CN213220844U - Wushu training stake fixing device - Google Patents

Wushu training stake fixing device Download PDF

Info

Publication number
CN213220844U
CN213220844U CN202021553639.XU CN202021553639U CN213220844U CN 213220844 U CN213220844 U CN 213220844U CN 202021553639 U CN202021553639 U CN 202021553639U CN 213220844 U CN213220844 U CN 213220844U
Authority
CN
China
Prior art keywords
base
balancing weight
ground
martial arts
arts training
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021553639.XU
Other languages
Chinese (zh)
Inventor
孙玉滨
孙瑞阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Institute of Physical Education
Original Assignee
Harbin Institute of Physical Education
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Institute of Physical Education filed Critical Harbin Institute of Physical Education
Priority to CN202021553639.XU priority Critical patent/CN213220844U/en
Application granted granted Critical
Publication of CN213220844U publication Critical patent/CN213220844U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model discloses a fixing device for martial arts training piles, which comprises a ground nail, wherein the ground nail comprises a hemispherical balancing weight, a connecting column is vertically and upwards fixedly arranged at the center of the surface of the balancing weight, a plurality of through holes are arranged on the surface of the balancing weight, a horizontal threaded hole is arranged on the connecting column, the balancing weight is completely buried under the ground when the fixing is carried out, and a structure matched with the connecting column is arranged at the bottom of the martial arts training pile; the semi-V-shaped convex ring is sleeved on the side surface of the hemispherical balancing weight; the base is arranged above the balancing weight, a circular through groove is formed in the center of the bottom surface of the base, a plurality of metal reinforcing rods matched with the through holes are uniformly arranged on the bottom surface of the base, the base is horizontally placed on the ground when the fixing is carried out, the martial arts training pile is inserted into the circular through groove, and the metal reinforcing rods are inserted into the through holes to be fixed; the utility model discloses the insecure problem of wushu training stake has effectively been solved.

Description

Wushu training stake fixing device
Technical Field
The utility model belongs to the technical field of training apparatus auxiliary assembly, concretely relates to wushu training stake fixing device.
Background
Often will use wushu training stake in wushu training, however because wushu training stake overall structure is unreasonable, wushu training stake is fixed insecure with ground, when training personnel hit the wushu training stake, wushu training stake often can appear rocking or topple over, injures by a crashing object or impairs other training personnel, brings the trouble for training personnel.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a wushu training stake fixing device has solved the insecure problem of wushu training stake.
The utility model discloses the technical scheme who adopts is, a wushu training stake fixing device, include:
the ground nail comprises a hemispherical balancing weight, a connecting column is vertically and upwards fixedly arranged at the center of the surface of the balancing weight, a plurality of through holes are formed in the surface of the balancing weight, a horizontal threaded hole is formed in the connecting column, the balancing weight is completely buried under the ground when the balancing weight is fixed, and the connecting column is inserted into the bottom of the martial arts training pile and is fixedly connected with the martial arts training pile through a screw;
the semi-V-shaped convex ring is arranged on the side surface of the hemispherical balancing weight and is completely buried under the ground when being fixed;
the base, the base sets up in the top of balancing weight, and the surperficial center of base is provided with circular logical groove, and the internal diameter that circular leads to the groove is not less than the diameter of training stake, and the bottom surface of base still evenly be provided with a plurality ofly with through-hole complex metal anchor strut, and the base level is placed subaerial when fixing, and the martial arts training stake inserts circular logical inslot, and the metal anchor strut inserts and fixes in the through-hole.
The side of base has a plurality of base fixed plates through the screw connection, and the base fixed plate passes through set screw and ground connection.
A base connecting plate is also arranged on the base fixing plate, the upper part of the base connecting plate is connected with the base fixing plate through screws, and the lower part of the base connecting plate is connected with the ground through expansion bolts
The utility model has the advantages that:
the fixing device for martial arts training piles increases the contact area between the base and the ground under the combined action of the base connecting plate and the base fixing plate, so that the stand column base 6 is more stably connected with the ground;
the fixing device for the martial arts training pile adopts the balancing weight with a spherical structure, and is connected with the martial arts training pile through the connecting column, the weight of the bottom of the martial arts training pile is increased by the balancing weight, and the side surface of the balancing weight is sleeved with a half V-shaped convex ring to be embedded into a soil layer after being buried, so that the stability of the balancing weight is enhanced; the metal reinforcing rod on the base is connected with the balancing weight in a matched mode, the balancing weight of the spherical structure is prevented from inclining, and the fixing is more firm.
Drawings
Fig. 1 is a schematic structural view of the martial arts training pile fixing device of the present invention.
In the figure, 1, a ground nail, 2, a balancing weight, 3, a connecting column, 4, a half V-shaped convex ring, 5, a threaded hole, 6, a base, 7, a metal reinforcing rod, 8, a through hole, 9, an expansion bolt, 10, a base fixing plate, 11, a fixing screw, 12, a connecting plate and 13, screws are arranged.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings and specific embodiments. The following examples are only used to illustrate the technical solutions of the present invention more clearly, and the protection solutions of the present invention are not limited thereto.
Example 1
A martial arts training pile anchor, as shown in fig. 1, comprising: the ground nail 1 comprises a hemispherical balancing weight 2, a connecting column 3 is vertically and upwards fixedly arranged at the center of the surface of the balancing weight 2, a plurality of through holes 8 are formed in the surface of the balancing weight 2, a horizontal threaded hole 5 is formed in the connecting column 3, the balancing weight 2 is completely buried below the ground when the balancing weight is fixed, and a structure matched with the connecting column 3 is arranged at the bottom of the martial arts training pile; the connecting column 3 is inserted into the bottom of the martial arts training pile and is fixedly connected with the martial arts training pile through a screw; the semi-V-shaped convex ring 4 is sleeved on the side surface of the hemispherical balancing weight 2, and the semi-V-shaped convex ring 4 is completely buried under the ground when the semi-V-shaped convex ring 4 is fixed; base 6 in addition, base 6 sets up in the top of balancing weight 2, and the bottom surface center of base 6 is provided with circular logical groove, and the internal diameter that circular logical groove is not less than the diameter of training stake, and the bottom surface of base 6 still evenly is provided with a plurality ofly and through-hole 8 complex metal anchor strut 7, and 6 levels of base are placed subaerial when fixing, and the martial arts training stake inserts circular logical inslot, metal anchor strut 7 inserts and fixes in the through-hole 8.
Example 2
On the basis of embodiment 1, furthermore, the side surface of the base 6 is connected with a plurality of base fixing plates 10 through screws 13, and the base fixing plates 10 are connected with the ground through fixing screws 11; the base fixing plate 10 is further provided with a base connecting plate 12, the upper portion of the base connecting plate 12 is connected with the base fixing plate 10 through a screw 13, and the lower portion of the base connecting plate 12 is connected with the ground through an expansion bolt 9.
The working principle is as follows: the training pile fixing device of the utility model increases the contact area of the base 6 and the ground under the combined action of the base connecting plate 12 and the base fixing plate 10, so that the stand column base 6 is more firmly connected with the ground; meanwhile, a balancing weight 2 with a spherical structure is adopted and connected with a martial arts training pile through a connecting column 3, the weight of the bottom of the martial arts training pile is increased by the balancing weight 2, a semi-V-shaped convex ring 4 is sleeved on the side surface of the balancing weight 2 and embedded into a soil layer after being buried, and the stability of the balancing weight is enhanced; the metal reinforcing rod 7 is arranged on the base 6, and the metal reinforcing rod 7 is connected with the balancing weight 2 in a matched mode, so that the balancing weight with a spherical structure is prevented from inclining; the martial art training pile fixing device is reasonable in structure, has the advantages of being simple in structure, convenient to use, simple to install and the like, and effectively solves the problem that the martial art training pile is not firm to fix.
The above-mentioned embodiments are only preferred embodiments of the present invention, and the protection scope of the present invention is not limited thereto, and any person skilled in the art can obviously obtain simple changes or equivalent replacements of the technical solutions within the technical scope of the present invention.

Claims (3)

1. A martial arts training pile fixing device, comprising:
the ground nail (1), the ground nail (1) comprises a hemispherical balancing weight (2), a connecting column (3) is vertically and upwards fixedly arranged at the center of the surface of the balancing weight (2), a plurality of through holes (8) are formed in the surface of the balancing weight (2), a horizontal threaded hole (5) is formed in the connecting column (3), the balancing weight (2) is completely buried under the ground when the ground nail is fixed, and the connecting column (3) is inserted into the bottom of a martial arts training pile and is fixedly connected with the martial arts training pile through a screw;
the semi-V-shaped convex ring (4) is arranged on the side surface of the balancing weight (2), and the semi-V-shaped convex ring (4) is completely buried under the ground when the balancing weight is fixed;
base (6), base (6) set up in the top of balancing weight (2), the surface center of base (6) is provided with circular logical groove, the internal diameter that circular logical groove is not less than the diameter of training stake, the bottom surface of base (6) still evenly be provided with a plurality ofly with through-hole (8) complex metal anchor strut (7), when fixing base (6) level is placed subaerial, and the martial arts training stake inserts circular logical inslot, metal anchor strut (7) insert through-hole (8) are internal to be fixed.
2. A martial arts training pile anchor apparatus as claimed in claim 1, wherein a plurality of anchor anchors (10) are attached to the side of the anchor (6) by screws (13), the anchors (10) being attached to the ground by anchor screws (11).
3. A martial arts training pile fixing device according to claim 2, wherein a base connecting plate (12) is further provided on the base fixing plate (10), the upper portion of the base connecting plate (12) is connected with the base fixing plate (10) through a screw (13), and the lower portion of the base connecting plate (12) is connected with the ground through an expansion bolt (9).
CN202021553639.XU 2020-07-30 2020-07-30 Wushu training stake fixing device Active CN213220844U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021553639.XU CN213220844U (en) 2020-07-30 2020-07-30 Wushu training stake fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021553639.XU CN213220844U (en) 2020-07-30 2020-07-30 Wushu training stake fixing device

Publications (1)

Publication Number Publication Date
CN213220844U true CN213220844U (en) 2021-05-18

Family

ID=75892189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021553639.XU Active CN213220844U (en) 2020-07-30 2020-07-30 Wushu training stake fixing device

Country Status (1)

Country Link
CN (1) CN213220844U (en)

Similar Documents

Publication Publication Date Title
CN207260360U (en) A kind of Anti-seismic building structure
CN213220844U (en) Wushu training stake fixing device
CN206878313U (en) A kind of lightning-arrest needle construction with multiple fixed structure
CN211946011U (en) Novel anti-wind and anti-seismic tower crane base for building tower crane
CN211898493U (en) Pile and pile foundation platform connecting device for building
CN217954764U (en) Thunder and lightning early warning instrument
CN207405664U (en) Pile damping device in a kind of civil engineering
CN206467698U (en) A kind of complicated boundary slip damping energy dissipating support
CN107034796B (en) A kind of bridge earthquake resistance holder
CN210766792U (en) Deep foundation pit supporting device
CN108708388A (en) Pole and tower foundation and preparation method thereof
CN210659116U (en) Adjustable overhead floor support
CN217642216U (en) Switch board with prevent wind function
CN219974055U (en) Tower leg installation connection structure for transmission line iron tower
CN214272114U (en) Novel anti-seismic building pile
CN213508421U (en) Anti-seismic building pile
CN216973515U (en) Anti-seismic and shock-absorbing structure for constructional engineering
CN217947388U (en) Adjustable hoist mount
CN218116426U (en) Embedded structure of high pile foundation
CN215888238U (en) Hydraulic engineering is with pile extractor convenient to installation
CN212561592U (en) Building pile foundation
CN212595617U (en) Large-scale boiling reaction kettle side-mounted detachable damping device
CN215059171U (en) Vibration damper of wind driven generator
CN212866434U (en) Anti-seismic steel structure
CN219933406U (en) Impact-resistant foundation bolt

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant