.
Preferably, the number of the sliding grooves is four, and the distance between any two adjacent sliding grooves is equal.
Preferably, the sliding block is of a hemispherical structure, and the sliding block is matched with the sliding groove.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model is provided with the positioning needle, the fixing column and the fixing sleeve, when the axis needs to be adjusted, the position of the positioning needle can be rotated by rotating the fixing sleeve, and the sliding block slides in the sliding chute when rotating, and one point is fixed by the fixing column, then, the positioning needle is used for searching a point to be positioned, when the positioning point needs to be searched in the transverse direction, the sliding block at one end of the positioning needle is moved to different positions of the sliding groove, so that the sliding block can push the connecting rod to slide towards the inside of the fixed tube, thereby the spring is compressed, the whole length of the positioning needle is shortened, on the contrary, the whole length of the positioning needle can be prolonged, the positioning can be carried out in the transverse direction, under the condition that need not demolish original spud pile, can adjust the axis, not only practiced thrift manpower, material resources, brought the convenience for constructor, improved the progress of construction.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic sectional view of the present invention;
FIG. 3 is a schematic top view of the cross-sectional structure of the present invention;
fig. 4 is an enlarged schematic view of a portion a in fig. 2.
In the figure: 1-positioning the pile; 11-a cone head; 2-adjusting the structure; 21-fixed column; 22-a cushion cap; 23-fixing a sleeve; 24-a limiting plate; 25-a mounting block; 26-a positioning needle; 261-a fixed tube; 262-a connecting rod; 263-spring; 264-a first stopper; 265-a slider; 266-a second stop block; 27-chute.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a positioning pile for building construction comprises a positioning pile 1 and an adjusting structure 2, wherein the adjusting structure 2 is arranged at one end of the positioning pile 1, preliminary positioning can be carried out through the positioning pile 1, a fixing column 21 is fixedly connected to one end of the positioning pile 1 through a bolt, a bearing platform 22, a limiting plate 24 and a fixing sleeve 23 are sleeved on the fixing column 21, the bearing platform 22 is fixedly connected with the fixing column 21 through the bolt, the limiting plate 24 is fixedly connected with the fixing column 21 through the bolt, the fixing sleeve 23 is rotatably connected with the fixing column 21, an installation block 25 is fixedly connected to one side of the fixing sleeve 23 through the bolt, the other side of the fixing sleeve 23 can fix the fixing sleeve 23 through the bolt, when the bolt is unscrewed, the fixing sleeve 23 can rotate around the fixing column 21, and a positioning needle 26 is fixedly connected to one side of the installation block 25, the upper surface of the bearing platform 22 is provided with a sliding groove 27, the positioning needle 26 is connected with the sliding groove 27 in a sliding manner, when the axis needs to be adjusted, the position of the positioning needle 26 can be rotated by rotating the fixing sleeve 23, and when the axis needs to be adjusted, the sliding block 265 slides in the sliding groove 27, one point is fixed by using the fixing column 21, then the point needing to be positioned is found by using the positioning needle 26, the principle of the compasses is the same, the positioning needle 26 further comprises a fixing tube 261 and a connecting rod 262, one end of the fixing tube 261 is welded with a first limiting block 264, one end of the connecting rod 262 passes through the first limiting block 264 and the fixing tube 261, the connecting rod 262 is connected with the first limiting block 264 and the fixing tube 261 in a sliding manner, the middle part of the periphery of the connecting rod 262 is sleeved with a spring 263 and a second limiting block 266, the spring 263 is connected with the connecting rod 262 in a sliding manner, and the, one end of the spring 263 is welded with the first limit block 264, the other end of the spring 263 is welded with the second limit block 266, one end of the connecting rod 262 is fixedly connected with a sliding block 265, the sliding block 265 is matched with the sliding groove 27, one end of the positioning pile 1 is fixedly connected with a conical head 11, the positioning pile 1 and the conical head 11 are in an integral casting structure, casting is performed through a template, the structure of the template is matched with the shape and structure of the positioning pile 1 and the conical head 11, the conical head 11 is in a regular triangular pyramid structure, the number of the sliding grooves 27 is four, the distance and the size of any two adjacent sliding grooves 27 are equal, when a positioning point needs to be searched in the transverse direction, the sliding block 265 can push the connecting rod 262 to slide towards the inside of the fixed tube 23 by moving the position of the sliding block 265 at the sliding groove 27 at one end of the positioning pin 26, so that the spring, the length of the whole positioning needle 26 is shortened, positioning can be carried out in the transverse direction, the sliding block 265 is of a hemispherical structure, the sliding block 265 is matched with the sliding groove 27, and the sliding block 265 slides in the sliding groove 27 and cannot slide out.
The working principle is as follows: when the positioning pile is used, the conical head 11 of the positioning pile 1 is driven into the soil, then the positioning pile 1 is driven into the soil to be fixed, when the axis needs to be adjusted, the position of the positioning needle 26 can be rotated by rotating the fixing sleeve 23, and when the positioning pile 1 rotates, the sliding block 265 slides in the sliding groove 27, one point is fixed by the fixing column 21, then the point needing to be positioned is searched by the positioning needle 26, when the positioning point needs to be searched in the transverse direction, the sliding block 265 can push the connecting rod 262 to slide towards the inside of the fixing tube 23 by moving the sliding block 265 at one end of the positioning needle 26 at different positions of the sliding groove 27, further the spring 263 is compressed, the whole length of the positioning needle 26 is shortened, on the contrary, the whole length of the positioning needle 26 is prolonged, the positioning can be carried out in the transverse direction, after the positioning is finished, the fixing sleeve 23 is fixed by the bolt on the fixing sleeve 23, meanwhile, the positioning needle 26 is also fixed, the axis can be adjusted under the condition that the original positioning pile is not required to be detached, manpower and material resources are saved, convenience is brought to constructors, and the construction progress is improved.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a spud for construction which characterized in that includes:
a spud (1);
an adjustment structure (2);
wherein, one end of the positioning pile (1) is provided with an adjusting structure (2);
wherein, bolt fixedly connected with fixed column (21) is passed through to spud (1) one end, cushion cap (22), limiting plate (24) and fixed cover (23) have been cup jointed on fixed column (21), cushion cap (22) with fixed column (21) pass through bolt fixed connection, limiting plate (24) with fixed column (21) pass through bolt fixed connection, fixed cover (23) with fixed column (21) rotate to be connected, bolt fixedly connected with installation piece (25) are passed through to fixed cover (23) one side, bolt fixedly connected with location needle (26) are passed through to installation piece (25) one side, cushion cap (22) upper surface is provided with spout (27), location needle (26) with spout (27) sliding connection.
2. The spud for construction according to claim 1, wherein: the positioning pin (26) further comprises:
a fixed tube (261);
a connecting rod (262);
wherein, fixed pipe (261) one end welding has first stopper (264), connecting rod (262) one end is passed first stopper (264) with fixed pipe (261), just connecting rod (262) with first stopper (264) with fixed pipe (261) all sliding connection, spring (263) and second stopper (266) have been cup jointed in the peripheral middle part of connecting rod (262), spring (263) with connecting rod (262) sliding connection, second stopper (266) with connecting rod (262) pass through bolt fixed connection, the one end of spring (263) with first stopper (264) welding, the other end of spring (263) with second stopper (266) welding.
3. The spud for construction according to claim 2, wherein: connecting rod (262) one end fixedly connected with slider (265), slider (265) with spout (27) phase-match.
4. The spud for construction according to claim 1, wherein: one end of the positioning pile (1) is fixedly connected with a conical head (11), and the conical head (11) is of a regular triangular pyramid structure.
5. The spud for construction according to claim 1, wherein: the number of the sliding grooves (27) is four, and the distance between any two adjacent sliding grooves (27) is equal.
6. The spud for construction according to claim 3, wherein: the slider (265) is of a hemispherical structure, and the slider (265) is matched with the sliding groove (27).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021183369.8U CN213233406U (en) | 2020-06-23 | 2020-06-23 | Positioning pile for building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021183369.8U CN213233406U (en) | 2020-06-23 | 2020-06-23 | Positioning pile for building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213233406U true CN213233406U (en) | 2021-05-18 |
Family
ID=75885823
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021183369.8U Expired - Fee Related CN213233406U (en) | 2020-06-23 | 2020-06-23 | Positioning pile for building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213233406U (en) |
-
2020
- 2020-06-23 CN CN202021183369.8U patent/CN213233406U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207001687U (en) | A kind of tube pulling keeps off pipe device | |
CN205967981U (en) | Be used for small -bore tubular product welded frock that is geared to needs of job fast | |
CN206752884U (en) | A kind of self-adhesion waterproof thermal insulating coiled material cloth laying apparatus | |
CN203190989U (en) | Tunnel lining detection support with height and angle capable of being automatically adjusted | |
CN210253976U (en) | Bending device of renewable reinforcing steel bar | |
CN213233406U (en) | Positioning pile for building construction | |
CN210208415U (en) | Reinforcing bar bending device for construction | |
CN210280298U (en) | Adjustable angle steel angle opening and closing device | |
CN209508822U (en) | A kind of temporary support micromatic setting in steel box beam erection working procedure | |
CN210116050U (en) | Concrete prefabricated section cutting device | |
CN209097946U (en) | A kind of steel strand wires feeding device | |
CN217167239U (en) | Device for butt welding of flange and pipe joint | |
CN208455628U (en) | A kind of piling machine positioning device | |
CN214741043U (en) | Movable ladder stand for pipe gallery construction | |
CN207272036U (en) | Down conductor bending tool | |
CN106193616B (en) | A kind of glomeration building limit type wears muscle device and wears muscle method using what this wore muscle device | |
CN206053360U (en) | A kind of glomeration building limit type wears muscle device | |
CN209021527U (en) | Tooling platform for pump case built-up welding | |
CN206779193U (en) | A kind of swing pipe fitting equipment for straightening | |
CN206930253U (en) | Steel plate bending angle measurement equipment | |
CN209398924U (en) | A kind of efficient plumbing built-in pipe setting tool | |
CN207077290U (en) | One kind is used for angle grinder aerial platform | |
CN207131103U (en) | One kind builds unwrapping wire positioning support by laying bricks or stones for brick fetal membrane | |
CN205552239U (en) | Pipe cutter | |
CN206769413U (en) | A kind of new fixing device that can integrally lift assembling reinforcement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210518 |