CN213208015U - Intelligent heating and hot water system control workstation with standby operation function - Google Patents

Intelligent heating and hot water system control workstation with standby operation function Download PDF

Info

Publication number
CN213208015U
CN213208015U CN202020463086.2U CN202020463086U CN213208015U CN 213208015 U CN213208015 U CN 213208015U CN 202020463086 U CN202020463086 U CN 202020463086U CN 213208015 U CN213208015 U CN 213208015U
Authority
CN
China
Prior art keywords
socket
heating
controller
heater
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020463086.2U
Other languages
Chinese (zh)
Inventor
赵昕
赵振田
谭力宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020463086.2U priority Critical patent/CN213208015U/en
Application granted granted Critical
Publication of CN213208015U publication Critical patent/CN213208015U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

The utility model discloses an intelligence heating with reserve operation function, hot water system control work station, chassis exterior internally mounted has the controller of taking waterproof housing, the switch is protected to the hourglass, pipe heater and business turn over water pipe, chassis exterior is last to be provided with reserve operation socket and business turn over water pipe interface, the controller passes through electric wire connection with the hourglass switch power output end of protecting, pipe electric heater, the built-in electric heater of water tank passes through electric wire connection with the controller output, reserve operation socket passes through the electric wire with the hourglass and protects the switch output end and link to each other direct power supply, in case when controller or one of them heater breaks down and can not heat, the water pump of inserting on the controller, the electricity assists the heating plug and pulls out, insert reserve operation socket and can maintain heating system operation. The utility model discloses when other parts that influence the operation broke down in master controller or workstation, can make auxiliary heating and circulating pump normally work maintain the heating on switching to the reserve connector through user operation, win the time for the maintenance.

Description

Intelligent heating and hot water system control workstation with standby operation function
Technical Field
The utility model relates to a heating technical field, concretely relates to intelligence heating, hot-water heating system control workstation with reserve operation function.
Background
The domestic electric heating equipment used in the northern rural coal-to-electricity market has the important defect that once a main controller breaks down, the electric heating equipment cannot work, a circulating pump does not run, the normal operation of a heating system is influenced, and the maintenance and the replacement need time. In cold areas, particularly in systems using solar heat sources for heating, such as a solar heat collection system and an indoor heating system, the systems do not operate for several hours, the communication pipeline is frozen, the whole system pipeline is completely frozen and blocked in the time of waiting for maintenance and replacement, and the system can not operate even if the main controller is maintained.
SUMMERY OF THE UTILITY MODEL
The utility model discloses aim at solving one of the problem among the prior art at least.
An object of the utility model is to provide an intelligence heating, hot-water heating system control workstation with reserve operation function.
According to the utility model discloses an intelligence heating, hot water system control workstation with reserve operation function, including chassis exterior, controller, hourglass guarantor's switch, pipe heater, reserve operation socket/binding post and business turn over water pipe, chassis exterior internally mounted has and takes waterproof shell the controller leak guarantor's switch the pipe heater with business turn over water pipe, chassis exterior is last to be provided with reserve operation socket/binding post with business turn over water pipe interface, the controller with leak guarantor's switching power output passes through connection of electric lines, pipeline electric heater, water tank built-in electric heater with the controller output passes through connection of electric lines, reserve operation socket/binding post with leak guarantor's switching power output passes through the electric line and links to each other the direct power supply, in case during operation the controller, When the pipeline heater or the built-in electric heater of the water tank fails and cannot supply heat, the water pump connecting plug and the electric auxiliary heating plug inserted on the controller can be pulled out, and then the water pump connecting plug and the electric auxiliary heating plug are inserted into the standby operation socket/wiring terminal, so that the operation of a heating system can be maintained.
In addition, according to the utility model discloses intelligence heating, hot-water heating system control workstation with reserve operation function of above-mentioned embodiment can also have following additional technical characteristics:
according to the utility model discloses an embodiment, the controller outside is provided with waterproof shell, the function socket has been pre-installed on the waterproof shell, the function socket includes water-feeding solenoid valve socket, evacuation solenoid valve socket, conversion motorised valve socket, thermal-arrest circulating pump socket, heating circulating pump socket and water tank heater socket, water-feeding solenoid valve socket evacuation solenoid valve socket the conversion motorised valve socket the thermal-arrest circulating pump socket the heating circulating pump socket with the water tank heater socket is connected with the control scheme board to carry out control command.
According to the utility model discloses an embodiment, chassis exterior has preassembled a plurality of standby function socket/binding post, standby function socket/binding post includes thermal-arrest circulating pump socket/binding post, heating circulating pump socket/binding post and water tank heater socket/binding post, thermal-arrest circulating pump socket/binding post heating circulating pump socket/binding post with water tank heater socket/binding post with it connects to leak guarantor switching power supply output.
According to the utility model discloses an embodiment, chassis exterior is last to be provided with display screen and control switch, the display screen with control switch with controller connection of electric lines.
According to an embodiment of the present invention, the pipe heater is a pipe heater in which a heater formed by an electric heating rod or a PTC heating member is installed in a pipe.
According to the utility model discloses an embodiment, the controller the hourglass protect the switch with pipe heater with chassis exterior spiro union is fixed, reserve operation socket/binding post with chassis exterior adopts the card formula fixed.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses a control workstation when other parts that influence the operation break down in master controller or workstation, can switch to on the reserve connector through user's operation, can make auxiliary heating and circulating pump normal work maintain the heating, wins the time for maintenance and change.
Drawings
The drawings are only intended to illustrate and explain the present invention and do not limit the scope of the invention. Wherein:
fig. 1 is a schematic diagram of an internal structure of an intelligent heating and hot water system control workstation with a standby operation function according to an embodiment of the present invention;
fig. 2 is a schematic structural diagram of a functional socket of an intelligent heating and hot water system control workstation with a standby operation function according to an embodiment of the present invention;
fig. 3 is a schematic structural diagram of a chassis housing of an intelligent heating and hot water system control workstation with a standby operation function according to an embodiment of the present invention;
fig. 4 is a schematic structural diagram of a standby operation socket/terminal of an intelligent heating and hot water system control workstation with a standby operation function according to an embodiment of the present invention;
fig. 5 is a schematic structural diagram of a controller of an intelligent heating and hot water system control workstation with a standby operation function according to an embodiment of the present invention.
In the figure: 1-case shell, 2-controller, 21-waterproof shell, 22-water supply electromagnetic valve socket, 23-conversion electric valve socket, 24-heat collection circulating pump socket, 25-heating circulating pump socket, 26-water tank heater socket, 3-leakage protection switch, 4-pipeline heater, 5-standby operation socket/wiring terminal, 6-water inlet and outlet pipe, and 61-water inlet and outlet pipe interface.
Detailed Description
The invention is further explained below with reference to the drawings and examples. In the following detailed description, certain exemplary embodiments of the present invention have been described by way of illustration only. Needless to say, a person skilled in the art will recognize that the described embodiments can be modified in various different ways without departing from the spirit and scope of the invention. Accordingly, the drawings and description are illustrative in nature and not intended to limit the scope of the claims.
As shown in fig. 1 to 5, the intelligent heating and hot water system control workstation with standby operation function according to the embodiment of the present invention comprises a case shell 1, a controller 2, a leakage protection switch 3, a pipeline heater 4, a standby operation socket/terminal 5 and a water inlet/outlet pipe 6, wherein the controller 2 with a waterproof shell, the leakage protection switch 3, the pipeline heater 4 and the water inlet/outlet pipe 6 are installed inside the case shell 1, the standby operation socket/terminal 5 and the water inlet/outlet pipe interface 61 are arranged on the case shell 1, the controller 2 is connected with the power output end of the leakage protection switch 3 through an electric wire, the pipeline electric heater 4 and the water tank built-in electric heater are connected with the output end of the controller 2 through an electric wire, the standby operation socket/terminal 5 is connected with the output end of the leakage protection switch 3 through an electric wire for direct power supply, when the controller 2, the pipeline heater 4 or the built-in electric heater of the water tank fails to supply heat during operation, the water pump connecting plug and the electric auxiliary heating plug inserted in the controller 2 can be unplugged, and then the water pump connecting plug and the electric auxiliary heating plug are inserted in the standby operation socket/wiring terminal 5, so that the operation of a heating system can be maintained.
The utility model discloses intelligent heating, hot water system control workstation with reserve operation function when using, when other parts that influence the operation broke down in master controller or workstation, can switch to on the reserve connector through user operation, can make auxiliary heating and circulating pump normally work and maintain the heating, realize not having automatic control's compulsory operation, win the time for maintenance and change.
During installation, two lines are connected from a power supply inlet of the leakage protection switch 3 and are connected with the standby running socket/wiring terminal 5 on the chassis shell 1.
Fig. 4 is a schematic view of an opening of the mounting socket.
Further, 2 outsides of controller are provided with waterproof shell 21, the function socket has been preassembled on the waterproof shell 21, the function socket includes water-feeding solenoid valve socket 22, evacuation solenoid valve socket, conversion motorised valve socket 23, thermal-arrest circulating pump socket 24, heating circulating pump socket 25 and water tank heater socket 26, water-feeding solenoid valve socket 22 evacuation solenoid valve socket conversion motorised valve socket 23 thermal-arrest circulating pump socket 24 heating circulating pump socket 25 with water tank heater socket 26 is connected with the control scheme board to carry out control command.
Furthermore, a plurality of standby functional sockets/wiring terminals are preassembled on the chassis housing 1, the standby functional sockets/wiring terminals include a heat collection circulating pump socket/wiring terminal, a heating circulating pump socket/wiring terminal and a water tank heater socket/wiring terminal, and the heat collection circulating pump socket/wiring terminal, the heating circulating pump socket/wiring terminal and the water tank heater socket/wiring terminal are connected with the power output end of the leakage protection switch 3.
Further, a display screen and a control switch are arranged on the case shell 1, and the display screen and the control switch are connected with the controller 2 through wires.
Further, the pipe heater 4 is a pipe heater formed by installing a heater formed by an electric heating rod or a PTC heating body in a pipe.
Further, the controller 2, the leakage protection switch 3 and the pipeline heater 4 are fixed with the case shell 1 in a threaded manner, and the standby operation socket/wiring terminal 5 is fixed with the case shell 1 in a clamping manner. The embodiment includes, but is not limited to, fixing the controller 2, the leakage protection switch 3 and the pipe heater 4 with the chassis housing 1 by screwing, and fixing the standby operation socket/terminal 5 with the chassis housing 1 by clamping.
Wherein, the embodiment of the utility model provides an intelligent heating, hot water system control workstation with reserve operation function also can be called as intelligent heating, the hot water hanging electric boiler that has reserve operation function.
The utility model discloses a control workstation when other parts that influence the operation break down in master controller or workstation, can switch to reserve connector through user operation on, can make auxiliary heating and circulating pump normal work maintain the heating, for the maintenance with change and win the time, the practicality is strong.
The above description is only exemplary of the present invention, and is not intended to limit the scope of the present invention. Any person skilled in the art should also realize that such equivalent changes and modifications can be made without departing from the spirit and principles of the present invention.

Claims (6)

1. Intelligent heating, hot-water heating system control workstation with reserve operation function, its characterized in that: including chassis exterior, controller, hourglass protect switch, pipe heater, reserve operation socket/binding post and business turn over water pipe, chassis exterior internally mounted have take waterproof shell the controller leak protect the switch pipeline heater and business turn over water pipe, chassis exterior is last to be provided with reserve operation socket/binding post with business turn over water pipe interface, the controller with leak protect switch power output end and pass through the connection of electric lines, pipe heater, the built-in electric heater of water tank with the controller output end passes through the connection of electric lines, reserve operation socket/binding post with leak protect switch output end and pass through the electric line and link to each other direct power supply, in operation in case the controller, pipe heater or the built-in electric heater of water tank breaks down and when can not heating, can insert water pump connecting plug, water pump connecting plug on the controller, And pulling the electric auxiliary heating plug off, and then inserting the water pump connecting plug and the electric auxiliary heating plug into the standby operation socket/wiring terminal to maintain the operation of the heating system.
2. The intelligent heating, hot water system control workstation with standby operation function of claim 1, characterized in that: the controller outside is provided with waterproof housing, the function socket has been pre-installed on the waterproof housing, the function socket includes water electromagnetic valve socket, evacuation solenoid valve socket, conversion motorised valve socket, thermal-arrest circulating pump socket, heating circulating pump socket and water tank heater socket, go up water electromagnetic valve socket evacuation solenoid valve socket the conversion motorised valve socket the thermal-arrest circulating pump socket the heating circulating pump socket with the water tank heater socket is connected with the control scheme board to carry out control command.
3. The intelligent heating, hot water system control workstation with standby operation function of claim 1, characterized in that: the heat collection circulating pump socket/wiring terminal, the heating circulating pump socket/wiring terminal and the water tank heater socket/wiring terminal are connected with the power output end of the leakage protection switch.
4. The intelligent heating, hot water system control workstation with standby operation function of claim 1, characterized in that: and the case shell is provided with a display screen and a control switch, and the display screen and the control switch are connected with the controller through wires.
5. The intelligent heating, hot water system control workstation with standby operation function of claim 1, characterized in that: the pipeline heater is formed by installing a heater formed by electric heating rods or a pipeline heater formed by PTC heating bodies in a pipeline.
6. The intelligent heating, hot water system control workstation with standby operation function according to any one of claims 1-5, characterized in that: the controller, the leakage protection switch and the pipeline heater are fixed with the case shell in a threaded manner, and the standby operation socket/wiring terminal is fixed with the case shell in a clamping manner.
CN202020463086.2U 2020-04-02 2020-04-02 Intelligent heating and hot water system control workstation with standby operation function Expired - Fee Related CN213208015U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020463086.2U CN213208015U (en) 2020-04-02 2020-04-02 Intelligent heating and hot water system control workstation with standby operation function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020463086.2U CN213208015U (en) 2020-04-02 2020-04-02 Intelligent heating and hot water system control workstation with standby operation function

Publications (1)

Publication Number Publication Date
CN213208015U true CN213208015U (en) 2021-05-14

Family

ID=75817623

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020463086.2U Expired - Fee Related CN213208015U (en) 2020-04-02 2020-04-02 Intelligent heating and hot water system control workstation with standby operation function

Country Status (1)

Country Link
CN (1) CN213208015U (en)

Similar Documents

Publication Publication Date Title
CN201875878U (en) Solar photoelectric mutual-compensation electric water heater
CN213208015U (en) Intelligent heating and hot water system control workstation with standby operation function
CN101672531A (en) Split non-pressure-bearing wall hanging type solar water heater
CN205747118U (en) A kind of Indoor environment electricity heating heating metope
CN110416886A (en) A kind of outdoor electrical electrical safety cabinet
CN101260790B (en) Wellhead heat insulation and heating equipment for well workover
CN104170687A (en) Solar heating device for supplying heat to greenhouse
CN203147886U (en) Micro energy-saving and environment-friendly electric heating stove and heating system
CN114198796A (en) Solar photovoltaic power generation heat storage and supply system
CN210718167U (en) Solar hot water storage heat exchange device
CN202254415U (en) Indoor electric connection structure of solar water heater
CN206771507U (en) Heating system based on gas heater
CN205690522U (en) The water circuit system of wall hanging electric boiler and wall hanging electric boiler
CN204424871U (en) A kind of electrocution-proof protection system of electric heater
CN105305237B (en) Substation feeder cabinet and before safeguard feeder line gather instruction device
CN213340863U (en) Waterproof plug assembly
CN214665293U (en) Multifunctional heat storage water tank
CN217109747U (en) Heat storage type bed kang
CN216244865U (en) Intelligent heating water tank with double-lug type drainage nut structure and reserved control panel installation position
CN201731553U (en) Electric hot-water warmer
CN219199487U (en) Integrated valley voltage and low voltage heating and heat storage device
CN214797149U (en) Hydraulic energy storage mechanism based on power circuit breaker
CN2518011Y (en) Household computer program-controlled radiator
CN217114130U (en) Switch equipment convenient to install for water conservancy building
CN202231443U (en) Valve block

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210514